Basic Objectives Reservoir
The purpose of storing water is to meet balancing requirements and plannedshut-downs. The balancing volume is required to cater for peak outflows whilea constant (or variable) inlet flow is being received. Water needs will usuallyvary between morning and evening. If clean water is unavailable, then theinstallation must be capable of supplying water processing a huge need,especially at peak time (peak hour demand reached 1.27 times the averagedaily requirement). For the possibility that water processing installation shallhave a capacity of about 2 time of the average daily requirement, if notavailable reservoir. With a reservoir (reservoir) is adequate, then the watertreated and distributed only by the amount of the distribution network inaccordance with the needs of the daily average
Volume Reservoir
A. Services ReservoirVolume reservoir services or services reservoir is determined by
The maximum volume of water that must be accommodated atthe minimum water usage plus the volume of water that must beprovided during hours of peak flux fluctuations due to waterconsumption in its service area and the period of reservoir filling.
The water supply for the city fire department in accordance withexisting regulations for the local Fire Department.
The need for special water, draining the reservoir, parks andspecial events.
B. Balancing reservoir
Effective reservoir volume balance or the balance is determined bythe balance reservoir outflow and inflow of water in the reservoirduring the use of the service area. System filling reservoir and pumpsystem can be gravity.Water supply to consumers conducted by gravity.
Effective reservoir volume calculation method:1) The tabulation , By way of tabulation, effective volume is the
largest positive gap amount (m3) and the biggest difference isnegative (m3) between fluctuations in water use and supply water tothe reservoir. The results of calculation of the cumulative value arecreated in table form.2) Method of the curveEffective volume obtained from the largest percentage of theaccumulated surplus plus the accumulated deficit of water use wateruse to the greatest accumulation of runoff water into the reservoir
1
-
7/31/2019 16 Offtake -Reservoir Umbulan
2/34
(where the drainage of water into the reservoir for 24 hours).3) The percentage ofEffective volume was set at a percentage of the maximum waterdemand per day at least 15%. Determination in this way depends onthe habits of the city is concerned, because it must be based on
experience.
The design of the reservoirs themselves for the design of coveredservice reservoirs for the storage of potable drinking water. Essentiallyboth reservoirs are large concrete storage tanks. The common designfeatures on both reservoirs which will site below ground level, can besummarized as follows:
Concrete base, walls and fully enclosed roof;
Internal dividing wall to allow for draining of half of each reservoirfor future repair and/or inspection;
Pipe links from the Inlet House to deliver newly treated water intothe reservoirs;
Pipe links to the Outfall House where water is distributed throughthe system to the customers.
2
-
7/31/2019 16 Offtake -Reservoir Umbulan
3/34
PROPOSED WINONGAN RESERVOIR PLAN
Location Off take : Desa Tenggilis RejoDistrict : Kabupaten PasuruanNearest Existing Transmission Pipeline : Jl.Desa MenyarikDistance to the Main pipe line : 2970 mCapacity design : 125 l/secPDAM : Kab Pasuruan
Specification:
1. Reservoir will be build underground and the location is 18 mabove the see level.2. Elevation for the Winongan Reservoir around the 19 m on top the
sea3. Distance from the Pump Station Umbulan to tapping point offtake
is 3500 m with diameter pipe 1800 mm4. Distance from the tapping point to the reservoir is 2970 m and
the pipe diameter 300 mm
3
-
7/31/2019 16 Offtake -Reservoir Umbulan
4/34
The building is generally placed near the reservoir distribution networkat a height sufficient to drain the water properly and evenly to all areasof consumers.
Reservoir Calculation:
OFFTAKE WINONGAN
1 Allocation from Umbulan 125 m3
2 flow rate for a day 10,800 m3
3 Reservoir Capacity Calculation 2,160 m3
4 Area Reservoir With Depth 4 m is 540 m2
5 Add area for Facility around Reservoir 270 m2
6Total Area / Land Requirement forReservoir 810 m2
Note
1Water allocation has been determined byEJPG
2 Flow rate , 125 x 3600 x 24 / 1000
3 take 20 % x Flow rate a day (2)
4 alternative depth 4 m, 5m and 6 m
5 add land using 50 % from reservoir area 50 % x (4) area reservoir
6 point (4) + (5)
Alternative Dimension Reservoir
Alternative Dimension Winongan Reservoir Sequare Rectangular
Cap ReservoirDept
hArea
add50%
TotalArea Length Width Length Width
[m3] [m][m2] [m2] [m2] [m] [m] [m] [m]
4 540 270 810 28 28 41 13
2,160 5 432 216 648 25 25 36 12
6 360 180 540 23 23 33 11
4
-
7/31/2019 16 Offtake -Reservoir Umbulan
5/34
Off TAKE POHJENTREK
Location Off take : Desa Sungi KulonDistrict : KabupatenPasuruananNearest Existing Transmission Pipeline : Jl. Raya PlinggisanDistance to the Main pipe line : 1720 m
Capacity design : 75 l/secPDAM : Kab Pasuruan
Specification:
1. Reservoir will be build elevated above ground2. Elevation for the Pohjentrek offtake around the 18 m on top the
sea3. Distance from Tapping Winongan to tapping point offtake
pohjentrek is 9416 m with diameter pipe 1800 mm
4. Distance from the tapping point to the reservoir pohjentrek is1720 m and the pipe diameter 350 mm
OFFTAKE POHJENTREK
1 Allocation from Umbulan 75 m3
2 flow rate for a day 6,480 m3
3 Reservoir Capacity Calculation 1,296 m3
4 Area Reservoir With Depth 4 m is 324 m2
5 Add area for Facility around Reservoir 162 m2
6
Total Area / Land Requirement for
Reservoir 486 m2
Note
1Water allocation has been determined byEJPG
2 Flow rate , 75 x 3600 x 24 / 1000
3 take 20 % x Flow rate a day (2
4 alternatif depth 4 m, 5m and 6 m
5
-
7/31/2019 16 Offtake -Reservoir Umbulan
6/34
5 add land using 50 % from reservoir area 50 % x (4) area reservoir
6 point (4) + (5)
Alternative Dimention Winongan Reservoir Sequare Rectangular
Cap ReservoirDept
hArea
add50%
TotalArea Length Width Length Width
[m3] [m][m2] [m2] [m2] [m] [m] [m] [m]
4 324 162 486 22 22 31 10
1,296 5 259 130 389 20 20 28 9
6 216 108 324 18 18 26 8
6
-
7/31/2019 16 Offtake -Reservoir Umbulan
7/34
Offtake Pleret
Location Off take : Desa PleretDistrict : Kabupaten PasuruanNearest Existing Transmission Pipeline : Jl. Raya Warung dowoDistance to the Main pipe line : 100 mCapacity design : 110 l/secPDAM : Kota PasuruanCapacity Reservoir Existing : 500 m3
1. Reservoir will be build under ground2. Elevation for the Pleret offtake around the 16 m on top the sea3. Distance from Tapping pohjentrek to reservoir is 180 m with
diameter pipe 250 mm
OFFTAKE PLERET
1 Allocation from Umbulan 110 m3
2 flow rate for a day 9,504 m3
3 Reservoir Capacity Calculation 1,901 m3
4 Area Reservoir With Depth 4 m is 475 m2
5 Add area for Facility around Reservoir 238 m2
6
Total Area / Land Requirement for
Reservoir 713 m2
Note
1Water allocation has been determined byEJPG
2 Flow rate , 110 x 3600 x 24 / 1000
3 take 20 % x Flow rate a day (2)
4 alternatif depth 4 m, 5m and 6 m
5 add land using 50 % from reservoir area 50 % x (4) area reservoir
6 point (4) + (5)
7
-
7/31/2019 16 Offtake -Reservoir Umbulan
8/34
Alternative Dimention Pleret Reservoir Sequare Rectangular
Cap ReservoirDept
hArea
add50%
TotalArea Length Width Length Width
[m3] [m]
[m
2] [m2] [m2] [m] [m] [m] [m]4 475 238 713 27 27 38 13
1,901 5 380 190 570 24 24 34 11
6 317 158 475 22 22 31 10
8
-
7/31/2019 16 Offtake -Reservoir Umbulan
9/34
Off take PIERLocation Off take : Desa PejangkunganDistrict : Kabupaten PasuruanNearest Existing Transmission Pipeline : Jl. Raya KanigoroDistance to the Main pipe line : 2500 m
Capacity design : 100 l/secPDAM : Kota Pasuruan
1. Reservoir will be build elevated above ground2. Elevation for the PIER offtake around the 16 m on top the sea3. Distance from Tapping Pohjentrek to tapping point Pier offtake
is 12000 m with diameter pipe 1700 mm4. Distance from the tapping point to the reservoir pohjentrek is
2500 m and the pipe diameter 300 mm
OFFTAKE PIER
1 Allocation from Umbulan 100 m3
2 flow rate for a day 8,640 m3
3 Reservoir Capacity Calculation 1,728 m3
4 Area Reservoir With Depth 4 m is 432 m2
5 Add area for Facility around Reservoir 216 m2
6 Total Area / Land Requirement for Reservoir 648 m2
Note
1 Water allocation has been determined byEJPG
2 Flow rate , 75 x 3600 x 24 / 1000
3 take 20 % x Flow rate a day (2)
4 alternatif depth 4 m, 5m and 6 m 5 add land using 50 % from reservoir area 50 % x (4) area reservoir
6 point (4) + (5)
9
-
7/31/2019 16 Offtake -Reservoir Umbulan
10/34
Alternative Dimention Pier Reservoir Sequare Rectangular
Cap ReservoirDept
hArea
add50%
TotalArea Length Width Length Width
[m3] [m][m2] [m2] [m2] [m] [m] [m] [m]
4 432 216 648 25 25 36 12
1,728 5 346 173 518 23 23 32 11
6 288 144 432 21 21 30 10
10
-
7/31/2019 16 Offtake -Reservoir Umbulan
11/34
Off take BejiLocation Off take : Desa Gunung SariDistrict : Kabupaten PasuruanNearest Existing Transmission Pipeline : Jl. Raya SidowayahDistance to the Main pipe line : 30 m
Capacity design : 100 l/secPDAM : Kota Pasuruan
1. Reservoir will be build under ground2. Elevation for the Beji offtake around the 17 m on top the sea3. Distance from Tapping Pier to tapping point Beji offtake is 6500
m with diameter pipe 1700 mm4. Distance from the tapping point to the reservoir Beji is 30 m
and the pipe diameter 250 mm
OFFTAKE BEJI
1 Allocation from Umbulan 150 m3
2 flow rate for a day 12,960 m3
3 Reservoir Capacity Calculation 2,592 m3
4 Area Reservoir With Depth 4 m is 648 m2
5 Add area for Facility around Reservoir 324 m2
6 Total Area / Land Requirement for Reservoir 972 m2
Not
e
1Water allocation has been determined byEJPG
2 Flow rate , 150 x 3600 x 24 / 1000
3 take 20 % x Flow rate a day (2)
4 alternatif depth 4 m, 5m and 6 m 5 add land using 50 % from reservoir area 50 % x (4) area reservoir
6 point (4) + (5)
11
-
7/31/2019 16 Offtake -Reservoir Umbulan
12/34
Alternative Dimention Beji Reservoir Sequare Rectangular
Cap ReservoirDept
hArea
add50%
TotalArea Length Width Length Width
[m3] [m][m2] [m2] [m2] [m] [m] [m] [m]
4 648 324 972 31 31 44 15
2,592 5 518 259 778 28 28 40 13
6 432 216 648 25 25 36 12
12
-
7/31/2019 16 Offtake -Reservoir Umbulan
13/34
Off take GempolLocation Off take : Desa WinongDistrict : Kabupaten PasuruanNearest Existing Transmission Pipeline : Jl. Hasan MusadiDistance to the Main pipe line : 1400 m
Capacity design : 70 l/secPDAM : kab Pasuruan
1. Reservoir will be build under ground2. Elevation for the Gempol offtake around the 9 m on top the sea3. Distance from Tapping Beji to tapping point Gempol offtake is
7900 m with diameter pipe 1700 mm4. Distance from the tapping point to the reservoir Gempol is 1400
m and the pipe diameter 250 mm
OFFTAKE GEMPOL
1 Allocation from Umbulan 70 m3
2 flow rate for a day 6,048 m3
3 Reservoir Capacity Calculation 1,210 m3
4 Area Reservoir With Depth 4 m is 302 m2
5 Add area for Facility around Reservoir 151 m2
6Total Area / Land Requirement forReservoir 454 m2
Note
1Water allocation has been determined byEJPG
2 Flow rate , 70 x 3600 x 24 / 10003 take 20 % x Flow rate a day (2)
4 alternatif depth 4 m, 5m and 6 m
5 add land using 50 % from reservoir area 50 % x (4) area reservoir
6 point (4) + (5)
13
-
7/31/2019 16 Offtake -Reservoir Umbulan
14/34
Alternative Dimention Gempol Reservoir Sequare Rectangular
Cap ReservoirDept
hArea
add50%
TotalArea Length Width Length Width
[m3] [m]
[m
2] [m2] [m2] [m] [m] [m] [m]4 648 324 972 31 31 44 15
2,592 5 518 259 778 28 28 40 13
6 432 216 648 25 25 36 12
14
-
7/31/2019 16 Offtake -Reservoir Umbulan
15/34
Off take JabonLocation Off take : Desa Pangreh
District : Kabupaten PasuruanNearest Existing Transmission Pipeline : Jl. Raya MelikanDistance to the Main pipe line : 3700 mCapacity design : 100 l/secPDAM : kab Pasuruan
1. Reservoir will be build under ground2. Elevation for the Jabon offtake around the 9 m on top the sea3. Distance from Tapping Gempol to tapping point Jabon offtake is
2962 m with diameter pipe 1700 mm4. Distance from the tapping point to the reservoir Gempol is 3700
m and the pipe diameter 250 mm
OFFTAKE JABON
1 Allocation from Umbulan 100 m3
2 flow rate for a day 8,640 m3
3 Reservoir Capacity Calculation 1,728 m3
4 Area Reservoir With Depth 4 m is 432 m2
5 Add area for Facility around Reservoir 216 m2
6Total Area / Land Requirement forReservoir 648 m2
Note
1Water allocation has been determined byEJPG
2 Flow rate , 100 x 3600 x 24 / 1000
3 take 20 % x Flow rate a day (2)
4 alternatif depth 4 m, 5m and 6 m
5 add land using 50 % from reservoir area 50 % x (4) area reservoir
6 point (4) + (5)
15
-
7/31/2019 16 Offtake -Reservoir Umbulan
16/34
Alternative Dimention Jabon Reservoir Sequare Rectangular
Cap Reservoir
Dept
h
Are
a
add
50%
Total
Area Length Width Length Width
[m3] [m][m2] [m2] [m2] [m] [m] [m] [m]
4 432 216 648 25 25 36 12
1,728 5 346 173 518 23 23 32 11
6 288 144 432 21 21 30 10
16
-
7/31/2019 16 Offtake -Reservoir Umbulan
17/34
Off take PorongLocation Off take : Desa Kebon Agung PorongDistrict : Kabupaten Pasuruan
Nearest Existing Transmission Pipeline : Jl. Kedung SoloDistance to the Main pipe line : 3600 mCapacity design : 50 l/secPDAM : kab Pasuruan
1. Reservoir will be build elevated2. Elevation for the Porong offtake around the 8 m on top the sea3. Distance from Tapping Jabon to tapping point Porong offtake is
5096 m with diameter pipe 1700 mm4. Distance from the tapping point to the reservoir Porong is 3600
m and the pipe diameter 300 mm
OFFTAKE PORONG
1 Allocation from Umbulan 50 m3
2 flow rate for a day 4,320 m3
3 Reservoir Capacity Calculation 864 m3
4 Area Reservoir With Depth 4 m is 216 m2
5 Add area for Facility around Reservoir 108 m2
6Total Area / Land Requirement forReservoir 324 m2
Note
1Water allocation has been determined byEJPG
2 Flow rate , 50 x 3600 x 24 / 1000
3 take 20 % x Flow rate a day (2)4 alternatif depth 4 m, 5m and 6 m 5 add land using 50 % from reservoir area 50 % x (4) area reservoir
6 point (4) + (5)
17
-
7/31/2019 16 Offtake -Reservoir Umbulan
18/34
Alternative Dimention Porong Reservoir Sequare Rectangular
Cap ReservoirDept
hArea
add50%
TotalArea Length Width Length Width
[m3] [m][m2] [m2] [m2] [m] [m] [m] [m]
4 216 108 324 18 18 26 8864 5 173 86 259 16 16 23 8
6 144 72 216 15 15 21 7
Off take TanggulanginLocation Off take : Desa RandenganDistrict : Kabupaten PasuruanNearest Existing Transmission Pipeline : Jl. Lapindo Brantas
18
-
7/31/2019 16 Offtake -Reservoir Umbulan
19/34
Distance to the Main pipe line : 300 mCapacity design : 150 l/secPDAM : kab Sidoarjo
1. Reservoir will be build elevated
2. Elevation for the Tanggulangin offtake around the 6 m on topthe sea3. Distance from Tapping Porong to tapping point Tanggulangin
offtake is 6300 m with diameter pipe 1700 mm4. Distance from the tapping point to the reservoir Tanggulangin is
300 m and the pipe diameter 200 mm
OFFTAKE TANGGULANGIN
1 Allocation from Umbulan 150 m32 flow rate for a day 12,960 m3
3 Reservoir Capacity Calculation 2,592 m3
4 Area Reservoir With Depth 4 m is 648 m2
5 Add area for Facility around Reservoir 324 m2
6Total Area / Land Requirement forReservoir 972 m2
Note
1Water allocation has been determined byEJPG
2 Flow rate , 150 x 3600 x 24 / 1000
3 take 20 % x Flow rate a day (2)4 alternatif depth 4 m, 5m and 6 m
5 add land using 50 % from reservoir area 50 % x (4) area reservoir
6 point (4) + (5)
19
-
7/31/2019 16 Offtake -Reservoir Umbulan
20/34
Alternative Dimention Tanggulangin Reservoir Sequare Rectangular
Cap ReservoirDept
hArea
add50%
TotalArea Length Width Length Width
[m3] [m][m2] [m2] [m2] [m] [m] [m] [m]
4 648 324 972 31 31 44 15
2,592 5 518 259 778 28 28 40 13
6 432 216 648 25 25 36 12
Off take CandiLocation Off take : Desa RandenganDistrict : Kabupaten Pasuruan
20
-
7/31/2019 16 Offtake -Reservoir Umbulan
21/34
Nearest Existing Transmission Pipeline : Jl. Desa SudimoroDistance to the Main pipe line : 2656 mCapacity design : 270 l/secPDAM : kab Sidoarjo
1. Reservoir will be build under Ground2. Elevation for the Candi offtake around the 6 m on top the sea3. Distance from Tapping Tanggulangin to tapping point Candi
offtake is 5100 m with diameter pipe 1700 mm4. Distance from the tapping point to the reservoir Candi is 2656
m and the pipe diameter 600 mm
OFFTAKE CANDI
1 Allocation from Umbulan 270 m3
2 flow rate for a day 23,328 m3
3 Reservoir Capacity Calculation 4,666 m3
4 Area Reservoir With Depth 4 m is 1,166 m2
5 Add area for Facility around Reservoir 583 m2
6Total Area / Land Requirement forReservoir 1,750 m2
Note
1Water allocation has been determined byEJPG
2 Flow rate , 270 x 3600 x 24 / 1000
3 take 20 % x Flow rate a day (2)
4 alternatif depth 4 m, 5m and 6 m
5 add land using 50 % from reservoir area 50 % x (4) area reservoir
6 point (4) + (5)
21
-
7/31/2019 16 Offtake -Reservoir Umbulan
22/34
Alternative Dimention Candi Reservoir Sequare Rectangular
CapReservoir
Depth
Area
add50%
TotalArea Length Width Length Width
[m3] [m][m2
] [m2] [m2] [m] [m] [m] [m]
41,16
6 583 1,750 42 42 60 20
4,666 5 933 467 1,400 37 37 53 18
6 778 389 1,166 34 34 49 16
Off take SidoarjoLocation Off take : Desa Jati
22
-
7/31/2019 16 Offtake -Reservoir Umbulan
23/34
District : Kabupaten SidoarjoNearest Existing Transmission Pipeline : Jl. Raya SukoDistance to the Main pipe line : 3700 mCapacity design : 300 l/secPDAM : kab Sidoarjo
1. Reservoir will be build Elevated2. Elevation for the Sidoarjo offtake around the 4 m on top the sea3. Distance from Tapping Candi to tapping point Sidoarjo offtake is
2375 m with diameter pipe 1600 mm4. Distance from the tapping point to the reservoir Sidoarjo is
3700 m and the pipe diameter 500 mm
OFFTAKE SIDOARJO
1 Allocation from Umbulan 300 m32 flow rate for a day 25,920 m3
3 Reservoir Capacity Calculation 5,184 m3
4 Area Reservoir With Depth 4 m is 1,296 m2
5 Add area for Facility around Reservoir 648 m2
6Total Area / Land Requirement forReservoir 1,944 m2
Note
1Water allocation has been determined byEJPG
2 Flow rate ,300 x 3600 x 24 / 1000
3 take 20 % x Flow rate a day (2)4 alternatif depth 4 m, 5m and 6 m
5 add land using 50 % from reservoir area 50 % x (4) area reservoir
6 point (4) + (5)
Alternative Dimention Sidoarjo Reservoir
CapReservoir
Depth
Area
add50%
TotalArea
[m3] [m][m2
] [m2] [m2]
41,29
6 648 1,944
5,184 51,03
7 518 1,555
6 864 432 1,296
23
-
7/31/2019 16 Offtake -Reservoir Umbulan
24/34
Off take BuduranLocation Off take : Desa Anggas Wangi
District : Kabupaten SidoarjoNearest Existing Transmission Pipeline : Jl. Desa Kebon AgungDistance to the Main pipe line : 1250 mCapacity design : 100 l/secPDAM : kab Sidoarjo
1. Reservoir will be build Under Ground
24
-
7/31/2019 16 Offtake -Reservoir Umbulan
25/34
2. Elevation for the Buduran offtake around the 7 m on top thesea
3. Distance from Tapping Sidoarjo to Tapping point Buduranofftake is 3150 m with diameter pipe 1500 mm
4. Distance from the tapping point to the reservoir Buduran is
1250 m and the pipe diameter 400 mm
OFFTAKE BUDURAN
1 Allocation from Umbulan 100 m3
2 flow rate for a day 8,640 m3
3 Reservoir Capacity Calculation 1,728 m3
4 Area Reservoir With Depth 4 m is 432 m2
5 Add area for Facility around Reservoir 216 m2
6Total Area / Land Requirement forReservoir 648 m2
Note
1Water allocation has been determined byEJPG
2 Flow rate , 100 x 3600 x 24 / 1000
3 take 20 % x Flow rate a day (2)
4 alternatif depth 4 m, 5m and 6 m
5 add land using 50 % from reservoir area 50 % x (4) area reservoir
6 point (4) + (5)
Alternative Dimention Buduran Reservoir Sequare Rectangular
Cap ReservoirDept
hArea
add50%
TotalArea Length Width Length Width
[m3] [m][m2] [m2] [m2] [m] [m] [m] [m]
4 432 216 648 25 25 36 12
1,728 5 346 173 518 23 23 32 11
6 288 144 432 21 21 30 10
25
-
7/31/2019 16 Offtake -Reservoir Umbulan
26/34
Off take GedanganLocation Off take : Desa Klopo SepuluhDistrict : Kabupaten SidoarjoNearest Existing Transmission Pipeline : Jl. SD Klopo SepuluhDistance to the Main pipe line : 1375 mCapacity design : 200 l/secPDAM : kab Sidoarjo
26
-
7/31/2019 16 Offtake -Reservoir Umbulan
27/34
1. Reservoir will be build Under Ground2. Elevation for the Gedangan offtake around the 7 m on top the
sea3. Distance from Tapping Buduran to Tapping point Gedangan
offtake is 2950 m with diameter pipe 1500 mm
4. Distance from the tapping point to the reservoir Gedangan is1375 m and the pipe diameter 450 mm
OFFTAKE GEDANGAN
1 Allocation from Umbulan 200 m3
2 flow rate for a day 17,280 m3
3 Reservoir Capacity Calculation 3,456 m3
4 Area Reservoir With Depth 4 m is 864 m2
5 Add area for Facility around Reservoir 432 m2
6Total Area / Land Requirement forReservoir 1,296 m2
Note
1Water allocation has been determined byEJPG
2 Flow rate , 200 x 3600 x 24 / 1000
3 take 20 % x Flow rate a day (2)
4 alternatif depth 4 m, 5m and 6 m
5 add land using 50 % from reservoir area 50 % x (4) area reservoir
6 point (4) + (5)
Alternative Dimention Gedangan Reservoir Sequare Rectangular
Cap Reservoir Dept Are add Total Length Width Length Width
27
-
7/31/2019 16 Offtake -Reservoir Umbulan
28/34
h a 50% Area
[m3] [m][m2] [m2] [m2] [m] [m] [m] [m]
4 864 432 1,296 36 36 51 17
3,456 5 691 346 1,037 32 32 46 15
6 576 288 864 29 29 42 14
Off take WaruLocation Off take : Desa PepelegiDistrict : Kab SidoarjoNearest Existing Transmission Pipeline : Jalan pepelegiDistance to the Main pipe line : 3100 mCapacity design : 200 l/sec
28
-
7/31/2019 16 Offtake -Reservoir Umbulan
29/34
PDAM : PDAM Kab Sidoarjo
1. Reservoir will be build Under Ground2. Elevation for the Waru offtake around the 7 m on top the sea3. Distance from Tapping Gedangan to Tapping point Waru offtake
is 4550 m with diameter pipe 1400 mm4. Distance from the tapping point to the reservoir Waru is 3100
m and the pipe diameter 400 mm
OFFTAKE WARU
1 Allocation from Umbulan 200 m3
2 flow rate for a day 17,280 m3
3 Reservoir Capacity Calculation 3,456 m3
4 Area Reservoir With Depth 4 m is 864 m2
5 Add area for Facility around Reservoir 432 m2
6Total Area / Land Requirement forReservoir 1,296 m2
Note
1Water allocation has been determined byEJPG
2 Flow rate ,200 x 3600 x 24 / 1000
3 take 20 % x Flow rate a day (2)
4 alternatif depth 4 m, 5m and 6 m
5 add land using 50 % from reservoir area 50 % x (4) area reservoir
6 point (4) + (5)
Alternative Dimention Waru Reservoir Sequare Rectangular
Cap Reservoir Depth
Area
add50%
TotalArea Length Width Length Width
[m3] [m][m2] [m2] [m2] [m] [m] [m]
[m]
4 864 432 1,296 36 36 51 173,456 5 691 346 1,037 32 32 46 15
6 576 288 864 29 29 42 14
29
-
7/31/2019 16 Offtake -Reservoir Umbulan
30/34
Off take Alas Malang
Location Off take : Alas MalangDistrict : Kota SurabayaNearest Existing Transmission Pipeline : JalanDistance to the Main pipe line : 3100 m
Capacity design : 1000 l/secPDAM : PDAM Kota Surabaya
1. Reservoir will be build Under Ground2. Elevation for the Alas Malang offtake around the 12 m on top
the sea3. Distance from Tapping Waru to Tapping point Alas Malang
offtake is 23100 m with diameter pipe 1000 mm
30
-
7/31/2019 16 Offtake -Reservoir Umbulan
31/34
4. Distance from the tapping point to the reservoir Alasmalang is3100 m and the pipe diameter 400 mm
OFFTAKE ALAS MALANG
1 Allocation from Umbulan 1,000 m3
2 flow rate for a day 86,400 m3
3 Reservoir Capacity Calculation 17,280 m3
4 Area Reservoir With Depth 4 m is 4,320 m2
5 Add area for Facility around Reservoir 2,160 m2
6Total Area / Land Requirement forReservoir 6,480 m2
Note
1Water allocation has been determined byEJPG
2 Flow rate ,1000 x 3600 x 24 / 1000
3 take 20 % x Flow rate a day (2)
4 alternative depth 4 m, 5m and 6 m
5 add land using 50 % from reservoir area
6 point (4) + (5)
31
-
7/31/2019 16 Offtake -Reservoir Umbulan
32/34
Alternative Dimension Alas Malang Reservoir Sequare Rectangular
CapReservoir
Depth
Area
add50%
TotalArea Length Width Length Width
[m3] [m][m2
] [m2] [m2] [m] [m] [m] [m]
44,32
0 2,160 6,480 80 80 115 38
17,280 53,45
6 1,728 5,184 72 72 103 34
62,88
0 1,440 4,320 66 66 94 31
32
-
7/31/2019 16 Offtake -Reservoir Umbulan
33/34
Off take Giri
Location Off take : Desa GiriDistrict : Kab GresikNearest Existing Transmission Pipeline : Jl.Sunan Giri
Distance to the Main pipe line : 50 mCapacity design : 1000 l/secPDAM : PDAM Kab Gresik
1. Reservoir will be build Under Ground2. Elevation for the Giri offtake around the 91 m on top the sea3. Distance from Tapping Alas Malang to Tapping point Giri
offtake is m with diameter pipe 1000 mm4. Distance from the tapping point to the reservoir Giri is 50 m
and the pipe diameter 300 mm
OFFTAKE GIRI
1 Allocation from Umbulan 1,000 m3
2 flow rate for a day 86,400 m3
3 Reservoir Capacity Calculation 17,280 m3
4 Area Reservoir With Depth 4 m is 4,320 m2
5 Add area for Facility around Reservoir 2,160 m2
6Total Area / Land Requirement forReservoir 6,480 m2
Not
e
1Water allocation has been determined byEJPG
2 Flow rate , 1000 x 3600 x 24 / 1000
3 take 20 % x Flow rate a day (2)
4 alternative depth 4 m, 5m and 6 m
5 add land using 50 % from reservoir area 50 % x (4) area reservoir
6 point (4) + (5)
33
-
7/31/2019 16 Offtake -Reservoir Umbulan
34/34
Alternative Dimention Giri Reservoir Sequare Rectangular
CapReservoir
Depth
Area
add50%
TotalArea Length Width Length Width
[m3] [m][m2
] [m2] [m2] [m] [m] [m] [m]
44,32
0 2,160 6,480 80 80 115 38
17,280 53,45
6 1,728 5,184 72 72 103 34
62,88
0 1,440 4,320 66 66 94 31