12345

1
7/21/2019 12345 http://slidepdf.com/reader/full/12345-56e139519ad37 1/1 WELD JOINT NO. SPEC HEAT NO. BASE METAL-1 SPEC HEAT NO. BASE METAL-2 TYPE OF WELD SIZE/ SCHEDULE WELDER NO. DATE OF WELDING WELDINGELECTORODE/ WIRE USED MATERIAL SIZE REPORT NO. MT/PT RT/UT PWHT HARDNESS PMI/Ferrie REMAR!S KUWAIT NATIONAL PETROLEUM CO -PROJECTS DEPARTMENT WELD INSPECTION / NDT SUMMARY REPORT C"#r$%"r & D$e'i( I#)*+ri$' C", L) Pr"e% Ti'e & FCC, SWT CT C"#r$% N". & CFP-A/EPC/01 S* C"#r$%"r &AL! Re"r N" & TIE-IN CFP-134-51-1 D$e & Li#e N". / I+" D67. N". & ID-SWS-134-118-1 9RE:. 1; 2  A2<5-WPB CP4< A18-B 8<402 BW 2. /S2  AL!-P-25=/AL!-P- 253 210-11-= ER 3S-2 E31= 2 / 2.5 2.5 / 5  <S1  A2<5-WPB CS1=3 A2<5-WPB CJ241 BW 2. /S2  AL!-P-25=/AL!-P- 253 210-11-8 ER 3S-2 E31= 2 / 2.5 2.5 / 5  5  A2<5-WPB CJ241 A18-B 8<402 BW 2. /S2  AL!-P-25=/AL!-P- 253 210-11-= E81 E31= 2.5 / 2.5 2.5 / 5  0  A18-B 8<402 A10 >11! SO 2. /S2  AL!-P-12/AL!-P- 21< 215-4-13 ER 3S-2 E31= 2 / 2.5 2.5 / 5  8A  A18-B 8<402 A2<5-WPB CS1=3 BW 2. /S2  AL!-P-25=/AL!-P- 253 210-11-= E81 E31= 2.5 / 2.5 2.5 / 5  3A  A2<5-WPB CS1=3 A2<5-WPB CS1=3 BW 2. /S2  AL!-P-25=/AL!-P- 253 210-1-24 ER 3S-2 E31= 2 / 2.5 2.5 / 5  =A E?ISTING TEE N /A A2<5-WPB CP4< BW 28. /S2  AL!-P-25=/AL!-P- 253 210-11-14 FSC-DPT-F-=<< E81 E31= 2.5 / 2.5 2.5 / 5 FW FSC-RT-F-84=A 4A  A18-B  A<8  A<8 8<402 A18-B 8<402 8<485 8<485 BW 2. /S2  AL!-P-25=/AL!-P- 253 210-11-1 E81 E31= 2.5 / 2.5 2.5 / 5  1F  A2<5-WPB CP4< FW 28. /4((  AL!-P-80 210-11-24 FSC-DPT-F-=4= ER 3S-2 E31= 2 / 2.5 2.5 / 5 FW  11F E?ISTING TEE N/A FW 28. /4((  AL!-P-80 210-11-24 FSC-DPT-F-=4= ER 3S-2 E31= 2 / 2.5 2.5 / 5 FW  Note : 1; PWHT NDE ARE AS PER CONTRACT SPECIFICATIONS. 2; PWHT NDE WERE WITNESSED AND / OR RE:IEWED. <; ALL MATERIAL USED ARE AS PER CONTRACT SPECIFICATION. CONTRACTOR QC ENGINEER SIGNATURE : NAME : DATE : KNPC CONSTRUCTION ENGINEER SIGNATURE : NAME : DATE : KNPC INSPECTION ENGINEER SIGNATURE : NAME : DATE : BASE METAL NUMBERING SHALL FOLLOW PROCESS FLOW DIRECTION @ BUTT WELD - BW @ FILLET WELD - FW @ BRANCH CONNECTION - BR PRJ-QMS-9I-02-5072 Rev_3

Upload: rajeshg23

Post on 10-Mar-2016

1 views

Category:

Documents


0 download

DESCRIPTION

12345

TRANSCRIPT

Page 1: 12345

7/21/2019 12345

http://slidepdf.com/reader/full/12345-56e139519ad37 1/1

WELDJOINT NO.

SPEC HEAT NO.

BASE METAL-1

SPEC HEAT NO.

BASE METAL-2 TYPEOF

WELD

SIZE/SCHEDULE

WELDER NO.DATE OFWELDING

WELDING ELECTORODE/WIRE USED

MATERIAL SIZE

REPORT NO.

MT/PT RT/UT PWHT HARDNESS PMI/Ferrie REMAR!S

KUWAIT NATIONAL PETROLEUM CO -PROJECTS DEPARTMENT

WELD INSPECTION / NDT SUMMARY REPORT

C"#r$%"r & D$e'i( I#)*+ri$' C", L) 

Pr"e% Ti'e & FCC, SWT CT C"#r$% N". & CFP-A/EPC/01

S* C"#r$%"r &AL!  Re"r N" & TIE-IN CFP-134-51-1

D$e &

Li#e N". / I+" D67. N". & ID-SWS-134-118-1 9RE:. 1;

2   A2<5-WPB CP4< A18-B 8<402 BW 2. /S2  AL!-P-25=/AL!-P-253

210-11-=ER 3S-2E31=

2 / 2.52.5 / 5

 

<S1   A2<5-WPB CS1=3 A2<5-WPB CJ241 BW 2. /S2  AL!-P-25=/AL!-P-253

210-11-8ER 3S-2E31=

2 / 2.52.5 / 5

 

5   A2<5-WPB CJ241 A18-B 8<402 BW 2. /S2  AL!-P-25=/AL!-P-253

210-11-=E81E31=

2.5 / 2.52.5 / 5

 

0   A18-B 8<402 A10 >11! SO 2. /S2  AL!-P-12/AL!-P-21<

215-4-13ER 3S-2E31=

2 / 2.52.5 / 5

 

8A   A18-B 8<402 A2<5-WPB CS1=3 BW 2. /S2  AL!-P-25=/AL!-P-253

210-11-=E81E31=

2.5 / 2.52.5 / 5

 

3A   A2<5-WPB CS1=3 A2<5-WPB CS1=3 BW 2. /S2  AL!-P-25=/AL!-P-253

210-1-24ER 3S-2E31=

2 / 2.52.5 / 5

 

=A  E?ISTING TEE N/A A2<5-WPB CP4< BW 28. /S2  AL!-P-25=/AL!-P-253

210-11-14FSC-DPT-F-=<<

E81E31=

2.5 / 2.52.5 / 5FW

FSC-RT-F-84= A

4A   A18-B

 A<8

 A<8

8<402 A18-B 8<402

8<485

8<485

BW 2. /S2  AL!-P-25=/AL!-P-253

210-11-1E81E31=

2.5 / 2.52.5 / 5

 

1F   A2<5-WPB CP4< FW 28. /4((  AL!-P-80 210-11-24FSC-DPT-F-=4=

ER 3S-2E31=

2 / 2.52.5 / 5FW

 

11F  E?ISTING TEE N/A FW 28. /4((  AL!-P-80 210-11-24FSC-DPT-F-=4=

ER 3S-2E31=

2 / 2.52.5 / 5FW

 

Note : 1; PWHT NDE ARE AS PER CONTRACT SPECIFICATIONS.2; PWHT NDE WERE WITNESSED AND / OR RE:IEWED.<; ALL MATERIAL USED ARE AS PER CONTRACT SPECIFICATION.

CONTRACTOR QC ENGINEER

SIGNATURE :

NAME :

DATE :

KNPC CONSTRUCTION ENGINEER

SIGNATURE :

NAME :

DATE :

KNPC INSPECTION ENGINEER

SIGNATURE :

NAME :

DATE :

BASE METAL NUMBERING SHALL FOLLOW PROCESS FLOW DIRECTION@ BUTT WELD - BW@ FILLET WELD - FW@ BRANCH CONNECTION - BR

PRJ-QMS-9I-02-5072 Rev_3