1 M.E-CONSTRUCTION ENGINEERING & MANAGEMENT GUJARAT TECHNOLOGICAL UNIVERSITY BIRLA VISHVAKARMA MAHAVIDHYALAYA PREPAIRED BY: CHAUDHARI JAYDIPKUMAR V M.E-CONSTRUCTION ENGINEERING & MANAGEMENT(140080714002) B.V.M. ENGINEERING COLLEGE VALLABH VIDHYANAGAR UNDER GUIDANCE OF: PROF. JAYESHKUMAR R.PITRODA ASSISTANT PROFESSOR & RESEARCH SCHOLAR CIVIL ENGINEERING DEPARTMENT B.V.M. ENGINEERING COLLEGE VALLABH VIDHYANAGAR REVIEW PRESENTATION OF PAPER (RP) A CRITICAL LITERATURE REVIEW ON INTEGRATED FRAMEWORK F ASSESSING FACTORS AFFECTING HUMAN RESOURCE MANAGEMENT CONSTRUCTION

Upload: pitroda24977

Post on 13-Apr-2017

150 views

Category:

Engineering


1 download

TRANSCRIPT

Page 1: 140080714002 paper-1

1

M.E-CONSTRUCTION ENGINEERING & MANAGEMENT

GUJARAT TECHNOLOGICAL

UNIVERSITY

BIRLA VISHVAKARMA

MAHAVIDHYALAYA

PREPAIRED BY:CHAUDHARI JAYDIPKUMAR VM.E-CONSTRUCTION ENGINEERING & MANAGEMENT(140080714002)B.V.M. ENGINEERING COLLEGEVALLABH VIDHYANAGAR

UNDER GUIDANCE OF:PROF. JAYESHKUMAR R.PITRODA

ASSISTANT PROFESSOR & RESEARCH SCHOLARCIVIL ENGINEERING DEPARTMENT

B.V.M. ENGINEERING COLLEGEVALLABH VIDHYANAGAR

REVIEW PRESENTATION OF PAPER (RP) A CRITICAL LITERATURE REVIEW ON INTEGRATED FRAMEWORK FORASSESSING FACTORS AFFECTING HUMAN RESOURCE MANAGEMENT INCONSTRUCTION

Page 2: 140080714002 paper-1

2

A CRITICAL LITERATURE REVIEW ON INTEGRATED FRAMEWORK FOR ASSESSINGFACTORS AFFECTING HUMAN RESOURCE MANAGEMENT INCONSTRUCTION

NARESHKUMAR PRAJAPATI*JAYESHKUMAR PITRODA**PROF. CHETNA M. VYAS***

*Student of Final Year, M.E.(Construction Engineering& Management), B.V.M. Engineering College, Vallabh Vidyanagar,Gujarat, India**Assistant Professor, Civil Engineering Dept., B.V.M. Engineering College, Vallabh Vidyanagar, Gujarat, India***Assistant Professor, Civil Engineering Dept., A.D.Patel Institute of Technology, New Vallabh Vidyanagar, Gujarat, India

JOURNAL OF INTERNATIONAL ACADEMIC RESEARCH FOR MULTIDISCIPLINARYImpact Factor 1.625, ISSN: 2320-5083, Volume 2, Issue 12, January 2015

Page 3: 140080714002 paper-1

3

ABSTRACT• Human resources are the live resources in the construction field, who have all the

types of needs and risks.

• It is difficult and risky to manage them as they are live and they are not mostly permanent like other industries.

• Therefore, it is necessary to analyze the Human Resource Management(HRM) in the construction industry.

• However, past research has been done on HRM are mostly qualitative and there is a lack of quantitative research.

• Due to this lack of quantitative research, there is no good-developed framework for factors affecting HRM in the construction industry.

• This paper deals with identification of factors affecting HRM and developing a framework for assessing the factors affecting HRM.

• In the end, a framework has been developed which can be used for the future research in this area.

Page 4: 140080714002 paper-1

4

INTRODUCTION• Human resources are nothing but the personals working in the organizations

for achieving the goals of the business and earning benefits for themselves for their survivals or for their specific purpose.

• Employees are largely a factor of production of any organization, whether it b construction or manufacturing.

• Human resource is required for an organization to conduct different business activities.

• Without the support of human resource, the organization cannot exist or operate effectively.

• The success of any organization depends on the effective use of human resources.

• quality of HRM can affect a range of issues, and in the context of construction, poor

• employment relations may have an impact upon levels of work quality, innovation, project delays, and corporate reputation .

Page 5: 140080714002 paper-1

5

PREVIOUS RESEARCH REVIEW BASED ON IDENTIFYING FACTORS AFFECTING HRM IN CONSTRUCTION• Tiwari et al. (2002) found that HRM practices get affected by external and internal factor sand

directly or indirectly affect other variables such as employee’s attitude, employee, employer relations, financial performance, employee productivity etc. and ultimately contribute to overall corporate performance.

• Wan et al. (2002) examined the relationship between strategic HRM variables and firm performance using 29 variables and revealed in their analysis that the strategic HRM variables were found to have a positive effect on organizational outcomes, especially with respect to a firm’s HR performance.

• Budhwar et al. (2002) found that there is a strong need for more cross-national HRM studies. However, the literature showed the absence of an integrated framework. They developed an integrated framework (containing 40 variables) for understanding cross-national human resource management practices

• Makulsawatudom et al. (2004) by questionnaire survey and interviews of 34 project managers, disclosed the ten most significant factors (out of 23) affecting construction productivity in Thailand as lack of material, incomplete drawings, incompetent supervisors, lack of tools and equipment, absenteeism, poor communication, instruction time, poor site layout, inspection delay and rework.

• Budhwar et al. (2004) presented a previously developed framework (containing 40 variables) useful for highlighting the main determinants of HRM policies and practices from a cros snational comparative perspective and stated that there is the need to examine HRM systems of Asian countries.

Page 6: 140080714002 paper-1

6

PREVIOUS RESEARCH REVIEW BASED ON IDENTIFYING FACTORS AFFECTING HRM IN CONSTRUCTION• Hashem et al. (2006) carried out an investigation of 30 factors affecting labor productivity and

ranked according to their relative severity from the viewpoint of 41 project managers in building sites. The ten most significant problems affecting labor productivity were identified as length of workday, equipment breakdown, lack of materials, lack of proper equipments, lack of proper tools, inadequate supervision skill, material type, large volume of work,quality required, and work complexity.

• Du et al. (2007) stated that a variety of factors influence the implementation of HRM ininternational construction. They also summarized the key factors of HRM implementation in international construction and the HRM function of each of project participants over the project period.

• Min et al. (2007) concluded that in order to take better use of the asset of manpower, complete HR strategy should be established.

• Kundu et al. (2007) studied 22 variables related to human resource management practices in shipping companies, based on 250 observations from 125 shipping companies. Factor analysis brought about five factors, which were further analyzed.

• Kundu et al. (2009) discovered that ‘Training and benefits’ was found highly in practice in the insurance companies. Further, ‘performance appraisal,’ ‘selection and socialization of employees,’ and ‘HR planning and recruitment’ were moderately practised in insurance companies. ‘Workforce diversity and contemporary HR practices’ and ‘competitive compensation’ were also practised to some extent.

Page 7: 140080714002 paper-1

7

PREVIOUS RESEARCH REVIEW BASED ON IDENTIFYING FACTORS AFFECTING HRM IN CONSTRUCTION

• Özutku et al. (2009) carried out an empirical study on the determinants of human resource practices of 217 companies using 16 different variables and found that both internal and external factors have significant influences on the HR practices in the Turkish manufacturing industry.

• Agyepong et al. (2010) conducted a cross-sectional survey in Ghana to identify the factors, which influence the development of HRM policies of large construction organizations operating within the Ghanaian Construction. It can be clearly said from their empirical evidence that, the organizational situational factors identified by the Harvard model and the external influencing factors identified by the Warwick Model affect the development of HRM policies in large construction companies operating in Ghana. However, according to them, further research is recommended to validate the factors identified in this study.

• Alinaitwe et al. (2010) studied 36 factors affect productivity with respect to time, cost and quality. The ten most significant problems affecting labour productivity were identified as incompetent supervisors; lack of skills from the workers; rework; lack of tools/equipment; poor construction methods; poor communication; inaccurate drawings; stoppages because of work being rejected by consultants; political insecurity; tools/equipment breakdown; and harsh weather conditions

• Fagbenle et al. (2011) identified some factors perceived to be negatively affecting the performance of construction labor and also examined how these factors vary from site to site in the Nigerian construction industry using structured questionnaires on forty constructionsites, which incorporated 12 different factors.

• Durdyev et al. (2011) identified the key constraints of on-site labor productivity in the New Zealand construction industry and prioritized the constraints based on their relative levels of impact. 56 sub-factors had identified under 8 broad categories of internal and external constraints. Results showed that compared to the external factors, the internal constraints were found to contribute far more to the on-site labor productivity issues.

Page 8: 140080714002 paper-1

8

PREVIOUS RESEARCH REVIEW BASED ON IDENTIFYING FACTORS AFFECTING HRM IN CONSTRUCTION• Al-Jabari (2012) studied three factors that affect HR practices in some Palestinian

organizations: firm size (No. of employees), sector (whether government, private or nongovernment organization), and profitability (profit vs. non-profit organization). Findings show that larger firms apply more formalized HR practices than smaller firms do; also nonprofit sector is practicing HR higher than profit sectors.

• Rouyendegh et al. (2012) presented a real case study, which examined a fuzzy Analytic Hierarchy Process (FAHP) for selecting the most suitable academic staff, where five candidates under ten different sub-criteria are evaluated and prioritized.

• Pai et al. (2013) found that factors that motivate workers are money, hygiene environment and good working culture. Many companies keep their skilled workers with them by paying competitive wages, timely payments, good working culture, hygiene environment and sufficient work. In addition to these companies providing bonuses, incentives, and gifts for achievement of targets and also providing PF through labour contractor.

• Zhai et al. (2013) developed a reliable and valid human resource measurement scale in the context of Chinese construction organizations after exploratory and confirmatory factor analyses, which include 15 items to indicate four HR practices of employment relations, training, staffing, and rewards.

Page 9: 140080714002 paper-1

9

PREVIOUS RESEARCH REVIEW BASED ON IDENTIFYING FACTORS AFFECTING HRM IN CONSTRUCTION• Nukić et al. (2013) measured the influence of different HRM activities on business result

of construction companies in Croatia considering 18 independent variables classified in 4 groups and 7 control variables in their model. They suggested that, among other human resources activities, the material motivation activities have the most significant impact on business results. In the end, they recommended to employers in construction not to neglect the influence of HRM activities, especially material motivation, on the performance of the company.

• Attar et al. (2013) identified ten most significant factors affecting labor productivity for small, medium and large companies. They suggested that practically it is a difficult task for all to improve labor productivity up to 100%, but if we have properly control on above factors, productivity can be improved up to a large extent.

• Mahamid et al. (2013) completed a structured questionnaire survey, including the 32 factors (in 5 groups) affecting labor productivity in public construction projects in Saudi Arabia from the contractor’s viewpoint. As per the responses from 41 contractors, the top ten important factors negatively affecting labor productivity in public construction projects were: lack of labor experience, poor communication and coordination between construction parties, bad relations between labors and management team, payment delay by owner, misuse of time schedule, rework, labor’s low wage, financial conditions of contractor, poor site management, and frequent change orders.

Page 10: 140080714002 paper-1

10

PREVIOUS RESEARCH REVIEW BASED ON IDENTIFYING FACTORS AFFECTING HRM IN CONSTRUCTION

• Rosman et al. (2013) found 12 different factors affecting the role of the HR department in the private healthcare sector in KPK, Pakistan categorized in two groups. They found that internal factors have a negative impact on the motivation, performance and morale of the employees whereas external factors create difficulties for HR departments to attract andretain the desired workforce.

• Raj et al. (2014) carried out three questionnaire surveys between 50, 75 and 100 labors of various companies using SPSS software and extracted their responses for studying the impact of human resource management on productivity and financial performance in the construction industry based on various 33 factors from the labor’s point of view, which were classified in 10 different groups.[20,21,22] Based on the literatures studied, the following figure 1 has been shown, describing the studied papers published till the year stated and indicating the key findings till this year.

Page 11: 140080714002 paper-1

11

Page 12: 140080714002 paper-1

12

CONCLUSION:• For job analysis and HR planning regular job analysis, regular human resource planning,

emphasis on service employees, human resource information system, employee attitude surveys

• For recruitment and selection Number of Job Applications, Tests and Candidates Assessment, Recruitment Policy, Efforts in Selection, Amount of Money Spent on process, Education of Candidates, Working Experience of Candidates, Language knowledge of Candidates, Technical knowledge of candidates, Members of the selection team, Poor communication

• For education and training Quality of programs provided, Adequacy and quantity of programs, Attendance of workers, Money spent on program, Kinds of training, Opportunities for training, High priority on training, Systematically structured training process.

• For retaining, motivation and performance appraisal, the previous work as: sufficient work to workers, Hygiene Environment, Good Working Culture, Paying competitive wages, Timely payments, Providing PF, Employees’ opinion and ideas, Probability of promotion, Regular performance appraisal, Due weight to service performance, Proper HR information system.

• For compensation and rewards Bonuses, Incentives, Pay for performance, Competitive salaries

• For employment relations Clearly defined duties, Accurate job description, Employee involvement in decisions, Awareness to the employees, Involvement in suggesting improvements, Flexible work hours.

Page 13: 140080714002 paper-1

13

• For health and safety Accommodation, Job security, Life security, Health service, Insurance. For other external factors labour strikes, Extra work, Large volume of work, Length of work day, Rework, Changing crew members, Improper crew design, Firm size (No. of employees),Organizational culture, National policies, Labour act, DisputesOther factors were introduced based on recruitment and selection by the authors as:Social background of the candidates, Type of work and based on external factors as: Organizational unstability, Political emergencies.