17734529 wimax project planning
TRANSCRIPT
-
8/6/2019 17734529 Wimax Project Planning
1/29
HCL INFOSYSTEMHCL INFOSYSTEM
WIWI--MAXMAX
-
8/6/2019 17734529 Wimax Project Planning
2/29
Requirement of WiRequirement of Wi--MAXMAX
To extend reach and coverage, WiMAXTo extend reach and coverage, WiMAXintends to cater voice, video and dataintends to cater voice, video and data
service requirements of customers.service requirements of customers. To extend wire free reach/coverage toTo extend wire free reach/coverage to
cluster/pockets with limited or no wirecluster/pockets with limited or no wire--line (Fiber/Copper) coverage.line (Fiber/Copper) coverage.
To provide IP and TDM services.To provide IP and TDM services.
To provide Quality of services.To provide Quality of services.
-
8/6/2019 17734529 Wimax Project Planning
3/29
P2MP ArchitectureP2MP Architecture
Bharti IP-MPLSNetwork
Bharti InternetNetwork
WWWLocation 1
)))))))))))))))))))
Location 2
)))))))))))))))))))
VLAN 1
VLAN 2
VLAN 1
Internet Traffic
MPLS Traffic
Location 3
)))))))))))))))))))
VLAN 1
-
8/6/2019 17734529 Wimax Project Planning
4/29
Service ArchitectureService Architecture
Bharti I
-
et
rk
Bharti I ter et
et
rk
F
B/Micr
ave
Backhaul
C
E 2
C
E 3
i t t Multip i t
i t t
i t
i-
de
E
I/Part er
DXC
Bharti
D
M
et
rk
G 703,
,35
Poit to poi
t
Ether
et
-
8/6/2019 17734529 Wimax Project Planning
5/29
AgendaAgenda
1.RF1.RF--PlanningPlanning
2.Site Survey2.Site SurveyBase Station (BS) SiteBase Station (BS) Site
Subscriber Station (SS) Site.Subscriber Station (SS) Site.
3.Installation & Commissioning3.Installation & CommissioningBS (Base station )BS (Base station )SS (Subscriber station)SS (Subscriber station)
4.Acceptance Test Procedure4.Acceptance Test ProcedurePre AT ChecksPre AT ChecksPhysical ATPhysical ATFinal ATFinal AT
-
8/6/2019 17734529 Wimax Project Planning
6/29
6) Optimization6) Optimization..Drive TestDrive TestPhysical validationPhysical validationCustomer complain.Customer complain.
-
8/6/2019 17734529 Wimax Project Planning
7/29
RFRF--PlanningPlanning
-
8/6/2019 17734529 Wimax Project Planning
8/29
Details Required for RFDetails Required for RF--PlanningPlanning
1.1. Detail of Already exist sites.Detail of Already exist sites.
2.2. Hot spots to be covered.Hot spots to be covered.
3.3. Existing Customer Detail.Existing Customer Detail.4.4. Customer Requirement.Customer Requirement.
5.5. Specification of BTS and CPE.Specification of BTS and CPE.
6.6. No. of CPE support by the BTS.No. of CPE support by the BTS.
-
8/6/2019 17734529 Wimax Project Planning
9/29
Steps for RFSteps for RF--PlanningPlanning
Area Survey to check hot spotsArea Survey to check hot spots
Details of clutter of area.Details of clutter of area. Location of BSLocation of BS
Sectorial orientationSectorial orientation
Location of CPELocation of CPE Link feasibilityLink feasibility
-
8/6/2019 17734529 Wimax Project Planning
10/29
Result of RFResult of RF--PlanningPlanning
1.1. Total Numbers of BS site Required.Total Numbers of BS site Required.
2.2. Optimum Location of BS site.Optimum Location of BS site.
3.3. Coverage Area of BS.Coverage Area of BS.4.4. No. of sector required per BTS.No. of sector required per BTS.
5.5. Total BoQ, TSSR required.Total BoQ, TSSR required.
6.6. Customer site feasibility.Customer site feasibility.7.7. Throughput required per CPE.Throughput required per CPE.
-
8/6/2019 17734529 Wimax Project Planning
11/29
Tools required for RFTools required for RF--PlanningPlanning
Spectrum AnalyzerSpectrum Analyzer
RF PlanningRF Planning--ToolTool
Map infoMap info
MIPT2GMIPT2G
Digital MAPDigital MAP
Frequency MeterFrequency Meter
-
8/6/2019 17734529 Wimax Project Planning
12/29
SITE SURVEYSITE SURVEY
-
8/6/2019 17734529 Wimax Project Planning
13/29
Site surveySite survey
1) Check for basic Infra material like tower, specification1) Check for basic Infra material like tower, specificationof pole, presence of electricity.of pole, presence of electricity.
2) Existing Radiation Patterns (Height and azimuth of2) Existing Radiation Patterns (Height and azimuth of
Anteena,Microwave)Anteena,Microwave)
3) Space in the BS site, parabolic photo, cable length ,CPE3) Space in the BS site, parabolic photo, cable length ,CPEsurvey ,LOS, place for CPE mounting.survey ,LOS, place for CPE mounting.
4)4) Making of site survey Report, with building,shelter,layMaking of site survey Report, with building,shelter,layout diagrams.out diagrams.
5)5) Pole at CPE and Tower Extention at BS if requiredPole at CPE and Tower Extention at BS if required
Team size 1 Engineer + 1 TechnicianTeam size 1 Engineer + 1 Technician
-
8/6/2019 17734529 Wimax Project Planning
14/29
Tools Required For SiteTools Required For Site--SurveySurvey
1.1. GPSGPS
2.2. Digital CameraDigital Camera
3.3. Measuring TapeMeasuring Tape4.4. CompassCompass
5.5. BinocularBinocular
-
8/6/2019 17734529 Wimax Project Planning
15/29
Proposed poleProposed pole
-
8/6/2019 17734529 Wimax Project Planning
16/29
GPS Location Building Top view Building side view
Inside shelter diagramRadiation PatternObstruction Details
-
8/6/2019 17734529 Wimax Project Planning
17/29
Installation&CommissioningInstallation&Commissioning
-
8/6/2019 17734529 Wimax Project Planning
18/29
Tools for Installation & CommissioningTools for Installation & Commissioning
1)1) Standared Tool kit.Standared Tool kit.Drilled machineDrilled machine
Crimping toolCrimping tool
Spanner set(7Spanner set(7--32)32)Screw driver setScrew driver set
Safety kitSafety kit
2)2) Test EquipmentTest Equipment
VSWR meterVSWR meterPower meterPower meter
LaptopLaptop
-
8/6/2019 17734529 Wimax Project Planning
19/29
Installation ProcedureInstallation Procedure1.1. Pre Installation checklist.Pre Installation checklist.2.2. Installation of IDU,GPSInstallation of IDU,GPS--SSU.SSU.3.3. Installation of ODU and Antenna.Installation of ODU and Antenna.4.4. Installation of required switches and router, converter.Installation of required switches and router, converter.5.5. Routing.Routing.
6.6. Earthing.Earthing.7.7. Labeling.Labeling.8.8. Power connectionPower connection9.9. GPS InstallationGPS Installation10.10. Installation ofSSInstallation ofSS--AntennaAntenna11.11. Post Installation checklist.Post Installation checklist.
Team size 1 Engineer + 2 Technician + 1 RiggerTeam size 1 Engineer + 2 Technician + 1 Rigger
-
8/6/2019 17734529 Wimax Project Planning
20/29
I ED URGE RRE OR
-
8/6/2019 17734529 Wimax Project Planning
21/29
2M oop to Jumper cable
-
8/6/2019 17734529 Wimax Project Planning
22/29
Jumper cablefrom to IDU
IF Cable routi e fr om Hatch plate to
IF Cable e teri g i rack
-
8/6/2019 17734529 Wimax Project Planning
23/29
CommissioningCommissioning
1)1) Commissioning of BS site including , required switches,Commissioning of BS site including , required switches,router and converter at site.router and converter at site.
2)2) Integration with NMS.Integration with NMS.
3)3) Commissioning ofSS siteCommissioning ofSS site4)4) Integration with BS & NMS.Integration with BS & NMS.
Team size 1 EngineerTeam size 1 Engineer
-
8/6/2019 17734529 Wimax Project Planning
24/29
Acceptance TestAcceptance Test
-
8/6/2019 17734529 Wimax Project Planning
25/29
Acceptance Test ProcedureAcceptance Test Procedure
1)1) Pre AT Checks including proper routing of cablesPre AT Checks including proper routing of cablesaccording to standards, loose connection and fault inaccording to standards, loose connection and fault injumper if any which also include the physical AT.jumper if any which also include the physical AT.
2)2) Details of BS
and CPEDetails of BS
and CPE3)3) LinkLink AvailabilityAvailability
4)4) ThroughputThroughput relatedrelated
5)5) Quality related (latency, Packet loss, jitter etc.)Quality related (latency, Packet loss, jitter etc.)
6) End to end Service Testing, Ping response.7)7) Final AT done with the customer and hand over to theFinal AT done with the customer and hand over to the
Customer.Customer.
Team size 1 Engineer + 1 TechnicianTeam size 1 Engineer + 1 Technician
-
8/6/2019 17734529 Wimax Project Planning
26/29
OptimizationOptimization
-
8/6/2019 17734529 Wimax Project Planning
27/29
Drive TestDrive Test
After completion of site to check theAfter completion of site to check theparameter whichparameter whichWe planned for the networks.We planned for the networks.
2)2) Physical ChangesPhysical ChangesPhysical Changes needs to be donePhysical Changes needs to be doneLike swapping, Handover, change the tilt ,Like swapping, Handover, change the tilt ,height and the azimuth of the sector for theheight and the azimuth of the sector for thegood coverage.good coverage.
3) Drive Test On customer complain or For3) Drive Test On customer complain or ForInfiller sites.Infiller sites.
Team size 1 Engineer + 1 RiggerTeam size 1 Engineer + 1 Rigger
-
8/6/2019 17734529 Wimax Project Planning
28/29
EVERYBODY IN THE NETWORKEVERYBODY IN THE NETWORK
-
8/6/2019 17734529 Wimax Project Planning
29/29