1 08-2008 Power Transmission Division E T PS SL/Re 1 Power Transmission Division E T PS SL/Re 08-2008 13th Kassel Symposium Energy Systems Technology Power Converters in Grids, September 18-19, 2008, ISET Kassel, Germany Dietmar Retzmann FACTS Technologies Basics and Applications FACTS Technologien Prinzipen und Anwendungen Energy Sector

Upload: truongkien

Post on 05-Jun-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

1 08-2008 Power Transmission DivisionE T PS SL/Re1 Power Transmission DivisionE T PS SL/Re08-2008

13th Kassel Symposium Energy Systems Technology – Power Converters in Grids, September 18-19, 2008, ISET Kassel, Germany

Dietmar Retzmann

FACTS Technologies – Basics and Applications

FACTS Technologien – Prinzipen und Anwendungen

Energy Sector

Page 2: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

2 08-2008 Power Transmission DivisionE T PS SL/Re

Gon Power Markets

2 Power Transmission DivisionE T PS MT/Re

lobal Trends

08-2008

Page 3: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

3 08-2008 Power Transmission DivisionE T PS SL/Re

Electrical Energy is the Backbone of our Society …

… today and in Future

3 Power Transmission DivisionE T PS SL/Re08-2008

Page 4: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

4 08-2008 Power Transmission DivisionE T PS SL/Re

Greenland Melt-Down has accelerated –

Sea-Level Rise from Ice-Melting and thermal Expansion: 1961-2003: +18 +/-5 cm per 100 Years 1993-2003: +31 +/-8 cm per 100 Years

Source: Gregory et al., Nature (2004)

Possible Maximum Value as Worst-CaseBusiness-As-Usual Scenario

Source: "An End to Global Warming“, L.O. Williams,Elsevier 2002

Accelerated Greenland Melt-Down North of Germany after Sea-Level Rise by 100 m

Pictures of the Future ?

Page 5: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

5 08-2008 Power Transmission DivisionE T PS SL/Re5 Power Transmission DivisionE T PS MT/Re

ecurity

ask 1

of Power Supply08-2008

Page 6: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

6 08-2008 Power Transmission DivisionE T PS SL/Re

Power System Enhancement

6 08-2008 Power Transmission DivisionE T PS MT/Re

Security of Power Supply

and Blackout Prevention

Page 7: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

7 08-2008 Power Transmission DivisionE T PS SL/Re

Source: National Transmission Grid Study; U.S. DOE 5/2002 – “Preview”

System Enhancement necessary !

Source: ITC 8/2003 – “Blackout”

The US Blackout 2003:Congestion, Overloadsand Loop Flows

Problems only in thesynchronously interconnected Systems

* PTDF = Power Transfer Distribution Factor

*

If Power Flow exceeds the Design Criteria: Blackout

PTD7777

E T PS MT/Re

08-2008

Page 8: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

8 08-2008 Power Transmission DivisionE T PS SL/Re

Elimination of Bottlenecks in Transmission –Prevention of Overloads and Outages

Load Displacement by Series Compensation

Load Management by HVDC

Short-Circuit Current Limitation for connecting new Power Plants

SVC & HVDC for Voltage Collapse Prevention

8888

E T PS SL/Re

08-2008 * PTDF = Power Transfer Distribution Factor

*

The FACTS & HVDC “Application Guide”

Page 9: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

9 08-2008 Power Transmission DivisionE T PS SL/Re

Power Transmission – The basic Equation

VV11 VV22

VV11 VV22

Parallel Compensation

XX

XX

Series Compensation

sin (sin (δ 1 - δ 2)

Power-Flow Control

PP

PP ==

G ~ G ~

,, δ 2,, δ 1

Power Transmission DivisionPower Transmission Division99

E T PS SL/Re

08-2008 E T PS SL/Re08-2008

FACTS

HVDC

Each of these Parameters can be used for Load-Flow Control and Power Oscillation Damping

Page 10: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

10 08-2008 Power Transmission DivisionE T PS SL/Re10 08-2008 E T PS SL/Re

Use ofUse of

FACTSFACTSfor for SystemSystemEnhancementEnhancement

Power Transmission Division

Flexible AC Transmission Systems

Page 11: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

11 08-2008 Power Transmission DivisionE T PS SL/Re

Voltage Control

Parallel Compensation

Power-Flow Control

P P

Section of a Transmission Line

C >C >VV

VV

Series Compensation

C <C <

L L >>~ 1/X1/X

L L <<

XX

Tasks of Reactive Power Compensation

Page 12: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

12 08-2008 Power Transmission DivisionE T PS SL/Re

VL

V1V2

δ

PPVV11

XXG ~ G ~

,, δ1II

VV22,, δ2

where VV11 = VV22 , δ = δ1 - δ2

V V 22

XXPP == sinsin δ

VC

without Compensation

-- XXCC

Series Compensation

BenefitsReduction in Transmission AngleIncrease in Transmission Capacity

XXCC

1st Step: Influence of Series Compensation

V1 V2

δ

with Compensation

Page 13: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

13 08-2008 Power Transmission DivisionE T PS SL/Re

FACTS – Application of Series Compensation

TCSCTCSC//TPSCTPSC FSCFSCα

~ ~

Increase in Transmission Capacity

Fixed Series Compensation:

Damping of Power OscillationsLoad-Flow ControlMitigation of SSR

Controlled Series Compensation:

Page 14: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

14 08-2008 Power Transmission DivisionE T PS SL/Re

230 kV - 300 km

V1

Grid

with SVC

a) b) c) d)1.2

1.1

1.0

0.9

0.8

V2

V2N

The maximal Voltage ControlRange depends on:

a) Heavy Load

b) Light Load

c) Outage of 1 Line(at full Load)

d) Load Rejectionat Bus 2

System Conditions:

SVC

V2

Load

(var. Slope)

QSVC/SCP *

without SVC

* SCP = Short-Circuit Power (System MVA)

2nd Step: Improvement in Voltage Profile with SVC

Page 15: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

15 08-2008 Power Transmission DivisionE T PS SL/Re15 Power Transmission DivisionE T PS SL/Re

Option:Option: 12-Pulse TCRwith Trans. Y/y/dplus TSC & Filteron each sec. Side

TCR, FC TSR, TSCTCR, TSC, FC

Thyristor ControlledReactor

Thyristor Switched Capacitor

TSC:

TCR:

TSR:Thyristor Switched Reactor

FC:Fixed Capacitor /Filter

SVC Configurations

Page 16: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

16 08-2008 Power Transmission DivisionE T PS SL/Re16 Power Transmission DivisionE T PS SL/Re

ask 2

of Power Supply08-2008

ustainability

Page 17: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

17 08-2008 Power Transmission DivisionE T PS SL/Re

SVC Radsted DK – makes Wind Power feasible …

17 Power Transmission DivisionE T PS SL/Re

… by providing Voltage Support –

More Wind Power – less CO2 Emissions

for the “fuzzy” Wind Farms2006installed in a very weak AC System

08-2008

Page 18: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

18 08-2008 Power Transmission DivisionE T PS SL/Re

Benefits of SVC Radsted – Denmark

Power Transmission Division18

174,000 tons p.a. – by using Wind Power … and SVC for Voltage Support

Reduction in CO2

E T PS MT/Re

and even more – in Future

08-2008

Page 19: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

19 08-2008 Power Transmission DivisionE T PS SL/Re

SVC Siems – the 1st HV SVC in Germany

2004The Problem: no Right-of-Way for 400 kV ACGrid Access of Baltic Cable HVDC – only 110 kV

HVDC: Power Reduction from 600 MW to 450 MW

The Solution

HVDC and FACTS in parallel Operation

HVDC: Power Increase – from 450 MW to 600 MW

634,000 tons p.a.

Reduction in CO2:

More Hydro Power fromNORDEL to Germany

Page 20: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

20 08-2008 Power Transmission DivisionE T PS SL/Re

Flexible AC Transmission Systems

20 E T PS SL/Re08-2008

FACTSFACTSPower Quality

in High-Voltage

AC Systems

Power Transmission Division

Page 21: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

21 08-2008 Power Transmission DivisionE T PS SL/Re

FACTS – Flexible AC Transmission Systems: Support of Power FlowSVC – Static Var Compensator* (The Standard of Shunt Compensation)SVC PLUS (= STATCOM – Static Synchr. Compensator, with VSC) FSC – Fixed Series Compensation TCSC – Thyristor Controlled Series Compensation*TPSC – Thyristor Protected Series Compensation**GPFC – Grid Power Flow Controller* (FACTS-B2B)UPFC – Unified Power Flow Controller (with VSC)

TCSC/TPSC

FSC

ACAC

/ TPSC

/ STATCOMSVC

ACAC

Advanced Power Transmission Systems

GPFC/UPFC

AC AC

/ UPFC

* with LT Thyristors** with special High

Power LT Thyristors

and SCCL **for Short-Circuit Current Limitation

LTT = Light-Triggered Thyristor

Page 22: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

22 08-2008 Power Transmission DivisionE T PS SL/Re

Application of SVC – Pelham, UK

Benefits:o Improvement in Voltage Qualityo Increased Stability

400 kV, 50 Hz

Voltage Control Reactive Power ControlPower Oscillation DampingUnbalance Control (Option)

19912 parallel SVCs

Page 23: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

23 08-2008 Power Transmission DivisionE T PS SL/Re

Features:o Coordinated Voltage Control &o Damping of Power Oscillations

2 SVCs Mead-Adelanto – USA, 1995

HVDC and FACTS in parallel Operation

2323

E T PS SL/Re

08-2008

Benefits:

Increase in Transmission Capacity

Improvement in System Stability

Support of existing HVDC

Page 24: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

24 08-2008 Power Transmission DivisionE T PS SL/Re

SVC Bom Jesus da Lapa, Enelpower, Brazil500 kV, +/-250 MVAr

Valves & Control

Benefits:o Improvement in Voltage Qualityo Increased Stabilityo Avoidance of Outages

– Containerized Solution

2002

Page 25: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

25 08-2008 Power Transmission DivisionE T PS SL/Re

SVC Radsted – an innovative indoor Solution *

25 Power Transmission DivisionE T PS MT/Re

HVDC Storebælt

Customer:SEAS-NVE Holding A/S

System Data:Rating 80 MVAr cap.

65 MVAr ind.Voltage 132 kVConfiguration TCR + FC

12-Pulse

* Extremely high Requirements for Noise Abatement

SVC Radsted

08-2008

Page 26: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

26 08-2008 Power Transmission DivisionE T PS SL/Re

Outdoor: Only Switchgear

26 Power Transmission DivisionE T PS SL/Re

& Cooling Systems

08-2008

Page 27: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

27 08-2008 Power Transmission DivisionE T PS SL/Re

TCR Reactors, Thyristor Valve & Filters

Power Transmission and Distribution27 09-2007 PTD H 1 MT/Re27 09-2007 PTD H 1 MT/Re

Page 28: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

28 08-2008 Power Transmission DivisionE T PS SL/Re

SVC Devers, Southern California Edison, USA, 500 kV: 110 MVAr ind. / 330 MVAr cap. – 440 MVAr cap. 1 hr

2006

Guaranteed Availability: 99,6 %2 x TCR, 2 x TSC, 2 x FC & MSC

Page 29: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

29 08-2008 Power Transmission DivisionE T PS SL/Re

Powerlink – Australia, Refurbishment of 10 SVCs for Voltage Support in a Traction Supply Network

2007

9 SVCs with Advanced 48 hrs containerized Solution1 SVC with Standard Refurbishment Solution

Railway Line

275 kV AC Line132 kV AC Line

Siemens is an Expert in Refurbishment of Valves & Controls

Page 30: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

30 08-2008 Power Transmission DivisionE T PS SL/Re

9 QR SVCs – using the Advanced 48 hrs containerized Solution

A unique Solution – for very fast Re-Energization of the existing SVC Components (Transformers, Reactors, Capacitors, Filters etc.

Page 31: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

31 08-2008 Power Transmission DivisionE T PS SL/Re

After 48 hrs – Step 1 finished and all SVC Functions available

Work is done –and the SVC operates properly

Step 2:

4 Weeks for full Refurbishment of Valves, Controls & Protection in the SVC Building

Step 3:

48 hrs for Disconnection of SVC Container and Energization of the fully refurbished QR SVC

Container ready fornext QR SVC Plant

Excellent Workof a great Team

Page 32: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

32 08-2008 Power Transmission DivisionE T PS SL/Re

The containerized SVC PLUS Solution

32 Power Transmission DivisionE T PS SL/Re08-2008

2009 - 2011

Source: UCTE Interim Report 10-27-2003Rating: 25 MVAr, 35 MVAr – or 50 MVAr

Seven Projects:

Dynamic Voltage Support

Page 33: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

33 08-2008 Power Transmission DivisionE T PS SL/RePoste Montagnais, Canada – FSC

1993

FACTS – at EHV 735 kV plus harsh Environment

33 08-2008 E T PS SL/Re

- 50 o C

Page 34: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

34 08-2008 Power Transmission DivisionE T PS SL/Re

* 25 US $/MWh x 1400 MW x 24 hrs

1999

500 kV TCSC Serra da Mesa, Furnas/Brazil –Essential for Transmission

Benefits:50 – 70 % Increase inTransmission CapacitySystem Stability Improvement

Up to 500 Stability Operations per Dayfor saving the System Stability

Up to 1 m US $ Cost Savings per Day *

Application of

Return on Investmentswithin a few Weeks only !

new Technologies:

> + 60 o C

up to 85 o

Page 35: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

35 08-2008 Power Transmission DivisionE T PS SL/Re

FSC Fengjie, China: 500 kV

35 Power Transmission DivisionE T PS SL/Re08-2008

Page 36: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

36 08-2008 Power Transmission DivisionE T PS SL/Re

Tala TCSC Project:Bulk Hydro Power from Bhutan to Delhi Area

Safe andClean Energy for Mega-cities

2 x FSCs: Increase in Transmission Capacity2 x TCSCs: Power Oscillation Damping

475 km

Hydro Power from Purnea to Delhi Area

World’s Biggest FACTS Project forSeries Compensation

2 x 1.7 GVAr !

2006

Page 37: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

37 08-2008 Power Transmission DivisionE T PS SL/Re

SeriesFSC

NGH

TPSC

TCSC

2, 2 Tian Guang 2003Kayenta 1992

Serra de Mesa 1999

Imperatriz 1999

Fortaleza 1986••

Samambaia 2002

Virginia Smith 1988

•Welsh 1995

Acaray 1981

•••Dürnrohr 1983

Etzenricht 1993Wien Südost 1993

Bom Jesus da Lapa 2002

Limpio 2003

Ibiuna 2002

••

Jacinto 2000

Funil 2001

2 Pelham, 2 Harker & 2 Central, 1991-1994

Clapham 1995,Refurbishment

Atacama 1999

P. Dutra 1997

•Cerro Gordo 1999

•Chinú 1998

•Impala

•2 Adelanto 1995

•3 Montagnais 1993

2 Kemps Creek 1989

•Brushy Hill 1988

Campina Grande 2000

2 Zem Zem 1983

••

Rejsby Hede 1997

•Sullivan 1995

•Paul Sweet 1998

Inez 1998

2 Marcy 2001-2003

Military Highway 2000

•Kanjin (Korea) 2002

Lugo 1985

Laredo 2000

Spring Valley 1986

••IllovoAthene•

Muldersvlei 1997

2 Tecali 20023 Juile 2002

•Barberton 2003

Maputo 2003

Milagres 1988

• 2 Yangcheng 2000

•2 Hechi 2003

Eddy County 1992

2 Dominion 2003

2 Cuddapah 20032 Gooty 2003

2 Midway 2004

Seguin 1998•

1994-1995

Porter 2006Dayton 2006

Nine Mile 2005

ParallelSVC

MSC/R

.

.Moyle MSC 2003Willington 1997

2 Hoya Morena &Jijona 2004

Baish 2005Samitah 2006 .

K.I. North 2004

Kapal 1994

Ghusais,Hamria,Mankhool, Satwa

1997

.

Siems 2004

Cano Limón 1997

•••

••• Châteauguay 1984

Ahafo 2006•

2 Lucknow 2006

3 Puti 2005

• Shinyanga 2006 Iringa 2006

3, 2 El Dorado2006

• 2 Sabah 2006

Nebo 2007, Refurbishment

Devers 2006

2 Benejama &Saladas 2006

La Pila 1999

•• •• ••

Jember 1994

•Nopala 2007

Sa o Luis 2007

Sinop 2007

2 Fengjie 2006•

Status: 08-2008

••

Strathmore 2007

2 x 1.7 GVAr !

… and over 120 Industry SVCs all over the World

5 North-South III, Lot B 2007

••

••

Siemens FACTS & HVDC - worldwide

E T PS SL/Re

37

In total: over 180 SVCs

••

2 Greenbank & Southpine 2008

Trans Bay Cable2010

Alligator Creek 2009

9 Powerlink 2007, Refurbishment

Buzwagi 2007Dodoma 2008

Lamar 2005

Radsted 20062 Bellaire & Crosby 2008 2 Thannet, 3 Greater Gabbard 2009-2011

SVC PLUS

20062, 2 Purnea2, 2 Gorakhpur

Islington, 20092 Kikiwa &

STATCOMFlicker STATCOM

Load FlowB2B/GPFC

HVDC PLUS

UPFCCSC

19 x VSC

Plus 24 Projects for HVDC Long-Distance Transmission …8 alone between 2000 &2005 on 4 Continents

3 Vincent 2000

Lakehead 2009

Page 38: 13th Kassel Symposium Energy Systems Technology – … · 1 08-2008 E T PS SL/Re Power Transmission Division 13th Kassel Symposium Energy Systems Technology – Power Converters

38 08-2008 Power Transmission DivisionE T PS SL/Re

Lessons learned:FACTS and HVDC areessential for Transmission

38 E T PS SL/Re Power Transmission Division08-2008

Conclusions