2nd Semester 2012 Design 6
School of Architecture and Planning
Camia Young & Jordon Saunders
FUTURE CHRISTCHURCH V2
DESIGN CONCEPT
DESIGN INVESTIGATION
RESEARCH
PROJECT DESCRIPTION
Christchurch has lost an estimated 6,000 houses due
to the 2010-2011 earthquakes. With projections of
36,000 workers expected to move to the city for the
rebuild, there is a very real and urgent housing crisis.
Cambridge Terrace is located along the Avon River
and is still, two years after the earthquakes, within
the CBD closed cordon. Many buildings have been
demolished while others fate is pending. With a vast
area of the neighbourhood having to be rebuilt, this
site was selected for the potential to revitalise the riv-
erside.
The proposal is for a multi-unit residential complex
with a focus on connecting the river with the neigh-
bourhood. This evolved from investigations on water
supply and treatment methods and led on to experi-
mentations with porosity and ow. These studies were
carried out through sponge absorption testings and
informed the building concept and inspired the overalldesign form to be canyon-like volumes. The buildings
are lifted 24metres above ground to share the same
maximum height of the neighbouring buildings.
The design intends to integrate public life of the street
with private spaces and examine the relationship be-
tween these different programmes. In order to do
this the arrangement of the buildings is focused on
enhancing connections between public and private.
The idea of porosity was also incorporated into the
meeting ground between these spaces with perme-
able surfaces that allow light, noise and smells to lter
through.
In response to the urgency for single to small house-
hold dwellings, the target market is focused on young
single households, couples without children, and the
working population in the trade area.
HYDROCITY | AVON APARTMENTSSophia Kim
Facultative
Aerated
Freewat
ersurfa
ce
Subsurf
aceow
Aquacultur
e
WaterH
yacinths
Duckwe
ed
Intermitten
t
Recircu
lating
Aquatic
HCR
Sedim
ent
ltrati
on
Slow
Sand
ltra
tion
FastS
and
ltratio
n
Flocculation
Land Treatment
Slow-
rate
Overla
ndow
Rapid
inltra
tion
Subsurfac
einltr
ation
Const
ructed
wetlan
ds
Oxidat
iondit
ch
Extended
aerati
on
Sequen
cing
batchr
eactor
Tricklin
glter
-SCP
MechanicalAct
ivated
carbo
nltra
tion
Settlin
g
Microlt
ration
Ultra
ltration
Nanoltr
ation
Distilla
tion
Revers
e
Osmo
sis
Ionexc
hange
resins
Acid
neutr
alisation
Water
soften
er
Boilin
g
Ozoni
zation
Work + LiveStudioPrivateHighDensityResidentialStudios Live
Retail
Convention/ Events Centre
SemiPublicMediumDensityInvitingFlexibleConvention/ EventsCentre
PublicLowDensityOpenInviting
Public Plaza
Convention/Events Centre
Retail
Carparking
SECTION AA
MATERIALS
C T E T U L E L T I H I
(E)SunriseMorningWarming
(N)NoonMainliving/
Occupation
(W)SunSetAfternoon
overheating
(S)No
SunZone
InviteFlowof Pedestrians
OptimizeViewsand
CreateaLinktoAvonRiver
IconicCorner-Visibleat Intersection.
HighDensityTight KnitPrivateSpaceLess FlowMoreConcentrat edprogramme
MediumDensityNot soTight KnitAllows MinglingwhilestillallowingPrivacy
LowDensityNot tight KnitInvites IntegrationBiggerPublic Spaces
Level10
Level23000
Level3
6000
Level4
9000
Level5
1200
Level615000
Level718000
Level821000
24000
LIVE
CENTRAL
CORE
CIRCULATION
CENTRAL
CORE
CIRCULATION
LIVECONVENTIONSPACE EXHIBITION SPACE
CONVENTION
SPACE
RETAILGREEN
SPACE
GREEN
SPACERETAIL
BICYCLE
PARKINGCARPARKING
GREEN
SPACE
GREENSPACE
Convention/ Exhibitionspace720m2
Retail
860m2
GreenSpace
640m2
Live
8600m2
CentralCore650m2
BicycleParking110m2
CarParking
560m2
75Apartments-Studio
-1Bedroom-2BedroomEachrangingfrom 49-80m2
View across the Avon River along Cambrige Terrace
daniel yang sophia kim natalee tan
~^WLGpGZWL G G
\ G G \
G G G G G G G G G
r l I v s ti t i : s r t i
Red-zoned area of Cambrige Tce as of September 2012 Red-zoned area of Cambrige Tce as of September 2012, with
view of the Band Rotunda
Onsite investigation on the current condition of Cam-
bridge Terrace and CBD area.
SECOND FLOOR FOYER
Water10%Ink 90%
Water30%Ink 70%
ABSORPTION TESTING 1felt, syringe, water, black ink
MASSING STUDIES
CHRISTCHURCH WATER SUPPLYSYSTEM
POST EARTHQUAKE WASTEWATER INFRASTRUCTURE DAMAGESource: SCIPT
POST EARTHQUAKE WATER SUPPLYINFRASTRU CTURE DAMAGESource: SCIPT
Water70%Ink 30%
Water90%Ink 10%Water50%Ink 50%
Water30%Ink 70%Water70%Ink 30%Water 90% Ink 10%
Water50%Ink 50%
ABSORPTION TESTING 2wrappingpaper, sponge, water, black ink
ABSORPTION TESTING 3
wrapping paper, paper towel, sponge, water, black ink
Water30%Ink 70%Water70%Ink 30%Water90%Ink 10% Water50%Ink 50%
voronoi
positivespace
multiplied
Withasample of testing2, theapproachof
explorationintolinearity thenmanipulation
intothreedimentionalform is derived
REINTERPRETATING THE SIZES OF THE HOLES IN THE TESTINGS
AS HEIGHTS INTO THREE DIMENTIONALFORM
maskinginto2d
n u mb e r of s am p le p o in t s: 1 0x 1 0 n u mb e r of s am p le p o in t s : 2 0 x 20 n u mb e r of s am p le p o in t s: 5 0 x 50
INVESTIGATION OF DIFFERENT WAYS TO PROCESS WATER
v or on oi + He ig ht e ld V or on oi + He ig ht e ld + Fl ow al on gs ur fa ce
PROGRAM BAR PROGRAM VS DENSITY BUILDING FOOTPRINT INVESTIGATION
S E CT IO NA L PR OG RA M O RG AN IS AT IO N D IA GR AM T HE DE SI GN AI MS TO GI VE DW EL LE RS TH E E XP ER IE NC E O F B EI NG IN SI D E A C AN YO N
View of Antelop Canyon
PROPOSAL
Cambridge Tce and Oxford Tce is accessible to pedestrians onlybus stops are reallocated to the west and east end of the market.
Vehicular route
Public transportation route
Pedestrian route
Bus stop
Cambridgetce
Oxfordtce
Kilmoretce
Armagh St
ManchesterSt
KEY
Cambridge Tce and Oxford Tce is accessible to cars ,publictransportation and pedestrians.
PRE-EARTHQUAKE CCDUPLAN
Cambridgetce
Oxfordtce
Kilmoretce
Armagh St
ColomboSt
ManchesterSt
Cambridgetce
Oxfordtce
Kilmoretce
Armagh St
ColomboSt
ManchesterSt
Cambridge Tce and Oxford Tce is accessible to publictransportation and pedestrians.
Cambridgetce
Oxfordtce
Kilmoretce
Armagh St
ColomboSt
ManchesterSt
2
1
3
21
3
KEY
R e si d en t ia l ( So p hi a ) M a rk e t (N a ta l ee ) Hybrid (Daniel)
CONTEXTUALRELATIONSHIPS
Steel Sheet
Fiberglass Double Glazing
Laminated Timber
Smooth ConcreteSteel I Beam
SOUTH ELEVATION
daniel yang sophia kim natalee tan
^ G G~`WLGpGXWL
\ G G \
vGSGSGSGG
r l I v s ti t i : s r t i daniel yang sophia kim natalee tan
^ G G G G
~\WLGp\WL
G G G G G G G G G
r l I v s t i t i : s r t i
INTERIOR PERSPECTIVE
CIRCULATION DIAGRAM
Everyone/ Public
Residents
Goods
Vehicles
Employees/ Staff
VerticalCirculationCores
GROUND FLOOR
FIRST FLOOR
SECOND FLOOR
0 5 m 10 m
N
FIRST FLOOR PLAN
A
A
1.
2.
3.
2.
2.
3.
3.
6.
6.
4.
4.
4.
4.
1. Reception/ Information Centre
2. Convention/ Exhibition Space
5. Meeting Area
3. Events/ Seminar/ Gallery Space
. t u r u n t
4. Core - Services, Circulation, Restroom
1 . tu i r t m n t
. r m r t m n t
. n r m r tm n t
. y r t i n r
1 . c t i n I n r m t i n n t r
. r r v ic , i r cu l t i n , t r m
. t i n r
0 5 m 10 m
N
SECOND FLOOR PLAN
A
A
1 . c t i n I n r m t i n n tr
. n v n t i n h i i t i n c
. t in r
. v n t m i n r l l r y c
. t u r u n t
. r r v i c , i r cu l t i n , t r m
1. Studio Apartment
3. Two Bedroom Apartment
2. OneBedroom Apartment
4. Foyer/ Meeting Area
1 . c t i n I n r m t i n n tr
. r r v ic , i r cu l t i n , t r m
. t i n r
2
3
4
1
1
1
2
2
2
2
2
2
3
33
33
1
1
4
4
A
A
0 5 m 10 m
N
GROUND FLOOR PLAN
1 . c t i n I n r m t i n n tr
. n v n t i n h i i t i n c
. t in r
. v n t m i n r l l r y c
2. Cafe/ Restauraunt
. r r v ic , i r cu l t i n , t r m
1 . tu i r t m n t
. r m r t m n t
. n r m r tm n t
. y r t i n r
1. Reception/ Information Centre
3. Core - Services, Circulation, Restroom4. Meeting Area
1
2
3
4
1
4
4
4
33
1
2