Recent Results from the IGS
Terrestrial Frame Combinations__________________________________________________________________________________________________
Elaboration of IGS08
Paul Rebischung, Bruno Garayt
Session 2:Strenghts, weaknesses, modelling standards
and processing strategies of space geodetic techniques
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
2/17
Outline
• The IGS terrestrial frame combinations:– Presentation– Methodology– Results– Prospects
• IGS08:– Definition– Availability over time– IGS08 core network
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
3/17
TF combination: Products
• Weekly combined solution:– Combination of 9 AC solutions
– Station positions
– ERP (XPO, XPOR, YPO, YPOR, LOD)
– « Apparent geocenter »
• Cumulative solution:– Stacking of the weekly solutions
– Station positions at 2005.0 and velocities
– Updated each week
NRCAN since 1999
IGN since 2010
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
4/17
TF combination: Network
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
5/17
TF combination: Methodology
• Preparation of AC solutions:– Remove constraints → Unconstrained, singular normal matrices– Fix some parameters (UT, satellite PCOs)– Solve normal equations by adding minimal constraints
• Iterative combinations of AC solutions– Estimated parameters:
• Combined station coordinates and ERP• « AC → combined » transformation parameters
– Internal constraints ⇒ Combined solution is in a mean frame.– Rejection of outliers (5 cm / 5 σ)– Update of AC variance factors
• Final combination with transformation parameters fixed
• Explicitation of combined geocenter
• Alignment to IGS05
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
6/17
TF combination: ResultsW. avg. of AC residuals Std. dev. of AC residuals
East
North
Up
Change in the combination method
Global level of agreement between AC solutions:
• 1-2 mm in horizontal• 2-5 mm in vertical
Excellent agreement with ‘mig’:
< 0.5 mm in horizontal< 1 mm in vertical⇒ Independent validation of the combination
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
7/17
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
8/17
TF combination: How to progress?
• Need to understand the discrepancies between AC frames
⇒ Maps of the « AC – igs » residuals
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
9/17
COD
EMR
ESA
GFZ
GRG
JPL
MIT
NGS
SIO
Mean SH fits of « AC-igs » residuals over weeks 1548-1599
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
10/17
TF combination: How to progress?
• Study the « AC distorsions » over 1994 – 2010(using repro1)
• Replace the cumulative solution by a new onebased on repro1
• Study « AC – cumulative solution » residuals in the frequency domain
• Study the geocenter discrepancies
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
11/17
IGS08
• IGS realization of ITRF2008:– Will become the Reference Frame of IGS products.
⇒ Consistency and stability of IGS products will critically depend on IGS08.
– Will be used by many GNSS users to access ITRF2008.
• Initially intended to be a subset of “good” GNSS stations from ITRF2008– But because of new antenna robot calibrations included in
igs08.atx,small shifts will be applied to the ITRF2008 coordinates of some stations.
• Unlike IGS05, IGS08 should include RF stationsback to 1994 (for repro2).
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
12/17
IGS08: Selection criteria
• Geographical location
• “ITRF2008 quality”:– Data span (5 years at least)– Maximal time spans between two discontinuities (3 years at least)– Number of discontinuities (5 at most)– Absence of velocity discontinuities– Standard deviation of last velocity (0.3 mm/y at most)– Residual time series (RMS + visual inspection)
• Equipment:– Type of antenna calibration– GPS+GLONASS capability– Presence of an external atomic clock– Co-location with other techniques
• Belonging to IGS05
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
13/17
IGS08: Result of the selection
• 241 stations
• Global coverage
• But densityheterogeneities
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
14/17
IGS08: Availability over time
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
15/17
Aliasing of loading signals
• Weekly solutions are aligned to IGSxx.
• Helmert parameters absorb part of the loading signals. ⇒ Station annual signals are reduced/amplified and/or shifted.
• This aliasing can be reduced by using a well distributed RF (Collilieux, 2010).
⇒ « IGS08 core network »
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
16/17
IGS08 core network
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
17/17
Thanks for your attention!
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
18/17
Backup slides
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
19/17
TF combination: Methodology
• Variance component estimation:
– A priori: variance factors from previous week
– After each iteration:
• : weighted squared sum of solution s residuals
• : redundancy factor of solution s
• : number of observations from solution s
• : design matrix of solution s
• : combined covariance matrix
s
ssTsi
sis f
vPv 221
ssTs vPv
sTss
obsss PQAAtrnf
obssn
sA
Q
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
20/17
RF combination: Methodology
• Paradox of the combined geocenter:– Rigorous geocenter combination ⇒ No translation parameters
– But…
– In practice, AC solutions are brought to the same framebefore geocenter is combined.
⇒ Estimated precision is too optimistic (usually [1 mm ; 1 mm ;3 mm]).
– To be used with care!
– There is still a long way before GNSS can contribute to the ITRF origin.
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
21/17
IGS08: Selection criteria
Distribution of GNSS stations among IGS stations in ITRF2008
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
22/17
IGS08: Selection criteria
Distribution of antenna calibration types among IGS stations in ITRF2008
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
23/17
IGS08: Availability over time
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
24/17
New antenna calibrations
• New robot calibrations by Geo++ available for igs08.atx
• But repro1 (input for ITRF2008) computed with old calibrations
• To ensure consistency between IGS08 & igs08.atx:– Drop affected stations from IGS08
– Apply shifts to the ITRF2008 coordinates of these stations
Same problem as the transition from ITRF2005, relative calibrations to IGS05, absolute calibrations
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
25/17
New antenna calibrations
• To estimate coordinate shifts due to calibration changes,– PPP tests were performed at IGN, ESA and CNES.
– ACs provided parallel solutions using the new calibrations.
• Good global agreement– But for certain antenna types, fixing ambiguities or not seems to have
an impact on the estimated shifts.
• When possible, IGN PPP shifts will be applied.
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
26/17
IGS08 core network
• Simulations performed by Xavier Collilieux:
Differences at the annual frequency between the true values and the residuals of the 7-parameter transformation:
⇒ Annual signals are better retrieved if « IGS08 core » is used instead of IGS08.
In (mm) Out (mm) In (mm) Out (mm) In (mm) Out (mm)
Full IGS08 0.3 0.3 0.4 0.2 1.0 1.3
IGS08 core 0.1 0.1 0.2 0.1 0.6 1.1
East North Height
x(t) = In cos(ωt) + Out sin(ωt)
REFAG Symposium6 October 2010 – Marne-la-Vallée, France
27/17
IGS08 core network
• Simulated translations and scale factor:
Full IGS08
IGS08 core