INTRODUCTION Indian Register of Shipping (IRS) is an autonomous organization, established in March 1975, following a decision of the Union Cabinet and Registered under section 25 of Companies Act 1956 as a “Not for Profit” organization. IRS was formed with active support and cooperation of the Ministry of Transport, Government of India (GOI), which it continues to enjoy. IRS has no profit motive and primarily aspires only for self support, development and growth. The company has no shareholder, hence no dividends are distributed and surplus, if any, is ploughed back into the organization for promoting its objective and activities and services to its customers, through appropriate Research and Development. IRS is widely recognized for its technical competence, vast experience in related fields and customer friendly approach. Its proven expertise developed in the Marine sector with excellent track record has enabled IRS to suitably diversify its services to the Industrial Sector and to the field of quality management system certification. Indian Register of Shipping has three divisions: 1. Marine Services 2. Indian Register of Quality System 3. IRS – Industrial Services The third aspect “IRS Industrial Services” which is relevant here and covers the following aspects of projects: 1. Third Party Inspection & certification of Projects 1

Upload: sachin-jadhav

Post on 21-Apr-2015

58 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: 2 Audit Sanpada

INTRODUCTION

Indian Register of Shipping (IRS) is an autonomous organization,

established in March 1975, following a decision of the Union Cabinet and

Registered under section 25 of Companies Act 1956 as a “Not for Profit”

organization.

IRS was formed with active support and cooperation of the Ministry of

Transport, Government of India (GOI), which it continues to enjoy. IRS has no

profit motive and primarily aspires only for self support, development and

growth. The company has no shareholder, hence no dividends are distributed

and surplus, if any, is ploughed back into the organization for promoting its

objective and activities and services to its customers, through appropriate

Research and Development.

IRS is widely recognized for its technical competence, vast experience

in related fields and customer friendly approach. Its proven expertise

developed in the Marine sector with excellent track record has enabled IRS

to suitably diversify its services to the Industrial Sector and to the field of

quality management system certification.

Indian Register of Shipping has three divisions:

1. Marine Services

2. Indian Register of Quality System

3. IRS – Industrial Services

The third aspect “IRS Industrial Services” which is relevant here and

covers the following aspects of projects:

1. Third Party Inspection & certification of Projects

2. Project monitoring, Quality Assurance & Surveillance

3. Third Party Technical Quality audits & Projects

4. Design Evaluation

5. Proactive & cost effective expediting services

6. Technical Investigation & Advisory Services

1

Page 2: 2 Audit Sanpada

Further infrastructure is backbone of country’s economic development.

Owing to high cost & complexity, there is a need to monitor the quality of

work on a regular basis.

Emphasizing on this, IRS – Industrial services ventured into third party

Inspection & certification of infrastructure projects.

IRS –IS provide third party inspection & technical audit services to

a) Bridges (Rail/ Road),

b) Roads & Highways (Flexible / Rigid),

c) Buildings (High rise, Township, Green Building),

d) Irrigation Projects (Dams, Canals & Via ducts)

e) Sport Complex,

f) Skywalks

g) Sewage Treatment Plants & allied Underground Drainage Networking

h) Water treatment Plants, Head works and connected gravity & rising

mains pipe lines

i) ESR & connected Distribution Pipe lines

We have pleasure to cater to your needs from our various 16 offices

spread over India and further wish to state that we have an International

presence in ten top countries of the world.

2

Page 3: 2 Audit Sanpada

FOREWORD

The first post-independence development plan for The first post-independence development plan for Mumbai, formulated, formulated by the Mayer-MODAK Committee dates back to 1948 which suggestedby the Mayer-MODAK Committee dates back to 1948 which suggested Satellite Towns North of Satellite Towns North of Mumbai. Ten years later, the BARVE Committee. Ten years later, the BARVE Committee suggested the formation of a township on the mainland across the Thanesuggested the formation of a township on the mainland across the Thane Creek as a counter-magnet to draw away population from the over crowdedCreek as a counter-magnet to draw away population from the over crowded city. city.

Accordingly NMMC was constituted on 17Accordingly NMMC was constituted on 17 thth Dec, 1991; by the state Dec, 1991; by the state government for the catering to the requirements of 29 villages in CIDCO Navigovernment for the catering to the requirements of 29 villages in CIDCO Navi Mumbai Project and 15 villages from KALYAN. The local Self Government Project and 15 villages from KALYAN. The local Self Government started functioning from 1started functioning from 1stst Jan, 1992. NMMC has an area of 344.70 sq. km. Jan, 1992. NMMC has an area of 344.70 sq. km. under its supervision. The population in 1991 was just 3, 97,000; which roseunder its supervision. The population in 1991 was just 3, 97,000; which rose to 7, 50,000 in 2001 census and during the last decade it has grownto 7, 50,000 in 2001 census and during the last decade it has grown substantially.substantially.

Navi Navi Mumbai is a beautiful planned city; a Counter Magnet for Mumbai. It has been developed as an Independent, Fully Self Contained Metro City, having the World’s Large, Totally Planned, Well Balanced, and Modern City. The Well Planned Transportation Net-Work consisting of Road, Rail, and Water Way System: makes Navi Navi Mumbai easily accessible from all parts of the Country. The proposed Domestic cum International Airport is envisaged to further enhance this accessibility

The development plan for Navi Navi Mumbai envisages planning & development of various nodes [There are 8 nodes.] or township. The entire Navi Navi Mumbai township is expected to have about 20 nodes with a population of about 2 million.

The urban development consists of a Well Planned System for Sewerage & Water Supply exist in NMMC area.

Such three Sewage Treatment Plants at BELPUR CBD, SANPADA & KOPARKHAIRNE having capacities of 19, 37.5, & 87.5 MLD are already in the process of becoming functional with under-ground drainage system in tow.

In order to cope up with massive tasks taken on the shoulders, it has become imperative to draw up a coherent urbanization policy to implement the projects on mission mode such as J.N.N.U.R.M.

Indian Register of Shipping (IRS) was appointed as Third Party Quality Audit of Sewage Treatment Plants vide letter of acceptance No. NMMC / EE

3

Page 4: 2 Audit Sanpada

(SS/PT) / 497 /20-11 dated 23rd Nov, 2011 and subsequent W.O. No.NMMC/EE(SS/PT)/601/2011 dtd.15.12.2011. The scope of the Audit includes the Technical Audit of site records, tender documents, drawings, quality control practices, programme of works etc. consisting in the process of implementation of quality system for execution of the Sewage Treatment Plants.

Accordingly the 2nd Quality audit was conducted by us for the Integrated Development of Sewerage System in Navi Mumbai Corporation area (Underground Sewerage System) Providing of Sewer Network and Improvement in Sewerage System in Vashi and Turbhe Ward. Constructing, Erecting and Commissioning of Sewage Treatment Plant based on advance technology including operation and Maintenance for 3 years at sector-20.Sanpada during the period from 18.1.12 to 20.1.12.. The Quality Audit report is classified under following heads

1. Details of work & status of the work.2. Structure of Audit team & dates of audit.3. Organizational set up & experience level of

a. NMMC, b. PMC and c. Contractor

4. Review of compliance of earlier audit report.5. Methodology & Quality assurance plan.6. Control of Data & documentation at site.7. Plants & equipments deployed at site.8. Workmanship.9. Quality control of testing.10. Contractual aspects.11. Safety aspects.12. Visits of senior officers & their instructions / observations.13. Site observations of Civil, Mechanical & Electrical Engineering Works.14. Executive Summary.

The above documents were seen for the period from 1.6.2010 to 28.2.2011, as 2nd Third Party Technical Quality Audit was limited to nine months from the date of commencement.

The status & observations under each heads are given in detail item wise.

Findings & suggestions/recommendations are described in Audit summary. Some photographs illustrating workmanship and quality of works are taken during site inspection carried out along with the NMMC officials; PMC and Contractors representative are enclosed, with our comments.

4

Page 5: 2 Audit Sanpada

We hope that the findings / suggestions submitted for your perusal are taken in right perspective thereby enhancing quality of the work in general.

1.0 Details of Works:

Name of work “Under the Integrated Development of Sewerage System in Navi Mumbai area (Underground Sewerage System for NMMC). Providing of Sewer Network and Improvement in Sewerage System in Vashi and Turbhe ward. Constructing, Erecting and commissioning of Sewerage Treatment Plant based in advance technology including operation and maintenance for 3 years at Sector – 20, Sanpada.”Part A –

Designing, Constructing, Erecting and Commissioning of Sewage treatment plant of avg. capacity 37.5 MLD based in advance technology including operation and maintenance for 3 years at Sector – 20, Sanpada.

Part B – 1. Designing, providing and Laying of Sewer Network

and Improvement in Sewerage System at Turbhe and Vashi ward.

Supplying and Installation of Sewerage Pumping Machinery at Sector – 9 (SPH) Sanpada, Sector – 9D (SPH) Turbhe, Sector – 30 (SPH), Sector – 3 (SPH), Sector – 12 (SPH), Sector – 28 (SPH) Vashi and Turbhe ward and Designing, constructing and commissioning of sewerage pump house at Vashigaon.

Work order no NMMC/TENDER/ACE/745/2009 Dtd. 18.08.2009Tender Cost 127.5 Crs.Revised Cost if any

No

Date of work order

18.08.2009

Time period as per tender

Part A – 16 Months (Including Monsoon)Part B – 24 months (Including Monsoon)

Date of commencement as per Tender

18.08.2009

Actual date of starting of work

18.08.2009

Revised date of Part A – 31.12.2011

5

Page 6: 2 Audit Sanpada

completion Part B – 31.03.2012Name of the contractor

M/s. Gharpure Engineering and construction Pvt. Ltd

Name of Project Management Consultancy

M/s. Tandon & Associates

Actual Status of work

Part: A: STP:

C-tech – raft & wall concrete in progressPrimary unit – footing & plinth beam in progressSluge sump - Raft concrete in progressWert well – plinth work in progressBlower room – Staircase in progressHT Sub station – footing in progressAdmin bldg. – 1stslab in progress% ge of progress – 76.77%

Part:B: UGDPipe laying – around 30 Kms. CompletedPumping machinery – 51.72%Vash gaon pump house – 50.70%

RMC Supplier approved by NMMC

1) M/s. RMC India Ltd, 2) M/s. Lafarge 3) Ms. Godrej 4) Ms. Ultratech 5) M/s. Venkateshwara

Asphalt mix supplier approved by NMMC

M/s. Swastik Infraprojects Ltd.

6

Page 7: 2 Audit Sanpada

2.0 Structure of Audit team:

M/s. Indian Register of Shipping has deployed their qualified and experienced surveyors for Audit Work as below:

Sr. No. Designation Name

1. Team Leader Mr. R. C. Bhave

3. Auditor Mr. M. D. Deshmukh

4. Auditor Mr. G. B. Sable

5. Auditor Mr. N. C. Shah

6. Auditor Mr. T.K. Dutta

8.. Auditor Mr. V.P. Nipurte

7

Page 8: 2 Audit Sanpada

3.0 Organization set up

I. Organization set up of NMMC:

Sr. No. Designation Name

1 Addl. City Engineer Mr. Surendra W. Patil

2 Executive Engineer Mr. Arvind Shinde

3 Deputy EngineerMr. Santosh s. UnawaneMr. Prashant Deshmukh

4 Junior Engineer Mr. Vishwe

8

Page 9: 2 Audit Sanpada

II. Organization Set-up of PMC M/s. Tandon & Associates:

Sr.No

Designation Name Qualification

Works experience

1 Project Manager Mr. Anil Kokane M. tech Civil 10 years

2 Deputy Manager Mr. Yogesh Kondalkar M. tech Civil 5 years

3 Sr. Engg. Mr.Mahesh Banwaskar B.E. Civil 4 years

4 Sr. Engg. Mr. P. Rajulkar B.E. Civil 4 years

5 Sr. Engg. Mr. Raj Nagargoje B.tech 3 years

Comments / observations:

i. The agreement between NMMC & PMC Viz. M/s. Tondon and Asso. Is available now but after going through the contents, it is observed that details regarding man power deployment is not mentioned.

9

Page 10: 2 Audit Sanpada

III. Organization Set-up of Contractors M/s. Gharpure Engineering and construction Pvt. Ltd:

SrNo

Designation Name Qualification

Works experience

1 Project Manager Mr. Anil Khadke B.E. 30 Years

2Construction Manager

Mr. Milind Jadhav Civil Engr 15 Years

3 Senior Engineer

Mr. Pradeep UbheMr. Abhay PotdarMr. Suresh NewaleMr. Ganesh Sonawane

Civil Engr.

8 Years15 Years6 Years 7 year

4 Quality Engineer

Mr. Sachin JadhavMr. Tanmay BhabalMr. Wadgaonkar Mr. P.S. Hirve

Mech. Engr.

2 Years 1 Years30 year25 Year

SupervisorsMr. Sampat JadhavMr. B. T. Nalwade

35 Year 25 Year

Comments / observations:

The present technical staff in adequate for the execution of project.

10

Page 11: 2 Audit Sanpada

4.0 REVIEW OF COMPLAINCES OF EARLIER AUDIT REPORT :

Since the compliance report for 1 st periodic audit was not received the points raised in that remain non complied. The above matter is discussed with NMMC , PMC & the Contractor for early submission of compliance report.

5.0 Methodology & Quality Assurance Plan:

I. It is stated by the contractor that tender conditions do not specify preparation of methodology for the work, hence methodology is not prepared.

II. It is suggested that contractor shall prepare a methodology for each and every item of the BOQ to know how the items will be executed by means of methodology of the sequence etc.

III. It is obligatory on the part of contractor to prepare QAP within 14 days from commencement of work and as such QAP is prepared by the contractor but not approved by PMC / NMMC.

IV. It is further noticed that many points are not being complied as stated in the QAP prepared by the contractor though it is claimed that QAP is prepared for their own guidance.

7.0 Control of Data and Documentation:

a) Base Documents:i) Tender copy Vol. I & IIii) Work Order copyiii) STP billing break up (Approved)iv) Correspondence file v) Daily progress reports

b) Technical Documents:A. STP –

i) Concrete consumption register- Day to day concrete consumption of various grades of concrete is maintained in register.

ii) Cube testing register- Cube test register is maintained at site.

iii) Reinforcement steel challan file is maintained at site .

11

Page 12: 2 Audit Sanpada

iv) R.C.C. Pipe File- R.C.C Pipe invoice along with manufacturers test record is maintained

v) Batch record file – Date wise concrete batch record is maintained

vi) Mix design file – RMC concrete was procured from Lafarge, Ultratech, and RMC India. Mix design from Lafarge, Ultratech, and RMC India was approved by PMC M/s. Tandon & Associate

vii) Instruction book- Instruction book should be maintained at site to record suggestions of senior officer’s visit / their observations of ongoing works & compliances of the same.

viii) Drawing file- Various Drawing files are maintained as per various units of sewage treatment plant.

ix) Shuttering/reinforcement checked/approved etc. The general remark of inspection passed is ticked in the RFI which in fact should have been more elaborate taking into the account above aspects of importance.

B . UGD-

Under mentioned documents were found maintained at site.

a. Approved General master plan/cross section b. Challans along with MTCs for pipes/materialsc. Level register d. Cube test registere. Approval/testing of pipes recordf. Bill recordg. Source approval record

Remark: in addition to above some records not available during audit are as follows.

i) Approved hydro test recordii) Approval for bitumen macadam

8.0 Plants and Equipments deployed at site: The site laboratory has the following equipments -

1. Cube moulds (150mmx150mmx150mm)-40 nos.

12

Page 13: 2 Audit Sanpada

2. CTM of capacity 1000KN3. Sieves-1 set4. Core cutter5. Oven6. Weighing Balance of capacity 10Kg.7. Slump cone-3 nos.

Remark: Quality control lab has been established at site. All necessary equipments were available at site. Calibration of CTM is available.

8.0 WORKMANSHIP & SITE OBSERVATION

1. Visited new Sewage Pumping Station in Vashi sector-31Wet Well – completed.Screen of inlet raw- sewage is not installed, lots of lump/plastics was observed during audit.4 pumps installed along with control panels, Flooring Balance.Compound wall around plant & infrastructure development is still balance.

2. Old Pumping Station in Sector 9A, Sanpada. New pumps, are installed along with control panel.

3. UGD Works-i. Sector – 4 (sanpada ) It is observed during visit that corramandel cement was used for construction of manhole, a deviation from tender specification.

Sector – 5 It is observed that top levels of old manhole & new manhole were at different elevation .this may cause problem in construction of new proposed road.Sector- 9 TMT MMC reinforcement steel was used for construction of manhole,a deviation from tender spec.Sector – 16 800 dia pipe laying work is in progress (water line) since this was fouling in UGD system.

Cross-sectional width for laying pipe is not being maintained as per approved cross section i.e. 500 mm clearance on either side for easy maneuvering for carrying out sub base works below pipe..Sector -29 Push through is in progress. Safety precaution shall be strictly followed as location is near petrol pump & continuous vehicle movement near the work site.

13

Page 14: 2 Audit Sanpada

9.0 Quality Control & Testing

A. Reinforcement records have been reviewed & following are the observation

SR. NO.

DATE OF

RECEIPT

DIA OF BAR

SUPPLYER / AGENCY /

SECONDARY MANUFACTURER

QTY IN MT

CAST NO. / LOT NO.

REMARK MTC / ITC

AVAILABLE

1 6.6.10 20 JAIN STEEL [REGENCY] 20.010RT/42

BITC

2 8.6.10 20 JAIN STEEL [GUARDIAN]

22.160 GT-62 MTC3 8.6.10 12 9.920 GT-70 MTC4 8.6.10 16 11.900 GT-67 MTC

5 1O.6.10 12

JAIN STEEL [REGENCY]

9.660RT/45

BMTC

6 1O.6.10 20 9.870RT/42

BMTC

7 1O.6.10 16 20.130RT/47

BMTC

8 1O.6.10 20 19.970RT/60.B

MTC

9 23.6.10 12 SUMIT STEEL[GUARDIAN]

2.0.040

GT-75ITC

10 24.6.10 12 20.020 GT-75 ITC11 30.6.10 20

NEETA STEEL[GUARDIAN]

20.060 GT-75 ITC

12 1.7.10 12 14.800 GT-86ITC /MTC

/ OK

13 1.7.10 20 7.060 GT-81MTC / OK/

ITC

14 3.7.10 20 20.060 GT-81MTC / OK/

ITC

15 3.7.10 20 20.820 GT-81MTC / OK/

ITC 16 18.7.10 12 SAPANA

STEEL[GUARDIAN] 15.080 GT-90 MTC - OK

17 18.7.10 16 1.820 GT-94 MTC / OK/

14

Page 15: 2 Audit Sanpada

ITC 18 18.7.10 20 8.100 GT-89 MTC*

1918.7.10

10 15.000 GT-89MTC / OK/

ITC

2018.7.10

12 10.240 GT-89MTC / OK/

ITC

21 28.8.10 8

SUMIT STEEL[ REGENCY]

10.160RT/

100BMTC / OK/

ITC

22 28.8.10 10 10.150RT/

100BMTC / OK/

ITC

23 29.8.10 8 20.780RT/

100BMTC / OK/

ITC

2413.11.1

08

SHUBH M.L. SHAH & SONS [REGENCY]

15.43RT/

184BMTC / OK/

ITC

25 13.11.10 12 14.98NO MTC & ITC OK

26 13.11.10 20 20.21NO MTC & ITC OK

27 13.11.10 25 4.08NO MTC & ITC OK

28 13.11.10 10 8.110NO MTC & ITC OK

29 13.11.10 16 11.98NO MTC & ITC OK

3016.12.1

08

JATIN STEEL {ECEIVED FROM VASHI PUMP

HOUSE} [REGENCY]

2.095MTC OK

& NO ITC

31 16.12.10 12 7.360MTC OK

& NO ITC

32 16.12.10 12 6.490MTC OK

& NO ITC

33 16.12.10 16 7.56MTC OK

& NO ITC

34 16.12.10 20 0.74MTC OK

& NO ITC

1. For the reinforcement steel received, Physical Testing is done for 0.2 % Proof Stress Value, UTS, Elongation and Chemical Testing for Carbon, Sulphur, and Phosphorous % Content and generally found in order. The testing is done in Structwel Designers & Contractors, TCR Engineering

15

Page 16: 2 Audit Sanpada

Services, both NABL accredited Labs; but Vigilance and Quality Control Regional Lab, Turbhe, Navi Mumbai is PWD’s Vigilance Regional Laboratory.

2. Total Quantities of Reinforcement Steel received as per Challans are not matching with actual received [receipt] in the Reinforcement Test Register.

3. On 16.12.10 the 8, 12, 16, 20, and 25 dia. steel is received from M/S JATIN STEEL, but shifted from Vashi Pump House for which no entry is made in the Steel Testing Register(STR) [Test reports to be submitted from the other site and record should be available in STR.

4. Test results of Guardian Steel of Lot / Cast No. 75 & 86 no separate tests are conducted for 12 mm dia bar. Only one test conducted in A.R.O. V & Q Control PWD Lab at Turbhe.

5. MTC is available for the material brought from Vashi Pump House for all the consignments of 8, 12, 16, 20, and 25 MM dia steel with individual quantities mentioned in Regency Thermax MTC dated 14 \ 12 \ 2010 vide Test Certificate No. Regency / TMX / 2586 / 2010 dated 14 \ 12 \ 2010; but independent test certificate not available.

6. Reinforcement Test Register is maintained properly with all the requisites and individual Test Results recorded with signatures of Contractors / PMC & NMMC authorities. But it is not exhaustive considering different Cast Nos. of steel received.

7. 20 mm dia bar steel received on 6 \ 6 \ 2010 & 8 \ 6 \ 2010 from two different Secondary Manufacturers viz. Regency Thermax & Guardian Steel vide Cast No. RT/42-B & GT-62 respectively; Quantity being 20.010 MT and 22.160 MT respectively, where as only one ITC is available and Lot wise testing is not conducted.

8. Steel received 12 mm dia Sumit Steel [Guardian] of 40.06 MT dated 23 \ 6 \ 2010 having Cast / Lot No. GT-75 and from NEETA Steel [Guardian]; of 14.8 MT, having Cast / Lot No. GT-86 test report from V & Q Control Regional Lab Navi Mumbai shows only one specimen test for the 12bar. Where as different Cast Nos. are recorded for which separate tests should have been conducted. Further only on specimen is tested in this case, which is not as per the Codal Provision.

9. Reinforcement steel received on 10 \ 6 \ 2010 of 12, 16, and 20 MM from Regency Steel [Supplier JAIN Steel] show different Cast No. of 20

16

Page 17: 2 Audit Sanpada

MM bar steel however only one specimen tested in V & Q Control Lab at Turbhe for all the diameters mentioned above.

10. Reinforcement steel received on 8 \ 6 \ 2010 of 12, 16, and 20 MM from Guardian Steel [Supplier JAIN Steel] shows Cast No. as GT-70, GT-67 & GT-62. Only one test conducted in V & Q Control Lab, vide No. 1416 as per dated 30 \ 6 \ 2010

.

B. Observation on Mix Design:i. PMC, Tondon & associates has approved RMC plant vendor

Venkateshwara . via. Letter no. T&A/NMMC/SNG/RMC/335 dated 29-6-2010. M/S Tandon Associates, PMC has approved the vendors for RMC supplier’s on the basis of trial mix, physical & chemical test record of concrete ingredients . Record of physical & chemical tests of concrete ingredient from Supplier Venkateshwara is available however the tests on ingredient has been carried out after approval of mix design.

ii. Mix design for M25 grade has not been produced during Audit.

C. Concrete test - i. Cube test record is maintained at site & It is observed that some cube

tests results of M35 grade concrete carried out on 19 ,20 ,24 January 2011 are less than 35 N/mm2.

ii. Standard deviation has been computed as per Sp-23 for various concreting period & results of concrete cube tests during audit . Standard deviation computed is satisfying for good quality concrete criteria.

iii. No NDT test i.e. Rebound hammer test & ultrasonic pulse velocity test record is available at site,since the photograph shown indicated this.

iv. Independent cube tests have been carried out at structwel lab, PWD & SKG Lab.

v. Frequency of testing has not been maintained as per 15.2.2 of IS 456 for

following concreting works.

Sr Grade Date of Particular Quantity Test Required

17

Page 18: 2 Audit Sanpada

No.

of concrete casting

carried out at site

frequency of Testing

1M35 17.6.201

0Raft C-Tech basin

198 cu-m

5 no4 no

228.6.2010

Raft C-Tech basin

255 cu-m

3 no5 no

329.7.2010

Raft C-Tech basin

225 cu-m

3 no4 no

430.6.2010

Raft C-Tech basin

210 cu-m

3 no 4 no

5 3.7.2010Raft C-Tech basin

237 cu-m

5 no 5 no

6 7.7.2010Raft C-Tech basin

198 cu-m

3 no 4 no

7 8.7.2010Raft C-Tech basin

238 cu-m

3 no 4 no

8 9.7.2010Raft C-Tech basin

220 cu-m

5 no 4 no

D. Concrete batch record – Concrete batch slips have been verified co-relating mix design during audit & found in order.

E. RFI record has been maintained at site. Stage passing of various activities, noncompliance’s, suggestions have been recorded on RFI sheets as per standard inspection procedure . RFI are duly signed by Contractor, PMC and NMMC.

F. Building construction material - Brick, sand , cement challan ,MTC , test record is maintained at site.

G. Cement consumption record to ascertain the quality of various work i.e Brick work , plaster .coping ,flooring , etc. is not maintained.

H. Bar bending schedule was prepared at initial level of project.

FOR UGD

A. R.C.C. Pipe – R.C.C. pipe has been procured from Dhere concrete product, Siddhivinayak cement product, Mahadev precast , Vaitarna cement & pipe, Bharat spun pipe, Amey concretcek Pvt.ltd & Vendor are approved by PMC Tondon Associate.

B. Third party inspection certificate including a) Inspection test plan report including i) Workmanship & finish verification ii) Dimension verification

18

Page 19: 2 Audit Sanpada

iii) Three edge load bearing test iv) Hydrostatic testing v) Permeability test vi) Straightness test As per IS 458/2003 Class NP3 RCC Pipe for each lot wise testing is

available however following detail reports are not available i) Third party reviewed physical & chemical test reports of coarse & fine

aggregate Cement, steel etc. ii) Calibration record of measuring instrument, test equipment. iii) MTC of cement, steel.

C. No record of newly constructed Vashi pump house has been produced during audit.

D. Cement , brick , sand & coarse aggregate test record has been maintained.

E. Cement consumption record to ascertain the quality of various work i.e PCC ,Manhole brick work & plaster etc. is not maintained.

F. No record of reinstatement of road etc. available. i.e. Job mix design for various layer, test record of various material or ingredient of WBM .,DBM, BM, AC.

G. As R.C.C pipe line is designed for gravity flow, the slope of R.C.C pipe line shall be desirable to control sewer gases and to maintain self –cleansing velocities at all rates of flow within the design limits. It is observed that level record is maintained for excavation, PCC , Invert level , Ground level is maintained chainage wise & duly signed by PMC &NMMC. Slope for laying various diameter RCC Pipes is maintained with in the permissible limits.

H. Concrete cube test record is maintained.

Contractual Aspects:

I. Bar chart planning is prepared by the contractor but not approved by PMC / NMMC.

II. The time extension is approved three times.III. There is no variation in contract up to 28.2.2011.IV. It is stated by the contractor that no weekly / monthly progress is

being submitted. however it is stated by the contractor that PMC is submitting MPR based on the information and facts.

V. RFI is being maintained for each and every activity duly signed by contractor, PMC and NMMC engineer.

VI. Work order book is not maintained by the contractor though obligatory to maintain as per contract conditions.

VII. PMC had some format for issuing necessary instructions to the contractor whenever solicited but there is no trace of compliances for the instructions given by PMC engineer.

VIII. QAP and safety manual is not approved by PMC and NMMC.

19

Page 20: 2 Audit Sanpada

IX. Till period of 31.05.2010. Contractor has claimed Four R.A. Bills and mobilization advance payment.

X. No claims were made towards price escalation.

11.0 SAFETY MEASURES:

I. CAR and W.C. are valid policy are in force since commencement of the work and both are valid up to 20.08.2012 and 20.08.2011 respectively.

II. Contractor is having a labour Licence no DC / THA / KLA / 057 / 057/55 dated 18.12. 2009 is valid up to 31.12.2011.

III. It is obligatory on the part of contractor to submit and get approval of safety manual from PMC / NMMC

IV. Contractor has prepared a safety manual in general but same is not approved by PMC / NMMC.

12.0 Electrical Observations:

Document referred:-Tender Specification & Material Inward Register.

Scope of Audit is for the period 1.6.2010 to 28.02.2011.

The verification of the material quality system done based on sample delivery challans as found from respective inward material register and the observations are given below:

1. Crompton Greaves supplied motors as per delivery challan 11136 dated 2.6.2010. Data sheet, QAP are not available. Also, there is no test certificate from manufacturer available.

2. Chavare Engineering supplied MCC and control panels as per delivery challan 407 to 412 dated 26.9.2010. QAP is not available. Routine test certificates from manufacturer are available. However, type test certificates from manufacturer as indicated in tender specification are not available.

3. Polycab Cables supplied wires & cables as per delivery challan 00270 dated 2.11.2010. Data sheet, QAP are not available. Also, there is no test certificate from manufacturer found. Only MTCs for component materials are available.

4. Chavare Engineering supplied Level Transmitters as per delivery challan 331 dated 16.12.2010. Data sheet are available for FMU43 & FMU90 type Level Transmitters. But for level Transmitter type FDU90 there is data sheet available. Also, QAP and test certificates from manufacturer are not available.

20

Page 21: 2 Audit Sanpada

13.0 Mechanical works:

SIZE/MAKE QTY(MTRS) CHALLAN NO600MMX 6.35 THK/LANCO

21 048/49/50 DT 13/12/2010

2” B CLASS/LANCO 5.99 18915 DT 17/12/20102 ½” B CLASS/LANCO 5.99 18915 DT 17/12/20103” B CLASS/LANCO 91.55 18915 DT 17/12/20105” B CLASS/LANCO 231.88 18915 DT 17/12/20106” B CLASS/LANCO 163.89 18915 DT 17/12/201012” B CLASS/LANCO 144 18915 DT 17/12/201016”X6.35THK/LANCO 148 18915 DT 17/12/20108”X 5THK/LANCO 109 18916 DT 17/12/201014”X 6.35THK/LANCO 78 18916 DT 17/12/2010820O/DX 8THK/LANCO 16NOS 024263 DT

29/12/20101) MS PIPES (ERW)

A) Above Qty verified with challan & found in order Certificates for the same are not

available to be provided

2) BLOWERS SWAM MAKE

Sr no :-48 to 53-6nos Cap :-5750nm3/hr

21

Page 22: 2 Audit Sanpada

Motor:- 225 hp 1100 rpm Sr no :- NADZC 2276 to 2281-6NOS

A) Above Qty verified with challan & found in order Certificates for the same are available but motor certificates to be provided

B) Datasheet/QAP seen & found ok C) Guarantee certificate to be provided3) VALVES

KIRLOSKAR MAKE

A) Qty checked as per register verifying challan & found okB) No certificates availableC) Datasheet/QAP seen & fou

EXECUTIVE SUMMARY

1) Organizational Setupii. The agreement between NMMC & PMC Viz. M/s. Tondon and Asso. Is

available now but after going through the contents, it is observed that details regarding man power deployment is not mentioned.

iii. Contractor/s M/s. Gharpure Engineering Pvt. Ltd has given the list of Technical staff with qualifications & experience and generally it is in order.

2 ) REVIEW OF COMPLIANCE OF EARLIER AUDIT REPORT:i. Since the compliance report for 1 st periodic quality audit was not

received the points raised in that remain non complied. The above matter is discussed with NMMC ,PMC , & Contractor for early submission of compliance report.

3) Methodology and Quality Assurance Plan:

i. Certain important documentation is needed and the site staff is given suggestions in this regard.

4) Control of Data & Documentation at site:

22

Page 23: 2 Audit Sanpada

ii. Certain important documentation is needed and the site staff is given suggestions in this regard.

5) Plants & Equipments:

i. Quality control lab has been established at site. All necessary equipments

were available at site.

6) Quality Control & Testing:

i. Third party inspection certificate including inspection test plan report along with Workmanship & finish verification Dimension verification ,Three edge load bearing test , Hydrostatic testing Permeability test, Straightness test as per IS 458/2003 Class NP3 for each lot wise testing is available however following detail reports are not availablea. Third party reviewed physical & chemical test reports of coarse &

fine aggregate Cement, steel etc.b. Calibration record of measuring instrument, test equipment.c. MTC of cement, steel

ii. No record of newly constructed Vashi pump house has been produced during audit.

iii. No record of reinstatement of road etc. available. i.e. Job mix design for various layer, test record of various material or ingredient of WBM .,DBM, BM, AC.

iv. No NDT test i.e. Rebound hammer test & ultrasonic pulse velocity test record is available at site

v. Cement consumption record to ascertain the quality of various work i.e Brick work , plaster .coping ,flooring , etc. is not maintained

7) Contractual Aspects:

i. Bar chart planning is prepared by the contractor but not approved by PMC / NMMC.

ii. There is no variation in contract up to 28.2.2011.iii. It is stated by the contractor that no weekly / monthly progress is

being submitted. however it is stated by the contractor that PMC is submitting MPR based on the information and facts.

iv. PMC had some format for issuing necessary instructions to the contractor whenever solicited but there is no trace of compliances for the instructions given by PMC engineer.

v. QAP and safety manual is not approved by PMC and NMMC.vi. Till period of 31.05.2010. Contractor has claimed Four R.A. Bills and

mobilization advance payment.

8) Safety Aspects:

23

Page 24: 2 Audit Sanpada

I. CAR and W.C. are valid policy are in force since commencement of the work and both are valid up to 20.08.2012 and 20.08.2011 respectively.

II. Contractor is having a labour Licence no DC / THA / KLA / 057 / 057/55 dated 18.12. 2009 is valid up to 31.12.2011.

III. It is obligatory on the part of contractor to submit and get approval of safety manual from PMC / NMMC

IV. Contractor has prepared a safety manual in general but same is not approved by PMC / NMMC.

9) Electrical observations-

Following compliance as per Tender requirements to be fulfilled by the

Contractor:

i. Compliance not received against observation made during first audit dated 15.12.2011. This is to be fulfilled.

ii. In most cases there is no QAP available. This is to be arranged for all the materials delivered.

iii. Test certificate for motors from manufacturer to be made available.

iv. Type test certificate for MCC panel to be arranged.

v. Test certificate of cable to be produced.

vi. Test certificates of Level transmitters to be arranged.

10) Mechanical Observation-i. It is observed that the delivery pipe connected to Blower passing

through the Blower room wall (housing 6nos Blower) give vibration to the wall & some cracks are observed on the wall. These vibration can be contained by providing rubber/wrapping to the outer surface of pipe for the wall portion & further a saddle support from the ground outside the wall before bend portion to be provided which can also minimize vibration on the wall

ii. Sludge pump discharge is seen to be by passed & discharged into open nallah instead of going to sludge sump which is to be avoided.

24

Page 25: 2 Audit Sanpada

SUGGESTIONS TO IMPROVE

LONGEVITY AND SAFETY OF STP’s IN GENERAL

Suggestions to improve Longevity and Safety of STP’s in general:

I.] It is observed in all STP ’s that the main walkways passing through C Tech Basins are provided Antiskid Ceramic Tiles along with Poly Carbonate Circular Roof and this is alright considering main area of operation as well as for Visiting Personals. However, the other walkways are left bare without tiling and the concrete finish is also rough. These walkways are on top of C Tech Basins wall portion projecting on either side. The rough finish on top of walk way will soak rainwater during rainy season. Further transverse cracks are observed in this slab which when saturated by rainwater can endanger reinforcement of slab as well as walls of C Tech Basins. This problem cannot be solved by just sealing the cracks even with epoxy. Therefore, it is suggested to cover this entire portion with Chequered tiles or any other suitable material.

II.] The above walkways have SS railing on both sides with two horizontal runners, however the bottom [above the walkway slab] portion is left open without any arrester in the form toe flat, so that no accident can occur slipping through this large gap.Regular maintenance gangs will walk on this plant walkways and hence this precaution is necessary from safety point of view, for the workers.

25

Page 26: 2 Audit Sanpada

III.] Decanter Actuator Arm niche is open now and is susceptible for

mishap. It is therefore suggested to have a raised platform so that any person will not hamper Arm Movement along with smooth ride. [Arm Movement will not be hampered along with smooth ride by any person.]

26