Page 1: 1Snowmaker Transfer of Snowmaker Construction Plans WSL Institute for Snow and Avalanche Research SLF Martin Schneebeli, Matthias Jaggi Davos, 27th May

Snowmaker 1

Transfer of Snowmaker Construction Plans

WSL Institute for Snow and Avalanche Research SLF

Martin Schneebeli, Matthias Jaggi

Davos, 27th May 2014

Page 2: 1Snowmaker Transfer of Snowmaker Construction Plans WSL Institute for Snow and Avalanche Research SLF Martin Schneebeli, Matthias Jaggi Davos, 27th May

Snowmaker 2

Old and new Snowmaker

Page 3: 1Snowmaker Transfer of Snowmaker Construction Plans WSL Institute for Snow and Avalanche Research SLF Martin Schneebeli, Matthias Jaggi Davos, 27th May

Snowmaker 3

From prototype I to prototype II

Old and new Snowmaker

• Both prototypes use the same main principles to produce nature-identical snow• the ice crystals are brushed off the nylon cords instead of vibration motor• Some components were transferred from old to new Snowmaker

Higher reproducibility of the snow cristal size Higher amount of snow production High flexiblity because of modules on wheels (e.g. defrosting) Compacter device

Advantages

There is no CE certification for this machine

Page 4: 1Snowmaker Transfer of Snowmaker Construction Plans WSL Institute for Snow and Avalanche Research SLF Martin Schneebeli, Matthias Jaggi Davos, 27th May

Snowmaker 4

Design (CAD, NX UGS)

• Single parts: construction number_PRT.prt• Assemblies: construction number_ASM.prt• Drawings: construction number_DWG.prt• For ordering: construction number_XXX.pdf

It is possible to export the files into other formats (iges, step, dxf)

Exploded view with numbered part list

Sketch (drawing)

Exploded view

Page 5: 1Snowmaker Transfer of Snowmaker Construction Plans WSL Institute for Snow and Avalanche Research SLF Martin Schneebeli, Matthias Jaggi Davos, 27th May

5

Design (Assemblies)

1: Water evaporation basin («Wasserbecken»)

Water basin mady of aluminum with heating coil Fan and motor Electronics

2: Nucleation chamber («Nukleationskammer»)

Nylon wires Brush rack on linear guides Snow accumulation box Door

3: Condensation of residual humidity («Schneefänger»)

1

3

2

Page 6: 1Snowmaker Transfer of Snowmaker Construction Plans WSL Institute for Snow and Avalanche Research SLF Martin Schneebeli, Matthias Jaggi Davos, 27th May

Snowmaker 6

Design main frame by item Schweiz

All parts which belong to the main frame of the Snowmaker are composed with the aluminum profile system from item Schweiz.

We made the construction (we defined the all dimensions) in CAD … BUT NOT how the single elements are connected. This was done by item company

Contact person [email protected], www.item24.ch

Page 7: 1Snowmaker Transfer of Snowmaker Construction Plans WSL Institute for Snow and Avalanche Research SLF Martin Schneebeli, Matthias Jaggi Davos, 27th May

7Snowmaker

Frame of water basin, motor and fan

insulated top cover of water basin

wheel

motor

fan

fan fixation plate

motor fixation plate

thermal insulated water basin

humid air outlet

connector brackets to nucleations chamber

protective metal cover

water inlet

Page 8: 1Snowmaker Transfer of Snowmaker Construction Plans WSL Institute for Snow and Avalanche Research SLF Martin Schneebeli, Matthias Jaggi Davos, 27th May

Snowmaker 8

Construction of thermal insulated water basin

insulation

waterproof thermometer

sacrificial anode (magnesium)against corrosion

heatingCoil framework

heating coil

cupperwaterproof connectors to the heating coil

heating coil framework

water level safety switch

water basin aluminum

Page 9: 1Snowmaker Transfer of Snowmaker Construction Plans WSL Institute for Snow and Avalanche Research SLF Martin Schneebeli, Matthias Jaggi Davos, 27th May

Snowmaker 9

Divergent flow channel between water basin and nucleation chamber

magnet

joint flat face to water basin

Main frame connection holes

plates to build divergent flow channel

magnetic locking plate

threads

Page 10: 1Snowmaker Transfer of Snowmaker Construction Plans WSL Institute for Snow and Avalanche Research SLF Martin Schneebeli, Matthias Jaggi Davos, 27th May

Snowmaker 10

Nucleation chamber

screws to tighten the wires

wires

linear guides

linear guides connection shaft

brush rack motor

brush rackwheel

divergent flow channel

snow accumulation box

tilted top cover of nucleation chamber

locking plates

door

Page 11: 1Snowmaker Transfer of Snowmaker Construction Plans WSL Institute for Snow and Avalanche Research SLF Martin Schneebeli, Matthias Jaggi Davos, 27th May

Snowmaker 11

Construction for residual humidity

fixation plate for white cloth bag

opening to nucleation chamber

angle bracket (red)

frame of cloth bag can be removed upwards

Page 12: 1Snowmaker Transfer of Snowmaker Construction Plans WSL Institute for Snow and Avalanche Research SLF Martin Schneebeli, Matthias Jaggi Davos, 27th May

Snowmaker 12

List of components

List is not complete

Page 13: 1Snowmaker Transfer of Snowmaker Construction Plans WSL Institute for Snow and Avalanche Research SLF Martin Schneebeli, Matthias Jaggi Davos, 27th May

Snowmaker 13

Electronic components

fan speed control

water basin temperature control

brush rack control

Page 14: 1Snowmaker Transfer of Snowmaker Construction Plans WSL Institute for Snow and Avalanche Research SLF Martin Schneebeli, Matthias Jaggi Davos, 27th May

Snowmaker 14

Possible (necessary) Improvements

• Heating coil in the divergent wind channel• mechanical support of the glasses where the wires are• new fan with integrated motor (24 VDC)• design• …

Page 15: 1Snowmaker Transfer of Snowmaker Construction Plans WSL Institute for Snow and Avalanche Research SLF Martin Schneebeli, Matthias Jaggi Davos, 27th May

Snowmaker 15

Discussion / Questions