30 May 2014 Loudoun County Department of Transportation & Capital Infrastructure 209 Gibson Street Leesburg, Virginia 20176 Attn: Sandy Hunter Re: AE Services – Offsite SWM/BMP Coordination, Design, Permitting, Bid Alternate & CA
with the Town of Lovettsville Sidewalk Improvements Project- Cost Proposal Ms. Hunter: LSY is pleased to offer this cost proposal for the above referenced project. Our cost proposal is based our understanding of services to redesign the proposed SWM/BMP facility for the Lovettsville Community Center Site to accommodate the required SWM/BMP volumes for the offsite Town of Lovettsville, Broadway (RT 673) Sidewalk and Utility Improvement project. A detailed understanding of our scope is detailed in Timmons proposal, see attachment. The firm fixed price of this work is $ 20,394. A detailed back up worksheet is attached and provides labor cost breakdowns. Please let me know if you need further information or clarifications on the proposal. I am available at your convenience to discuss. Sincerely,
Heather K. Johnson, AIA, LEED AP BD + C, NCARB Principal, LSY Architects Att: Labor Cost Worksheets, dated 30 May 2014 Timmons Proposal, dated 16 May 2014
New Loudoun County Lovettsville Community CenterCost Proposal Summary REV 7
Opt 1 ‐ Hazardous Materials
Identification & Monitoring
Mod 1 ‐ Town Council Mtg & Option 1a & 2a
Mod 2 ‐ Security Design/ Town
Council Redesign/ CUP
Mod 3 ‐ Civil‐Offsite SWM/BMP Coord, Design,
Permitting, Bid Alt & CA
Fee
Fee
Fee
Fee
Fee
Fee
In‐House Labor (including OH & P)Architecture / Proj Management $116,376 $37,357 $0 $2,283 $21,364 $3,165
Consultant LaborCivil $138,073 $21,829 $0 $0 $0 $15,663Structural $24,754 $8,964 $0 $0 $0 $0MEP $89,953 $28,545 $0 $0 $0 $0Cost Estimating $0 $0 $0 $0 $0 $0Tele/ Security/ AV/ Acoutical $0 $0 $0 $0 $22,594 $0Hazardous Materials $0 $0 $10,700 $0 $0 $0
Subtotal Consultant Labor $252,780 $59,338 $10,700 $0 $22,594 $15,663OH & P on Consultants @ 10% $25,278 $5,934 $1,070 $0 $2,259.36 $1,566Subtotal Consultant Labor (Incl OH & P) $278,058 $65,272 $11,770 $0 $24,853 $17,229
Other Direct Costs (ODCs)Other Direct Costs
Boundary Survey $5,800Utility Location & SWM/BMP Outfall Survey $4,950Reprographics & Delivery $3,250 $450 $150Other
Subtotal ODC $14,000 $450 $0 $150 $0 $0OH & P on ODCs @ 10% $1,400 $45 $0 $15 $0 $0Subtotal ODCs (Incl OH & P) $15,400 $495 $0 $165 $0 $0
Total Fees by Task/ Option $409,833 $103,124 $11,770 $2,448 $46,217 $20,394
Base Fee
Total Fee with All Options & Mods
$512,957
Design & SPEX or ZMOD
Bidding, Construction Administration
& Record Documents
$593,786
30 May 2014
New Loudoun County Lovettsville Community CenterMod #3‐ Civil Offsite SWM/BMP Coordination, Design, Permitting, Bid Alt CA ‐ Cost Proposal
Labor Worksheet
Discipline Labor Categories Labor Rates Coordination Redesign
Bidding & Construction
Administration
Labor Subtotals Price
Principal 250.71$ 0 ‐$
Project Manager 141.30$ 12 12 1,695.56$
QC Manager 146.94$ 0 ‐$
Architect 1 122.45$ 8 4 12 1,469.40$
Architect 2 94.21$ 0 ‐$
Task Leader 84.77$ 0 ‐$
Technician 1 84.77$ 0 ‐$
Technician 2 72.75$ 0 ‐$
Administrative Assistant 81.64$ 0 ‐$
Civil Project Manager $143.07 0 ‐$
Senior Civil Engineer $179.02 18 8 26 4,654.54$
Civil Engineer $127.77 12 28 24 64 8,177.59$
Land Planner $184.33 0 ‐$
Park & Recreation Planner $124.92 0 ‐$
Landscape Architect $94.87 0 ‐$
CAD Technician $88.45 32 32 2,830.46$
Principal 199.80$ 0 ‐$
Project Manager 172.80$ 0 ‐$
Engineer 1 151.20$ 0 ‐$
Engineer 2 129.60$ 0 ‐$
Engineer 3 113.40$ 0 ‐$
Tech 1 108.00$ 0 ‐$
Tech 2 70.20$ 0 ‐$
Administrative 70.20$ 0 ‐$
Principal $145.80 0 ‐$
Project Manager $129.60 0 ‐$
Senior Engineer $118.80 0 ‐$
QC Manager $102.60 0 ‐$
Designer $91.80 0 ‐$
CAD Technician $70.20 0 ‐$
Administrative $59.40 0 ‐$
Project Manager 129.60$ 0 ‐$
Engineer 1 151.20$ 0 ‐$
Tech 1 108.00$ 0 ‐$
Cost Engineer 151.20$ 0 ‐$
0 ‐$
Project Manager/ QA/QC 135.00$ 0 ‐$
Certified Industrial Hygienist 155.00$ 0 ‐$
Tech 1 85.00$ 0 ‐$
Totals 42 76 28 146 18,827.55$
Haz M
at ID
&
Mon
itorin
gLSY Archite
cts
Civil
Structural
MEP
Engineerin
gTele/
Security/ AV/
Acou
tical
Cost
Estim
ati
ng
30 May 2014
May 16, 2013
Heather K. Johnson, AIA NCARB LEED® AP BD+C
LSY Architects
8484 Georgia Ave, Suite 650
Silver Spring MD 20910
t 301.588.1500 f 301.588.5300
RE: Lovettsville Community Center Civil Design: Change Order #1 Offsite SWM/BMP coordination, design, permitting, bid alternate and CA
Dear Heather,
Timmons Group is pleased to provide you with this scope and fee proposal to provide additional
civil design services for the new Lovettsville Community Center. The following scope of services
has been developed based on the request from the Owner / Architect for Timmons Group to
redesign the proposed SWM/BMP facility for the Lovettsville Community Center Site to
accommodate the required SWM/BMP volumes for the offsite Town of Lovettsville, Broadway (RT
673) Sidewalk and Utility Improvement project. The additional scope includes meeting and
coordination with Town Staff and their consulting engineers, redesign and routing of the
SWM/BMP facility, construction sequence planning, review and permitting coordination, creation
of bid alternate drawings and construction administration.
We anticipate that the following Scope of Services will be provided by Timmons Group:
A. Coordination with Town of Lovettsville Staff & Pennoni, Concept Design: Timmons
Group will meet and coordinate with the Town of Lovettsville Staff and Pennoni to discuss
the offsite SWM/BMP needs and ability to include these required volumes into the
Community Center Design. This task includes exchange of design data, review of offsite
design, scoping and developing concept SWM/BMP design. Timmons Group will develop
concept design to identify location of facility expansion, identify critical invert elevations,
grading and embankment limits. Included are up to (3 – 2 hour) meetings.
Lump Sum: $4,700
B. Redesign of SWM/BMP Facility: Timmons Group will redesign the SWM/BMP facility
to fully incorporate the offsite drainage. The facility will treat and detain as required. The
site plan will be updated to include the following redesign:
•••• Stormwater Management (SWM) and Best Management Practices (BMP) as
required by Loudoun County and the State of Virginia to include the offsite area.
Includes analysis and calculation of offsite drainage areas, impervious cover
percentage, facility routing analysis, bmp volume requirements, embankment and
outfall structure design.
•••• The redesign of the SWM/BMP facility will include grading, adjustment to the
embankment height, outfall structure, sediment forebay, tie in with proposed
parking lot.
•••• Adjust E&S Phase I and II design to accommodate larger SWM/BMP Facility and
construction sequencing.
•••• All required Notes, tabulations, typical sections, construction details and
computations.
•••• Timmons Group will manage the site plan permitting for this project with the
Town of Lovettsville Staff and their consulting review engineer and attend any
additional site plan comment review meetings. This task includes all plan
submissions, comment review & responses and resubmissions until plan approval.
Lump Sum: 6,800
C. Bid Phase: As directed by the Owner, Timmons Group will create Add Alternate bid
sheets to be used to establish the additional construction cost for facility expansion to
include offsite improvements. Prepare final construction documents incorporating the add
alternates as chosen by the Owner. This task does not include analysis or cost estimation of
the additional SWM/BMP construction costs.
Lump Sum: $1,750
D. Construction Monitoring - Timmons Group will perform construction observation and
field notes pursuant to the enlarged SWM/BMP facility. This scope includes attendance at
construction progress meetings, response to RFIs and review of shop drawings as required.
Lump Sum: $2,325
Exclusions
• Preparation of Town/County SWM/BMP shared use agreements and associated
easement plats associated with the enlarged SWM/BMP facility
• Preparation or analysis of construction cost estimates of the enlargement of the
SWM/BMP facility
• Additional downstream analysis or survey to accommodate adequate outfall of
enlarged SWM/BMP facility as may be required.
Anticipated Schedule
Plans can be developed and submitted for review on a mutually agreed upon schedule as time
of contract signing.
Printing, postal, travel, etc. are reimbursable expenses.
Should you have any questions or if we could be of any further assistance, please do not hesitate to
call us at (703) 554-6705.
Respectfully,
Timmons Group, Inc.
Bill Vest, P.E. Senior Project Manager