SN. Who Measurement Date Accept Reject Signature
1 Material Preparation Batch No. Quantity
- Sikagard 62 HB
Component A 9 kg9kg of each bucket
9-Dec Yes
Component B 3 kg3 kg of each bucket
Paint will mix
by machine Paint will mix atleast
See photos
attached
(TONG HOR) 3 mins, Please see
Work procedure
2 Steel Surface Preparation
- HB Done. But, photos
not taken. 17-Oct
started
and
Complet
ed 27-
Oct
Yes
- HB Done at see
attached photos10-Nov Yes
- HB Steel thickness
survey with
ultrasonic
thickness Guage
test report
submited.
Test
Done on
Nov-10
& report
submit
on 19 -
Nov
Yes
Supervisor: Samrat Srabua Project Engineer: Prakash Singh Rawal Date: Dec 9, 2012.
Perform steel surface preparation
according to Sa 2 as defined by ISO
8501-1 (Shotblasting)
Replica tape testing for 5 location per
beam for first 5 beams and 1 locationfor each beam afterwards
Steel member thickness with Ultra
Thickness Guage after shot blasting
calculation of steel loss will be
submitted.The required additional steel
plate will be welded as per calculation
to the beam sections.Refer to work
procedure flow chart.After that start of
coating of entire one beam.
Check List for Steel Lining with Sikagard
62
Area: Steel Beam at Grid H1 and G2.
Himalayan Builders and EngineersEOB Steel Beam Upgrade Project
at the American Embassy, Bangkok, Thailand
Contract No.: SGE500- 12 - C - 0024
Description of work
..........................
(Sika Thailand)
................................
(Applicator)
.....................
(Consultant representa
-
7/28/2019 1.a Sika 62 Coating checklist grid H1 & G2.xls
2/3
Pa
SN. Who Measurement Date Accept Reject Signature
Supervisor: Samrat Srabua Project Engineer: Prakash Singh Rawal Date: Dec 9, 2012.
Check List for Steel Lining with Sikagard
62
Area: Steel Beam at Grid H1 and G2.
Himalayan Builders and EngineersEOB Steel Beam Upgrade Project
at the American Embassy, Bangkok, Thailand
Contract No.: SGE500- 12 - C - 0024
Description of work3 Application of Sikagard 62 (1 Coat by Hand Roller)
- HB / Sika
(Thailand)
at start up
and agreed
time
intervals
If rust found, Hand
tool grinding and
cleaner used for
cleaning metal
surface.
8-Dec Yes
- HB For Each beam qty
is 36m2
(with 5%
extra area), redq
material = 8.64
kgs, so mixing 9kgof A and 3 kg of B
= 12 kgs for each
batch is enough for
One beam 1st
coatings
9-Dec Yes
- HB Substrate temp -
31.7 C, Humidity =
75% and Dew point
= 24.9 C
9-Dec Yes
- HB 1 day for 30
substrate
temperature
9-Dec Yes
- HB / Sika
(Thailand)
at start up
and agreed
time
intervals
Done see attached
photos
10-Dec Yes
4 Application of Sikagard 62 (2n
Coat by Hand Roller)
- HB For Each beam qty
is 36m2
(with 5%
extra area), redq
material = 8.64
kgs, so mixing 9kg
of A and 3 kg of Bfor each batch is
enough for One
beam 2nd
coatings
10-Dec Yes
- HB Substrate temp -
28.3 C, Humidity =
75% and Dew point
= 24.4 C
10-Dec Yes
Check no visible rust on steel surface
and steel surface is free from dust and
other friable matter.
Check material quantity per area
before application of First coat
100microns (Sika
Guard-62 coating datasheet reveals
that the theoretical value of dry filmthickness for each of 170micron
coatings consumes approx. 0.24
kg/m2
material) Application of 1st
Coat by Roller
Check substrate temp. > 3C above
dew point, humidity should be 80%
Allow coat to cure based on minimum /
maximum intercoat waiting times
Check dry film thickness before
application of 2nd
coat for 5 location
per beam face
Check material quantity per area
before application of 2nd coat 170
microns (Sika
Guard-62 coating datasheet reveals
that the theoretical value of dry film
thickness for each of 170microncoatings consumes approx. 0.24
kg/m2 material) Application of
2nd
Coat by Roller
Check substrate temp. > 3C above
dew point, humidity should be 80%
..........................
(Sika Thailand)
................................
(Applicator)
.....................
(Consultant representa
-
7/28/2019 1.a Sika 62 Coating checklist grid H1 & G2.xls
3/3
Pa
SN. Who Measurement Date Accept Reject Signature
Supervisor: Samrat Srabua Project Engineer: Prakash Singh Rawal Date: Dec 9, 2012.
Check List for Steel Lining with Sikagard
62
Area: Steel Beam at Grid H1 and G2.
Himalayan Builders and EngineersEOB Steel Beam Upgrade Project
at the American Embassy, Bangkok, Thailand
Contract No.: SGE500- 12 - C - 0024
Description of work- HB 1 day for 30
substrate
temperature
10-Dec Yes
- HB / Sika
(Thailand)
at start up
and agreed
time
intervals
Done see attached
photos
11-Dec Yes
5 Application of Sikagard
62 (3rd
or Final Coat by Hand Roller)
- HB For Each beam qty
is 36m2
(with 5%
extra area), redqmaterial = 8.64
kgs, so mixing 9kg
of A and 3 kg of B
for each batch is
enough for One
beam 3rd
coatings
11-Dec Yes
- HB Substrate temp -
28.0 C, Humidity =
75% and Dew point
= 25.3 C
11-Dec Yes
- HB 1 day for 30
substrate
temperature
11-Dec Yes
- HB / Sika
(Thailand)
at start up
and agreed
time
intervals
Done see attached
photos
12-Dec Yes
With reference to the various Check listed above, Sika confirms with its signatures that, based on its respective site visits
on the dates indicated above, the application of the above mentioned Sika products has been effected in accordance with
Sikas written recommendations; Sika has not detected any visible defects in Sika's products as applied. However, the
above confirmations are based only on a visual check of the actual status of the job site and the works executed as seen
during Sikas site visit. Sikas responsibility is therefore limited to the results of its visual check and does not imply anyfurther responsibility as to Sika's products, and/or their correct application by any third party.
Allow coat to cure based on minimum /
maximum intercoat waiting times
Check material quantity per area
before application of 3rd
coat 170
microns (SikaGuard-62 coating datasheet reveals
that the theoretical value of dry film
thickness for each of 170micron
coatings consumes approx. 0.24
kg/m2 material) Application of
3rd
Coat by Roller
Check substrate temp. > 3C above
dew point, humidity should be 80%
Check dry film thickness of coat's
applied by Coating thickness Tester
Allow coat to cure based on minimum /maximum intercoat waiting times
Check dry film thickness of coat's
applied by Coating thickness Tester
..........................
(Sika Thailand)
................................
(Applicator)
.....................
(Consultant representa