140219 lcc mod #1_town council meeting cost proposal
TRANSCRIPT
-
8/11/2019 140219 LCC Mod #1_Town Council Meeting Cost Proposal
1/3
19 February 2014
Loudoun CountyDepartment of Transportation & Capital Infrastructure209 Gibson StreetLeesburg, Virginia 20176
Attn: Sandy Hunter
Re: Architectural Services for Lovettsville Community Center RenovationTown Council Meeting Cost Proposal
Ms. Hunter:
LSY is pleased to offer this cost proposal for the above referenced project. Our cost proposal is
based on my understanding of services from your latest email on 2/18/14 at approximately 3:50PM. LSY proposes to attend one town council meeting in Lovettsville, VA to present the threeoriginal exterior and massing options (Options 1, 2, 3); as well as two new exterior conceptualoptions (Options 1a & 2a).
1. Option 1a LSY will add representational alpine or wooden detailing to the facades,similar to the images provided by K. Markel.
2. Option 2a LSY will revise the colors to be more reminiscent of the existing communitycenter.
LSY will prepare the new options and present all 5 options, via powerpoint with correspondinghandouts for 20 people in 11 x17 page format. The firm fixed price of this work will be $ 2,448.
A detailed back up worksheet is attached and provides labor cost breakdowns.
We are happy to facilitate this presentation and thus the project. I look forward to reviewing thenew options with you prior to the meeting, as well as discussing the agenda and format, onceyou have reviewed the proposal.
Sincerely,
-
8/11/2019 140219 LCC Mod #1_Town Council Meeting Cost Proposal
2/3
NewLoudounCountyLovettsvilleCommunityCenter
CostProposalSummaryREV5
Opt1
Hazardous
Materials
Identification&
Monitoring
Mod1 Town
CouncilMtg&
Option1a&2a
Fee
Fee
Fee
Fee
InHouse
Labor
(including
OH
&
P)
Architecture/ProjManagement $116,376 $37,357 $0 $2,283
ConsultantLabor
Civil $138,073 $21,829 $0 $0
Structural $24,754 $8,964 $0 $0
MEP $89,953 $28,545 $0 $0
Tele/Security/AV/Acoutical $0 $0 $0 $0
CostEstimating $0 $0 $0 $0
HazardousMaterials $0 $0 $10,700 $0
SubtotalConsultantLabor $252,780 $59,338 $10,700 $0
OH&PonConsultants@10% $25,278 $5,934 $1,070 $0
SubtotalConsultantLabor(InclOH&P) $278,058 $65,272 $11,770 $0
OtherDirectCosts(ODCs)
OtherDirectCosts
BoundarySurvey $5,800
Utility
Location
&
SWM/BMP
Outfall
Survey $4,950Reprographics&Delivery $3,250 $450 $150
Other
SubtotalODC $14,000 $450 $0 $150
OH&PonODCs@10% $1,400 $45 $0 $15
SubtotalODCs(InclOH&P) $15,400 $495 $0 $165
TotalFeesbyTask/Option $409,833 $103,124 $11,770 $2,448
BaseFee
TotalFeewithAllOptions&Mods
$512,957
Design&SPEXor
ZMOD
Bidding,
Construction
Administration
&Record
Documents
$527,175
19 February2014
-
8/11/2019 140219 LCC Mod #1_Town Council Meeting Cost Proposal
3/3
NewLoudounCountyLovettsvilleCommunityCenter
Mod#1 TownCouncilMtg CostProposal
LaborWorksheet
Discipline Labor Categories Labor
RatesConceptual
Design
Formal
Presentations
Labor
SubtotalsPrice
Principal 250.71$ 0 $
Project Manager 141.30$ 5 5 706.48$
QC Manager 146.94$ 0 $
Architect 1 122.45$ 0 $
Architect 2 94.21$ 12 3 15 1,413.13$
Task Leader 84.77$ 0 $
Technician 1 84.77$ 0 $
Technician 2 72.75$
0
$
Administrative Assistant 81.64$ 2 2 163.27$
Civil Project Manager $143.07 0 $
Senior Civil Engineer $179.02 0 $
Civil Engineer $127.77 0 $
Land Planner $184.33 0 $
Park & Recreation Planner $124.92 0 $
Landscape Architect $94.87 0 $
CAD Technician $88.45 0 $
Principal 199.80$ 0 $
Project Manager 172.80$ 0 $
Engineer 1 151.20$
0
$
Engineer 2 129.60$ 0 $
Engineer 3 113.40$ 0 $
Tech 1 108.00$ 0 $
Tech 2 70.20$ 0 $
Administrative 70.20$ 0 $
Principal $145.80 0 $
Project Manager $129.60 0 $
Senior Engineer $118.80 0 $
QC Manager $102.60 0 $
Designer $91.80 0 $
CAD Technician $70.20 0
$
Administrative $59.40 0 $
Project Manager 129.60$ 0 $
Engineer 1 151.20$ 0 $
Tech 1 108.00$ 0 $
Cost Engineer 151.20$ 0 $
0 $
Project Manager/ QA/QC 135.00$ 0 $
Certified Industrial Hygienist 155.00$ 0 $
Tech 1 85.00$ 0 $
Totals 12 10 22 2,282.88$
HazMatID&
Monitoring
LSYArchitects
Civil
Structural
MEPEngineering
Tele/
Security/AV/
Acoutical
Cost
Estimati
ng
19February2014