  • Revision Control

    EPLAN Training 1

    Revision Control

  • Revision Control

    EPLAN Training 2

    1 Completing Projects and Pages ..................................................................3 1.1 Complete pages........................................................................................3

    2 Generating Revisions ...................................................................................5

    3 Generating Comparison Projects ................................................................6 3.1 Show revisioned project / comparison projects .........................................6

    4 Comparing Projects......................................................................................8 5 Specifying Comparison Settings...............................................................10

    6 Adding Revision Markers...........................................................................12 6.1 Add revision markers after a project comparison ....................................12

    7 Displaying or Hiding Revision Markers ....................................................14 7.1 Display revision markers.........................................................................14 7.2 Hide revision markers .............................................................................14 7.3 Find revision modifications in properties .................................................15

    8 Removing Revision Markers ......................................................................16

    9 Removing Write Protection........................................................................17

    This functionality is only available for certain module packages. Info

  • Revision Control

    EPLAN Training 3

    1 Completing Projects and Pages In EPLAN, projects can be completed at any time. The project is then write-protected and can no longer be changed. A completed project is stored in the project directory with the extension *.elr.

    Precondition:

    You have opened a project.

    1. Select the menu item Utilities > Revision control > Complete project.

    If you have not yet completed all of the pages of the project, a message will be displayed.

    2. Click [Yes] in the message window in order to use the comments on the revision as the description for the page modification. (If you click [No], the process will be canceled, and you can complete the pages manually).

    First, all of the pages are completed. The project is then write-protected (i.e. it is written as an *.elr project).

    1.1 Complete pages 1. Select the project or the modified pages in the page overview, and select the

    menu item Utilities > Revision control > Complete pages.

    2. In the Description of the page modification dialog, you can enter the revision data (index, description, and reason for change) for the modified pages.

    3. Click [OK].

    The marker on the pages as "draft" is removed.

  • Revision Control

    EPLAN Training 4

    The revision data is saved to the modified pages.

    This functionality is only available for certain module packages. Info

  • Revision Control

    EPLAN Training 5

    2 Generating Revisions Precondition:

    You have opened a project.

    Utilities > Revision control > Generate revision

    1. In the Generate revision dialog, enter a name for the revision in the Revision name field.

    2. In the Comment field you can enter a short description of the revision, but the field may also be left blank.

    3. Click [OK].

    EPLAN generates the revision and is then saved with the extension *.ell.

    If a page is then modified, it is marked as a "draft".

    This functionality is only available for certain module packages. Info

  • Revision Control

    EPLAN Training 6

    3 Generating Comparison Projects Precondition:

    You have selected a project in the page navigator.

    Utilities > Revision control > Generate comparison project 1. In the Generate comparison project dialog, enter a name for the comparison

    project in the Project name field.

    2. In the Comment field you can enter a short description of the comparison project, but the field may also be left blank.

    3. Select the check box Generate temporary comparison project if you would like to generate a non-write-protected project that you can delete again later.

    4. Click [OK].

    EPLAN generates the comparison project with the file extension *.elr.

    3.1 Show revisioned project / comparison projects In order to show revised projects or comparison projects in the page navigator, proceed as follows:

    1. Select the menu item Project > Open.

    2. In the Open project dialog in the Files of type field, select the entry "Revision of EPLAN project (*.elr)".

  • Revision Control

    EPLAN Training 7

    3. Select the desired project (if necessary, switch to a different directory) and click [Open].

    The selected project is shown in the page navigator.

    This functionality is only available for certain module packages. Info

  • Revision Control

    EPLAN Training 8

    4 Comparing Projects Differences between two projects are registered by comparing particular properties with one another. In the Compare projects dialog, you can determine which projects will be compared. The properties to be compared are determined in the Comparison settings dialog. If the value of the properties is identical for two projects, then no difference is registered between them.

    Preconditions: The result of the comparison is written to a MS Access database. To be able to

    interpret a comparison run, you therefore need to have the program MS Access installed on your computer.

    The database for the result of the project comparison is determined in the project settings in the Settings: Revision dialog.

    1. Select the desired project in the page navigator and select the menu item Utilities > Revision control > Compare projects.

    2. In the Compare projects dialog, select the check box Show only associated comparison projects.

    Then only the comparison projects of the marked project will be shown in the list. Otherwise, the list will show all of the projects in the project directory (except for the one marked).

    3. In the list, select Compare with to select the comparison project you would like to compare with the currently opened project.

    4. In the Comparison settings field, select the scheme which determines the settings for the comparison. (If you have not stored your own schemes, then only the standard scheme will be offered here. In this case create a new scheme by Specifying comparison settings.)

  • Revision Control

    EPLAN Training 9

    5. In the Text field, enter the text to be used to mark the revision changes in the properties.

    6. Click [OK].

    The comparison run is executed and the result of the comparison is written to the given database.

    To make the modifications visible in the project, you must generate revison markers.

    Notes: Such a comparison run can take a relatively long time for large projects; this also

    depends on the number of properties you have selected for comparison. It can therefore make sense to execute runs overnight or on a dedicated computer.

    To evaluate the results of a comparison run, you will need an external database program, such as MS Access.

    This functionality is only available for certain module packages. Info

  • Revision Control

    EPLAN Training 10

    5 Specifying Comparison Settings In the Comparison settings dialog, you have the option of determining in detail which properties should be compared with one another. The settings are stored in a scheme. You can create different schemes for different tasks, and retrieve settings together whenever needed.

    1. In the Compare projects dialog, click [...] beside the Comparison settings field.

    2. From the drop-down list in the Comparison settings dialog, select a user-defined scheme that you would like to change, or use (New) to create a new scheme.

    3. In the tabs in the lower part of the dialog, you can determine the properties of the different objects which should be compared. These tabs are all structured in the same way: In the Do not compare field, all of the properties are initially selected that can be compared. The properties in the Compare field are those which have been selected for comparison.

    4. In the field Do not compare, select the desired properties, and move them using the arrow button into the Compare field.

    5. To undo the selection, if necessary, use the second arrow button to move the property selected in the Compare field back into the Do not compare field.

    6. Click [OK].

    Your settings are saved in the scheme selected, and then you are returned to the Compare projects dialog.

  • Revision Control

    EPLAN Training 11

    This functionality is only available for certain module packages. Info

  • Revision Control

    EPLAN Training 12

    6 Adding Revision Markers Revision markers can be generated in two ways:

    If you have created a revision and are still working in it, changes are automatically marked ("change tracking").

    If you have compared two projects, you must first generate the revision markers in order to show the changes in the project.

    Revision changes in the schematic are shown with graphical markers. Under the project settings in the Settings: Revision dialog, define the appearance and size of this graphic.

    Changes in properties are shown with marker text entered into the "Revision marker (change tracking)" or "Revision marker (project comparison)" properties. In addition, the modified object is shown with a graphical marker.

    In change tracking, this text is generated automatically, but it can be changed. Formatting is determined in the project settings in the Settings: Revision dialog.

    In a project comparison, you enter this text in the Compare projects dialog.

    6.1 Add revision markers after a project comparison Preconditions:

    You have already executed a comparison run, so that changed information is present in the database for the comparison result.

    The project into which you would like to write the revision markers is open.

    Utilities > Revision control > Add revision markers

    1. In the Open dialog, select the database in which the results of the comparison run are stored. By default, the database Revision.mdb is set in the ..\Projects directory.

    2. Click [OK].

    EPLAN writes the revision markers into the project.

  • Revision Control

    EPLAN Training 13

    This functionality is only available for certain module packages. Info

  • Revision Control

    EPLAN Training 14

    7 Displaying or Hiding Revision Markers The revision markers can be displayed or hidden as needed. This is independent of whether they were generated through change tracking or by project comparison.

    7.1 Display revision markers

    Precondition:

    You have generated revision markers in the project.

    1. Select the menu item View > Revision markers.

    A check mark before the menu item signifies that the item is activated.

    The revision markers are displayed in the project.

    2. If necessary, update the display using the menu item View > Redraw.

    7.2 Hide revision markers

    Precondition:

    The display of revision markers is activated.

    1. Select the menu item View > Revision markers.

    The revision markers will be hidden.

    2. If necessary, update the display using the menu item View > Redraw.

  • Revision Control

    EPLAN Training 15

    7.3 Find revision modifications in properties Modified objects (even the objects to where their hidden properties have been changed) are shown on the page with a graphical marker. If you move the mouse pointer over a changed object in a revision, then a tooltip is displayed containing information about the revision.

    To make it easier to find changes in the properties of objects, you can use the Find function.

    Find > Find

    1. In the Find function in the Find what field, enter the text that you provided for the idenfication of revision changes in the Compare revision dialog.

    2. In the Search in group box, select the All properties of all components check box.

    3. In the Search location group box, determine whether the entire project or only the current page should be searched, and then select the Logic pages check box.

    4. Click [OK].

    The results of the search are displayed in the Search results dialog.

    This functionality is only available for certain module packages. Info

  • Revision Control

    EPLAN Training 16

    8 Removing Revision Markers You can remove revision markers created via change tracking or a project comparison from the project separately.

    Precondition:

    You have opened a project containing revision markers.

    Utilities > Revision control > Delete revision markers

    1. In the Delete revision markers dialog, select which markers you would like to delete: Check the corresponding check boxes.

    2. Click [OK].

    The selected revision markers will be deleted from the current revision.

    This functionality is only available for certain module packages. Info

  • Revision Control

    EPLAN Training 17

    9 Removing Write Protection Completed projects and comparison project are always write-protected. Only temporary comparison projects are not write-protected. However, it is possible to remove the write protection if necessary.

    Precondition:

    You have opened a write-protected project.

    Utilities > Revision control > Remove write protection

    EPLAN removes the write protection from the project.

    Note: You can reactivate the write protection by completing the project.

  • Revision Control

    EPLAN Training 18