160316 ex401 rebuild welding report
TRANSCRIPT
REPAIR REPORT
EX401
WELDING REBUILD: Bucket; Boom; Cascade Room; superstructure; Engine Module;
Date of Rebuild: Feb-March 2016
NDT Technique: Magnetic Particle Test
Weld Rebuild report: Ray Krueger
1 | P a g e G G M A s s e t M a n a g e m e n t & R e l i a b i l i t y
20th Sept 2015
REPAIR REPORTREPAIR COMPLETED FOR FRONT CLAM EX401—340FW2
2 | P a g e G G M A s s e t M a n a g e m e n t & R e l i a b i l i t y
Chromium Carbide plates fitted to Both walls in and outside and also the floor.
Build up adaptor stations to fit template
REPAIR REPORT
3 | P a g e G G M A s s e t M a n a g e m e n t & R e l i a b i l i t y
Cut out worn section of side wall on both sides and replace with new plate 25mm, weldox 400 or A514 plate.
Refer to Ray for exact position of cut.
REPLACEMENT REAR SIDE WALL SECTIONS FITTED AND WELDED TO PROCEDURE.
REPAIR REPORT
4 | P a g e G G M A s s e t M a n a g e m e n t & R e l i a b i l i t y
All bars removed and replaced with chromium Carbide after all cracks repaired
Replace complete impact bar across back of Jaw
Cracks repaired , new chromium carbide fitted and new impact block
New Chromium Carbide floor
New corner blocks, new wear package on outside walls
REPAIR REPORT
COMPLETED FRONT CLAM
BACK WALL OF BUCKET REPAIRS
5 | P a g e G G M A s s e t M a n a g e m e n t & R e l i a b i l i t y
WEAR PACKAGE FITTED, CRACKS REPAIRED
REPAIR REPORTCOMPLETED BUCKET
EX401 BOOM REPAIR:
Major cracks continually developing from the man hole.
6 | P a g e G G M A s s e t M a n a g e m e n t & R e l i a b i l i t y
Complete removal of stressed section and fully weld in position.
REPAIR REPORT
7 | P a g e G G M A s s e t M a n a g e m e n t & R e l i a b i l i t y
Fully welded and back gouged from inside and fully welded both sides. Full pre heat and quality welds with stress relieving peening.
FINISHED REPAIR TO MANHOLE AND FULL REPAIRS TO ALL PADS.
REPAIR REPORT
8 | P a g e G G M A s s e t M a n a g e m e n t & R e l i a b i l i t y
POOR QUALITY WELDING ON BLOCKS ON BOOM, THAT HAVE LED TO CRACKS.
COMPLETE REPAIR OF CRACKS AND REWELDING OF PADS TO CORRECT STANDARD FOLLOWING ALL WELD PROCEDURES.
BOOM CONTINUED
REPAIR REPORT
Superstructure repairs
9 | P a g e G G M A s s e t M a n a g e m e n t & R e l i a b i l i t y
REPAIR REPORTCOMPLETE FULLY GOUGE AND REWELD
CASCADE ROOM REPAIRS:
10 | P a g e G G M A s s e t M a n a g e m e n t & R e l i a b i l i t y
MULTIPLE CRACKS IN WALLS AND AROUND MOUNTING BLOCKS.
REPAIR REPORT
11 | P a g e G G M A s s e t M a n a g e m e n t & R e l i a b i l i t y
GOUGING AND WELDING ALL CRACKS AND BACK GOUGED AND WELDED FROM INSIDE WHERE POSSIBLE.
FULLY WELDED AND BLENDED
REPAIR REPORT EX401 ENGINE MODULE
ALL CRACKED SECTIONS REMOVED AND REPAIRED.
12 | P a g e G G M A s s e t M a n a g e m e n t & R e l i a b i l i t y
REPAIR REPORTNDT Technician - Comments
1.2.3.4.5.
Welding Supervisor - Comments
1.2.3.4.5.
Condition Monitoring & Reliability - Comments
1.2.3.4.5.