18-maintenanceandinspectionofbridgestaycablesystems
TRANSCRIPT
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
1/38
MAINTENANCE ANDMAINTENANCE AND
INSPECTION OF BRIDGEINSPECTION OF BRIDGE
STAY CABLE SYSTEMSSTAY CABLE SYSTEMS
ByBy
Habib Tabat abaiHabib Tabat abai
Univers i t y o f Wisc onsinUnivers i t y o f Wisc onsin --M i lwaukeeMi lwaukee
Work shop on WindWork shop on Wind --Induc ed V ibrat ionsInduc ed V ibrat ions
St . Louis, Missour iSt . Louis, Missour i
Apr i l , 2006Apri l , 2006
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
2/38
I n t roduc t ion
This w o rk i s based on NCHRPSynt hesis 353, Inspec t ion andMaint enanc e of Br idge St ay CableSyst em s, 2005.
A comprehens ive review of l i t eratu re A quest ionna ire fo r US and Canadian
agenc ies
Rev iew of t est repor t s , m aintenanc emanuals Pat e nt searc h es,
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
3/38
US Invent ory
yes1991336 (1100)GeorgiaTalmadge Memorial Bridge, Savannah10
yes2003351 (1150)MissouriBill Emerson / Cape Girardeau Bridge9
yes2002366 (1200)KentuckyWilliam Natcher / Owensboro Bridge8
no1987366 (1200)FloridaSunshine Skyway Bridge7
yes1984373 (1222)LouisianaHale Boggs / Luling Bridge6
yes2003381 (1250)GeorgiaSidney Lanier Bridge, Brunswick5
yes1995381 (1250)TexasFred Hartman /Houston Ship Channel4
yes1989397 (1300)FloridaDame Point Bridge3
yes2005420 (1378)MississippiGreenville Br, US 82 Over Mississippi2
yes2005472 (1546)South CarolinaCooper River Bridge1
Surveyin?
YearSpan, m (ft)StateBridge NameNo
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
4/38
Cable-St ayed Br idges int he U.S. and Canada
Cable-Stayed Bridge Constructionin the U.S.
0
2
4
6
8
10
12
14
16
18
1960
1970
1980
1990
2000
More
Years
Numb
erofBridgesBuilt
Cable-Stayed Bridge Construction inCanada
0
1
2
3
4
5
6
7
8
1960 1970 1980 1990 2000 More
Years
Numb
erofBridgesBuilt
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
5/38
No. of Br idges
In t he U.S., over 40 c ab le-s t ayedbridges - t he o ldes t i s t he S i t kaHarbor Br idge in A lask a bui l t in
1970
In Canada, over 16 c able -s t ayed
bridges - t he o ldes t i s t he Nor thRom aine Br idge in Quebec bui l tin 1960.
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
6/38
Moist ure ins ide Cable?
Moisture Inside Stay Cables
0.0
10.020.0
30.0
40.050.0
60.0
yes no not tested not known not
applicable
no answer
Presence of Moisture
P
ercentofBridges
U.S. Canada
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
7/38
MTE Cor rosion?
MTE Corrosion
0.0
20.0
40.0
60.0
80.0
yes no not known not
applicable
no answer
Corrosion
P
ercentofBrid
ges
U.S. Canada
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
8/38
Fat igue?
Fatigue of MTE
0.0
20.0
40.0
60.080.0
100.0
yes no not known not
applicable
no answer
Fatigue
P
ercentofBridges
U.S. Canada
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
9/38
Crac k ing of Sheat h ing orConnect ions?
Cracking of Sheathing and Connections
0.010.020.030.040.050.060.0
70.0
yes-
sheathing
yes-
connections
yes-both
no
notknown
not
applicable
noanswe
r
Cracking
P
ercentofBrid
ges
U.S. Canada
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
10/38
Met hods Ef fec t ive?Inspection, testing, monitoring and Repair Effective and
Adequate?
0.0
20.0
40.0
60.0
80.0
100.0
yes no not known
Methods Effective?
Perce
ntofBridges
U.S. Canada
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
11/38
Manual Avai lab le?
Inspection & Maintenance Manual Available?
0.0
20.0
40.0
60.0
80.0
100.0
yes no not known no answer
Maintenance Manual?
PercentofBridges
U.S. Canada
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
12/38
Cables Repa ired?
Cables Repaired?
0.0
20.0
40.0
60.0
80.0
yes no not known no answer
Cables Repaired?
PercentofBridges
U.S. Canada
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
13/38
Dam age t o Tape?
Damage to Wrapping Tape
0
20
40
60
80
yes no not known not applicable no answer
Wrapping Tape
Pe
rcentofBridg
es
U.S. Canada
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
14/38
Cables Replac eable?
Can the Cables (or Strands) be Replaced?
0.0
20.0
40.0
60.0
80.0
100.0
yes no not known no answer
Replaceable?
Perc
entofBridges
U.S. Canada
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
15/38
NDT on St ay Cables?Non-Destructive Testing on Stay Cables?
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
magnet
ic
x-ra
y
ultrasonic
vibration-
basedforce
measuremen
ts
othe
r
notperforme
d
notknow
n
noanswe
r
NDT Methods
PercentofB
ridges
U.S. Canada
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
16/38
Long-Term Moni t or ing?
Sensor Based Long-Term Monitoring?
0.020.040.060.0
80.0100.0
acoustic
wire
break
detection
vibra
tion
monitoring
force
measurem
ents
other
notperformed
notkn
own
noanswer
Monitoring
Percentof
Bridges
U.S. Canada
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
17/38
Rain-Wind Vibra t ions?
Rain-Wind Vibrations?
0.020.040.060.0
80.0
ye
s
no
notknow
n
not
applicable
noanswer
Rain-Wind Vibrations
PercentofBridges
U.S. Canada
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
18/38
Visc ous Dam pers Used?
Viscous Dampers Used?
0.0
20.0
40.0
60.080.0
100.0
yes - from the
beginning
yes - retrofitted
to correct
vibrations
no no answer
Viscous Dampers
PercentofBrid
ges
U.S. Canada
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
19/38
Cross Cables Used?
Cross Cables Used?
0.0
20.0
40.0
60.080.0
100.0
yes - from the
beginning
yes - retrofitted
to correct
vibrations
no no answer
Cross Cables
P
ercentofBrid
ges
U.S. Canada
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
20/38
Visua l Inspec t ions
I n g reat ma jor it y of cases, t h is is t he onl ym et hod ut i l ized in c ab le-s t ayed br idges.
Typ ica l ly inc lude surveys of t he ex te r io rsur faces o f c ab les, ex posed sur fac es o f
t he anc horages, c ross cab les and t he i rc onnect ions, dam pers, and c ondi t ions o fneoprene boot s and gu ide p ipes.
Inspec t ions o f neoprene r ings inside gu ide
p ipes are also per form ed in someinspect ions .
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
21/38
Visual Inspec t ions (Cont .)
Boresc opes or v ideosc opes c an be used t oc hec k t he condi t ion o f t he c able andpresenc e of mois t ure inside t he gu ide p ipe.
Anc h or age c aps c an be rem o ved t o c hec k
t he cond i t ion o f w edges or but t on heads,and to c hec k fo r m o ist u re.
V isua l i nspec t ions c ould pot ent ial ly i nvolvem easurem ents o f c ab le sag and inc l ina t ion
angle by t he inspec t or f rom t he dec k levelus ing s im ple dev ic es.
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
22/38
Magnet ic Flux Leak age
Long h is t o ry in inspec t ion o findust r ia l c ab les and ropes.
Syst e ms t h at c an t ravel along t hes tay c able are com m erc ial lyavai lab le .
This m et hod does not w ork w el l w i t hc ab les t ha t have s t ee l sheath ing.
The cable s ize cannot be t oo l arge ind iamete r
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
23/38
Magnet ic Flux Leak age(Cont.)
The syst e m c a n ident i fy t he ex t ent ofdamage and it s loca t ion along the lengt h o fc ab le, bu t c annot ident i fy loc a t ion o fdam age w i th in the c ross sec t ion.
I n i t s c urr ent s t a t e of developm e nt , t h ism et hod c annot be used fo r inspec t ions int he anc horage zones and t he v ic in i t y o fanc horage zones. Unfor t unat e ly , t hose aret he areas w here m ost ser ious prob lem shave oc c ur red .
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
24/38
Cable Forc e Measurem ent s
Using ac c e lerom e t e rs Using non-c ont ac t
sensors suc h as
laser vib rom et ers
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
25/38
Cable Forc e Measurem ent s(Cont.)
This approach is t he m ost w ide lyused, and som et im es m isunders tood,NDE m et hod.
Measu rement o f c able forc es c anhe lp det erm ine i f g loba l s t i f fnessc hanges have occ ur red in c ab les .How ever, m oderat e damage, in t he
form of MTE sec t ion loss, does notnec essari l y t rans la te in t o g loba ls t i f fness c hange.
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
26/38
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
27/38
Ult rason ic Tes t ing
A st r ess w ave is sent i nt o t he w i re ors t rand a t t he anchorage and t heref lec t ions are moni t ored and d isp layed.
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
28/38
Ult rasonic Test ing (Cont .)
There has not been asys tem at i c and c ont rol ledevaluat ion o f th is m et hod t o
de te rm ine i t s degree ofe f fec t iveness fo r s t ay c ab leanchorages.
Cal ibrat ion w i t h m oc k -uprequi red.
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
29/38
Ult rasonic Test ing (Cont .)
Seven-w i re st rand a la rger cha llenge thanind iv idua l w i res bec ause t ransm iss ion o fs t ress w aves in t hem is more c omplex .
The opera to r m ust be h ighly qua li f i ed s ince
t he judgm ent o f t he opera tor is c ruc ia l . The prob lems ar ise due to t he ancho ragem at er ia ls sur rounding t he MTE. The s t ressw ave a t t enuat es s ign i f i can t l y in a w i re
em bedded in g rout o r epoxy c om pared to aw i re in ai r .
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
30/38
Ult rasonic Test ing (Cont .)
Th is m et hod i s not appl ied t ot he MTE in t he f ree lengt h o fcab le .
UT is t h e only k now n andprac t i ca l t es t t hat i s c u rren t l yava i lab le fo r t he assessm ent o fMTE in t he anc horage zones oft yp ic a l U.S. s t ay c ab les .
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
31/38
Radiography
This met h od has t he pot e nt i al t osuc c essfu l ly assess c ond it ions o fc able anchorages w here ac c ess t ot he per im et er c an be ac h ieved.
This m e t hod w as used on t h eanc horages of the Mer id ian Br idge inCal i fornia.
Sa fe t y issue, c ost , and t ypi ca l l ylarge and heavy equipm ent haves ign i f i c an t l y l im i t ed t he ir use.
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
32/38
Ac ous t i c Moni t o r ing
I t is a pass ive m on it o r i ng syst em . AM has long used t o det e c t w i re
break s in t he st ay cab le t es tspec imens.
As a w i re breaks , a s t r ess w avet ravels along t he lengt h o f t he c ab lein bot h d i rec t ions .
Ac c elerom e t ers at t ac h ed at t he
anchorage c an de t ec t t he event anddeterm ine i t s loc a t ion a long t hecab le .
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
33/38
Ac ous t ic Moni t o r ing(Cont.)
The rec orded response or s ignat ure c an be ana lyzed todeterm ine i f the event i s in fac t aw i re break .
A c om m erc i al syst e m i s c u rrent l yavai lab le and has been inst a l led on anum ber of br idges.
I n g rout ed c ables , t he a t t enuat i on o ft he w ave is s ign i f i c an t l y h igher t hanin the ungrout ed c ab les .
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
34/38
NDT For St ay Cab les
There is not a s i ngle m eth od t hat w ouldprov ide answ ers for a l l t he quest ionsregard ing t he c ondi t ion o f s tay c ab les .
I n most c ases , i t i s t he comb ina t i on o f NDTt echn iques toge ther w i th t he ex per ience ,
k now ledge, and judgm ent o f eng ineers ,inspec t o rs and t echn ic ians t hat c an leadt o the appropr iat e answ er .
The e ffec t i veness and accu racy o f many o ft he met hods desc r ibed above w ou ld bes ign i f icant ly enhanc ed i f base l inec om para t ive measurem ents are ava ilab le .
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
35/38
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
36/38
Rec om m endat ions (Cont .)
Pe rform research on t he feasibi l i t y o fbu i l t -in or rem ot e inspec t ion andim ag ing sys t em s fo r mon i t o r ing o fMTE c ond it ions in t he c ab les(espec ia l ly anc horages) forincorpora t ion in to new c ab ledesigns.
Perform researc h on iden t i fy ing
appropr ia t e c ho ic e and use o fc om binat ions of NDE m et hods basedon t he c ondi t ions a t hand.
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
37/38
Rec om m endat ions (Cont .)
Pe rform research on feasibi l i t y o fg lobal , 3-d im esional , physic alm apping o f s t ay cab les .
St udy t he c reat ion of a nat ional
resourc e for in form at ion on s t ayc ables and c able-s t ayed br idges
St udy c reat ion o f period ic t ra ining
program s for s t a t e eng ineers andinspectors .
-
7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems
38/38
Thank You