    SN. Who Measurement Date Accept Reject Signature

    1 Material Preparation Batch No. Quantity

    - Sikagard 62 HB

    Component A 9 kg9kg of each bucket

    9-Dec Yes

    Component B 3 kg3 kg of each bucket

    Paint will mix

    by machine Paint will mix atleast

    See photos

    attached

    (TONG HOR) 3 mins, Please see

    Work procedure

    2 Steel Surface Preparation

    - HB Done. But, photos

    not taken. 17-Oct

    started

    and

    Complet

    ed 27-

    Oct

    Yes

    - HB Done at see

    attached photos10-Nov Yes

    - HB Steel thickness

    survey with

    ultrasonic

    thickness Guage

    test report

    submited.

    Test

    Done on

    Nov-10

    & report

    submit

    on 19 -

    Nov

    Yes

    Supervisor: Samrat Srabua Project Engineer: Prakash Singh Rawal Date: Dec 9, 2012.

    Perform steel surface preparation

    according to Sa 2 as defined by ISO

    8501-1 (Shotblasting)

    Replica tape testing for 5 location per

    beam for first 5 beams and 1 locationfor each beam afterwards

    Steel member thickness with Ultra

    Thickness Guage after shot blasting

    calculation of steel loss will be

    submitted.The required additional steel

    plate will be welded as per calculation

    to the beam sections.Refer to work

    procedure flow chart.After that start of

    coating of entire one beam.

    Check List for Steel Lining with Sikagard

    62

    Area: Steel Beam at Grid H1 and G2.

    Himalayan Builders and EngineersEOB Steel Beam Upgrade Project

    at the American Embassy, Bangkok, Thailand

    Contract No.: SGE500- 12 - C - 0024

    Description of work

    ..........................

    (Sika Thailand)

    ................................

    (Applicator)

    .....................

    (Consultant representa

  • 7/28/2019 1.a Sika 62 Coating checklist grid H1 & G2.xls

    2/3

    Pa

    SN. Who Measurement Date Accept Reject Signature

    Supervisor: Samrat Srabua Project Engineer: Prakash Singh Rawal Date: Dec 9, 2012.

    Check List for Steel Lining with Sikagard

    62

    Area: Steel Beam at Grid H1 and G2.

    Himalayan Builders and EngineersEOB Steel Beam Upgrade Project

    at the American Embassy, Bangkok, Thailand

    Contract No.: SGE500- 12 - C - 0024

    Description of work3 Application of Sikagard 62 (1 Coat by Hand Roller)

    - HB / Sika

    (Thailand)

    at start up

    and agreed

    time

    intervals

    If rust found, Hand

    tool grinding and

    cleaner used for

    cleaning metal

    surface.

    8-Dec Yes

    - HB For Each beam qty

    is 36m2

    (with 5%

    extra area), redq

    material = 8.64

    kgs, so mixing 9kgof A and 3 kg of B

    = 12 kgs for each

    batch is enough for

    One beam 1st

    coatings

    9-Dec Yes

    - HB Substrate temp -

    31.7 C, Humidity =

    75% and Dew point

    = 24.9 C

    9-Dec Yes

    - HB 1 day for 30

    substrate

    temperature

    9-Dec Yes

    - HB / Sika

    (Thailand)

    at start up

    and agreed

    time

    intervals

    Done see attached

    photos

    10-Dec Yes

    4 Application of Sikagard 62 (2n

    Coat by Hand Roller)

    - HB For Each beam qty

    is 36m2

    (with 5%

    extra area), redq

    material = 8.64

    kgs, so mixing 9kg

    of A and 3 kg of Bfor each batch is

    enough for One

    beam 2nd

    coatings

    10-Dec Yes

    - HB Substrate temp -

    28.3 C, Humidity =

    75% and Dew point

    = 24.4 C

    10-Dec Yes

    Check no visible rust on steel surface

    and steel surface is free from dust and

    other friable matter.

    Check material quantity per area

    before application of First coat

    100microns (Sika

    Guard-62 coating datasheet reveals

    that the theoretical value of dry filmthickness for each of 170micron

    coatings consumes approx. 0.24

    kg/m2

    material) Application of 1st

    Coat by Roller

    Check substrate temp. > 3C above

    dew point, humidity should be 80%

    Allow coat to cure based on minimum /

    maximum intercoat waiting times

    Check dry film thickness before

    application of 2nd

    coat for 5 location

    per beam face

    Check material quantity per area

    before application of 2nd coat 170

    microns (Sika

    Guard-62 coating datasheet reveals

    that the theoretical value of dry film

    thickness for each of 170microncoatings consumes approx. 0.24

    kg/m2 material) Application of

    2nd

    Coat by Roller

    Check substrate temp. > 3C above

    dew point, humidity should be 80%

    ..........................

    (Sika Thailand)

    ................................

    (Applicator)

    .....................

    (Consultant representa

  • 7/28/2019 1.a Sika 62 Coating checklist grid H1 & G2.xls

    3/3

    Pa

    SN. Who Measurement Date Accept Reject Signature

    Supervisor: Samrat Srabua Project Engineer: Prakash Singh Rawal Date: Dec 9, 2012.

    Check List for Steel Lining with Sikagard

    62

    Area: Steel Beam at Grid H1 and G2.

    Himalayan Builders and EngineersEOB Steel Beam Upgrade Project

    at the American Embassy, Bangkok, Thailand

    Contract No.: SGE500- 12 - C - 0024

    Description of work- HB 1 day for 30

    substrate

    temperature

    10-Dec Yes

    - HB / Sika

    (Thailand)

    at start up

    and agreed

    time

    intervals

    Done see attached

    photos

    11-Dec Yes

    5 Application of Sikagard

    62 (3rd

    or Final Coat by Hand Roller)

    - HB For Each beam qty

    is 36m2

    (with 5%

    extra area), redqmaterial = 8.64

    kgs, so mixing 9kg

    of A and 3 kg of B

    for each batch is

    enough for One

    beam 3rd

    coatings

    11-Dec Yes

    - HB Substrate temp -

    28.0 C, Humidity =

    75% and Dew point

    = 25.3 C

    11-Dec Yes

    - HB 1 day for 30

    substrate

    temperature

    11-Dec Yes

    - HB / Sika

    (Thailand)

    at start up

    and agreed

    time

    intervals

    Done see attached

    photos

    12-Dec Yes

    With reference to the various Check listed above, Sika confirms with its signatures that, based on its respective site visits

    on the dates indicated above, the application of the above mentioned Sika products has been effected in accordance with

    Sikas written recommendations; Sika has not detected any visible defects in Sika's products as applied. However, the

    above confirmations are based only on a visual check of the actual status of the job site and the works executed as seen

    during Sikas site visit. Sikas responsibility is therefore limited to the results of its visual check and does not imply anyfurther responsibility as to Sika's products, and/or their correct application by any third party.

    Allow coat to cure based on minimum /

    maximum intercoat waiting times

    Check material quantity per area

    before application of 3rd

    coat 170

    microns (SikaGuard-62 coating datasheet reveals

    that the theoretical value of dry film

    thickness for each of 170micron

    coatings consumes approx. 0.24

    kg/m2 material) Application of

    3rd

    Coat by Roller

    Check substrate temp. > 3C above

    dew point, humidity should be 80%

    Check dry film thickness of coat's

    applied by Coating thickness Tester

    Allow coat to cure based on minimum /maximum intercoat waiting times

    Check dry film thickness of coat's

    applied by Coating thickness Tester

    ..........................

    (Sika Thailand)

    ................................

    (Applicator)

    .....................

    (Consultant representa