160206_gooddata
TRANSCRIPT
![Page 1: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/1.jpg)
BIM Data ConsultantsBIM Singularity
Good Data Management“Today, Tomorrow &
Beyond”Andy HamerBIM Data Consultant | BIM Evangelist | Certified BIM Project Manager
![Page 2: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/2.jpg)
![Page 3: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/3.jpg)
Available Today
• Multiple Models• 3D Design Platforms• Offices • Stakeholders• Time Zones• Continents
Capturing, Managing, Validating Data In Real-Time Collaboration Across:
![Page 4: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/4.jpg)
Data Information Knowledge Knowledge Centric Design
Building Lifecycle
Increasing Value
• PAS1192• Design 2 Operations• CAPEX 2 OPEX• PIM 2 AIM
Common Data Environment
Data Centric
![Page 5: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/5.jpg)
CHUM Montreal
![Page 6: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/6.jpg)
ROI Project Time• Saves over 40 weeks*• Impact is cumulative• Drives good practice• Improves productivity• Reduces cost
* Source: NBBJ
Got your attention Now!
![Page 7: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/7.jpg)
Authors
FormatsRelationships
Interconnected
![Page 8: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/8.jpg)
DataRelationships
3D Design Solutions
BIM Data Management
Software
3rd Party Briefing Program
Equipment Manufacturer / Service VendorDocumentation
EstimatingSoftware
ProcurementSoftware
SchedulingSoftware
Installation, Testing &
ComplianceSoftware
& Document's
Facilities Management
Software
DataSources
Architect
Briefing Program
Interior Designer
3rd Party Engineers
ConstructionOwner / Operator
Supplier
Installer
Maintainer
Fragmented
![Page 9: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/9.jpg)
Isolation
![Page 10: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/10.jpg)
170 Million Books
Unlock, Liberate, Socialise & Googlise Data
![Page 11: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/11.jpg)
Social > Connected > Integrated
Single Source of Truth
![Page 12: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/12.jpg)
Lets kills the myths!
![Page 13: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/13.jpg)
BIMPAS1192
OrganizationalInformation Requirement
(OIR)
ORGANIZATIONAL WHAT
Employers Information Requirement
(EIR)
PROJECT WHAT
BIM Execution Plan(BEP)
HOW
Master Information Delivery Plan
(MIDP)
WHEN
Close Out Handover
VALIDATE
Operations• What• Who• How• When• Validate• Feedback
Process
Standardised Process, Workflow & Procedure
![Page 14: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/14.jpg)
• One to Many• Accurate• Accessible• Attributable• Auditable• Bi-directional• Classifications• Centralised• Consistency• Co-ordinate• Collaboration • Database• Enterprise• Exportable• Federated• Interoperable• Libraries
• SQL • Real Time• Reportable• Relational• Revisable• Secure• Standardisation• Structured• Store Doc’s, Links & Files• Transparent• Transportable• Trusted• Unlocked• Unlimited – Data Fields / Database• Valuable• Validated
Attributes
“Do you meet the Hamer Test?”
![Page 15: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/15.jpg)
• Time• Money• Implementation• Training• People• Processes• Technology
Investment
It can’t be achieved in your spare time
![Page 16: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/16.jpg)
Solutions
Proven Performance
![Page 17: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/17.jpg)
Contact
+ 44 (0) 1276 537 282 / + 1 858 888 9048 / + 44 (0) 7912 869 976
andyhamer
![Page 18: 160206_GoodData](https://reader036.vdocuments.us/reader036/viewer/2022070513/58893dd31a28ab22578b6cff/html5/thumbnails/18.jpg)