1432b concrete step 39 and measured anchors
DESCRIPTION
....TRANSCRIPT
![Page 1: 1432B Concrete Step 39 and Measured Anchors](https://reader038.vdocuments.us/reader038/viewer/2022100509/5695d4b81a28ab9b02a27cf1/html5/thumbnails/1.jpg)
A1248.06
A2248.06
A3248.06
A4248.06
A5248.05
A6248.05
A7248.06
A8248.06
B1248.07
B10248.06
B11248.07
B12248.07
B13248.08
B14248.08
B15248.08
B16248.08
B17248.06
B18248.06
B19248.06
B2248.07
B20248.06
B21248.07
B22248.07
B23248.07
B24248.07
B3248.09
B4248.09
B5248.06
B6248.06
B7248.07
B8248.07
B9248.06
CO1
CO10
CO11
CO12
CO13
CO14
CO15
CO16
CO17
CO2
CO3
CO4
CO5
CO6
CO7
CO8
CO9
CO ... measured concrete Step 39
A/B ... measured inner corners of anchors
Date of survey: 10.12.10 /11./15.02.11
Kind of survey: As built
Received:
Project: Sava Bridge Belgrad
Draft: D. Rehn
Design: P6-04-02-0130-B5
Surveyor: S. Hellmich
Project no: 1432 / 1252
Date of draft: 16.02.2011
Scale: 1:25
Site: 3
Chainage: 6+450
Step: 39
Structure: Pylon
Axis: 6
Approved: