  • 8/6/2019 17734529 Wimax Project Planning

    1/29

    HCL INFOSYSTEMHCL INFOSYSTEM

    WIWI--MAXMAX

  • 8/6/2019 17734529 Wimax Project Planning

    2/29

    Requirement of WiRequirement of Wi--MAXMAX

    To extend reach and coverage, WiMAXTo extend reach and coverage, WiMAXintends to cater voice, video and dataintends to cater voice, video and data

    service requirements of customers.service requirements of customers. To extend wire free reach/coverage toTo extend wire free reach/coverage to

    cluster/pockets with limited or no wirecluster/pockets with limited or no wire--line (Fiber/Copper) coverage.line (Fiber/Copper) coverage.

    To provide IP and TDM services.To provide IP and TDM services.

    To provide Quality of services.To provide Quality of services.

  • 8/6/2019 17734529 Wimax Project Planning

    3/29

    P2MP ArchitectureP2MP Architecture

    Bharti IP-MPLSNetwork

    Bharti InternetNetwork

    WWWLocation 1

    )))))))))))))))))))

    Location 2

    )))))))))))))))))))

    VLAN 1

    VLAN 2

    VLAN 1

    Internet Traffic

    MPLS Traffic

    Location 3

    )))))))))))))))))))

    VLAN 1

  • 8/6/2019 17734529 Wimax Project Planning

    4/29

    Service ArchitectureService Architecture

    Bharti I

    -

    et

    rk

    Bharti I ter et

    et

    rk

    F

    B/Micr

    ave

    Backhaul

    C

    E 2

    C

    E 3

    i t t Multip i t

    i t t

    i t

    i-

    de

    E

    I/Part er

    DXC

    Bharti

    D

    M

    et

    rk

    G 703,

    ,35

    Poit to poi

    t

    Ether

    et

  • 8/6/2019 17734529 Wimax Project Planning

    5/29

    AgendaAgenda

    1.RF1.RF--PlanningPlanning

    2.Site Survey2.Site SurveyBase Station (BS) SiteBase Station (BS) Site

    Subscriber Station (SS) Site.Subscriber Station (SS) Site.

    3.Installation & Commissioning3.Installation & CommissioningBS (Base station )BS (Base station )SS (Subscriber station)SS (Subscriber station)

    4.Acceptance Test Procedure4.Acceptance Test ProcedurePre AT ChecksPre AT ChecksPhysical ATPhysical ATFinal ATFinal AT

  • 8/6/2019 17734529 Wimax Project Planning

    6/29

    6) Optimization6) Optimization..Drive TestDrive TestPhysical validationPhysical validationCustomer complain.Customer complain.

  • 8/6/2019 17734529 Wimax Project Planning

    7/29

    RFRF--PlanningPlanning

  • 8/6/2019 17734529 Wimax Project Planning

    8/29

    Details Required for RFDetails Required for RF--PlanningPlanning

    1.1. Detail of Already exist sites.Detail of Already exist sites.

    2.2. Hot spots to be covered.Hot spots to be covered.

    3.3. Existing Customer Detail.Existing Customer Detail.4.4. Customer Requirement.Customer Requirement.

    5.5. Specification of BTS and CPE.Specification of BTS and CPE.

    6.6. No. of CPE support by the BTS.No. of CPE support by the BTS.

  • 8/6/2019 17734529 Wimax Project Planning

    9/29

    Steps for RFSteps for RF--PlanningPlanning

    Area Survey to check hot spotsArea Survey to check hot spots

    Details of clutter of area.Details of clutter of area. Location of BSLocation of BS

    Sectorial orientationSectorial orientation

    Location of CPELocation of CPE Link feasibilityLink feasibility

  • 8/6/2019 17734529 Wimax Project Planning

    10/29

    Result of RFResult of RF--PlanningPlanning

    1.1. Total Numbers of BS site Required.Total Numbers of BS site Required.

    2.2. Optimum Location of BS site.Optimum Location of BS site.

    3.3. Coverage Area of BS.Coverage Area of BS.4.4. No. of sector required per BTS.No. of sector required per BTS.

    5.5. Total BoQ, TSSR required.Total BoQ, TSSR required.

    6.6. Customer site feasibility.Customer site feasibility.7.7. Throughput required per CPE.Throughput required per CPE.

  • 8/6/2019 17734529 Wimax Project Planning

    11/29

    Tools required for RFTools required for RF--PlanningPlanning

    Spectrum AnalyzerSpectrum Analyzer

    RF PlanningRF Planning--ToolTool

    Map infoMap info

    MIPT2GMIPT2G

    Digital MAPDigital MAP

    Frequency MeterFrequency Meter

  • 8/6/2019 17734529 Wimax Project Planning

    12/29

    SITE SURVEYSITE SURVEY

  • 8/6/2019 17734529 Wimax Project Planning

    13/29

    Site surveySite survey

    1) Check for basic Infra material like tower, specification1) Check for basic Infra material like tower, specificationof pole, presence of electricity.of pole, presence of electricity.

    2) Existing Radiation Patterns (Height and azimuth of2) Existing Radiation Patterns (Height and azimuth of

    Anteena,Microwave)Anteena,Microwave)

    3) Space in the BS site, parabolic photo, cable length ,CPE3) Space in the BS site, parabolic photo, cable length ,CPEsurvey ,LOS, place for CPE mounting.survey ,LOS, place for CPE mounting.

    4)4) Making of site survey Report, with building,shelter,layMaking of site survey Report, with building,shelter,layout diagrams.out diagrams.

    5)5) Pole at CPE and Tower Extention at BS if requiredPole at CPE and Tower Extention at BS if required

    Team size 1 Engineer + 1 TechnicianTeam size 1 Engineer + 1 Technician

  • 8/6/2019 17734529 Wimax Project Planning

    14/29

    Tools Required For SiteTools Required For Site--SurveySurvey

    1.1. GPSGPS

    2.2. Digital CameraDigital Camera

    3.3. Measuring TapeMeasuring Tape4.4. CompassCompass

    5.5. BinocularBinocular

  • 8/6/2019 17734529 Wimax Project Planning

    15/29

    Proposed poleProposed pole

  • 8/6/2019 17734529 Wimax Project Planning

    16/29

    GPS Location Building Top view Building side view

    Inside shelter diagramRadiation PatternObstruction Details

  • 8/6/2019 17734529 Wimax Project Planning

    17/29

    Installation&CommissioningInstallation&Commissioning

  • 8/6/2019 17734529 Wimax Project Planning

    18/29

    Tools for Installation & CommissioningTools for Installation & Commissioning

    1)1) Standared Tool kit.Standared Tool kit.Drilled machineDrilled machine

    Crimping toolCrimping tool

    Spanner set(7Spanner set(7--32)32)Screw driver setScrew driver set

    Safety kitSafety kit

    2)2) Test EquipmentTest Equipment

    VSWR meterVSWR meterPower meterPower meter

    LaptopLaptop

  • 8/6/2019 17734529 Wimax Project Planning

    19/29

    Installation ProcedureInstallation Procedure1.1. Pre Installation checklist.Pre Installation checklist.2.2. Installation of IDU,GPSInstallation of IDU,GPS--SSU.SSU.3.3. Installation of ODU and Antenna.Installation of ODU and Antenna.4.4. Installation of required switches and router, converter.Installation of required switches and router, converter.5.5. Routing.Routing.

    6.6. Earthing.Earthing.7.7. Labeling.Labeling.8.8. Power connectionPower connection9.9. GPS InstallationGPS Installation10.10. Installation ofSSInstallation ofSS--AntennaAntenna11.11. Post Installation checklist.Post Installation checklist.

    Team size 1 Engineer + 2 Technician + 1 RiggerTeam size 1 Engineer + 2 Technician + 1 Rigger

  • 8/6/2019 17734529 Wimax Project Planning

    20/29

    I ED URGE RRE OR

  • 8/6/2019 17734529 Wimax Project Planning

    21/29

    2M oop to Jumper cable

  • 8/6/2019 17734529 Wimax Project Planning

    22/29

    Jumper cablefrom to IDU

    IF Cable routi e fr om Hatch plate to

    IF Cable e teri g i rack

  • 8/6/2019 17734529 Wimax Project Planning

    23/29

    CommissioningCommissioning

    1)1) Commissioning of BS site including , required switches,Commissioning of BS site including , required switches,router and converter at site.router and converter at site.

    2)2) Integration with NMS.Integration with NMS.

    3)3) Commissioning ofSS siteCommissioning ofSS site4)4) Integration with BS & NMS.Integration with BS & NMS.

    Team size 1 EngineerTeam size 1 Engineer

  • 8/6/2019 17734529 Wimax Project Planning

    24/29

    Acceptance TestAcceptance Test

  • 8/6/2019 17734529 Wimax Project Planning

    25/29

    Acceptance Test ProcedureAcceptance Test Procedure

    1)1) Pre AT Checks including proper routing of cablesPre AT Checks including proper routing of cablesaccording to standards, loose connection and fault inaccording to standards, loose connection and fault injumper if any which also include the physical AT.jumper if any which also include the physical AT.

    2)2) Details of BS

    and CPEDetails of BS

    and CPE3)3) LinkLink AvailabilityAvailability

    4)4) ThroughputThroughput relatedrelated

    5)5) Quality related (latency, Packet loss, jitter etc.)Quality related (latency, Packet loss, jitter etc.)

    6) End to end Service Testing, Ping response.7)7) Final AT done with the customer and hand over to theFinal AT done with the customer and hand over to the

    Customer.Customer.

    Team size 1 Engineer + 1 TechnicianTeam size 1 Engineer + 1 Technician

  • 8/6/2019 17734529 Wimax Project Planning

    26/29

    OptimizationOptimization

  • 8/6/2019 17734529 Wimax Project Planning

    27/29

    Drive TestDrive Test

    After completion of site to check theAfter completion of site to check theparameter whichparameter whichWe planned for the networks.We planned for the networks.

    2)2) Physical ChangesPhysical ChangesPhysical Changes needs to be donePhysical Changes needs to be doneLike swapping, Handover, change the tilt ,Like swapping, Handover, change the tilt ,height and the azimuth of the sector for theheight and the azimuth of the sector for thegood coverage.good coverage.

    3) Drive Test On customer complain or For3) Drive Test On customer complain or ForInfiller sites.Infiller sites.

    Team size 1 Engineer + 1 RiggerTeam size 1 Engineer + 1 Rigger

  • 8/6/2019 17734529 Wimax Project Planning

    28/29

    EVERYBODY IN THE NETWORKEVERYBODY IN THE NETWORK

  • 8/6/2019 17734529 Wimax Project Planning

    29/29