130301 mntr kontrak lbkgaung (rev.1)

4

Click here to load reader

Upload: muhammad-zulkifli-harahap

Post on 13-Aug-2015

21 views

Category:

Documents


0 download

DESCRIPTION

fadfadfa

TRANSCRIPT

Page 1: 130301 Mntr Kontrak Lbkgaung (Rev.1)

MONITORING KONTRAK PROYEK MUSIM MAS - LUBUK GAUNGPERIODE s/d 28 FEBRUARI 2013

NILAI KONTRAK NILAI KONTRAK PERSENTASE

No. URAIAN AWAL ADDENDA KERJA TAMBAH KETERANGAN

(Include PPn 10%) (Include PPn 10%)

SUMMARY

A PROYEK MUSIM MAS XXXVIII 10.516.000.000,00 1.466.300.000,00 13,94%

B PROYEK MUSIM MAS XXXIX 103.398.900.000,00 10.039.030.250,00 9,71%

GRAND TOTAL 113.914.900.000,00 11.505.330.250,00 10,10%

Hal. 1/4 File: MM Lbkgaung Mntr Kontrak & SI/gs

Page 2: 130301 Mntr Kontrak Lbkgaung (Rev.1)

MONITORING KONTRAK PROYEK MUSIM MAS XXXVIIIPERIODE s/d 28 FEBRUARI 2013

NILAI KONTRAK NILAI KONTRAK

No. URAIAN AWAL ADDENDA KETERANGAN

(Include PPn 10%) (Include PPn 10%)

A KONTRAK AWAL

1 Kontrak No. 002/IBPT-LG/PRJ/I/2012 10.516.000.000,00

Upah Pemancangan Tiang Pancang

SUB TOTAL 10.516.000.000,00 -

B KONTRAK ADDENDA

1 Kontrak No. 008/IBPT-LG/PRJ/IV/2012 1.466.300.000,00 Selesai dikerjakan

Pek. Timbunan Tanah Lahan Bangunan Main Office, PKE Godown, Chemical Warehouse dan

Tank Farm 1670m3 & Tank Farm 3500m3 (Pek. Timbunan Paket 1)

- Main Office (SI No. 03/SI/BP/DM/III/2012)

- PKE Godown (SI No. 04/SI/BP/DM/III/2012)

- Chemical Warehouse (65mx31m) (SI No. 05/SI/BP/DM/III/2012)

- Tank Farm 1670m3 / 3500m3 (93mx125m) (SI No. 06/SI/BP/DM/III/2012)

SUB TOTAL - 1.466.300.000,00

TOTAL MUSIM MAS XXXVIII 10.516.000.000,00Rp 1.466.300.000,00Rp 11.982.300.000,00Rp

1.466.300.000,00Rp

10.516.000.000,00Rp x 100% = 13,94%Persentase kerja tambah terhadap kontrak awal =

Hal. 2/4 File: MM Lbkgaung Mntr Kontrak & SI/mm38

Page 3: 130301 Mntr Kontrak Lbkgaung (Rev.1)

MONITORING KONTRAK PROYEK MUSIM MAS XXXIXPERIODE s/d 28 FEBRUARI 2013

NILAI KONTRAK ADDENDDUM

No. URAIAN PEK. ± KETERANGAN

(Include PPn 10%) (Include PPn 10%)

A KONTRAK AWAL

1 Kontrak No. 003/IBPT-LG/PRJ/II/2012 103.398.900.000,00

Pek. Struktur, Finishing & MEP

SUB TOTAL 103.398.900.000,00 -

B KONTRAK ADDENDA

1 Kontrak No. 014/IBPT-LG/PRJ/VIII/2012 2.487.100.000,00

Pek. Urugan Tanah Timbun termasuk pemadatan untuk

peninggian lantai dibawah lantai bangunan dan lantai

selasar (Pek. Timbunan Paket 3)

- Bang. Main Office (SI NO : 11/SI/IBP/DM/VI/2012) Selesai dikerjakan

- Bang. Lab & Archive (SI NO : 12/SI/IBP/DM/VI/2012) Selesai dikerjakan

- Tank Farm 1670m3 / 3500m3 (SI NO : 13/SI/IBP/DM/VI/2012) Selesai dikerjakan

- Bang. Refinery (SI NO : 14/SI/IBP/DM/VI/2012) Selesai dikerjakan

- Cooling Tower (SI NO : 15/SI/IBP/DM/VI/2012) Selesai dikerjakan

- Weighing Hopper (SI NO : 17/SI/IBP/DM/VI/2012) Selesai dikerjakan

- PKE Godown Selesai dikerjakan

- Chemical Warehouse Selesai dikerjakan

- Workshop & Sparepart Workshop Selesai dikerjakan

- Kernel Crushing Plant Sedang dikerjakan

ADDENDUM : - SI no. 27 (Timbunan Public Toilet) 1.383.800,00 Selesai dikerjakan

- SI no. 28 (Timbunan Ruang Trafo) 8.835.750,00 Selesai dikerjakan

- SI no. 29 (Timbunan Guard Pos & Custom Room) 5.161.200,00 Selesai dikerjakan

2 Kontrak No. 015/IBPT-LG/PRJ/VIII/2012 1.568.600.000,00

Pek. Timbunan Tanah Lahan Bangunan Unloading Station For Kernel, unloading

Station, Silo dia. 14,63m, Kernel Crushing Plant, Weighing Hoppper, SWRO Plant &

Power Plant (Pek. Timbunan Paket 2)

- Unloading For Kernel (SI NO : 07/SI/IBP/DM/IV/2012) Selesai dikerjakan

- UNLOADING 96m' (SI NO : 08/SI/IBP/DM/IV/2012) Selesai dikerjakan

- SILO 14,63 (SI NO : 09/SI/IBP/DM/IV/2012) Selesai dikerjakan

- Kernel Crushing Plant (SI NO : 10/SI/IBP/DM/IV/2012) Selesai dikerjakan

- Weighing Hopper Selesai dikerjakan

- SWRO Plant Selesai dikerjakan

- Power Plant, Boiler & Turbin Selesai dikerjakan

ADDENDUM : - SI no. 26 (Timbunan SEP) 513.383.000,00 Selesai dikerjakan

- SI no. 30 (Timbunan Waste Water Treatment Plant) 176.689.500,00 Selesai dikerjakan

3 Kontrak No. 021/IBPT-DUM/PRJ/XI/2012 357.500.000,00

Pek. Struktur Site - C, Dumai Pelabuhan

4 Kontrak No. 024/IBPT-LG/PRJ/XII/2012 272.800.000,00 Selesai dikerjakan

Pek. Penambahan Silo Semen kap. 60 ton

5 Kontrak No. 025/IBPT-LG/PRJ/XII/2012 1.331.000.000,00 Selesai dikerjakan

Pek. 1 unit Batching Plant

6 Kontrak No. 001/IBPT-LG/PRJ/I/2013 876.700.000,00 Selesai dikerjakan

Gantry & Pipe Rack (SI no. 24)

SUB TOTAL - 7.599.153.250,00

C PENGAJUAN ADDENDA (ADA SURAT PENAWARAN)

1 SI no. 25 (SWRO Plant 2) 968.000.000,00

SUB TOTAL - 968.000.000,00

Hal. 3/4 File: MM Lbkgaung Mntr Kontrak & SI/mm39

Page 4: 130301 Mntr Kontrak Lbkgaung (Rev.1)

MONITORING KONTRAK PROYEK MUSIM MAS XXXIXPERIODE s/d 28 FEBRUARI 2013

NILAI KONTRAK ADDENDDUM

No. URAIAN PEK. ± KETERANGAN

(Include PPn 10%) (Include PPn 10%)

D PENGAJUAN ADDENDA (BELUMA ADA PENAWARAN / PREDIKSI)

1 SI no. 20 (Pagar temporary Zona 2 Non Berikat) 68.970.000,00 Selesai dikerjakan

2 SI no. 31 (Pagar temporary Zona 1 Non Berikat) 20.625.000,00 Selesai dikerjakan

3 SI no. 32 (Pondasi Navigator Lamp Tower) 9.900.000,00 Sedang dikerjakan

4 SI no. 30a (Bangunan MV Room & Gardu Induk) 276.100.000,00 Segera dikerjakan

5 SI no. 31a (Cor Lantai Suspended Refinery) 633.600.000,00 Segera dikerjakan

6 SI no. 32a (Keramik lantai Suspended Refinery) 456.192.000,00 Segera dikerjakan

7 SI no. 33 (Pondasi Cymney Refinery) 6.490.000,00 Segera dikerjakan

SUB TOTAL - 1.471.877.000,00

TOTAL MUSIM MAS XXXIX 103.398.900.000,00Rp 10.039.030.250,00Rp 113.437.930.250,00Rp

10.039.030.250,00Rp

103.398.900.000,00Rp Persentase kerja tambah terhadap kontrak awal = x 100% = 9,71%

Hal. 4/4 File: MM Lbkgaung Mntr Kontrak & SI/mm39