115 E 75th St Renovation December 17, 2018

Upload: others

Post on 22-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 115 E 75th St Renovation - d1jiktx90t87hr.cloudfront.net · LEXINGTON AVENUE E 75 ST orthell ealth 115 E 75th Street enovation nnd architects LLP ecemer 17, 2018 4 Proposed Primary

115 E 75th St Renovation

December 17, 2018

Page 2: 115 E 75th St Renovation - d1jiktx90t87hr.cloudfront.net · LEXINGTON AVENUE E 75 ST orthell ealth 115 E 75th Street enovation nnd architects LLP ecemer 17, 2018 4 Proposed Primary

PAR

K A

VE

NU

E

LEX

ING

TON

AV

EN

UE

E 75 ST

E 76 ST

E 77 ST

NORTHWELL HEALTHPHYSICIAN PARTNERS

NORTHWELL HEALTHLENOX HILL HOSPITAL

115 E 75

Building/Lot: 70’ - 0”

Lot: 102’ - 2”Building: 97’ - 0”

①②

115 E 75

UES

His

toric

Dis

tric

t Bou

ndar

y

ennead architects llp December 17, 2018Northwell Health — 115 E 75th Street Renovation 2

Location

Page 3: 115 E 75th St Renovation - d1jiktx90t87hr.cloudfront.net · LEXINGTON AVENUE E 75 ST orthell ealth 115 E 75th Street enovation nnd architects LLP ecemer 17, 2018 4 Proposed Primary

ennead architects llp December 17, 2018Northwell Health — 115 E 75th Street Renovation 3

Existing conditions, 2018

Page 4: 115 E 75th St Renovation - d1jiktx90t87hr.cloudfront.net · LEXINGTON AVENUE E 75 ST orthell ealth 115 E 75th Street enovation nnd architects LLP ecemer 17, 2018 4 Proposed Primary

LEX

ING

TON

AV

EN

UE

E 75 ST

ennead architects llp December 17, 2018Northwell Health — 115 E 75th Street Renovation 4

Proposed Primary (South) Elevation

1. Restoration Reconstructed original openings flanking central entry and on third floor; New masonry infill to match original.2. Contemporary New marquee, signage, and lighting, with modern portals at east, west, and central bays at historic locations.3. Windows New, non-operational, aluminum frame windows with insulated glazing throughout elevation.

Page 5: 115 E 75th St Renovation - d1jiktx90t87hr.cloudfront.net · LEXINGTON AVENUE E 75 ST orthell ealth 115 E 75th Street enovation nnd architects LLP ecemer 17, 2018 4 Proposed Primary

UP

UPUP

DN

UP

DN

UP DN

Sheet No.

Sheet Title

Date

Key Plan

Project Title

Project Number

Scale

Copyright ©

2011 Ennead A

rchitects, LLP

PAGE NO.

NYC DOB NUMBER

Seal

Project Title

Owner

ArchitectENNEAD ARCHITECTS, LLP320 West 13th StreetNew York, NY 10014-1278212.807.7171 tel 212.807.5917 fax www.ennead.com

NORTHWELL HEALTH100 East 77th StreetNew york, NY, 10075212.434.2348 tel

New York, NY, 10075

Healthcare ArchitectEWING COLE14 Penn Plaza14th FloorNew York, NY 110122212.897.4033 tel 212.967.1470 faxwww.ewingcole.com

Structural EngineerSEVERUD ASSOCIATES469 Seventh Avenue, Suite 900New York, NY 10018212.986.3700 tel 212.687.6467 faxwww.severud.com

MEP EngineerLIZARDOS200 Old Country RoadMineola, NY 11501516.484.1020 tel 516.484.0926 faxwww.leapc.com

Building EnclosureSIMPSON GUMPERTZ HEGER19 West 34th StreetNew York, NY 10001212.271.7000 tel 212.271.0111 faxwww.ennead.com

Civil EngineerLANGAN 360 West 31st StreetNew York, NY 10001-2727212.479.5400 tel 212.479.5444 faxwww.langan.com

Vertical ConveyanceIROS884 Paterson AvenueEast Rutherford, NY 07073973.773.4711 tel www.iroselevator.com

115 East 75th Street

EAST 76 ST

PAR

K A

VE

LEXI

NG

TON

AVE

EAST 75 ST

N

1/8" = 1'-0"

C:\U

sers\fbunel\Docum

ents\Revit\N

orthwell_75thR

eno_Local\1756_A-Northw

ellH

ealth 75_fbunel.rvt2018-05-16 09:46:21

A-100

C&S FLOOR PLANS -CELLAR & LEVEL 1

May 25, 2018 1756

1/8" = 1'-0"10 FLOOR PLAN - CELLAR 1/8" = 1'-0"11 FLOOR PLAN - LEVEL 1

No. Issue Name Date

Solid Glazed

NEW PAINTED STEEL DOORS AND TRANSOM

NEW PAINTED STEEL LINTEL IN ORIGINAL LOCATION

NEW GLASS AND PAINTED STEEL ENTRY MARQUEE

RECONSTRUCTEDMASONRY ARCH TO

MATCH ORIGINAL

RECONSTRUCTEDOPENINGS ANDWINDOWS PER

HISTORIC DOCUMENTS

NEW BRICK INFILL TO MATCH ORIGINAL

RECONSTRUCTED WATER COURSE WITH ORIGINAL/NEW BROWNSTONE COPING AND NEW GRAY GRANITE IN LIEU OF BRICK

NEW GLASS TRANSOM WITH SIGNAGE

NEW GLASS DOORS ATRESTORED PORTAL

NEW SCONCE LIGHTING

NEW LINTEL TOMATCH EAST ENTRY

NEW STRETCHBANNER SIGNAGE

ENTRYEGRESS EGRESS

LOBBY

VESTIBULE

NEW FILL PORT / VENTNEW SIAMESE STP / SPLR

Proposed Primary (South) Elevationennead architects llp December 17, 2018Northwell Health — 115 E 75th Street Renovation 5

Page 6: 115 E 75th St Renovation - d1jiktx90t87hr.cloudfront.net · LEXINGTON AVENUE E 75 ST orthell ealth 115 E 75th Street enovation nnd architects LLP ecemer 17, 2018 4 Proposed Primary

Sheet No.

Sheet Title

Date

Key Plan

Project Title

Project Number

Scale

Copyright ©

2011 Ennead A

rchitects, LLP

PAGE NO.

NYC DOB NUMBER

Seal

Project Title

Owner

ArchitectENNEAD ARCHITECTS, LLP320 West 13th StreetNew York, NY 10014-1278212.807.7171 tel 212.807.5917 fax www.ennead.com

NORTHWELL HEALTH100 East 77th StreetNew York, NY, 10075212.434.2348 tel

New York, NY, 10021

Healthcare ArchitectEWING COLE14 Penn Plaza14th FloorNew York, NY 110122212.897.4033 tel 212.967.1470 faxwww.ewingcole.com

Structural EngineerSEVERUD ASSOCIATES469 Seventh Avenue, Suite 900New York, NY 10018212.986.3700 tel 212.687.6467 faxwww.severud.com

MEP EngineerLIZARDOS200 Old Country RoadMineola, NY 11501516.484.1020 tel 516.484.0926 faxwww.leapc.com

Building EnclosureSIMPSON GUMPERTZ HEGER19 West 34th StreetNew York, NY 10001212.271.7000 tel 212.271.0111 faxwww.ennead.com

Civil EngineerLANGAN 360 West 31st StreetNew York, NY 10001-2727212.479.5400 tel 212.479.5444 faxwww.langan.com

Vertical ConveyanceIROS884 Paterson AvenueEast Rutherford, NY 07073973.773.4711 tel www.iroselevator.com

115 East 75th Street

EAST 76 ST

PAR

K A

VE

LEXI

NG

TON

AVE

EAST 75 ST

N

Page of

1/8" = 1'-0"

C:\U

sers\fbunel\Docum

ents\Revit\N

orthwell_75thR

eno_Local\1756_A-Northw

ell Health 75_fbunel.rvt

2018-10-29 10:55:47

EX200

EXISTING - BUILDINGELEVATIONS

May 25, 2018 1756

1/8" = 1'-0"10 EXISTING BUILDING ELEVATION - SOUTH 1/8" = 1'-0"11 EXISTING BUILDING ELEVATION - NORTH

1/8" = 1'-0"21 EXISTING BUILDING ELEVATION - EAST 1/8" = 1'-0"20 EXISTING BUILDING ELEVATION - WEST

No. Issue Name Date

Sheet No.

Sheet Title

Date

Key Plan

Project Title

Project Number

Scale

Copyright ©

2011 Ennead A

rchitects, LLP

PAGE NO.

NYC DOB NUMBER

Seal

Project Title

Owner

ArchitectENNEAD ARCHITECTS, LLP320 West 13th StreetNew York, NY 10014-1278212.807.7171 tel 212.807.5917 fax www.ennead.com

NORTHWELL HEALTH100 East 77th StreetNew york, NY, 10075212.434.2348 tel

New York, NY, 10075

Healthcare ArchitectEWING COLE14 Penn Plaza14th FloorNew York, NY 110122212.897.4033 tel 212.967.1470 faxwww.ewingcole.com

Structural EngineerSEVERUD ASSOCIATES469 Seventh Avenue, Suite 900New York, NY 10018212.986.3700 tel 212.687.6467 faxwww.severud.com

MEP EngineerLIZARDOS200 Old Country RoadMineola, NY 11501516.484.1020 tel 516.484.0926 faxwww.leapc.com

Building EnclosureSIMPSON GUMPERTZ HEGER19 West 34th StreetNew York, NY 10001212.271.7000 tel 212.271.0111 faxwww.ennead.com

Civil EngineerLANGAN 360 West 31st StreetNew York, NY 10001-2727212.479.5400 tel 212.479.5444 faxwww.langan.com

Vertical ConveyanceIROS884 Paterson AvenueEast Rutherford, NY 07073973.773.4711 tel www.iroselevator.com

115 East 75th Street

EAST 76 ST

PAR

K A

VE

LEXI

NG

TON

AVE

EAST 75 ST

N

1/8" = 1'-0"

C:\U

sers\fbunel\Docum

ents\Revit\N

orthwell_75thR

eno_Local\1756_A-Northw

ellH

ealth 75_fbunel.rvt2018-05-11 12:40:02

A200

C&S BUILDINGELEVATIONS

04/06/18 1756

1/8" = 1'-0"10 BUILDING ELEVATION - SOUTH (C&S) 1/8" = 1'-0"11 BUILDING ELEVATION - NORTH (C&S)

1/8" = 1'-0"20 BUILDING ELEVATION - WEST (C&S) 1/8" = 1'-0"21 BUILDING ELEVATION - EAST (C&S)

No. Issue Name Date

LEX

ING

TON

AV

EN

UE

E 75 ST

NEW ARCHEDOPENING TO

MATCH ADJACENTW/ NEW WINDOW

RECONSTRUCT ORIGINAL BRICK

ARCHES TOMATCH EXISTING

NEWCONNECTIVEWALKWAY TO 76TH STREET

BUILDING

NEW GUARDRAIL BEHIND

PARAPET

NEW MECHANICALEQUIPMENT WITH STEEL DUNNAGE

CAR LIFT DEMO’D;NEW ROOF TO

REPLACE

LOWER EXISTINGMASONRY REAR

YARD WALL

NEW WINDOWSIN EXISTING

OPENINGS THROUGHOUT

DASHED LINEINDICATESBUILDING

ELEMENT ON LOT LINE

ORIGINAL HINGE BLOCKS TO

REMAIN, TYP.

ennead architects llp December 17, 2018Northwell Health — 115 E 75th Street Renovation 6

North Facade

Various window types, including steel-framed center-pivot windows, and single-hung frames with metal or wood construction.

Non-operational, aluminum-frame, fire-rated windows with insulated single-light glazing throughout elevation.

Existing Proposed

Page 7: 115 E 75th St Renovation - d1jiktx90t87hr.cloudfront.net · LEXINGTON AVENUE E 75 ST orthell ealth 115 E 75th Street enovation nnd architects LLP ecemer 17, 2018 4 Proposed Primary

TOP 3 FT PARTIALLY VISIBLEFROM E 76 ST AT 175 FT AWAY

E 76 ST E 75 STCELLAR

L1

L2

L3

L4 / ROOF

REAR YARD

EQUIPMENTNOT VISIBLEFROM E 75 ST

175 FTT.O. EQ 12 FT

ennead architects llp December 17, 2018Northwell Health — 115 E 75th Street Renovation 7

Proposed

Sightlines to Mechanical Equipment — 76 St ‘gap’