Production and Development

WF10 033 01.08

Chris Bruijnzeels, Vice President Reservoir & ProductionJanuary 2008

14

Page 2: 14 Production and Development - Lundin Energy

WF8263 02.06

Resource Classification System

Society of Petroleum Engineers/World Petroleum Council Classi�cation

PRODUCTION

RESERVES

CONTINGENTRESOURCES

PROSPECTIVERESOURCES

Proved Proved &Probable

Proved, Prob.& Possible

Commercial

Discovered but no �rm investment decision

Exploration Prospectivity

1P 2P 3P

15

Page 3: 14 Production and Development - Lundin Energy

WF9974 01.08

2008 Proven & Probable Reserves

France (25.8)Netherlands (4.9)

Indonesia (16.1)

Tunisia (1.9)

UK (53.8)

Norway (57.0)

Russia (24.7)

Norway (57.0)

UK (53.8)

Indonesia (16.1)

France (25.8)Russia (24.7)

Total 184.2 MMboe

01.01.2007 176.4mmboe

- Produced (forecast) -12.4+ New reserves 18.4+ Acquisitions 1.8

01.01.2008 184.2

Reserves Replacement Ratio 148%

Increase in Reserves 12%

Oil 85.3%

Gas 14.7%

184.2

16

Page 4: 14 Production and Development - Lundin Energy

WF9974 01.08

Reserves Growth

0

20

40

60

80

100

120

140

160

180

200

2003 2004 2005 2006 2007

MM

boe

RussiaNorwayU.K.VenezuelaTunisiaIndonesiaNetherlandsFrance

2008

17

Page 5: 14 Production and Development - Lundin Energy

WF10014 01.08

-10.0 -5.0 0.0 5.0 10.0 15.0

France

Indonesia

Netherlands

Norway

Tunisia

U.K.

Russia

France

Indonesia

Netherlands

Norway

Tunisia

U.K.

Russia

MMBoe

Produced in 2007 Net Movement Acquisition

Reserves Changes

18

Page 6: 14 Production and Development - Lundin Energy

WF10014 01.08

Main Reserves Changes

UK Peik development moved from Contingent Resources to Reserves (4.8 MMBoe) Thistle South block infill drilling moved from Contingent Resources to Reserves (3.2 MMBoe)

Norway Peik development moved from Contingent Resources to Reserves (6.4 MMBoe) Alvheim (East Kameleon) moved from Contingent Resources to Reserves (3.9 MMBoe)

France Rheathian fields infill drilling moved from Contingent Resources to Reserves (2.4 MMBoe)

Russia First time audited by Gaffney, Cline and Associates. Reduction compared to pre-acquisition D&M* audited reserves (-3.8 MMBoe)

*DeGolyer and MacNaughton

19

Page 7: 14 Production and Development - Lundin Energy

WF9688 01.08

0

20

40

60

80

100

120

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Mb

oep

d

excludes any exploration success or acquisitions

2P as at 1.1.2008

as at 1.1.2008Contingent Resources (CR)

Production Profile based upon 2008 Resource Position

Existing resources have the potential to triple existing production

20

Page 8: 14 Production and Development - Lundin Energy

WF10022 01.08

0

5,000

10,000

15,000

20,000

25,000

30,000

boepd boepd

35,000

40,000

45,000

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

Q4Q1 Q2 Q3France

Netherlands

Indonesia

Russia

Tunisia

UK

Norway

Yearly Average : 36,500 boepd

2008 Production Forecast

21

Page 9: 14 Production and Development - Lundin Energy

WF10023 01.08

Norway - Alvheim delay to 1 April 2008

- 2007 study work and drilling delays resulted in lower expectations for 2008

- 2007 performance better than expected, leading to no requirement for additional water injection well in 2008

- Deferment of gaslift facilities on platform- Shutdown in 2008 related to redevelopment- Lower uptime assumption as result of the generator module �re

- Delay of Singa �rst gas from 2008 to 2009 Indonesia

United Kingdom

Broom

Thistle

Russia

6,200 boepd

1,100 boepd

1,800 boepd

2,900 boepd

3,000 boepd

2008 – Why not over 50,000 boepd?

22

Page 10: 14 Production and Development - Lundin Energy

2008 Development Capital Expenditure

WF10024 01.08

UK, 169

Norway, 116 Russia, 28

France, 21

Indonesia, 31

Netherlands,10

2008 Forecast 375 MMUSD

23

Page 11: 14 Production and Development - Lundin Energy

2008 Projects - Norway Alvheim

WF10025 01.08

Alvheim (WI 15%)FPSO status

Sail away from Haugesund FebruaryDeep water testing in Amoy�orden during FebruaryO�shore installation and hook up in MarchOn stream end Q1 2008

2006-2007 drillingDrilled and completed 4 Kneler and 2 Boa wells (one Multi Lateral)Drilled and completed 2 water disposal wellsDrilled KN5 and KAM2 to top reservoir

2008 DrillingRedrill KN3 due to casing integrity problemDrill and complete 1 Kneler, 1 Boa and 2 Kameleon wells (three Multi Laterals)

2010 DrillingDrill and complete 1 Kameleon and 2 East Kameleon wells (one to three Multi Laterals)

24

Page 12: 14 Production and Development - Lundin Energy

2008 Projects – Norway Alvheim

WF10029 01.08

BOA 12

Kameleon

East Kameleon

Kneler

Boa

KameleonKameleonKameleonKameleonKameleonKameleonKameleonKameleon

East KameleonEast KameleonEast KameleonEast KameleonEast KameleonEast KameleonEast KameleonEast KameleonEast KameleonEast KameleonEast KameleonEast Kameleon

KnelerKnelerKnelerKnelerKnelerKneler

BoaBoaBoaBOA 11

BOA 09

KAM 03

KAM 02

EKAM 01

EKAM 02

KN 02

KN 05

KN 03

KN 06

KN 07

KAM 01

Drilled Development WellsPhase 1 TargetsPhase 2 Targets

25

Page 13: 14 Production and Development - Lundin Energy

2008 Projects - Norway Volund

WF10026 01.08

Volund (WI 35%)

2008 Work Programme

Subsea facilitiesLong lead well items

2009 Drilling1 water injector, 3 producers

First production 2nd half 2009

0025

0024

009

4b

7b

7d

9a

6b

9c

9b

4h

4gUP

19

6aUP

6aLW

15b

15aLW

4c

14c

15c

7a

15aF1

4gLW

4fUP

4fLW

14aLW

4a

9e

15aUP14aUP

HEIMDAL

GEKKO

ALVHEIM

ALVHEIM

ALVHEIM

VOLUND

PEIK (UK)

PEIK (NORWAY)

6

5

8

7

5

4

3

1

7

65

3

2

1

43

2

1

3Z

2A

7a7a

15aF115aF115aF1

15aUP14aUP

PEIK (UK)PEIK (UK)PEIK (UK)

Lundin Licences

Oil Field

Gas Condensate Field

0 2.5 5

Kilometers

Volund

PL088Pl088BS

9/15a

PL413

PL340

9/15c

PL203

PL036c

PL150

26

Page 14: 14 Production and Development - Lundin Energy

WF10031 01.08

2008 Projects – Alvheim/Volund drilling schedule

Water disposalDrill Centre

Drilling Rig

KnelerDrill Centre A

KnelerDrill Centre B

BoaDrill Centre

East KameleonDrill Centre

MarathonOperated

Alvheim area

J F S O N DM A AM J J2006 2007 2008 2009 2010

J F S O N DM A AM J J J F S O N DM A AM J J J F S O N DM A AM J J J F S O N DM A AM J J

Deep Sea Bergen Songa Dee

KN06

Kneler 7 D&C wellsincl 2 KN05 pilot holes,

KN05 & KAM02 MLT set 30” & 18-5/8” casing

KAM 2 pilot hole

Drill & Comp.KN05 and dual

lateral wellKAM02

Drill & Comp.BOA12 and dual

lateral wellBOA09

Drill & Comp.dual lateral well

BOA11 and KAM01

EKAM

01

& 02

Volu

nd W

I

Volu

nd P

rod

1

Volu

nd P

rod

2

Volu

nd P

rod

3

KAM

03

Flex

KN02

KN03

KN02

&03

KN06

com

pKN

03 co

mp

KN04

H(K

N02H

redr

ill)

First Oil - End March 2008

27

Page 15: 14 Production and Development - Lundin Energy

WF10049 01.08

Thistle Redevelopment

STOIIP 846 MMstb

Produced 428.4 MMstb 50.6% Recovery Factor

Certified 2P reserves 17.4 MMstb

Contingent Resources 18.9 MMstb

2P Ultimate Recovery of 52.7%

2P + CR Ultimate Recovery of 55%

Is there additional upside?

OWC

DeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveronDeveron

28

Page 16: 14 Production and Development - Lundin Energy

WF10051 01.08

2P Investment

Facilities investment for 2P reserves is not attractive ....

Production

0

1

2

3

4

5

6

7

8

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

MB

oepd

2P

Drilling*

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

Facilities*

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

* Pre tax costs

Total drilling investment: USD 50 MM

Total facilities investment: USD 160 MM

29

Page 17: 14 Production and Development - Lundin Energy

WF10051 01.08

Long Term Investment Plan

2P CR

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

Drilling

Facilities

0

2

4

6

8

10

12

14

MB

oepd

Production

... investing to capture Thistle’s upside potential

* Pre tax costs

Total Facilities CR investment: USD 80 MM

Total Drilling CR investment: USD 160 MM

Lifting costs for contingent resources negligible

30

Page 18: 14 Production and Development - Lundin Energy

WF10052b 01.08

Thistle’s Future

Acquired new 3D seismic in 2007

Investment in drilling facilities in 2007/08

Workovers in 2008

Subsurface studies in 2008 ongoing Integrate seismic and update models De�ne contingent resource in�ll targets Move contingent resources into reserves (already moved 3.2 MMBoe in 2007)

Start infill drilling in 2009

Attract third party business

31

Page 19: 14 Production and Development - Lundin Energy

2008 Projects - Others

WF10027a 01.08

Netherlands (10.5 MMUSD)K5F development (WI 2.03%) Tie in of two development wellsK6GT in�ll (WI 3.841%) Two in�ll wellsK4A3 in�ll (WI 2.03%) One in�ll wellL4pn (WI 4.34%) Pipeline replacement

Russia (28.4 MMUSD)KalmEastern (WI 51%) 4 development wells plus facilities

OilGazTet (WI 50%) facilities

Komi assets (WI 50%) 6 development wells plus facilities

32

Page 20: 14 Production and Development - Lundin Energy

2008 Projects - Others

WF10027b 01.08

France (21.8 MMUSD)Les Mimosas development (WI 50%) Water injection wellSoudron development (WI 100%) Deepen water injectorVert La Gravelle (WI 100%) Drill water injectorGrandville Complete water injector

Indonesia (31.9 MMUSD)Singa Development (WI 25.88%) 2 Development wells plus facilities

Salawati Basin (WI 25.94%) 8 Development wellsSalawati Island (WI 14.51%) 2 Development wells

33

Page 21: 14 Production and Development - Lundin Energy

WF10015 01.08

Contingent Resources - Existing Discoveries

to R

eser

ves

Norway, 45.1

UK, 54.7

France, 12.4

Others, 20.8

Others, 13.0

133.0 MMboe net Lundin Petroleum

Norway, 105.4

UK, 60.3

- Thistle Infill- Heather Infill- Heather Triassic- SW Heather- Broom Infill- Scolty

- Luno- Greater Alvheim Area- Nemo- Pi South- SE Tor

France, 9.6

188.3 MMboe net Lundin Petroleum

2007

DiscoveriesLuno, Scolty

+70 MMboe

20 MMboe

2008

34

Page 22: 14 Production and Development - Lundin Energy

WF10016 01.08

Contingent Resource Movement

0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0

Norway - Alvheim

Norway - PL292

Norway - PL148

Norway - PL006

Norway - Luno

Norway - Others

Peik

UK - Heather

UK - Thistle

UK - Broom

UK - Heather Triassic

UK - SW Heather

UK - P9/10b

UK - Scolty

Tunisia

France

Indonesia

Congo

MMBoe

2007 2008

2007 Viodo Development

4.4 MMBoe Blora block relinquishment, 2.6 MMBoe TBC and KOI developments

2.4 MMBoe from CR to Reserves

Birsa full field development

2007 Discovery

Peik Acquisition

3.2 MMBoe from CR to Reserves

11.2 MMBoe from CR to Reserves

2007 Discovery

3.9 MMBoe from CR to Reserves, 4.1 MMBoe of additional resources identified

35

Page 23: 14 Production and Development - Lundin Energy

WF9434 01.08

027 028 029

020 021 022

013 014 015

007 008

002

006

003

009

001

030

00090008

001800170016

0026

0025

0027

00310030

0002

0007

016

0032

0003

A

5604

5504

0015

0001

023

0024

5603

5503

031

BergenSullom Voe

UNITED KINGDOM

NORWAY

0 100KM

OperatedNon Operated

PL148

PL338

PL203002400240024

PL340

PL292P1107

PL006c

Peik

9/10b

PL006c:South East Tor

75% interest (operator)gross resources: 22.5 mmboeappraisal drilling in 2008

PL148 7/7-2:Nemo

50% interest (operator)gross resources: 20.6 mmboeappraisal drilling ongoing

PL292:Pi South

40% interestgross resources: 10.9 mmboePi North prospect drilling in Q1 2008

PL340 15% interestgross resources: 11.0 mmboedrilling Marihone prospect in 2008

PL338Luno

50% interest (operator)gross resources: 65-190 mmboeappraisal drilling in 2008

* Excludes in�ll drilling within existing �elds

P1107:Scolty

40% interest (operator)gross resources: ~10 mmboedrilling amplitude anomaly prospect (Torphins) in 2008

PL203Gekko/Kobra

15% interestgross resources: ~36.6 mmboe

P090 (9/10b)9/10b discovery

85% interestgross resources: ~11.9 mmboe

Net Contingent Resources: 119 MMBOE

UK / Norwegian Undeveloped Discoveries*

36

Page 24: 14 Production and Development - Lundin Energy

WF10017 01.08

2008 Contingent Resource Work Programme

Norway Appraisal Drilling PL338 (Luno) PL006C (SE Tor) PL148 (Nemo)

Thistle and Heather Development studies New 3D seismic Update reservoir model Define infill targets

Exploration near contingent resources UK - Torphin exploration near Scolty discovery Norway – Pi North Exploration near Pi South PL292 discovery Norway – Marihone Exploration near PL340 discovery Congo – Exploration near Viodo discovery

France Ongoing development studies

37

Page 25: 14 Production and Development - Lundin Energy

WF10018 01.08

PL409

PL410

PL304

PL359

PL167

PL167 B

001001001660010010010015

00200250024

89a

6b

7b

5b

4a

3a

2b

4b

2a

1e

2

5a

10c

3e3dd

11g

3

6e

9

77777aaaaa

1c

1d11fff

11b

5b

6ddd

3f

8c

1g

3c

3b

1h

5e

6a

10f

8a

8b

6b

1a

12

1b

101010aaaaaa

8ddd

2828

1111

7c

3333333bbbb

101010ee

111111jjj

2929bbb282828bb29b2929b29

9ccc99dd

88ccc

101010PL167 B10PL167 BPL167 B10PL167 BPL167 B10PL167 BdddddPL167 BdPL167 BPL167 BdPL167 BPL167 BdPL167 BPL167 BdPL167 B

1111j11j cc

5555ffff

GUDRUN

GLITNE

HANZ

VOLVE

0024/12 (Area 3)GRANE

SLEIPNER WEST

SLEIPNER EAST + LOKE

DAGNY

GUNGNE

BRAE EAST

SIGYN

LUNO PROSPECT

9bb0 5 10

Kilometers

Oil fieldGas Condensate field

Luno Discovery - PL338

Lundin Petroleum interest: 50% (Operator) Revus 30%, RWE 20%

Discovery 16/1-8 Light oil in Jurassic reservoirUpside in TriassicLargest discovery in Norwegian North Sea in the last decadeNew play concept proven

Contingent Gross Resources

Discovered in 2007

Discovery MMBOE

13357?

1229a28aa

0024/12 (Area 3)0024/12 (Area 3)Lundin Petroleum OperatorLundin Petroleum Partner

PL338

Luno Jurassic (mean)Luno Jurassic upsideLuno Triassic upside

38

Page 26: 14 Production and Development - Lundin Energy

WF10018 01.08

Drill and test delineationwell 16/1-10 Q2/Q3 2008

Drill second delineationwell 16/1-11 andtest 16/1-8 in 2008/9

Decide on commerciality end 2008

Initiate a Plan for Developmentand Operation in 2009

Forward Plan Luno discoverywell 16/1-8 16/1-4

16/1-5

Luno discoverywell 16/1-8 16/1-4

16/1-5

Jurassic reservoir

Triassic reservoir

Appraisal 1

Appraisal 2

Appraisal programme to commence in 2008 to - appraise lateral extent and quality of Jurassic reservoir (Appraisal -1) - appraise Triassic potential (Appraisal -2)

A rig slot has been secured to beginappraisal programme in 2008

Existing wellsNew well

New well

Luno Discovery - PL338

39

Page 27: 14 Production and Development - Lundin Energy

WF9828a 11.07

Norway - Luno Regional

16/1-4

16/1-5

16/1-8

Utsirahigh south

PL338

PL304

PL167

PL359

PL410

Luno discoverywell

0 KM 10

Lundin 70%(operator)

Lundin 100%(operator)

Lundin 20%

Lundin 50%(operator)

Lundin 60%(operator)

Applied for and awarded additionalacreage in area on the assumption thatthe new Luno play concept worked

40

Page 28: 14 Production and Development - Lundin Energy

WF9920 01.08

Southern North Sea - PL148

Lundin Petroleum interest: 50% (operator) Noreco 20 %, Talisman 30%

Contingent Gross Resources

Field MMBOE

Nemo

Nemo additional upside

20.6

12.4

98

3

030

00000022

0008 00099

000000000333

0007

000116

13

89879

9

6

12

1110

12

7

4a

8b

3a

6a

9b

1

7b

7a

5b

2b

4a

4

12b

5 5 6 4

3a

8

1b

7b

11c

8

11a

4

10b

3b

21

5c

21

10

16

2a

5b1315

2UP

25

10

2b

26

2LW

5a

30

28a

7a

25a

32

10b

8c

10a

24b

27c

7b

23a24a

7a

19b

6b

23b

9a

28b

11c

30

27b

5c

30

19a

21

20b

17b

15

16

25

4b

7b

5e

8aUP

18W

11b

26c

5b

30a

29b

20c

4c

28N32a31a

1c1aF1

6LW

30b

12a

11a

20a

5b

5bLW

17a

7d

20a

2b

26c

9a

29

14

1g

23a

31a

4b

27c

12b

7a

20b

16f

5a

4d

4LW

20a

29c

27a

1d

10a

0 40KM

PL148PL335

PL400

PL398sPL440s

PL006C

4 6LW5bLW 4LW

Lundin Petroleum OperatorLundin Petroleum Partner

UKUKUKUKUKUKUKUKUK

DENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARK28a

DENMARK28a27c

DENMARK27c

26cDENMARK26c

NorwayNorwayNorwayNorwayNorwayNorway11cNorway11c

Nemo discovery

41

Page 29: 14 Production and Development - Lundin Energy

WF9920 01.08

Southern North Sea - PL148 - Nemo

PL148 - Nemo Net Production to LundinNet Production (mbopd)

0123456789

2007

2009

2011

2013

2015

2017

2019

2021

2023

2025

2027

2029

2031

(mbo

pd)

Gas ProductionOil Production

7/7-2 Statoil 1992, oil down to DST 5000 bbl/d, 36 API, Pressure 626 bar @3310 m SS

7/7-3 Statoil 1993, only shows (water up to)

Contingent gross resources 20.6 MMboe with additional upside

Upside volumes 12.4 MMboe

Planned appraisal well position to prove up significant upside: OWC, reservoir thickness/quality

Mærsk Giant rig commenced drilling on 15th December 2007

Nemo Discovery

-3500

-3525-3500

-3800-3750-3700-3650-3600-3550-3500-3450-3400-3350-3300

Depth

0 500 1000 1500 2000 2500m

1:63457

-

ODT -3323

PL148

TOP GYDA RESERVOIR MAP

Trias

sic Po

d

P1

I1

7/7 2

7/7-3

42

Page 30: 14 Production and Development - Lundin Energy

WF9915 11.07

Southern North Sea - PL006C

Lundin Petroleum interest: 75% (Operator) Noreco 25%

InfoDiscovery well 2/5-3 (1972) found lightoil in two formationsEach formation tested rates in excessof 4,300 bbl/d

Contingent Gross Resources

Discovery MMBOE

22.55.6

030

00000022

0008 00099

000000000333

0007

000116

13

89879

9

6

12

1110

12

7

4a

8b

3a

6a

9b

1

7b

7a

5b

2b

4a

4

12b

5 5 6 4

3a

8

1b

7b

11c

8

11a

4

10b

3b

21

5c

21

10

16

2a

5b1315

2UP

25

10

2b

26

2LW

5a

30

28a

7a

25a

32

10b

8c

10a

24b

27c

7b

23a24a

7a

19b

6b

23b

9a

28b

11c

30

27b

5c

30

19a

21

20b

17b

15

16

25

4b

7b

5e

8aUP

18W

11b

26c

5b

30a

29b

20c

4c

28N32a31a

1c1aF1

6LW

30b

12a

11a

20a

5b

5bLW

17a

7d

20a

2b

26c

9a

29

14

1g

23a

31a

4b

27c

12b

7a

20b

16f

5a

4d

4LW

20a

29c

27a

1d

10a

0 40KMPL148

PL335

PL400

PL440sPL398s

Lundin Petroleum OperatorLundin Petroleum Partner

UKUKUKUKUKUKUKUKUK

DENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARKDENMARK28bDENMARK28b26cDENMARK26c

NorwayNorwayNorwayNorwayNorwayNorway11cNorway11c

6a

4a4a4aPL006c

SE TorSE Tor additional upside

43

Page 31: 14 Production and Development - Lundin Energy

WF9915 11.07

Possible tie in points for South East Tor arethe Tor field, the Ekofisk field (and the Valhall field)

Licence plan to drill well with side track(exploration and appraisal targets) in order toprove most likely reserves and potential upside

Contract with Mærsk Gallant

Expected start drilling: December 2008

Forward Plan

Southern North Sea - PL006C - SE Tor

PL398 SPL440S

PL006c0002

5603

0001

030

031

6

9

8a7a

5b

4a

3

10

6a

1b

8c

3a2LW

25a

30

5c

30

4b

7c

31a

4e

7d

5f

9c

1a

27c

5a

4d

21b

9b

11d

11c

11b

28b

2UP

4c

11a

9a

26b32a

6aF1

27b

26bF1

12

28a

28c

1aF1

7e

26

27a

7b

27b26f

20b

26g

32b

31b

24

21a

20a

26c

TOMMELITEN ALPHA

TOMMELITEN GAMMA

TJALVE

0002/07 (Area 22)

0002/02 (Area 1)

VALHALL

0002/05 (Area 11)

HOD

EKOFISK PHILLIPS0002/05 (Area 4)

GYDA 0002/02 (Area 5)

FREJA

0002/06 (Area 5)

FLORA

0002/07 (Area 19)

ANGUS

EKOFISK NON PHILLIPS

FREJA

0002/04 (Area 10)

0002/07 (Area 29)

0002/01 (Area 11)

031/26 (Area 8)

0 5 102.5

Kilometers

5bEKOFISK NON PHILLIPSSouth East Tor

Target 2

Target 1

New well

9km

15km

30km

9km

15km

30kmExisting wells

44