2 all nrg - jwpajwpa.jp/pdf/2_all_nrg.pdfcompany presentation all nrg a world of power the road to...
TRANSCRIPT
![Page 1: 2 ALL NRG - JWPAjwpa.jp/pdf/2_ALL_NRG.pdfCompany Presentation ALL NRG a world of power The road to ALL NRG Annual turnover 600 MIO DKK Employees +600 2013 2014 2014 2015 OWNERS: 90%](https://reader036.vdocuments.us/reader036/viewer/2022062414/5f0a957c7e708231d42c5972/html5/thumbnails/1.jpg)
solutions
manpower
know-how
engineering
wind pioneers
windoil & gas
services
world leader
high voltage
safety
resources
competent
offshore expertsturn-key
ppe
inspection
Offshore Wind Delegation Japan - February 2017by Lars Rasmussen
Company Presentation
ALL NRGa world of power
![Page 2: 2 ALL NRG - JWPAjwpa.jp/pdf/2_ALL_NRG.pdfCompany Presentation ALL NRG a world of power The road to ALL NRG Annual turnover 600 MIO DKK Employees +600 2013 2014 2014 2015 OWNERS: 90%](https://reader036.vdocuments.us/reader036/viewer/2022062414/5f0a957c7e708231d42c5972/html5/thumbnails/2.jpg)
The road to ALL NRG
Annual turnover
600 MIO DKKEmployees
+600
2013 2014 2014 2015
OWNERS:
90% of all Danes
Electrical Wind
Mechanical Wind
Oil & Gas
Advisory & Inspection
![Page 3: 2 ALL NRG - JWPAjwpa.jp/pdf/2_ALL_NRG.pdfCompany Presentation ALL NRG a world of power The road to ALL NRG Annual turnover 600 MIO DKK Employees +600 2013 2014 2014 2015 OWNERS: 90%](https://reader036.vdocuments.us/reader036/viewer/2022062414/5f0a957c7e708231d42c5972/html5/thumbnails/3.jpg)
ALL NRG provide solutions in all phases
RESOURCES Electrical/mechanical
ENGINEERING Electrical/mechanical
MATERIAL DELIVERIES (e.g. completed cable sets)
SPECIAL PROJECTSTURN-KEY SOLUTIONS
INSPECTION & ADVISORY
PPE (Personal Protective Equipment)
![Page 4: 2 ALL NRG - JWPAjwpa.jp/pdf/2_ALL_NRG.pdfCompany Presentation ALL NRG a world of power The road to ALL NRG Annual turnover 600 MIO DKK Employees +600 2013 2014 2014 2015 OWNERS: 90%](https://reader036.vdocuments.us/reader036/viewer/2022062414/5f0a957c7e708231d42c5972/html5/thumbnails/4.jpg)
Combining worlds
COMPETENT SOLUTIONS – bringing down costs
Skilled certified technicians with hands on technicalexperience from numerous projects
Electrical and Mechanical Engineering -wind pioneers with extensive know-how
![Page 5: 2 ALL NRG - JWPAjwpa.jp/pdf/2_ALL_NRG.pdfCompany Presentation ALL NRG a world of power The road to ALL NRG Annual turnover 600 MIO DKK Employees +600 2013 2014 2014 2015 OWNERS: 90%](https://reader036.vdocuments.us/reader036/viewer/2022062414/5f0a957c7e708231d42c5972/html5/thumbnails/5.jpg)
We are partners – not competitors to suppliers and owners
DEVELOPMENT PRODUCTION PRE-ASSEMBLY INSTALLATION COMMISSIONING O & M LIFE TIME EXTENSION
PROACTIVEPARTNERSSUPPLIER
OWNER
COMPETITORS SUB CONTRACTORS
COMPETITORS SUB CONTRACTORS
DECOMMISSIONING
![Page 6: 2 ALL NRG - JWPAjwpa.jp/pdf/2_ALL_NRG.pdfCompany Presentation ALL NRG a world of power The road to ALL NRG Annual turnover 600 MIO DKK Employees +600 2013 2014 2014 2015 OWNERS: 90%](https://reader036.vdocuments.us/reader036/viewer/2022062414/5f0a957c7e708231d42c5972/html5/thumbnails/6.jpg)
Pre-assembly
Various EU locations DK, DE, NL, PL and UK• Electrical and mechanical pre-assembly • Handling and load-out
• Testing HV / MV / LV• Site- and project management
• Quality inspection and advisory• HSE responsibility
![Page 7: 2 ALL NRG - JWPAjwpa.jp/pdf/2_ALL_NRG.pdfCompany Presentation ALL NRG a world of power The road to ALL NRG Annual turnover 600 MIO DKK Employees +600 2013 2014 2014 2015 OWNERS: 90%](https://reader036.vdocuments.us/reader036/viewer/2022062414/5f0a957c7e708231d42c5972/html5/thumbnails/7.jpg)
Installation
Installation projects world wide • Foundation, TP and cable pull-in• Electrical installation and testing
• Mechanical installation and erection• Mechanical and electrical completion
• Test of transformers, SWG and MV cables and signals
![Page 8: 2 ALL NRG - JWPAjwpa.jp/pdf/2_ALL_NRG.pdfCompany Presentation ALL NRG a world of power The road to ALL NRG Annual turnover 600 MIO DKK Employees +600 2013 2014 2014 2015 OWNERS: 90%](https://reader036.vdocuments.us/reader036/viewer/2022062414/5f0a957c7e708231d42c5972/html5/thumbnails/8.jpg)
Commissioning
ALL NRG has grid connected more than 90% of the world’s offshore wind turbines• Grid connection• Commissioning personnel
• Reliability tests• Snag listing
• Test run• Experienced HV electricians
![Page 9: 2 ALL NRG - JWPAjwpa.jp/pdf/2_ALL_NRG.pdfCompany Presentation ALL NRG a world of power The road to ALL NRG Annual turnover 600 MIO DKK Employees +600 2013 2014 2014 2015 OWNERS: 90%](https://reader036.vdocuments.us/reader036/viewer/2022062414/5f0a957c7e708231d42c5972/html5/thumbnails/9.jpg)
Operation & Maintenance
Preferred service partner• HV service expert• Foundation, tower, nacelle and blades
• Painting and snagging work• Flexible inspection services
• WTG service campaigns• 24 h break-down service
![Page 10: 2 ALL NRG - JWPAjwpa.jp/pdf/2_ALL_NRG.pdfCompany Presentation ALL NRG a world of power The road to ALL NRG Annual turnover 600 MIO DKK Employees +600 2013 2014 2014 2015 OWNERS: 90%](https://reader036.vdocuments.us/reader036/viewer/2022062414/5f0a957c7e708231d42c5972/html5/thumbnails/10.jpg)
Life Time Extension
Upgrades and life time extension• Development of new technologies • Retrofit and upgrade campaigns
• Solution implementation • Project management
• Asset inspection and evaluation• End of Warranty inspection
![Page 11: 2 ALL NRG - JWPAjwpa.jp/pdf/2_ALL_NRG.pdfCompany Presentation ALL NRG a world of power The road to ALL NRG Annual turnover 600 MIO DKK Employees +600 2013 2014 2014 2015 OWNERS: 90%](https://reader036.vdocuments.us/reader036/viewer/2022062414/5f0a957c7e708231d42c5972/html5/thumbnails/11.jpg)
Solving solutions World wide
Akita Port:Grid test of 6 x 3.0 DD turbines in Akita Port/YurikogenAnnual maintenance on trafo and SWGRAd hoc service e.g.:• Transformer re-placement and transformer test• Inspection of MV cables between PU-TU in all turbines • Exchange MV cable sets in TU-PUs.
![Page 12: 2 ALL NRG - JWPAjwpa.jp/pdf/2_ALL_NRG.pdfCompany Presentation ALL NRG a world of power The road to ALL NRG Annual turnover 600 MIO DKK Employees +600 2013 2014 2014 2015 OWNERS: 90%](https://reader036.vdocuments.us/reader036/viewer/2022062414/5f0a957c7e708231d42c5972/html5/thumbnails/12.jpg)
Our reference list is long
ALLphases of a wind turbine life cycle
VESTAS SIEMENS Wind Power DONG Energy
MHI VESTAS A2SEA
Ballast Nedam
MT Højgaard
European Energy Mammoet
EnerginetVattenfall
Scotish PowerNKTEON ABB
VBMS
Envision
Bilfinger
![Page 13: 2 ALL NRG - JWPAjwpa.jp/pdf/2_ALL_NRG.pdfCompany Presentation ALL NRG a world of power The road to ALL NRG Annual turnover 600 MIO DKK Employees +600 2013 2014 2014 2015 OWNERS: 90%](https://reader036.vdocuments.us/reader036/viewer/2022062414/5f0a957c7e708231d42c5972/html5/thumbnails/13.jpg)
solutions
manpower
know-how
engineering
wind pioneers
windoil & gas
services
world leader
high voltage
safety
resources
competent
offshore expertsturn-key
ppe
inspection
Please visit our website www.allnrg.com for more information
Thank you for your attention
Any questions ?