8/15/2019 12052 Finnkoli Apparels Ltd FUiN_Structural v4.2
1/10
Factory Name Finnkoli Apparels
Ltd.
Accord ID 12052
Factory Address
Inspection Date
Date of ReviewInspection
Inspected by
Item
No
Accord
Observation
Accord
Recommendation Accord Timeline Final Action Plan
Final
Timeline(
DD/MM/
YYYY)
Comments after Physical
Inspection
Progress
StatusPictorial Evidence
1 Verify concrete
strengths incolumns in Building
2 (old building)
Factory Engineer to
review design, loadsand columns stresses
inBuilding 2.
within 6-weeks The buiding engineer
has already assessedthe loads and coulmn
stresses in building twowhile adding the twonew buildins with it.
Howevr, Factoryengineer promised to
come review thedesign, loads and
columns stresses inBuilding 2 which will
take some time. henceextentended time is
requested.
26 -02-2016 Previous T imeLine :
31/07/2015Committed TimeLine:
26/02/2016This issue is required to becovered in the Engineering
Assessment (EA) report.During first follow-up
inspection, EA submissiondeadline was extended up to
30 August, 2015. Somedrawings were present in the
factory during inspection butEA report was not submitted.
In Progress
2 Verify concrete
strengths incolumns in Building
2 (old building)
Verify insitu concrete
strengths either bytaking 100mm
diametercores from a minimum
of 4 columns or byusing existing cylinder
strength data if
available
w it hi n 6-weeks we have a lr eady
selected a reputedconsulting firm
to Verify insitutionconcrete strengths
either by taking 100mmdiameter
cores from a minimum
of 4 columns
26 -02-2016 Previous T imeLine :
31/07/2015Committed TimeLine:
26/02/2016In situ concrete strength
verification is required to becovered in the Engineering Assessment (EA) report.
During first follow-upinspection, EA submission
deadline was extended up to15 October, 2015. Some
drawings were present in the
factory during inspection butEA report was not submitted.
In Progress
Abu Bakar Md. Siddique
Structural Safety nspection
Plot No. 18 & 20, Road #11, Kadmtoly 1/A, Shyampur, Dhaka
02/24/2015
24-Feb-16
-
8/15/2019 12052 Finnkoli Apparels Ltd FUiN_Structural v4.2
2/10
Item
No
Accord
Observation
Accord
Recommendation Accord Timeline Final Action Plan
Final
Timeline(
DD/MM/
YYYY)
Comments after Physical
Inspection
Progress
StatusPictorial Evidence
3 Verify concretestrengths in
columns in Building2 (old building)
Produce and activelymanage a loading plan
for all floor plateswithin the factory
giving consideration tofloor capacity andcolumn capacity
within 6-months Building Engineer hasStatrted working on this
point. As soon aspossible we will try to
complete this
26 -02-2016 Previous T imeLine :30/11/2015
Committed TimeLine:26/02/2016
Loading plan is required to besubmitted with the EA report,
which was not submitted
during inspection. Factorymanagement was required to
maintain the live load under 2kPa but during inspection,
heavy loading was found inmost of the area. No height
marking for load management
was observed.
Corrected
4 Check st ructure forhigh loading from
boilers, machineryand crane
New boiler on secondfloor of Boiler House
(Building 3) and craneon roof of
Building 2 should not
be used until designchecks detailed below
are completed.•
within 6-weeks The boiler buoílding isspecially and carefully
designed to hold theboiler. Material wereused that way to be
able to hold the load.What is asked by you
is not understood. Thecrane is like a toy
which is visible fromthe picture too. It was
used to carry very
small quantities ofbricks or few bags of
cement to the roof forconstruction purpose.
Any way, it is alreadymoved from the roof.
Buliding Engineer alsoworking on it
26-02-2016 Previous Timeline: 31/07/2015Committed Timeline:
26/02/2016The crane was removed and
the boiler in 1st floor was
found to be in use. The boilerin second floor was not found
under use during inspection. Adequacy check of this
structure is required to beincluded in the EA, which was
not submitted.
In Progress
-
8/15/2019 12052 Finnkoli Apparels Ltd FUiN_Structural v4.2
3/10
Item
No
Accord
Observation
Accord
Recommendation Accord Timeline Final Action Plan
Final
Timeline(
DD/MM/
YYYY)
Comments after Physical
Inspection
Progress
StatusPictorial Evidence
5 Check st ructure forhigh loading from
boilers, machineryand crane
Building engineer tocheck that Boiler
House loading iswithin design limits
andadvise on appropriate
load
reduction/remedialmeasures if required.
within 6-weeks The buiding engineerhas already assessed
the loads and coulmnstresses in building two
while adding the twonew buildins with it.
Howevr, Factory
engineer promised tocome review the
design, and yourdemand which will take
some time. henceextentended time is
requested.
26-02-2016 Previous Timeline: 31/07/2015Committed Timeline:
26/02/2016The crane was removed and
the boiler in 1st floor wasfound to be in use. The boilerin second floor was not found
under use during inspection. Adequacy check of this
structure is required to beincluded in the EA, which was
not submitted.
In Progress
6 Check st ructure forhigh loading from
boilers, machineryand crane
Building engineer tocheck that the load
from machinery iswithin design limits
and advise on
appropriate loadreduction/remedial
measures if required
within 6-weeks The buiding engineerhas already assessed
the loads and coulmnstresses in building two
while adding the two
new buildins with it.Howevr, Factory
engineer promised tocome review thedesign, and your
demand which will takesome time. hence
extentended time isrequested.
26-02-2016 Previous Timeline: 31/07/2015Committed Timeline:
26/02/2016The crane was removed and
the boiler in 1st floor was
found to be in use. The boilerin second floor was not found
under use during inspection. Adequacy check of thisstructure is required to be
included in the EA, which wasnot submitted.
In Progress
7 Check st ructure for
high loading from
boilers, machineryand crane
Building engineer to
check roof of Building
2 for load from craneand advise on
appropriate load
reduction/remedialmeasures if required
within 6-weeks Crane has been
removed.
26-02-2016 Previous Timeline: 31/07/2015
Committed Timeline:
26/02/2016The crane was removed and
the boiler in 1st floor was
found to be in use. The boilerin second floor was not foundunder use during inspection.
Adequacy check of thisstructure is required to be
included in the EA, which wasnot submitted.
In Progress
-
8/15/2019 12052 Finnkoli Apparels Ltd FUiN_Structural v4.2
4/10
Item
No
Accord
Observation
Accord
Recommendation Accord Timeline Final Action Plan
Final
Timeline(
DD/MM/
YYYY)
Comments after Physical
Inspection
Progress
StatusPictorial Evidence
8 Check st ructure forhigh loading from
boilers, machineryand crane
Carry out loadreduction or remedial
measures as advisedby the
Building Engineer
within 6-months Bui ld ing EngineerWorking on it
26-02-2016 Previous Timeline: 31/07/2015Committed Timeline:
26/02/2016The crane was removed and
the boiler in 1st floor wasfound to be in use. The boilerin second floor was not found
under use during inspection. Adequacy check of this
structure and remedialmeasures are required to be
included in the EA, which wasnot submitted.
In Progress
9 Check st ructure for
high loading fromboilers, machinery
and crane
Continue to manage
loads in these areas toremain within design
limits
within 6-months As soon as the loading
plan will be preparedas per law 147 we will
start following it.
26-02-2016 Previous Timeline: 30/11/2015
Committed Timeline:26/02/2016
The crane was removed andthe boiler in 1st floor was
found to be in use. The boilerin second floor was not foundunder use during inspection.
Adequacy check of thisstructure and loading limits
are required to be included inthe EA, which was not
submitted.
In Progress
10 Check s ta ir s f orload from
additional steps(Building 2)
Check stairs for loadfrom additional steps
within 6-weeks Done 26-02-2016 Previous Timeline: 25/06/2015Committed Timeline:
26/02/2016The factory management
removed the additional stepsfrom the stair slab. But the
slab still needs to be checked.The adequacy check of thestair slab is required to be
included in the EA report,which was not submitted.
In Progress
-
8/15/2019 12052 Finnkoli Apparels Ltd FUiN_Structural v4.2
5/10
Item
No
Accord
Observation
Accord
Recommendation Accord Timeline Final Action Plan
Final
Timeline(
DD/MM/
YYYY)
Comments after Physical
Inspection
Progress
StatusPictorial Evidence
11 Check s ta ir s f orload from
additional steps(Building 2)
Prop stairs if designfound to be
inadequate
within 6-weeks Done 26-02-2016 Previous Timeline: 25/06/2015Committed Timeline:
26/02/2016The factory management
removed the additional stepsfrom the stair slab. But the
slab still needs to be checked.
The adequacy check of thestair slab is required to be
included in the EA report,which was not submitted. No
propping was done.
In Progress
12 Check s ta ir s f orload from
additional steps
(Building 2)
Remove steps andreplace with lighter
material (e.g. timber)if
structure found to be
inadequate.
within 6-months Done 26-02-2016 Previous Timeline: 25/06/2015Committed Timeline:
26/02/2016
The factory management
removed the additional stepsfrom the stair slab. But the
slab still needs to be checked.The adequacy check of the
stair slab is required to beincluded in the EA report,
which was not submitted.
In Progress
13 Control loading instorage areas
Building Engineer toensure the structure is
not loadedbeyond capacity
within 6-weeks Bui ld ing Engineerwotking on it
26-02-2016 Previous Timeline: 31/07/2015 Committed Timeline:
26/02/2016This issue is required to be
covered in the EA, which wasnot submitted during the timeof inspection. The live load
was found above 2kPa inseveral panels. No active load
management system or heightmarking was present in the
factory.
In Progress
-
8/15/2019 12052 Finnkoli Apparels Ltd FUiN_Structural v4.2
6/10
Item
No
Accord
Observation
Accord
Recommendation Accord Timeline Final Action Plan
Final
Timeline(
DD/MM/
YYYY)
Comments after Physical
Inspection
Progress
StatusPictorial Evidence
14 Control loading instorage areas
Produce and activelymanage a loading plan
for all floorplates within the
factory givingconsideration to floorcapacity and column
capacity.
within 6-weeks After completing theengineering
Assessment, theconsulting firm will
provide us a feasibleloading plan
considering to the
building structuralhealth and we shall
maintain the loadingconsidering our own
safety issue as well
26-02-2016 Previous Timeline: 31/07/2015 Committed Timeline:
26/02/2016Loading plan is required to be
included in the EA, which wasnot submitted during the timeof inspection. The live load
was found above 2kPa inseveral panels. No active load
management system or heightmarking was present in the
factory.
In Progress
15 Control loading instorage areas
Continue to implementload plan
within 6-months After completing theengineering
Assessment, the
consulting firm will
provide us a feasibleloading plan
considering to thebuilding structural
health and we shallmaintain the loading
considering our ownsafety issue as well
26-02-2016 Previous Timeline: 30/09/2015 Committed Timeline:
26/02/2016
Load plan is required to be
included in the EA, which wasnot submitted during the timeof inspection. The live loadwas found above 2kPa in
several panels. No active loadmanagement system or height
marking was present in thefactory.
In Progress
16 Structural drawings
not consistent withthe as-constructedarrangement of the
factory.Building permit not
available
Building Engineer to
survey as constructedbuilding. Updated
drawings to be
prepared showing thecorrect as constructed
layout
within 6-weeks Bui ld ing Engineer
Working on it aftercomplete then we
submit the drawing on
Accord
26-02-2016 Previous Timeline: 31/07/2015
Committed Timeline:26/02/2016
Updated drawings are
required to be covered in theEngineering Assessment (EA)
report. During first follow-upinspection, EA submission
deadline was extended up to30 August, 2015. Some
drawings were present in the
factory during inspection butEA report was not submitted.
In Progress
-
8/15/2019 12052 Finnkoli Apparels Ltd FUiN_Structural v4.2
7/10
Item
No
Accord
Observation
Accord
Recommendation Accord Timeline Final Action Plan
Final
Timeline(
DD/MM/
YYYY)
Comments after Physical
Inspection
Progress
StatusPictorial Evidence
17 Structural drawingsnot consistent with
the as-constructedarrangement of the
factory.Building permit not
available
Building engineer todetermine were
discrepancies existbetween as
drawings and as builtlayout.
within 6-weeks Bui ld ing EngineerWorking on it after
complete then wesubmit the drawing on
Accord
26 -02-2016 Previous T imeLine :31/07/2015
Committed TimeLine:26/02/2016
Updated drawings arerequired to be covered in theEngineering Assessment (EA)
report. During first follow-upinspection, EA submission
deadline was extended up to30 August, 2015. Some
drawings were present in thefactory during inspection butEA report was not submitted.
In Progress
18 Structural drawingsnot consistent with
the as-constructedarrangement of the
factory.
Building permit notavailable
Structure to bechecked for as
constructed layout,particularly foroffset columns.
within 6-weeks Bui ld ing EngineerWorking on it after
complete then wesubmit the drawing on
Accord
26 -02-2016 Previous T imeLine :31/07/2015
Committed TimeLine:26/02/2016
This issue is required to be
covered in the Engineering Assessment (EA) report.
During first follow-upinspection, EA submission
deadline was extended up to
30 August, 2015. Somedrawings were present in the
factory during inspection butEA report was not submitted.
In Progress
19 Structural drawings
not consistent withthe as-constructed
arrangement of thefactory.
Building permit not
available
Obtain building permit within 6-months During the Audit t ime
we had showed thepermit copy to the
Auditor, but we can'tunderstand what's theproblem with this. Any
way when we willsubmit all document
with the DE report thenwe will provide thisdocument again.
26 -02-2016 Previous T imeLine :
30/09/2015Committed TimeLine:
26/02/2016The permit documents are
required to be included with
the EA report. During firstfollow-up inspection, EA
submission deadline wasextended up to 30 August,2015. Some drawings were
present in the factory duringinspection but EA report was
not submitted.
In Progress
-
8/15/2019 12052 Finnkoli Apparels Ltd FUiN_Structural v4.2
8/10
Item
No
Accord
Observation
Accord
Recommendation Accord Timeline Final Action Plan
Final
Timeline(
DD/MM/
YYYY)
Comments after Physical
Inspection
Progress
StatusPictorial Evidence
20 Columns i n t hedelivery area in the
south of Building 2(old building) are
susceptible toimpact from
delivery vehicles
Building Engineer toreview column design
and potential forvehicle impact to
columns at southernend of building in
material delivery area.
If appropriate, impactprotection to be
provided
within 6-months Done 26-02-2016 Previous TimeLine:25/06/2015
Committed TimeLine:26/02/2016
Column adequacy is requiredto be covered in the EAreport, which was not
submitted. Vehicle impactprotection system was
provided in one column.
In Progress
21 Repai r o f col umn
on north eastelevation and in
basement
Columns to be
repaired by reinstatingcolumn section with
concrete of samestrength as specified
in original design
within 6-months Done 26-02-2016 Previous TimeLine:
25/06/2015Committed TimeLine:
26/02/2016Column was found to be
repaired during inspection. Adequacy of these columnsare required to be verified by
the factory engineer.
In Progress
22 Repai r o f col umn
on north eastelevation and in
basement
Drainage channel in
basement to bediverted away fromstructure or water
redirected down a pipe
within 6-months Done 26-02-2016 Previous TimeLine:
25/06/2015Committed TimeLine:
26/02/2016
Factory management did nottake any actions regarding
drainage channel relocation.
In Progress
23 Repai r o f col umnon north east
elevation and inbasement
Check RC walls inbasement have not
been damaged. Repairif
required
within 6-months Done 26-02-2016 Previous TimeLine:25/06/2015
Committed TimeLine:26/02/2016
Factory management did nottake any actions regarding this
issue. Marks of water ingresswas observed during
inspection.
In Progress
-
8/15/2019 12052 Finnkoli Apparels Ltd FUiN_Structural v4.2
9/10
Item
No
Accord
Observation
Accord
Recommendation Accord Timeline Final Action Plan
Final
Timeline(
DD/MM/
YYYY)
Comments after Physical
Inspection
Progress
StatusPictorial Evidence
24 Non -engineeredsteelwork roofs
over south stairsand above building
2 (old building)roof
Building Engineer tocheck the capacity of
the lightweight roofsand their supports,
and implement anynecessary structural
works
w it hi n 6-months Wil l be done i n t ime. 26 -02-2016 Previous T imeLine :30/09/2015
Committed TimeLine:26/02/2016
No action was taken regardingthis issue. During inspection,lightweight steel sheds are
found to be corroded andpieces of shed was about to
fall off owing to excessivecorrosion and cause serious
safety hazard.
In Progress
25 Stair columns,
Beams and stairslab was found as
damaged andcracked dew to
corrosion
Repair those stair
slab, columns andbeams immediately.
26-02-2016 Previous Timeline: 07/09/2015
Committed Timeline:26/02/2016
Factory management did nottake any action for repairing
those columns, beams andslabs.
In Progress
26 Stair columns,
Beams and stairslab was found as
damaged andcracked dew to
corrosion
Review the design of
that stair column andbeams by considering
this phenomena.
26-02-2016 Previous Timeline: 30/09/2015
Committed Timeline:26/06/2016
Design review of thesecolumns and beams are
required to be covered in the
EA, which was not submitted.
In Progress
-
8/15/2019 12052 Finnkoli Apparels Ltd FUiN_Structural v4.2
10/10
Item
No
Accord
Observation
Accord
Recommendation Accord Timeline Final Action Plan
Final
Timeline(
DD/MM/
YYYY)
Comments after Physical
Inspection
Progress
StatusPictorial Evidence
27 No water proofingmembrane was
found.
Provide water proofingmembrane on roof to
prevent water ingress.
26-02-2016 Previous Timeline: 30/09/2015Committed Timeline:
26/02/2016No water proofing membrane
was observed for preventionof water ingress in roof.Storage of wastes and
construction material over roofwas observed during
inspection. All the exposedreinforcement was corroded
and the roof surface becameslippery owing to the absence
of drainage system.
In Progress