MAINTENANCE
OF
HVDC
EQUIPMENT
-
7/30/2019 1.HVDC Operation & Maintenance
2/19
Valve HallValve Hall
The status of the Thyristor levels in the valve hall is available
online in the VBE printer.
VBE monitors continuously, the healthiness of the thyristors
and associated valve hall components while in service
Failure of thyristor is reported in the VBE printer and also in the
work station for the operator
Alarm is generated up to 3 thyristor failures in a valve and on
4th failure, trip is generated
-
7/30/2019 1.HVDC Operation & Maintenance
3/19
Failure may be in
Thyristor
Snubber capacitor
Snubber resistor TE card
To test the thyristor level Thyristor Level Test Unit is used
which tests thyristor and associated components
Type of failure in the thyristor can be detected Open circuit,
short circuit, gate open circuit FO cables from VBE to the TE card are tested using the FO
Attenuation test kit
Inspection of Grading electrodes Yearly / 2yearly
Valve Hall Thyristor level testing
-
7/30/2019 1.HVDC Operation & Maintenance
4/19
Thyristor level test unit
-
7/30/2019 1.HVDC Operation & Maintenance
5/19
Inspection of grading electrodes
-
7/30/2019 1.HVDC Operation & Maintenance
6/19
Converter Transformer
Following tests are done during yearly shutdown
Capacitance and tan of the bushings
Used to determine the healthiness of the bushing insulation
Checking the operation of the buchholz relays and Pressure Relief
Devices (PRD)
Checking of the WTI & OTI alarms and trips
Checking whether all the alarms are reported to HMI system
Checking the operation of fire fighting deluge valve system
-
7/30/2019 1.HVDC Operation & Maintenance
7/19
Converter Transformer
Replacement of the oil filters of OLTC (On-Load tap Changer) can be
replaced online when the alarm is generated
Periodic testing of the oil DGA to determine the incipient internal
faults of the transformer
Testing of all the associated protection relays
-
7/30/2019 1.HVDC Operation & Maintenance
8/19
Converter Transformer OLTC Inspection of the OLTC
Maintenance of OLTC after every 1 lakh operations
Wear and tear of all mechanical & electrical parts of the
OLTC to be inspected.
Replacement of mechanical parts with high wear & Tear.
Cleaning of Fixed and moving contacts.
Cleaning of OLTC chambers
Filling with fresh oil
Converter Transformer
-
7/30/2019 1.HVDC Operation & Maintenance
9/19
Overhauling of OLTC
-
7/30/2019 1.HVDC Operation & Maintenance
10/19
Overhauling of OLTC
-
7/30/2019 1.HVDC Operation & Maintenance
11/19
AC Filter
Maintenance of filter bay equipment includes
Associated breaker testing -Operation timings, alarm,
lockout checks etc.
Testing of CT C & Tan
Capacitance stack measurement and balancing if required
Inspection of capacitor stack for oil leakage
Measurement of resistors and reactors for deviation Testing of associated protection systems
-
7/30/2019 1.HVDC Operation & Maintenance
12/19
Apart from the yearly maintenance, failure of capacitor cans calls
for
Measurement of individual capacitor stacks /cans
Calculation of unbalance in the Capacitor H-bridge
Replacement of capacitor if required for balancing of the bridge
AC Filter
-
7/30/2019 1.HVDC Operation & Maintenance
13/19
Valve cooling
Maintenance of Valve Cooling
Replacement of resin in the resin chamber yearly or if the conductivity reaches
the alarm level 0.25S/cm which ever is early
Provision is there to replace the resin without the shutdown of the valve cooling
system
Cleaning of 50m main filter cartridges yearly this requires shutdown of the
system
Cleaning of 50m filters in the path of resin chambers and make up water line
path can be done without shutdown
Top up of hardness removal salt in the water treatment plant if the level falls
below 20%
Apart from this, daily monitoring of the parameters / motors / pumps is done
to detect the alarm levels in advance to take corrective action before it develops
into a major problem
-
7/30/2019 1.HVDC Operation & Maintenance
14/19
Valve Cooling- Maintenance of Main filter
-
7/30/2019 1.HVDC Operation & Maintenance
15/19
DC Yard disconnectors
Maintenance of DC disconnectors
Cleaning of the Male & Female contacts
Applying contact grease
Measurement of contact resistance
Replacement / Adjustments of mechanical linkages if
resistance found high
Tightening of the clamps & connectors
-
7/30/2019 1.HVDC Operation & Maintenance
16/19
DC Yard Maintenance
-
7/30/2019 1.HVDC Operation & Maintenance
17/19
Auxiliary System
Yearly servicing of DG sets and protection relays testing rating
1400KVA 2sets
Fire Fighting system checking the hydrant points
AC switchyard Maintenance of Circuit Breaker, CT, CVT and
Isolators as per standard procedures of AC stations
Maintenance of station batteries, chargers and UPS systems
LT system Relay testing & LT breaker maintenance
-
7/30/2019 1.HVDC Operation & Maintenance
18/19
Maintenance of LT breakers & Relay testing
-
7/30/2019 1.HVDC Operation & Maintenance