120511 iasi danube - mr orhan ibram
DESCRIPTION
River restoration project in the Danuabe DeltaTRANSCRIPT
1
Wetland restoration projects in the Wetland restoration projects in the Danube Delta Biosphere Danube Delta Biosphere
Reserve/RomaniaReserve/Romania
River Restoration Seminar – Iasi, May 2012
2
HUMAN INDUCED CHANGES IN DANUBE DELTA
BY
POLLUTION
AND
HABITATALTERATIONS
DREDGING CHANNELS
HABITAT REDUCTIONS
BY
AND
BUILDING BARRAGESAT KM 942 AND KM 863 FROM RIVER MOUTHS
DAMMING UPSTREAM FLOODPLAINAND 22% OF THE DELTA
B l a c k S e a
A
TULCEA
Pollution
LEGENDDamming (22%)
New channels
Phosphorous: 45,000-60,000 t/yearOil: 45,000-50,000 t/year
DANUBE
Nitrogen: 300,000-400,000 t/year
SEE HydroPower - Seminar addressed to stakeholders of hydropower target groups in Romania, 18-19 May, Tulcea/Romania
3
DAMMING FLOODPLAIN UPSTREAM DELTA
Jiu
Olt
Arges
Ialomita
Calmatui
Siret
<19601960-19651965-1970>1970
Damming period
Iron Gate II
Iron Gate I
Catch sizes in the Romanian Danube Delta and adjacent lakes
02000400060008000
1000012000140001600018000
1948
195 0
1952
1954
1956
1958
1960
1961
1964
1966
1968
1970
1972
1974
tons Cyprinus Carpio
Total
Damming floodplain area of the Danube river
0
100
200
300
400
500
1949 1952 1956 1960 1962 1966 1975
x1,000 ha
4
DAMMING AND CHANNEL EXCAVATION
Danube
Legend
1903-1916
1952-1960> 19601941-19511930-19401880-1902
Excavation period Legend
1960-19701971-19801981-1989
Building period
Danube
5
Channels blocking
7
CHANGES OF HYDROLOGY AND WATER CHEMISTRY
DANUBE RIVER
Water inflow (cm/s)P(PO4) (mg/l)N(NO3) (mg/l)
P(PO4) inflowtons/year
N(NO3) inflowtons/year
DELTA ECOSYSTEMSBefore 1960 1971-1980 1980-1989
309 359 620<0,01 0,06 0,070,4 1,5 1,5
100 700 1400
4000 17000 29300
2003-20057000,050,6
1100
13500
SEE HydroPower - Seminar addressed to stakeholders of hydropower target groups in Romania, 18-19 May, Tulcea/Romania
8
In 1994 - Babina (2,100 ha), - agricultural polder -
in 1996 - Cernovca(1,580 ha)- agricultural polder -
in 2000 - Popina(3,600 ha) - fishpond -
in 2002 - Fortuna (2,115 ha) -- agricultural polder -in 2006 - SF. Gheorghe arm’s meanders (687 ha)
In 2008 - Holbina -Dunavat(5,630 ha)- fishponds -
Restoration Works in the Danube Delta
TOTAL: 15,712
9
BABINABABINA--CERNOVCA PILOT PROJECTCERNOVCA PILOT PROJECT
Babina(2,100 ha)
Cernovca(1,580 ha)
Research 1991 - 1994 1991 - 1996Design 1994 1996Implementation 1994 1996Monitoring 1995 - 2003 1997 - 2003
Project status
fullyimplementedreverted to
wetlandsince 1994
fullyimplementedreverted to
wetlandsince 1996
Present status
a mosaic of water types,clear to turbid water
systems, depending onthe connectivity to the
river
10
A management master plan that have been elaborated in A management master plan that have been elaborated in a first phase for a first phase for DDBRcomprisedDDBRcomprised a number of areas to a number of areas to be restored. Preparative studies were conducted from be restored. Preparative studies were conducted from 19911991
11
BEFORE FLOODINGBEFORE FLOODING
12
2 YEARS AFTER FLOODING2 YEARS AFTER FLOODING
13
AGRICULTURAL POLDER IN DANUBE DELTA
14
BabinaBabina--CernovcaCernovca area area (satellite images)(satellite images)
1993
1996
1993
1996
15
BIOLOGICAL FILTERING CAPACITYBIOLOGICAL FILTERING CAPACITYOF THE PALUSTRIAN AND AQUATIC VEGETATIONOF THE PALUSTRIAN AND AQUATIC VEGETATION
Studies based on the model proposed by ConstantinescuStudies based on the model proposed by ConstantinescuAnd And BakkumBakkum (2001)(2001)--on on proccessesproccesses occuringoccuring in reed covered areasin reed covered areasIncluding nitrate and phosphorus cycles (model DANUBS_WQ)Including nitrate and phosphorus cycles (model DANUBS_WQ)
334kg/ha/year mineral nitrogen and 14.5 kg/ha/year total 334kg/ha/year mineral nitrogen and 14.5 kg/ha/year total phosphorusphosphorus
16
CONTACT OF CLEAN WATER FROM RESTORED AREACONTACT OF CLEAN WATER FROM RESTORED AREAWITH DANUBE WATER RICH IN SEDIMENTSWITH DANUBE WATER RICH IN SEDIMENTS
Positive effect Positive effect –– reduced reduced eutrophicationeutrophication
17
CONTROL FISHING RESULTS IN RESTORED AREAS INDICATES CONTROL FISHING RESULTS IN RESTORED AREAS INDICATES THE PRESENCE OF BOTH REPRODUCERS AND YOUNG FISHESTHE PRESENCE OF BOTH REPRODUCERS AND YOUNG FISHES
Fish diversity (more than 29 sp.)Fish diversity (more than 29 sp.)
Reproduction areasReproduction areas
Feeding and raising ground for juvenile and adult fishFeeding and raising ground for juvenile and adult fish
Refuge areasRefuge areas
18
•• S = 3,600 ha, fish pondsS = 3,600 ha, fish ponds --Research: 1996Research: 1996--19991999 --Implemented since 2000Implemented since 2000 --Status: permanent Status: permanent
wetland connected to the riverwetland connected to the river
Canalul Cardon
Popina Canal
Cardon Canal
Musura Branch
433283
860641
CHILIA Arm
POPINA I
Dâmbei Road
Popina Brook
M o n k
O p e n in g
EC 22
EC 21
POPINA PROJECTPOPINA PROJECT
19
FORTUNA PROJECTFORTUNA PROJECT
Fortuna Lake
Danube
•• S = 2,115 haS = 2,115 ha --Former polder for forestryFormer polder for forestry --Research: 2000Research: 2000--20022002 --Present status: Present status: implementatedimplementated 20022002
20
HOLBINAHOLBINA--DUNAVAT PROJECTDUNAVAT PROJECT
S = 5,630 ha, former fish farmsResearch: 1993-1996Result: Restoration strategyImplementation status:
Implemented 2010Evolution: water system reverted from turbid plankton- dominated state to clear macrophytes - dominated one (!)
21
3 islands - created as a result of rectification of Danube arm - were proposed to be connected to river
S= 687 ha
Hydrological connectivity restoration MEANDERS PROJECT
22
50-100 EURO/HA/YEAR with low costsinstead subsidies
FISH: 34 KG/HA/YEARREED: 1-2 TONES/HA/YEARPASTURE: 0,5 UVM/HA/YEAR
ECONOMICAL RESULTSECONOMICAL RESULTS
NUTRIENT REMOVAL- 15 KG PHOSPHORUS/HA/YEAR- 335 KG NITROGEN/HA/YEAR
SEDIMENT RETENTION- 11 TONES/HA/YEAR
HABITAT FOR BIRDS AND FISHES
AESTHETIC VALUES
WATER STORAGE
ECOLOGICAL VALUESECOLOGICAL VALUES
WETLAND REHABILITATION
UNSUSTAINABLE / ABANDONED POLDERS
BENEFITS OF ECOLOGICAL RESTORATION BENEFITS OF ECOLOGICAL RESTORATION BABINA&CERNOVCA PILOT PROJECTS BABINA&CERNOVCA PILOT PROJECTS -- S=3,600HAS=3,600HA
FILTERINGFILTERING
23
ECONOMICAL INDICATOR: MAXIMUM COST/BENEFIT RATIOECONOMICAL INDICATOR: MAXIMUM COST/BENEFIT RATIOBABINA&CERNOVCA PILOT PROJECTS BABINA&CERNOVCA PILOT PROJECTS -- S=3,600HAS=3,600HA
COSTSCOSTS:
RESEARCH, DESIGN & IMPLEMENTATION: 100,000 EURO
BENEFITS:BENEFITS:
FISH YIELD: 3,600HA x 34KG x 0.5EURO/KG = 60,000EURO/YEAR
REED HARVEST: 3,600HA x 1T/HA x 16EURO/T = 60,000EURO/YEAR
TOURISM: 10TURISTS x 100DAYS/YEAR x 10EURO/DAY = 10,000EURO/YEAR
CATTLE: 100HA x 0.5UVM/HA x 100KG x 2EURO/KG = 10,000EURO/YEAR
TOTAL VALUE : 140,000 EURO/YEARTOTAL VALUE : 140,000 EURO/YEARat low labour costs
24
&DANUBE DELTA BIOSPHERE RESERVE AUTHORITY
SUCCESSESSUCCESSES
25
CONSTRAINTSCONSTRAINTS
LEGISLATIVE FRAMEWORK
POLITICAL DECISION PUBLIC AWARENESS
GAPS IN KNOWLEDGEIRREVERSIBLEMAN MADE CHANGES
WATER QUALITY
WETLAND RESTORATION
STAKEHOLDERS PARTICIPATION
FUNCTIONALINTEGRITY
(after (after StarasStaras, 2000), 2000)
ECONOMICECONOMICINTERESTINTEREST
26
(after (after StarasStaras, 2000), 2000)
27
THANK YOU
28
Orhan IbramHydrobiology Lab.Danube Delta National Institute for Research and Development 165 Babadag street 820112 Tulcea / ROMANIA Phone 0040 240 524546Fax 0040 240 533547
Contact: [email protected]