Transbay Transit CenterCAC Presentation

Early Below Grade Package14 February 2012

Page 2: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

EARLY BELOW GRADE PROCESS

• Currently executing the Buttress and Shoring Package 

• Objectives 

o To include the substantial majority of below grade structural concrete 

work 

o Provide waterproofing for the mat slab and foundation walls

o Incorporate cast‐in elements for pipes, electrical and structural items

o Incorporate a major seismic joint

o Accommodate bracing and construction equipment  platform (trestle) 

o Accommodate dewatering 

o Accommodate utility penetrations 

Page 3: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

Shoring, Foundation & Train Box

Mat Foundation

Shoring Wall

Tie-downs

Water table

B12

Page 4: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

Slide 3

B12 animate this slide to sequentially show:1. shoring walls2. Mat slab (& shoring)3. Lower concourse and columnsTHEN ON A NEW SLIDE:4. Steel frame & concrete ground floor slab5. Steel superstructure

SHOW SHORING WALLS IN SAY BLUE, CONCRETE IN GREY; STEELWORK IN RED PRIMERBGibbons, 9/15/2011

Page 5: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

• Once the shoring wall is installed, excavation begins. 

• 2250 Micropile tie‐downs are installed and site dewatering commences.

• Then the Below Grade Package gets underway : which includes a 5ft thick Mat slab and 3ft thick Foundation walls running the full length of the site

Currently executing the Buttress and Shoring Package 

Page 6: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

To Include The Substantial Majority Of Below Grade Structural Concrete Work

Page 7: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

Provide Waterproofing For The Mat Slab And Foundation Walls

Page 8: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

Incorporate Cast‐in Elements For Pipes, Electrical And Structural Items

Page 9: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

Incorporate a Major Seismic Joint

Page 10: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

Accommodate Bracing And Construction Equipment  Platform (Trestle) 

Page 11: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

Accommodate Dewatering

Page 12: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

Accommodate Utility Penetrations

Page 13: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

EARLY BELOW GRADE DRAWINGS

• Approximately 450 drawings in the package 

• Consultant drawings and specifications 

o Structural

o Architectural

o Mechanical

o Electrical

o Plumbing 

Page 14: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

Scope of Early Below Grade Package 

Page 15: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

STRUCTURAL

• Concrete Mat slab

• Foundation walls

• Concrete structural columns 

• Water storage tanks 

• Vehicle and Bike Ramps

• Tiedowns

Page 16: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

Water Storage Tanks

Page 17: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

Vehicle and Bike Ramps

Page 18: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

2300 Tiedowns

• Installed in BSE package

• Top of micropiles cast in to Mat slab to hold down building

• Building expected to rise due buoyancy 1 1/2" 

• Returns to rest after building is fully loaded

Page 19: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

ARCHITECTURAL

• Slab edge drawings 

o Locations of slab opening for stairs, escalators and elevators 

o Opening locations for drains, sumps, pipes and major conduits 

• Room layouts 

o Provide location of reinforcing for future rooms 

• Waterproofing 

• Seismic joint 

• Cast in channels 

o Support of future MEP items 

o Support of ceilings 

o Support of future overhead catenary power system for trains 

Page 20: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

Seismic Joint

Page 21: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

MECHANICAL

• Geothermal loop system 

ELECTRICAL

• Cast in boxes and conduits 

• Grounding system 

PLUMBING

• Cast in pipes and sleeves for future pipes 

• Sump pits and drains 

Page 22: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

Geothermal Loop System

Page 23: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

Sump Pits and Drains

Page 24: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

t3

Page 25: 14 February 2012 - Transbay Transit Centertjpa.org/uploads/2012/02/20120214-CAC-Presentation.pdf · Slide 3 B12 animate this slide to sequentially show: ... o Support of future MEP

Slide 28

t3 Do not animatettuser, 9/21/2011