Week of December 20, 2018
MT PARK 63(1) Tom Miner Creek Road Capital Improvements Project Construction Newsletter
For questions regarding the project contact:
Matt Bean - WFL PE
(360) 607-4061
CONTRACT NO: 69056718C000009 AWARDED TO: Pavkov Contracting Corp Sumter, SC 29150
TheTomMinerCreekRoadCapitalImprovementsProjectislocatedapproxi-mately40milesSouthwestofLivingston,MontanainParadiseValley.Thepro-jectworkconsistsofremovalandreplacementofthetwodeterioratingshortspanconcretebridgesoverTomMinerCreekandRockCreek.TheexistingbridgeswillbereplacedwithlongerandwiderGRS-IBSbridges,riprapprotec-tion,andguardrail.TheprojectwillalsoincludesomerehabilitationworkontheCarbellaTrussBridgeconsistingofreplacingtheexistingbridgedeckandrepairingsomeofthetrussmembers.
Traf icControl
CurrentOperations
TheRockCreekbridgehasbeencompletedtothepointitisopenforusebypublictraf ic.Thetemporarytraf icdetourandbridgehavebeenremoved.Pleasedriveslowlythroughthepro-jectareaoverthewintermonthsastheroadwaywillbecompletedin2019.
Theprojectworkisbeingshutdownfortheremainderofthewintermonthsasthefrozengroundandwinterconditionshavepreventedtheremainingearthworkfrombeingcompletedthisyear.TheRockCreekbridgehasbeencompletedtothepointwhereitisopenforpublictraf ic.ThesepasttwoweekstheContractorhasworkedonopeningthenewbridge,buildingthebridgeapproaches,installingguardrail,removingthetemporarybridgeanddetour,andcompletingriprapinstallations.Workwillresumeinthespringof2019onceweatherconditionsallowfortheremainingroadwayworktobecompleted.Itisanticipatedthattherewillonlybeafewweeksofworkin2019inordertocompletetheremainingprojectwork.
Construction Photos
Page 2 MT PARK 63(1)
The Rock Creek bridge opened for traffic over the winter shutdown. Work will resume to complete the roadway in 2019.
Guardrail being installed along with the tempo-rary bridge re-moved and riprap installed around the bridge abut-ments.