  • 8/11/2019 140219 LCC Mod #1_Town Council Meeting Cost Proposal

    1/3

    19 February 2014

    Loudoun CountyDepartment of Transportation & Capital Infrastructure209 Gibson StreetLeesburg, Virginia 20176

    Attn: Sandy Hunter

    Re: Architectural Services for Lovettsville Community Center RenovationTown Council Meeting Cost Proposal

    Ms. Hunter:

    LSY is pleased to offer this cost proposal for the above referenced project. Our cost proposal is

    based on my understanding of services from your latest email on 2/18/14 at approximately 3:50PM. LSY proposes to attend one town council meeting in Lovettsville, VA to present the threeoriginal exterior and massing options (Options 1, 2, 3); as well as two new exterior conceptualoptions (Options 1a & 2a).

    1. Option 1a LSY will add representational alpine or wooden detailing to the facades,similar to the images provided by K. Markel.

    2. Option 2a LSY will revise the colors to be more reminiscent of the existing communitycenter.

    LSY will prepare the new options and present all 5 options, via powerpoint with correspondinghandouts for 20 people in 11 x17 page format. The firm fixed price of this work will be $ 2,448.

    A detailed back up worksheet is attached and provides labor cost breakdowns.

    We are happy to facilitate this presentation and thus the project. I look forward to reviewing thenew options with you prior to the meeting, as well as discussing the agenda and format, onceyou have reviewed the proposal.

    Sincerely,

  • 8/11/2019 140219 LCC Mod #1_Town Council Meeting Cost Proposal

    2/3

    NewLoudounCountyLovettsvilleCommunityCenter

    CostProposalSummaryREV5

    Opt1

    Hazardous

    Materials

    Identification&

    Monitoring

    Mod1 Town

    CouncilMtg&

    Option1a&2a

    Fee

    Fee

    Fee

    Fee

    InHouse

    Labor

    (including

    OH

    &

    P)

    Architecture/ProjManagement $116,376 $37,357 $0 $2,283

    ConsultantLabor

    Civil $138,073 $21,829 $0 $0

    Structural $24,754 $8,964 $0 $0

    MEP $89,953 $28,545 $0 $0

    Tele/Security/AV/Acoutical $0 $0 $0 $0

    CostEstimating $0 $0 $0 $0

    HazardousMaterials $0 $0 $10,700 $0

    SubtotalConsultantLabor $252,780 $59,338 $10,700 $0

    OH&PonConsultants@10% $25,278 $5,934 $1,070 $0

    SubtotalConsultantLabor(InclOH&P) $278,058 $65,272 $11,770 $0

    OtherDirectCosts(ODCs)

    OtherDirectCosts

    BoundarySurvey $5,800

    Utility

    Location

    &

    SWM/BMP

    Outfall

    Survey $4,950Reprographics&Delivery $3,250 $450 $150

    Other

    SubtotalODC $14,000 $450 $0 $150

    OH&PonODCs@10% $1,400 $45 $0 $15

    SubtotalODCs(InclOH&P) $15,400 $495 $0 $165

    TotalFeesbyTask/Option $409,833 $103,124 $11,770 $2,448

    BaseFee

    TotalFeewithAllOptions&Mods

    $512,957

    Design&SPEXor

    ZMOD

    Bidding,

    Construction

    Administration

    &Record

    Documents

    $527,175

    19 February2014

  • 8/11/2019 140219 LCC Mod #1_Town Council Meeting Cost Proposal

    3/3

    NewLoudounCountyLovettsvilleCommunityCenter

    Mod#1 TownCouncilMtg CostProposal

    LaborWorksheet

    Discipline Labor Categories Labor

    RatesConceptual

    Design

    Formal

    Presentations

    Labor

    SubtotalsPrice

    Principal 250.71$ 0 $

    Project Manager 141.30$ 5 5 706.48$

    QC Manager 146.94$ 0 $

    Architect 1 122.45$ 0 $

    Architect 2 94.21$ 12 3 15 1,413.13$

    Task Leader 84.77$ 0 $

    Technician 1 84.77$ 0 $

    Technician 2 72.75$

    0

    $

    Administrative Assistant 81.64$ 2 2 163.27$

    Civil Project Manager $143.07 0 $

    Senior Civil Engineer $179.02 0 $

    Civil Engineer $127.77 0 $

    Land Planner $184.33 0 $

    Park & Recreation Planner $124.92 0 $

    Landscape Architect $94.87 0 $

    CAD Technician $88.45 0 $

    Principal 199.80$ 0 $

    Project Manager 172.80$ 0 $

    Engineer 1 151.20$

    0

    $

    Engineer 2 129.60$ 0 $

    Engineer 3 113.40$ 0 $

    Tech 1 108.00$ 0 $

    Tech 2 70.20$ 0 $

    Administrative 70.20$ 0 $

    Principal $145.80 0 $

    Project Manager $129.60 0 $

    Senior Engineer $118.80 0 $

    QC Manager $102.60 0 $

    Designer $91.80 0 $

    CAD Technician $70.20 0

    $

    Administrative $59.40 0 $

    Project Manager 129.60$ 0 $

    Engineer 1 151.20$ 0 $

    Tech 1 108.00$ 0 $

    Cost Engineer 151.20$ 0 $

    0 $

    Project Manager/ QA/QC 135.00$ 0 $

    Certified Industrial Hygienist 155.00$ 0 $

    Tech 1 85.00$ 0 $

    Totals 12 10 22 2,282.88$

    HazMatID&

    Monitoring

    LSYArchitects

    Civil

    Structural

    MEPEngineering

    Tele/

    Security/AV/

    Acoutical

    Cost

    Estimati

    ng

    19February2014