18-maintenanceandinspectionofbridgestaycablesystems

Upload: tecanasio

Post on 05-Apr-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    1/38

    MAINTENANCE ANDMAINTENANCE AND

    INSPECTION OF BRIDGEINSPECTION OF BRIDGE

    STAY CABLE SYSTEMSSTAY CABLE SYSTEMS

    ByBy

    Habib Tabat abaiHabib Tabat abai

    Univers i t y o f Wisc onsinUnivers i t y o f Wisc onsin --M i lwaukeeMi lwaukee

    Work shop on WindWork shop on Wind --Induc ed V ibrat ionsInduc ed V ibrat ions

    St . Louis, Missour iSt . Louis, Missour i

    Apr i l , 2006Apri l , 2006

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    2/38

    I n t roduc t ion

    This w o rk i s based on NCHRPSynt hesis 353, Inspec t ion andMaint enanc e of Br idge St ay CableSyst em s, 2005.

    A comprehens ive review of l i t eratu re A quest ionna ire fo r US and Canadian

    agenc ies

    Rev iew of t est repor t s , m aintenanc emanuals Pat e nt searc h es,

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    3/38

    US Invent ory

    yes1991336 (1100)GeorgiaTalmadge Memorial Bridge, Savannah10

    yes2003351 (1150)MissouriBill Emerson / Cape Girardeau Bridge9

    yes2002366 (1200)KentuckyWilliam Natcher / Owensboro Bridge8

    no1987366 (1200)FloridaSunshine Skyway Bridge7

    yes1984373 (1222)LouisianaHale Boggs / Luling Bridge6

    yes2003381 (1250)GeorgiaSidney Lanier Bridge, Brunswick5

    yes1995381 (1250)TexasFred Hartman /Houston Ship Channel4

    yes1989397 (1300)FloridaDame Point Bridge3

    yes2005420 (1378)MississippiGreenville Br, US 82 Over Mississippi2

    yes2005472 (1546)South CarolinaCooper River Bridge1

    Surveyin?

    YearSpan, m (ft)StateBridge NameNo

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    4/38

    Cable-St ayed Br idges int he U.S. and Canada

    Cable-Stayed Bridge Constructionin the U.S.

    0

    2

    4

    6

    8

    10

    12

    14

    16

    18

    1960

    1970

    1980

    1990

    2000

    More

    Years

    Numb

    erofBridgesBuilt

    Cable-Stayed Bridge Construction inCanada

    0

    1

    2

    3

    4

    5

    6

    7

    8

    1960 1970 1980 1990 2000 More

    Years

    Numb

    erofBridgesBuilt

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    5/38

    No. of Br idges

    In t he U.S., over 40 c ab le-s t ayedbridges - t he o ldes t i s t he S i t kaHarbor Br idge in A lask a bui l t in

    1970

    In Canada, over 16 c able -s t ayed

    bridges - t he o ldes t i s t he Nor thRom aine Br idge in Quebec bui l tin 1960.

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    6/38

    Moist ure ins ide Cable?

    Moisture Inside Stay Cables

    0.0

    10.020.0

    30.0

    40.050.0

    60.0

    yes no not tested not known not

    applicable

    no answer

    Presence of Moisture

    P

    ercentofBridges

    U.S. Canada

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    7/38

    MTE Cor rosion?

    MTE Corrosion

    0.0

    20.0

    40.0

    60.0

    80.0

    yes no not known not

    applicable

    no answer

    Corrosion

    P

    ercentofBrid

    ges

    U.S. Canada

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    8/38

    Fat igue?

    Fatigue of MTE

    0.0

    20.0

    40.0

    60.080.0

    100.0

    yes no not known not

    applicable

    no answer

    Fatigue

    P

    ercentofBridges

    U.S. Canada

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    9/38

    Crac k ing of Sheat h ing orConnect ions?

    Cracking of Sheathing and Connections

    0.010.020.030.040.050.060.0

    70.0

    yes-

    sheathing

    yes-

    connections

    yes-both

    no

    notknown

    not

    applicable

    noanswe

    r

    Cracking

    P

    ercentofBrid

    ges

    U.S. Canada

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    10/38

    Met hods Ef fec t ive?Inspection, testing, monitoring and Repair Effective and

    Adequate?

    0.0

    20.0

    40.0

    60.0

    80.0

    100.0

    yes no not known

    Methods Effective?

    Perce

    ntofBridges

    U.S. Canada

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    11/38

    Manual Avai lab le?

    Inspection & Maintenance Manual Available?

    0.0

    20.0

    40.0

    60.0

    80.0

    100.0

    yes no not known no answer

    Maintenance Manual?

    PercentofBridges

    U.S. Canada

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    12/38

    Cables Repa ired?

    Cables Repaired?

    0.0

    20.0

    40.0

    60.0

    80.0

    yes no not known no answer

    Cables Repaired?

    PercentofBridges

    U.S. Canada

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    13/38

    Dam age t o Tape?

    Damage to Wrapping Tape

    0

    20

    40

    60

    80

    yes no not known not applicable no answer

    Wrapping Tape

    Pe

    rcentofBridg

    es

    U.S. Canada

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    14/38

    Cables Replac eable?

    Can the Cables (or Strands) be Replaced?

    0.0

    20.0

    40.0

    60.0

    80.0

    100.0

    yes no not known no answer

    Replaceable?

    Perc

    entofBridges

    U.S. Canada

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    15/38

    NDT on St ay Cables?Non-Destructive Testing on Stay Cables?

    0.0

    10.0

    20.0

    30.0

    40.0

    50.0

    60.0

    70.0

    80.0

    90.0

    magnet

    ic

    x-ra

    y

    ultrasonic

    vibration-

    basedforce

    measuremen

    ts

    othe

    r

    notperforme

    d

    notknow

    n

    noanswe

    r

    NDT Methods

    PercentofB

    ridges

    U.S. Canada

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    16/38

    Long-Term Moni t or ing?

    Sensor Based Long-Term Monitoring?

    0.020.040.060.0

    80.0100.0

    acoustic

    wire

    break

    detection

    vibra

    tion

    monitoring

    force

    measurem

    ents

    other

    notperformed

    notkn

    own

    noanswer

    Monitoring

    Percentof

    Bridges

    U.S. Canada

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    17/38

    Rain-Wind Vibra t ions?

    Rain-Wind Vibrations?

    0.020.040.060.0

    80.0

    ye

    s

    no

    notknow

    n

    not

    applicable

    noanswer

    Rain-Wind Vibrations

    PercentofBridges

    U.S. Canada

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    18/38

    Visc ous Dam pers Used?

    Viscous Dampers Used?

    0.0

    20.0

    40.0

    60.080.0

    100.0

    yes - from the

    beginning

    yes - retrofitted

    to correct

    vibrations

    no no answer

    Viscous Dampers

    PercentofBrid

    ges

    U.S. Canada

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    19/38

    Cross Cables Used?

    Cross Cables Used?

    0.0

    20.0

    40.0

    60.080.0

    100.0

    yes - from the

    beginning

    yes - retrofitted

    to correct

    vibrations

    no no answer

    Cross Cables

    P

    ercentofBrid

    ges

    U.S. Canada

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    20/38

    Visua l Inspec t ions

    I n g reat ma jor it y of cases, t h is is t he onl ym et hod ut i l ized in c ab le-s t ayed br idges.

    Typ ica l ly inc lude surveys of t he ex te r io rsur faces o f c ab les, ex posed sur fac es o f

    t he anc horages, c ross cab les and t he i rc onnect ions, dam pers, and c ondi t ions o fneoprene boot s and gu ide p ipes.

    Inspec t ions o f neoprene r ings inside gu ide

    p ipes are also per form ed in someinspect ions .

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    21/38

    Visual Inspec t ions (Cont .)

    Boresc opes or v ideosc opes c an be used t oc hec k t he condi t ion o f t he c able andpresenc e of mois t ure inside t he gu ide p ipe.

    Anc h or age c aps c an be rem o ved t o c hec k

    t he cond i t ion o f w edges or but t on heads,and to c hec k fo r m o ist u re.

    V isua l i nspec t ions c ould pot ent ial ly i nvolvem easurem ents o f c ab le sag and inc l ina t ion

    angle by t he inspec t or f rom t he dec k levelus ing s im ple dev ic es.

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    22/38

    Magnet ic Flux Leak age

    Long h is t o ry in inspec t ion o findust r ia l c ab les and ropes.

    Syst e ms t h at c an t ravel along t hes tay c able are com m erc ial lyavai lab le .

    This m et hod does not w ork w el l w i t hc ab les t ha t have s t ee l sheath ing.

    The cable s ize cannot be t oo l arge ind iamete r

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    23/38

    Magnet ic Flux Leak age(Cont.)

    The syst e m c a n ident i fy t he ex t ent ofdamage and it s loca t ion along the lengt h o fc ab le, bu t c annot ident i fy loc a t ion o fdam age w i th in the c ross sec t ion.

    I n i t s c urr ent s t a t e of developm e nt , t h ism et hod c annot be used fo r inspec t ions int he anc horage zones and t he v ic in i t y o fanc horage zones. Unfor t unat e ly , t hose aret he areas w here m ost ser ious prob lem shave oc c ur red .

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    24/38

    Cable Forc e Measurem ent s

    Using ac c e lerom e t e rs Using non-c ont ac t

    sensors suc h as

    laser vib rom et ers

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    25/38

    Cable Forc e Measurem ent s(Cont.)

    This approach is t he m ost w ide lyused, and som et im es m isunders tood,NDE m et hod.

    Measu rement o f c able forc es c anhe lp det erm ine i f g loba l s t i f fnessc hanges have occ ur red in c ab les .How ever, m oderat e damage, in t he

    form of MTE sec t ion loss, does notnec essari l y t rans la te in t o g loba ls t i f fness c hange.

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    26/38

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    27/38

    Ult rason ic Tes t ing

    A st r ess w ave is sent i nt o t he w i re ors t rand a t t he anchorage and t heref lec t ions are moni t ored and d isp layed.

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    28/38

    Ult rasonic Test ing (Cont .)

    There has not been asys tem at i c and c ont rol ledevaluat ion o f th is m et hod t o

    de te rm ine i t s degree ofe f fec t iveness fo r s t ay c ab leanchorages.

    Cal ibrat ion w i t h m oc k -uprequi red.

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    29/38

    Ult rasonic Test ing (Cont .)

    Seven-w i re st rand a la rger cha llenge thanind iv idua l w i res bec ause t ransm iss ion o fs t ress w aves in t hem is more c omplex .

    The opera to r m ust be h ighly qua li f i ed s ince

    t he judgm ent o f t he opera tor is c ruc ia l . The prob lems ar ise due to t he ancho ragem at er ia ls sur rounding t he MTE. The s t ressw ave a t t enuat es s ign i f i can t l y in a w i re

    em bedded in g rout o r epoxy c om pared to aw i re in ai r .

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    30/38

    Ult rasonic Test ing (Cont .)

    Th is m et hod i s not appl ied t ot he MTE in t he f ree lengt h o fcab le .

    UT is t h e only k now n andprac t i ca l t es t t hat i s c u rren t l yava i lab le fo r t he assessm ent o fMTE in t he anc horage zones oft yp ic a l U.S. s t ay c ab les .

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    31/38

    Radiography

    This met h od has t he pot e nt i al t osuc c essfu l ly assess c ond it ions o fc able anchorages w here ac c ess t ot he per im et er c an be ac h ieved.

    This m e t hod w as used on t h eanc horages of the Mer id ian Br idge inCal i fornia.

    Sa fe t y issue, c ost , and t ypi ca l l ylarge and heavy equipm ent haves ign i f i c an t l y l im i t ed t he ir use.

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    32/38

    Ac ous t i c Moni t o r ing

    I t is a pass ive m on it o r i ng syst em . AM has long used t o det e c t w i re

    break s in t he st ay cab le t es tspec imens.

    As a w i re breaks , a s t r ess w avet ravels along t he lengt h o f t he c ab lein bot h d i rec t ions .

    Ac c elerom e t ers at t ac h ed at t he

    anchorage c an de t ec t t he event anddeterm ine i t s loc a t ion a long t hecab le .

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    33/38

    Ac ous t ic Moni t o r ing(Cont.)

    The rec orded response or s ignat ure c an be ana lyzed todeterm ine i f the event i s in fac t aw i re break .

    A c om m erc i al syst e m i s c u rrent l yavai lab le and has been inst a l led on anum ber of br idges.

    I n g rout ed c ables , t he a t t enuat i on o ft he w ave is s ign i f i c an t l y h igher t hanin the ungrout ed c ab les .

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    34/38

    NDT For St ay Cab les

    There is not a s i ngle m eth od t hat w ouldprov ide answ ers for a l l t he quest ionsregard ing t he c ondi t ion o f s tay c ab les .

    I n most c ases , i t i s t he comb ina t i on o f NDTt echn iques toge ther w i th t he ex per ience ,

    k now ledge, and judgm ent o f eng ineers ,inspec t o rs and t echn ic ians t hat c an leadt o the appropr iat e answ er .

    The e ffec t i veness and accu racy o f many o ft he met hods desc r ibed above w ou ld bes ign i f icant ly enhanc ed i f base l inec om para t ive measurem ents are ava ilab le .

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    35/38

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    36/38

    Rec om m endat ions (Cont .)

    Pe rform research on t he feasibi l i t y o fbu i l t -in or rem ot e inspec t ion andim ag ing sys t em s fo r mon i t o r ing o fMTE c ond it ions in t he c ab les(espec ia l ly anc horages) forincorpora t ion in to new c ab ledesigns.

    Perform researc h on iden t i fy ing

    appropr ia t e c ho ic e and use o fc om binat ions of NDE m et hods basedon t he c ondi t ions a t hand.

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    37/38

    Rec om m endat ions (Cont .)

    Pe rform research on feasibi l i t y o fg lobal , 3-d im esional , physic alm apping o f s t ay cab les .

    St udy t he c reat ion of a nat ional

    resourc e for in form at ion on s t ayc ables and c able-s t ayed br idges

    St udy c reat ion o f period ic t ra ining

    program s for s t a t e eng ineers andinspectors .

  • 7/31/2019 18-MaintenanceandInspectionofBridgeStayCableSystems

    38/38

    Thank You