1304 hwy 051b - broadland application/706… · 1304/hwy/051 p b-original drawing. 24.05.17...
TRANSCRIPT
Footpath link as identifiedas missing link in the
network withinneighbourhood plan
Woodland
Type
3 R
oad
(HRA
)
1.5m
Foo
tway
1.5m
Foo
tway
1.5m Footway
Type 6 Road
(Block Paviors
Type 3 Road(HRA)1.5m Footway
P.O.S.
P.O.S.
2.0m Footpath
2.0m Footpath
DRAYTON HIGH ROAD
LODGE BRECK
FAIRVIEW CLOSE
P.O.S.
Visibility
Splay 2m x
25m
Vis Splay 2m x 25m
Visibility Splay 2.4m x 90m to Plot 1 driveway
Visibility Splay 4.5m x 90m
Visibility Splay 2m x 25m
PROPOSED LOCATION OFRELOCATED BUS STOP(DDA COMPLIANT)
1 No. TimberDemountableBollard
BCP71
BCP70
BCP67-69BCP
63-66
BCP62
BCP48
BCP47
BCP46
BCP45,50-53
BCP44
BCP43
BCP42
BCP55BCP41
BCP54
BCP23BCP40
BCP39 BCP22
BCP21BCP19
BCP18
BCP17BCP16
BCP15
BCP14BCP13
BCP12
BCP10
BCP9
BCP8
BCP5
BCP4
BCP3
BCP2
BCP6-7
BCP11
BCP24-26
BCP30-34
BCP27-28
BCP1
BCP29
BCP20
4.5m X 90m VISIBILTY TO THE CENTRELINEOF DRAYTON HIGH ROAD AS DISCUSSED
WITH NCC. EXISTING PEDESTRIAN REFUGE /ISLAND PROHIBITS APPROACHING VEHICLES
USING THE OPPOSITE LANE TO OVERTAKE
BCP38
BCP37
BCP36
BCP35
BCP58-61
BCP49,56&57
Reproduced from Ordnance Survey
Superplan Data © Crown Copyright 2016
Licence No. 100022432
ASD Engineering is part of the ASD Consultants group
ASD Consultants16A Bridge StreetHalesworthSuffolkIP19 8AQ
ENGINEERINGASD
REVISIONS
Rev Date
Scale:
Job Title:
Client:
Drawn By: Checked By:
Date:
Drawing Title:
Drg No.
Drawing Status:
For Client
For Comment
For Planning
For Construction
Tel: 01986 872250Fax: 01986 872228
DX 51201 HalesworthWebsite: www.ASD-consultants.co.uk
E-mail: [email protected]
Rev.
PROPOSED DEVELOPMENT AT:
LOW FARM, DRAYTON HIGH ROAD,
DRAYTON, NORFOLK.
PROPOSED SITE LAYOUT
Showing Bin Colection Points
with Refuse Vehicle Wintracking
1/500 (A1)
DC NMT
26 October 2017
1304/HWY/051
P
B
- Original drawing. 24.05.17
CONTRACTORS HEALTH & SAFETY ASSESSMENT
SCHEME - ACCREDITED CONTRACTOR
SCALE 1/500
0m 5m 10m 15m 25m20m
A Site layout up-dated. 21.09.17
and
Norfolk Land Limited
KEY:BCP Bin Collection Points and associated Plot Numbers.
Maximum 2 x Bins per Plot to be collected on 1 day.
Travel Route to Bin Collection Points.
4 axle Large Refuse Vehicle
B Site layout up-dated plus refuse vehicle dimensions added. 26.10.17