16th march 2005, eng target a.fabich, cern ab/atb 1 status of the tt2a target experiment status of...
TRANSCRIPT
16th March 200516th March 2005, ENG target, ENG target A.Fabich, CERN AB/ATBA.Fabich, CERN AB/ATB 11
Status of the TT2AStatus of the TT2Atarget experiment target experiment
A.FabichA.FabichCERN AB/ATBCERN AB/ATB
ENG/BENE meeting, CERN, 16ENG/BENE meeting, CERN, 16thth March 2005 March 2005
16th March 200516th March 2005 A.Fabich, CERN AB/ATBA.Fabich, CERN AB/ATB 22
Approval StatusApproval Status
APPROVEDAPPROVED by the research board CERN by the research board CERN 2.Dec.2004: … The proposal was approved by the Research 2.Dec.2004: … The proposal was approved by the Research
Board, subject to further clarification of the resources …Board, subject to further clarification of the resources … 3.March 2005: fully approved (oral information)3.March 2005: fully approved (oral information)
CERN experiment database: CERN experiment database: http://greybook.cern.chhttp://greybook.cern.ch : : nToF11nToF11
16th March 200516th March 2005 A.Fabich, CERN AB/ATBA.Fabich, CERN AB/ATB 33
SafetySafety
In close collaboration with Safety Commission (SC)In close collaboration with Safety Commission (SC)
No obstaclesNo obstacles
Hot issues (mercury, activation, …) evaluatedHot issues (mercury, activation, …) evaluated
Basic procedures and specifications defined for safe operationBasic procedures and specifications defined for safe operation
16th March 200516th March 2005 A.Fabich, CERN AB/ATBA.Fabich, CERN AB/ATB 44
NOMINAL target testNOMINAL target test
Target: 1-cm diameter mercury jet, v=20 m/sTarget: 1-cm diameter mercury jet, v=20 m/s Proton beam: 24 GeV, <28x10Proton beam: 24 GeV, <28x101212 ppp, total of 100 pulses ppp, total of 100 pulses Meson capture: 15 Tesla solenoid field (pulsed)Meson capture: 15 Tesla solenoid field (pulsed)
Study …Study … proton induced shocksproton induced shocks Magneto-fluid-dynamicsMagneto-fluid-dynamics Secondary particle yieldSecondary particle yield
16th March 200516th March 2005 A.Fabich, CERN AB/ATBA.Fabich, CERN AB/ATB 55
Mercury loop, targetMercury loop, targetPump Motor
CentrifugalPump w/MagneticCoupling
Hg Jet Containment
Sump Tank
Secondary Containment
Target Module
V.Graves, ORNL
16th March 200516th March 2005 A.Fabich, CERN AB/ATBA.Fabich, CERN AB/ATB 66
Pump SystemsPump Systems
Hydraulic Pump, Reservoir,& Flow Control Valve
EM centrifugal pumpEM centrifugal pump
oror
Hydraulic piston pumpHydraulic piston pump
16th March 200516th March 2005 A.Fabich, CERN AB/ATBA.Fabich, CERN AB/ATB 77
15 T pulsed solenoid15 T pulsed solenoid 33rdrd coil production completed coil production completed Integration into cryostat startsIntegration into cryostat starts Testing scheduled in summer 2005 at MITTesting scheduled in summer 2005 at MIT
P.Titus, MIT
16th March 200516th March 2005 A.Fabich, CERN AB/ATBA.Fabich, CERN AB/ATB 88
… … on the beam lineon the beam line
Solenoid
ProtonBeam
Hg DeliverySystem
BeamAttenuator
V.Graves, ORNL
16th March 200516th March 2005 A.Fabich, CERN AB/ATBA.Fabich, CERN AB/ATB 99
Cryogenic systemCryogenic system Base line scenarioBase line scenario
Final design dependent on Final design dependent on performance tests at MITperformance tests at MIT
16th March 200516th March 2005 A.Fabich, CERN AB/ATBA.Fabich, CERN AB/ATB 1010
Power supplyPower supply
Reuse existing Reuse existing CERN power CERN power supplysupply
Previously used for extraction Previously used for extraction towards SPS West Areatowards SPS West Area
Rated: <900 V, <8kARated: <900 V, <8kA
Required: 740 V, 7.2 kARequired: 740 V, 7.2 kA
100 kChF for refurbishment and 100 kChF for refurbishment and installationinstallation
16th March 200516th March 2005 A.Fabich, CERN AB/ATBA.Fabich, CERN AB/ATB 1111
TT2A PeripheryTT2A Periphery
A. Fabich
Equipment
Control Room
PS beam
ISRexperiment
Control room
16th March 200516th March 2005 A.Fabich, CERN AB/ATBA.Fabich, CERN AB/ATB 1212
Primary ContainmentPrimary ContainmentHg Jet Z=0 Viewport
SecondaryContainment
PrimaryContainment
ProtonBeam
16th March 200516th March 2005 A.Fabich, CERN AB/ATBA.Fabich, CERN AB/ATB 1313
Optical DiagnosticsRetro-reflected design, Optical high speed recording (<1 MHz)
One set of opticsper viewport
e-Drawing - Van Graves, ORNLe-Drawing - Van Graves, ORNL
T.Tsang, BNL
16th March 200516th March 2005 A.Fabich, CERN AB/ATBA.Fabich, CERN AB/ATB 1414
Secondary particle yieldSecondary particle yield• momentum p = 24 GeV/c• 4 bunches within 8 PS buckets at our discretion• tpulse= 0.5-2 microseconds• tbunch=50ns full length, peak-to-peak 250 ns• < 7 TP per bunch, total intensity < 28 TP/pulse• spot size at target: <2 mm r.m.s.
Pump-Probe method for cavitation studies and secondary meson yield
16th March 200516th March 2005 A.Fabich, CERN AB/ATBA.Fabich, CERN AB/ATB 1515
Time scheduleTime schedule 20052005
MarchMarch nToF11 approvednToF11 approved SpringSpring solenoid construction completedsolenoid construction completed SummerSummer solenoid testssolenoid tests WinterWinter construction of Hg systemconstruction of Hg system
20062006 AprilApril solenoid test finishedsolenoid test finished JuneJune solenoid shipped to CERNsolenoid shipped to CERN autumnautumn integrated test at CERNintegrated test at CERN DecDec fully ready for beamfully ready for beam
20072007 AprilApril final run at PS start-upfinal run at PS start-up
Budget: ~2.5 M$