document1
TRANSCRIPT
REGRESSION /DESCRIPTIVES MEAN STDDEV CORR SIG N /MISSING LISTWISE /STATISTICS COEFF OUTS CI(95) BCOV R ANOVA COLLIN TOL /CRITERIA=PIN(.05) POUT(.10) /NOORIGIN /DEPENDENT Productioninmilliontonnes /METHOD=ENTER Months /SCATTERPLOT=(*ZRESID ,*ZPRED) /RESIDUALS DURBIN HISTOGRAM(ZRESID) NORMPROB(ZRESID) /CASEWISE PLOT(ZRESID) OUTLIERS(3).
Regression
Notes
Output Created 18-MAR-2015 15:01:47
Comments
Input Active Dataset DataSet4
Filter <none>
Weight <none>
Split File <none>
N of Rows in Working Data
File128
Missing Value Handling Definition of Missing User-defined missing values are treated
as missing.
Cases Used Statistics are based on cases with no
missing values for any variable used.
Syntax REGRESSION
/DESCRIPTIVES MEAN STDDEV
CORR SIG N
/MISSING LISTWISE
/STATISTICS COEFF OUTS CI(95)
BCOV R ANOVA COLLIN TOL
/CRITERIA=PIN(.05) POUT(.10)
/NOORIGIN
/DEPENDENT
Productioninmilliontonnes
/METHOD=ENTER Months
/SCATTERPLOT=(*ZRESID ,*ZPRED)
/RESIDUALS DURBIN
HISTOGRAM(ZRESID)
NORMPROB(ZRESID)
/CASEWISE PLOT(ZRESID)
OUTLIERS(3).
Resources Processor Time 00:00:01.53
Elapsed Time 00:00:01.50
Memory Required 1740 bytes
Additional Memory Required
for Residual Plots912 bytes
Descriptive Statistics
Mean Std. Deviation N
Production (in million tonnes) 16.7709 4.40351 120
Months 60.50 34.785 120
Correlations
Production (in
million tonnes) Months
Pearson Correlation Production (in million tonnes) 1.000 .978
Months .978 1.000
Sig. (1-tailed) Production (in million tonnes) . .000
Months .000 .
N Production (in million tonnes) 120 120
Months 120 120
Variables Entered/Removeda
Model
Variables
Entered
Variables
Removed Method
1 Monthsb . Enter
a. Dependent Variable: Production (in million tonnes)
b. All requested variables entered.
Model Summaryb
Model R R Square
Adjusted R
Square
Std. Error of the
Estimate Durbin-Watson
1 .978a .957 .957 .91458 .640
a. Predictors: (Constant), Months
b. Dependent Variable: Production (in million tonnes)
ANOVAa
Model Sum of Squares df Mean Square F Sig.
1 Regression 2208.814 1 2208.814 2640.681 .000b
Residual 98.702 118 .836
Total 2307.516 119
a. Dependent Variable: Production (in million tonnes)
b. Predictors: (Constant), Months
Coefficientsa
Model
Unstandardized Coefficients
Standardized
Coefficients
t Sig.B Std. Error Beta
1 (Constant) 9.278 .168 55.215 .000
Months .124 .002 .978 51.388 .000
Coefficientsa
Model
95.0% Confidence Interval for B Collinearity Statistics
Lower Bound Upper Bound Tolerance VIF
1 (Constant) 8.945 9.610
Months .119 .129 1.000 1.000
a. Dependent Variable: Production (in million tonnes)
Coefficient Correlationsa
Model Months
1 Correlations Months 1.000
Covariances Months 5.809E-6
a. Dependent Variable: Production (in million
tonnes)
Collinearity Diagnosticsa
Model Dimension Eigenvalue Condition Index
Variance Proportions
(Constant) Months
1 1 1.868 1.000 .07 .07
2 .132 3.759 .93 .93
a. Dependent Variable: Production (in million tonnes)
Residuals Statisticsa
Minimum Maximum Mean Std. Deviation N
Predicted Value 9.4015 24.1403 16.7709 4.30830 120
Residual -1.90403 2.22212 .00000 .91073 120
Std. Predicted Value -1.711 1.711 .000 1.000 120
Std. Residual -2.082 2.430 .000 .996 120
a. Dependent Variable: Production (in million tonnes)
Charts