  • 8/7/2019 1st review (K)

    1/13

    Members:-

    CHENGANI . A

    HEMAVATHY . P

    SAI SHANDEEP . M.N

    THULASI RAMAN . S.E

    Guided By:-Prof. S.R.KANNAN

  • 8/7/2019 1st review (K)

    2/13

    Objective

    Methodology

    Introduction

    Project profile

    Design profile Present status

  • 8/7/2019 1st review (K)

    3/13

    y Estimate the project duration of a commercial

    complex.

    y

    To estimate the total cost of the commercialcomplex.

    y Carry out the Time-cost analysis of the

    complete project.

    y Study the effect of variation in rates of material

    and labour on overall cost of the project.

  • 8/7/2019 1st review (K)

    4/13

    y Selection of site for the proposed project.

    y Data collection :-o Overall project details.

    o

    Architectural plans and elevations.o Structural drawings.

    o Methods of estimation.

    o CPWD rates.

    o Standard specifications , drawings and condition of

    evaluation.

  • 8/7/2019 1st review (K)

    5/13

    y Analysis of rates of Project estimate.

    y Estimate of the cost of the construction By detailed

    analysis of normal duration.

    y Comparison of the rates with the preliminary estimate.

    y Verification of Time-cost analysis.

    y Analysis on effect of rates using software.

    y Preparation of the report.

  • 8/7/2019 1st review (K)

    6/13

    y Based on the data obtained the case study is aproposed guest house cum three star hotel inGreams road, Nungambakkam, Chennai.

    y It is to obtain the estimate and rate analysis andmaking a comparison on estimates of theproject.

    y It helps us to know about the estimationmethods on detailed analysis and softwareanalysis on estimation.

  • 8/7/2019 1st review (K)

    7/13

    y This project is proposed for Kerala Tourismand Development Corporation(KTDC) andconstructed by Kerala Industrial and Technical

    Consultancy Organization Ltd.,(KITCO).y The architectural consultant who designed this

    project for KITCO is Chitale & son.

    y

    The structural consultant are given byMr. B.S.Muralidhara.

    y The estimate is completely done based oncodes provided by CPWD.

  • 8/7/2019 1st review (K)

    8/13

    y The project covers a built-up area of 8010 sq.ftapproximately with one basement, ground floorand nine storeys.

    y The structure covers the guest house up to threefloors and continues as star hotel from fourthfloor.

    y The foundation is made on clay soil with endbearing pile system.

  • 8/7/2019 1st review (K)

    9/13

    FIRST

    FLOOR P

    LAN

  • 8/7/2019 1st review (K)

    10/13

    SECO

    NDFLOO

    R PLAN

  • 8/7/2019 1st review (K)

    11/13

    TYPICA

    LFLOO

    R PLAN

  • 8/7/2019 1st review (K)

    12/13

    o Structural drawings The reinforcement details and layout

    o Methods of estimation The preliminary estimate for approximate determination of

    project cost.

    The detailed estimate for arriving at the exact cost of the project. The software analysis by Bid for Builders software.

    o CPWD rates The rates are based on CPWD schedule ofwork, analysis of rates in 2007 and 2009.

    o Standard specifications , drawings and condition of

    evaluation The use of IS 2911, IS 6313:1981, IS 9103.