Diameter: 120 ft
Height: 40 ftCapacity 80,500 BBLBuilt: 1931Shell: RivetedFoundation: Earthen
Floating Roof: Steel AnnularPontoon
Fixed Roof: Aluminum Dome
Foundation Repairs for Out-of-Round Tanks
-
7/28/2019 12 . TankProjectsandRepairs[1]
3/145
Condition:
Tank was inspected in 2002
Maximum elevation difference of 0.53 ft or6 3/8 inches
Tank could only be filled half way
Aluminum dome installed mid 1980s
-
7/28/2019 12 . TankProjectsandRepairs[1]
4/145
Tank Foundation Settlement
-
7/28/2019 12 . TankProjectsandRepairs[1]
5/145
Edge Settlement was Found
-
7/28/2019 12 . TankProjectsandRepairs[1]
6/145
Out-of-Roundness
-8.75 in
+6.14 in
-
7/28/2019 12 . TankProjectsandRepairs[1]
7/145
Measuring
Out-of-
Roundness
-
7/28/2019 12 . TankProjectsandRepairs[1]
8/145
Windgirder Riveted to Shell
-
7/28/2019 12 . TankProjectsandRepairs[1]
9/145
Possible Solutions:
Continue service as the tank is
Remove the tank and build a new one
Re-level the existing tank
-
7/28/2019 12 . TankProjectsandRepairs[1]
10/145
Chosen Solution:
Re-level the foundation
Correct out-of-roundness
Allow utilization of the entire tank
Correct internal edge settlement
-
7/28/2019 12 . TankProjectsandRepairs[1]
11/145
The Plan:
A.R. Watson, U.S.A. to lift the tank level
with highest elevation
TCMS to excavate the area and install anew concrete ringwall foundation
-
7/28/2019 12 . TankProjectsandRepairs[1]
12/145
Implementation:
A.R. Watson started lifting
the tank
Aluminum skirt damage
observed on the dome Work stopped to consider
options
-
7/28/2019 12 . TankProjectsandRepairs[1]
13/145
Moving Forward
Remove the dome
Hold the dome over the tank
Re-level the Tank with the dome in Place
-
7/28/2019 12 . TankProjectsandRepairs[1]
14/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
15/145
Dome positionsmarked on Shell
-
7/28/2019 12 . TankProjectsandRepairs[1]
16/145
Wire Rope
Come Along to tension wire rope
Wire Rope Layout
-
7/28/2019 12 . TankProjectsandRepairs[1]
17/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
18/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
19/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
20/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
21/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
22/145
Dome Roof Support
Tank Windgirder
Bracing
Cross Bracing Between Supports At 4 Positions Around Dome
-
7/28/2019 12 . TankProjectsandRepairs[1]
23/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
24/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
25/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
26/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
27/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
28/145
New Foundation Installed
-
7/28/2019 12 . TankProjectsandRepairs[1]
29/145
New Foundation Installed
-
7/28/2019 12 . TankProjectsandRepairs[1]
30/145
New Foundation Installed
N k h t ill
-
7/28/2019 12 . TankProjectsandRepairs[1]
31/145
Never know what you will
find
T k
-
7/28/2019 12 . TankProjectsandRepairs[1]
32/145
Tank
Details
Built 1963
70 Diameter
51 Tall
Altered 1993
Dome
IFD
Windgirder
-
7/28/2019 12 . TankProjectsandRepairs[1]
33/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
34/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
35/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
36/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
37/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
38/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
39/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
40/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
41/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
42/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
43/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
44/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
45/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
46/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
47/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
48/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
49/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
50/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
51/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
52/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
53/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
54/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
55/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
56/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
57/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
58/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
59/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
60/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
61/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
62/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
63/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
64/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
65/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
66/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
67/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
68/145
Work Progressed on the Tank
-
7/28/2019 12 . TankProjectsandRepairs[1]
69/145
g
The Concrete ring was extended almost two feet
New Anodes added
A Leak Detection System added
Leak Containment Added
A New Bottom was installed
-
7/28/2019 12 . TankProjectsandRepairs[1]
70/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
71/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
72/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
73/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
74/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
75/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
76/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
77/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
78/145
Hot Asphalt Tank
-
7/28/2019 12 . TankProjectsandRepairs[1]
79/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
80/145
Tank BottomInspection Report
-
7/28/2019 12 . TankProjectsandRepairs[1]
81/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
82/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
83/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
84/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
85/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
86/145
Over Pressure Event
180 ft Diameter CRT Tank
-
7/28/2019 12 . TankProjectsandRepairs[1]
87/145
Breakout Tank for Pipeline Usage
Stores Diesel Fuel
Bottom Recently replacedAnnular Ring
5/16 inch bottom plates
Pipeline Nitrogen DisplacementTank Being used for Nitrogen Blow-down
Over Pressure Event
-
7/28/2019 12 . TankProjectsandRepairs[1]
88/145
Areas of bottom plate lifting.
These locations were directly
below the areas in the cone roof
where the over-pressurization
had damaged the roof plates.
Area of top shellcourse damage.
Over Pressure Event
-
7/28/2019 12 . TankProjectsandRepairs[1]
89/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
90/145
eformed Roof Plates.
C l t l b
-
7/28/2019 12 . TankProjectsandRepairs[1]
91/145
Columns are not plumb.
P
L
U
M
B
L
I
N
E.
Shell Failure.
-
7/28/2019 12 . TankProjectsandRepairs[1]
92/145
Twisted Roof Structure.
P
L
U
M
B
L
I
N
E.
-
7/28/2019 12 . TankProjectsandRepairs[1]
93/145
Twisted Roof Structure.
-
7/28/2019 12 . TankProjectsandRepairs[1]
94/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
95/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
96/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
97/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
98/145
New Tank Construction
-
7/28/2019 12 . TankProjectsandRepairs[1]
99/145
Diameter = 90 ft (27.4 M)
Height = 51 ft (15.48 M)
Internal Aluminum Skin& Pontoon Deck
Aluminum Dome Roof
Service = Gasoline
-
7/28/2019 12 . TankProjectsandRepairs[1]
100/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
101/145
ppen xO
-
7/28/2019 12 . TankProjectsandRepairs[1]
102/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
103/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
104/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
105/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
106/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
107/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
108/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
109/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
110/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
111/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
112/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
113/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
114/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
115/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
116/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
117/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
118/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
119/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
120/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
121/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
122/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
123/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
124/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
125/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
126/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
127/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
128/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
129/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
130/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
131/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
132/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
133/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
134/145
Hydrostatic Test
Testing of the shell
1. To the maximum design height
2. For a tank with a tight roof, 2in. Above weld
connecting roof plate, or
3. To a level lower than 1 or 2 when restricted by
overflows, internal roof, or other freeboard
-
7/28/2019 12 . TankProjectsandRepairs[1]
135/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
136/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
137/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
138/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
139/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
140/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
141/145
Finished ?
-
7/28/2019 12 . TankProjectsandRepairs[1]
142/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
143/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
144/145
-
7/28/2019 12 . TankProjectsandRepairs[1]
145/145