Proposal to Lanco

July 2012

Page 2: 120715 Novatec Solar Presentation to Lanco Novatec

1. Novatec Solar Technology & Projects

2. Novatec Solar´s Product Portfolio

1. Scope of Delivery

2. Novatec Solar/ABB CSP plant designs

3. Proposal to LANCO

2 - Confidential -

Page 3: 120715 Novatec Solar Presentation to Lanco Novatec

NOVATEC SOLAR´s Fresnel Technology

3

Fixed positioned

receiver system

Direct steam generation

Primary reflectors using

flat mirrors

30 MW plant Puerto Errado 2, Spain

- Confidential -

Page 4: 120715 Novatec Solar Presentation to Lanco Novatec

PE 1: 1.4MWel Demonstration Plant

Puerto Errado 1 – NOVATEC SOLAR´s demonstration plant

4

Synchronized in March 2009

Direct steam generation at 270°C

100 % solar steam generation

Air cooled condensers

- Confidential -

Page 5: 120715 Novatec Solar Presentation to Lanco Novatec

Puerto Errado 2 - proven, bankable Fresnel technology–

established in the utility market

PE 1: 1.4MWel Demonstration Plant

PE 2: 30MWel Solar Power Station

5 - Confidential -

Page 6: 120715 Novatec Solar Presentation to Lanco Novatec

Puerto Errado 2 - Project Structure

Project

Company

PE2

EPC Contractor

Off-taker

Lenders

Owner (5 Swiss utilities)

Lenders Advisors

O&M Contractor

Owner’s Technical Advisor

85 %

6 - Confidential -

Page 7: 120715 Novatec Solar Presentation to Lanco Novatec

Puerto Errado 2 – 30 MWel Solarthermal Power Station

7

Key data on the Solar Boiler

EPC Contractor Novatec Solar

Application Direct steam generation

Model 2x 15 MW GE Turbines

28 rows of linear Fresnel

collectors

Cooling Air-cooled condensers

Net aperture area 302,000 m²

Operating temperature

270 °C

Operating pressure 55 bar

Peak thermal output

150 MWth

O+M Contractor Novatec Solar

Cleaning Cleaning robots

• World‘s Largest Fresnel Solar Power Plant

• Synchronized in January 2012, Final Completion August 2012

- Confidential -

Page 8: 120715 Novatec Solar Presentation to Lanco Novatec

Impressions

8 - Confidential -

Page 9: 120715 Novatec Solar Presentation to Lanco Novatec

Impressions

9 - Confidential -

Page 10: 120715 Novatec Solar Presentation to Lanco Novatec

Impressions

10 - Confidential -

Page 11: 120715 Novatec Solar Presentation to Lanco Novatec

Solar Augmentation of a Coal fired power station

Key data on the Solar Boiler

EPC Contractor Novatec Solar

Owner Macquarie Generation

Application Direct steam generation

Model

Solar augmentation of a coal

fired power station in Liddell,

Australia

Net aperture area 18,500 m²

Peak thermal

output 9.3 MWth

Thermal Output per

year 13,550 MWhth

11 - Confidential -

Page 12: 120715 Novatec Solar Presentation to Lanco Novatec

1. Novatec Solar Technology & Projects

2. Novatec Solar´s Product Portfolio

1. Scope of Delivery

2. Novatec Solar/ABB CSP plant designs

3. Proposal to LANCO

12 - Confidential -

Page 13: 120715 Novatec Solar Presentation to Lanco Novatec

Thermal-to-electric efficiency order of idea

13

0%

5%

10%

15%

20%

25%

30%

35%

40%

Evaporator, 270°C, 55 bar , no reheat

Superheater, 500°C, 100 bar, superheated turbine

- Confidential -

Page 14: 120715 Novatec Solar Presentation to Lanco Novatec

Direct superheated steam > 500°C

Parallel rows of:

evaporator 700 m length

Superheater 300 m length

14 - Confidential -

Page 15: 120715 Novatec Solar Presentation to Lanco Novatec

Solar field Layout

Hot end header

Cold end header

Steam separation

unit

Supernova collectors

NOVA-1 collectors

Recirculation header

Collector row control valve Recirculation

pump

Superheated steam

Feed water

Recirculation line

15 - Confidential -

Page 16: 120715 Novatec Solar Presentation to Lanco Novatec

Superheater Design

Design: Everything similar to evaporating section, except receiver

design.

Receiver developed for the use of vacuum absorber tube.

Receiver: Evaporating Section Receiver: Superheating

section

16 - Confidential -

Page 17: 120715 Novatec Solar Presentation to Lanco Novatec

CSP Power Station Layout

17

jsdklf

skdöf

skdö

- Confidential -

Page 18: 120715 Novatec Solar Presentation to Lanco Novatec

Parabolic

trough

NOVATEC‘s

Fresnel technology

Operating temperature 390°C 500°C

Power block efficiency 38% 40%

Heat losses 10 % 5 %

Material per annual

MWh thermal yield

high low

Land use efficiency 270 kWh th

per m²

370 kWh th

per m²

Applicable storage

technolgy

Molten salt Molten salt

Comparison of CSP Technologies

18 - Confidential -

Page 19: 120715 Novatec Solar Presentation to Lanco Novatec

19

Superheater Performance verified by German Aerospace

Centre (DLR)

- Confidential -

Page 20: 120715 Novatec Solar Presentation to Lanco Novatec

Stable operation since August 2011

20 - Confidential -

Page 21: 120715 Novatec Solar Presentation to Lanco Novatec

1. Novatec Solar Technology & Projects

2. Novatec Solar´s latest Achievements

3. Scope of Delivery

4. Novatec Solar/ABB CSP plant designs

5. Proposal to LANCO

21 - Confidential -

Page 22: 120715 Novatec Solar Presentation to Lanco Novatec

Activities along the value chain

Project

Development

Turnkey Solar

Field Delivery

Solar Field

Manufacturing EPC

Operation &

Maintenance Project

Ownership

Novatec activities

Customers/Partners/Others

ABB/EPC Contractors

In March 2011, ABB acquired a 35% shareholding in Novatec Solar.

- Confidential - 22

Page 23: 120715 Novatec Solar Presentation to Lanco Novatec

Creating local value

Serial Production in the target market

Automated manufacturing system for high-volume production

Mass production line reproducible for the target market

Job effect in manufacturing and assembly process

Short distance transport to site

Novatec Solar has developed a fully-automated production line to

assemble primary mirror reflector elements:

- Confidential - 23

Page 24: 120715 Novatec Solar Presentation to Lanco Novatec

Creating local value

Site Assembly

Foundation & Support structure

Simple and light design

Standard steel profiles

Screw foundation allows easy and

quick assembly

Primary Reflector

Use of standard material such as sheet

plats and glass mirrors

Slightly curved flat mirrors simplify the

cleaning process

- Confidential - 24

Page 25: 120715 Novatec Solar Presentation to Lanco Novatec

Creating local value

Site Assembly

Receiver

Stationary receiver

Direct steam generation

Consisting of secondary reflector and

absorber tube

Tracking system

2 x 96 Wel electric motors (20 Wel

power consumption in operation)

Continuous monitoring of mirror

positioning using photovoltaic cells

ensuring precise calibration

- Confidential - 25

Page 26: 120715 Novatec Solar Presentation to Lanco Novatec

Solar field installation using local labor

Novatec Solar provides working

instructions and quality check routines

Number of workers scalable to factory

output of components to ensure in-

time installation

Local O&M personnel trained during

commissioning

Creating local value

Construction and Commissioning

- Confidential - 26

Page 27: 120715 Novatec Solar Presentation to Lanco Novatec

Creating local value

Operation & Maintenance

Self moving cleaning machines ensuring

high mirror cleanliness

Minimization of operating cost

High cleaning performance

(8100 m²/ hour)

Low water consumption

(1.1 liter per square meter and year)

No demineralised water required

Novatec Solar‘s automated cleaning system

- Confidential - 27

Page 28: 120715 Novatec Solar Presentation to Lanco Novatec

1. Novatec Solar Technology & Projects

2. Novatec Solar´s latest Achievements

3. Scope of Delivery

4. Novatec Solar/ABB CSP plant designs

5. Proposal to LANCO

28 - Confidential -

Page 29: 120715 Novatec Solar Presentation to Lanco Novatec

ABB / NOVATEC CSP plant designs – DSG

29

- Confidential -

Page 30: 120715 Novatec Solar Presentation to Lanco Novatec

ABB / NOVATEC CSP plant designs – DSG + DMS

30 - Confidential -

Page 31: 120715 Novatec Solar Presentation to Lanco Novatec

Reference case load curve

31 - Confidential -

Page 32: 120715 Novatec Solar Presentation to Lanco Novatec

ABB / NOVATEC CSP plant designs – Storage up to 4hours

32 - Confidential -

Page 33: 120715 Novatec Solar Presentation to Lanco Novatec

Larger DSG with storage load curve

33 - Confidential -

Page 34: 120715 Novatec Solar Presentation to Lanco Novatec

1. Novatec Solar Technology & Projects

2. Novatec Solar´s latest Achievements

3. Scope of Delivery

4. Novatec Solar/ABB CSP plant designs

5. Proposal to LANCO

34 - Confidential -

Page 35: 120715 Novatec Solar Presentation to Lanco Novatec

116 MWe Solar Thermal Power Station

116 MWel Solar Thermal Power

Plant

Linear state-of-the-art Fresnel

technology

~900.000 m2 solar field

Direct steam generation

Excellent site with high solar

irradiation

- Confidential - 35

Page 36: 120715 Novatec Solar Presentation to Lanco Novatec

LANCO Layout

36 - Confidential -

Page 37: 120715 Novatec Solar Presentation to Lanco Novatec

Conclusion

The ABB/Novatec Solar turnkey concept uses state of the art

Fresnel collector technology

Superheated steam generation with temperatures above 500°C

Flexible plant design according to the customers needs

Dispatchable power due to thermal storage can be added

Highly automated production lines in the target market leads to local

job creation