1st award
TRANSCRIPT
-
7/30/2019 1st Award
1/13
27.03.2013 1/13
Halle 58 Architekten
Since 1990 | Employees 5
Marzilistrasse 8a
3005 Bern
Switzerland
Phone: +41 31 302 10 30
Fax: +41 31 302 98 89
Neubau Gebhartstrasse
Liebefeld | Switzerland | Completed 2006
photographer: Christine Blaser, Bern
-
7/30/2019 1st Award
2/13
27.03.2013 2/13
photographer: Christine Blaser, Bern
photographer: Christine Blaser, Bern
-
7/30/2019 1st Award
3/13
27.03.2013 3/13
Design team:
Peter Schrch, Fabian Schwarz
Client:
Bchler-Haartje family, Arx-Brgi family, Schrch-Stepper family
Project partners:
MEP engineer: Gartenmann Engineering AG
Seven garages were demolished to make way fort the first Minergie-P-Eco multifamily home in Switzerland was built within the
space of one year.
The boat-shaped ground plan of the new wooden house was determined by the shape of the property. The ground plan and
elevation show the layout: Three apartments of equal size entirely built in wood, accessible via the concrete staircase,, are
perched slightly above the level of the site. The concentration of sanitation and technology services into a compact core, plus a
load-bearing faade frees up the interior design of the apartments, permitting a loft-loke spatial scheme. On each floor the faade
is composed of a combination of wooden framework elements, glazing and entrance doors. What appears at first glance to be
concrete cooling fins are in reality made of wood, derived timber sheets and Duripanel particle board.
The building was able to fulfill Minergie-P-Eco standard thanks to minimal thermal bridges, large windows to the southwest,sufficient thermal mass, good daylight utilization and consistent use of ecological materials.
photographer: Christine Blaser, Bern
-
7/30/2019 1st Award
4/13
27.03.2013 4/13
photographer: Christine Blaser, Bern
-
7/30/2019 1st Award
5/13
27.03.2013 5/13
photographer: Christine Blaser, Bern
-
7/30/2019 1st Award
6/13
27.03.2013 6/13
photographer: Christine Blaser, Bern
photographer: Christine Blaser, Bern
-
7/30/2019 1st Award
7/13
27.03.2013 7/13
photographer: Christine Blaser, Bern
photographer: Christine Blaser, Bern
-
7/30/2019 1st Award
8/13
27.03.2013 8/13
photographer: Christine Blaser, Bern
-
7/30/2019 1st Award
9/13
27.03.2013 9/13
photographer: Christine Blaser, Bern
-
7/30/2019 1st Award
10/13
27.03.2013 10/13
photographer: Christine Blaser, Bern
photographer: Christine Blaser, Bern
-
7/30/2019 1st Award
11/13
27.03.2013 11/13
Ground floor plan
-
7/30/2019 1st Award
12/13
27.03.2013 12/13
Roof plan
North front
East front
Cross section
-
7/30/2019 1st Award
13/13
27 03 2013 13/13
Situation plan
project link
http://www.architonic.com/aisht/neubau-gebhartstrasse-halle-58-architekten/5100527
Take a photo of the opposite Qr-Code using a Qr-code-reader Application for your mobile phone.This will allow you to access the product directly.
(Free QR-code-reader applications are available for most mobile devices that have a built-in camera.)