1_rjn, sses, i/i, and all the rest 30 minutes or less

Upload: rjn-group-inc

Post on 02-Jun-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    1/88

    Welcome to the4thAnnual RJN

    Collection System WorkshopWhen Wet Weather Flow Reduction Isnt

    EnoughNovember 6, 2014

    Drury Lane, Oakbrook Terrace, Illinois

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    2/88

    Question

    Are You Going to Do Something Corny

    Again This Year?

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    3/88

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    4/88

    Speaker Introductions Theatrically

    Zach Matyja, P.E. Host

    Tom Romza, E.I. Leonardo

    Dennis Gilbertson, GISP Cartogropher Vinnie Bergl, P.E. Severus Snape

    Mike Young, P.E. Donald Trump

    Matt Huska, P.E. Software Nerd Al Hollenbeck, P.E., BCEE Meterologist

    Cathy Morley, P.E. Super Mario

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    5/88

    Agenda

    8:15 RJN, I/I, SSES, and All the Rest in 30 Minutes or Less!

    8:45 Flow Monitoring & GIS - The Building

    Blocks for Collection System Solutions

    9:30 Hydraulic Modeling: The Black Art

    10:15 BREAK 10:30 Capacity Improvements and Wet-Weather Storage

    11:30 Inside the Gearbox - The Latest and Greatest in Data Collection,

    Management, and Analysis

    12:00 LUNCH

    12:45 Extreme Storm Events in Northern Illinois: There's SomethingHappening Here - But What It Is Ain't Exactly Clear

    1:30 When All Else Fails: Backflow Prevention

    2:00 Wet-Weather Freakonomics

    3:00 SCHOOLS OUT!

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    6/88

    RJN, I/I, SSES, and All the Rest in 30Minutes or Less!

    Zach Matyja, P.E.

    Client Manager

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    7/88

    PechaKucha

    From Wikipedia

    A presentation style developed by a

    Japanese architecture firm in which 20 slides

    are shown for 20 seconds each. The formatkeeps presentations concise and fast-

    paced

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    8/88

    My Inspiration:

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    9/88

    PechaKucha Presentation #1

    Becoming

    The Choice for Collection System Solutions

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    10/88

    1969 Cuyahoga River

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    11/88

    1972 Clean Water Act

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    12/88

    1975 RJN Environmental Associates

    Richard J. Nogaj 213 South Wheaton Avenue, Wheaton

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    13/88

    Knowledge is like money: to be of value

    it must circulate and in circulating it can

    increase in quantity and hopefully in

    value.

    Louis LAmour author

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    14/88

    1980 Specialty Field Services

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    15/88

    1981 Inflow Source Quantification

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    16/88

    1982 Dual Blower Smoke Testing

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    17/88

    1982 The Flow Balance

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    18/88

    1983 LineMate Sewer TV Software

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    19/88

    1986 Villa Park Wet Weather Treat. Facility

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    20/88

    1987 Elmhurst Relief Sewers and Pumping

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    21/88

    1985 Sewer Summit Agreement

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    22/88

    1990 - CASSWORKS

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    23/88

    1998 Scannable Field Forms

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    24/88

    2009 The Crumbling of America

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    25/88

    2009 Mobile CASS Trimble Units

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    26/88

    2012 The Sewer System Consultant

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    27/88

    2013 Design Build for Sewer Projects

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    28/88

    2014 - GATAR

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    29/88

    The Future???

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    30/88

    PechaKucha Presentation #2Inflow and Infiltration

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    31/88

    Inflow

    Rain or Surface Water that Finds Direct

    Entrance by Way of Downspouts, Sump

    Pumps, Manholes, and Catch Basins

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    32/88

    Infiltration

    Groundwater that Enters through

    Defective Pipes, Manholes, or Building

    Connections

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    33/88

    Why Should We Care?

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    34/88

    Why Should We Care?

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    35/88

    Inflow and Infiltration

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    36/88

    I/I In a Hydrograph

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    37/88

    Pre-Rehabilitation Flow Balance

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    38/88

    Inflow - Downspouts

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    39/88

    Inflow - Cleanouts

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    40/88

    Infiltration Sump Pumps and Diverter Valves

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    41/88

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    42/88

    Inflow Direct Storm Connections

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    43/88

    Inflow Manhole Frame / Adjustments

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    44/88

    Infiltration Manhole Frame / Adjustments

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    45/88

    Infiltration Manhole Wall / Trough

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    46/88

    Infiltration Indirect Cross-Connections

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    47/88

    Lateral Defects

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    48/88

    Mainline Defects

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    49/88

    Flow Migration

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    50/88

    FOG (Fats, Oil, and Grease) and Roots

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    51/88

    PechaKucha Presentation #3Sanitary Sewer Evaluation Survey

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    52/88

    Sanitary Sewer Evaluation Surveys

    Flow Monitoring

    Manhole Inspections

    Smoke Testing

    CCTV

    Building Inspections

    Dyed Water Flooding

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    53/88

    Flow and Rainfall Monitoring

    What Is the Objective?

    I/I Analysis?

    Hydraulic Model Calibration?

    Billing?

    Basin Selection Tactical Basin Sizes of 10,000 lf to 40,000 lf

    Strategic Basin Sizes of 80,000 lf to 120,000 lf

    Rain Gauges

    The More, the Better

    Duration

    Short-Term

    Long-Term

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    54/88

    Parts of a Flow Meter

    Flow Meter Canister

    A Computer in a Wet, Toxic, Corrosive Environment

    Data Collector

    Battery

    Telemetry (integral or separate)

    Velocity Probe

    Pressure Sensor

    Ultrasonic Sensor(s)

    Desiccant

    Antenna

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    55/88

    Calculating & Measuring Flow Flow Meters Dont Measure Flow Flow Meters

    Measure Depth and Velocity

    Using Depth, We Calculate Area

    Using Area and Velocity

    We Calculate Flow Q = Flow = A*V

    With No Velocity, We Can

    Approximate with Manning, But

    NO DEPTH, NO DATA

    D

    V

    Depth Varies Exponentially (r2)

    Velocity is 1:1

    Must have Depth to Calculate Q

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    56/88

    Site Inspections & Measurements

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    57/88

    Installation

    Proper Installation prevents debris buildup and extends

    the life of the installation and equipment

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    58/88

    Calibrations

    Multi-point Profile

    Depth Velocity Profile

    ~At least 4-5 throughout the

    duration of any metering period!

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    59/88

    Manhole Inspections

    Quick Inspections

    Surface Inspections

    Full-Depth Entry Inspections

    Rehabilitation Focused Inspections

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    60/88

    Smoke Testing So Easy a Concept

    THE FOLLOWING VIDEO IS A SIMULATION

    FEATURING PAID ACTORS

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    61/88

    Smoke Testing

    Dual Blower, Single Segment Multi-Person Teams

    Photograph (or Video)

    GPS Locate

    Smoke Testing Defect Summary

    Source SINGLE Blower DUAL Blower

    Main Sewer Defect 8 26

    Indirect Storm Sewer

    Cross Connection6 16

    Building Lateral Defect 29 100

    Area Drains/Downspouts 2 12

    Cleanouts 22 80

    TOTAL 67 234

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    62/88

    Photo and GPS Linking

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    63/88

    CCTV

    Objectives:

    Structural integrity

    Location of laterals

    Technology

    Pan and tilt digital camera 3D Laser / Sonar Scanning

    Deliverables

    Digital video with PACP codes

    X/Y Coordinates for defects /laterals

    Viewable through GIS

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    64/88

    Televising Prioritization

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    65/88

    Building / Private-Property Inspections

    Full Inspection (Interior and Exterior) Non-Invasive Inspection (Exterior

    Only)

    Suspect list (done during smoke

    testing) MH inspection (listen, look for

    sumps kicking on)

    Building interior smoke (quick

    inspection)

    Follow Up Dye Test (Confirmation

    Inspection)

    Corrective Action (Post Rehab

    Inspection)

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    66/88

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    67/88

    Flow Quantification

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    68/88

    Flow Balance

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    69/88

    Flow Balance

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    70/88

    Defect Mapping

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    71/88

    PechaKucha Presentation #4Sanitary Sewer Rehabilitation

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    72/88

    Getting the Flow Out

    Manhole Rehabilitation

    Mainline Rehabilitation

    Lateral Rehabilitation

    Easy Private Property Disconnections

    Sump Pump Disconnection

    Foundation Drain Removal

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    73/88

    Renewal -- Not Replacement

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    74/88

    Manhole Chimney and Frame Rehabilitation

    Internal/ExternalChimney Seals Frame and GradeAdjustments / CorbelReplacement

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    75/88

    Manhole Grouting/Lining/Coating Rehabilitation

    Chemical InjectionGroutingCement Lining

    Epoxy Coating

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    76/88

    Mainline Grouting / Lining / Coating

    Lining & Grouting

    Advancements - Can Line More than Before

    Renewal NOT Replacement

    Flow Migration

    Manage your Expectations

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    77/88

    Lateral Rehabilitation

    Whats your Responsibility? Rehabilitation Methods

    Top Hat

    T-Liner

    Grouting

    Point Repair / Pipe Burst

    Funding Considerations

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    78/88

    Private Property Disconnection Program

    Private Property Disconnection Programs

    Code Enforcement Letter for Quick Fixes

    Sumps / Combination Sumps / Foundation

    Drains Easier to Sell if Public Sector Is Fixed

    Overhead Sewers as Incentive?

    Cost Sharing Programs?

    Follow-up Inspections

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    79/88

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    80/88

    Sump Pump Disconnection

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    81/88

    Foundation Drain Separation

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    82/88

    Relief Sewers / Sewer Upsizing

    S

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    83/88

    Wet-Weather Storage

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    84/88

    Post-Rehabilitation Flow Monitoring

    Total

    Infiltration/Inflow

    Time - Years

    Start of

    Rehabilitation

    1 2 6543

    Fl B l U d d

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    85/88

    Flow Balance - Updated

    CMOM

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    86/88

    CMOM

    R i b A H ik

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    87/88

    Rainbows A Haiku

    Th E d!

  • 8/10/2019 1_RJN, SSES, I/I, and All the Rest 30 Minutes or Less

    88/88

    The End!