11/3/2018 alabama department of transportation … · total cost: $4,306 $1,076 $5,382 ......
TRANSCRIPT
Route CR-15 ProjectDescription
RESURFACING CR-15 FROM SR-75 NORTH WEST TO SR-79
Type of Work RESURFACING
Project Length in Miles 5.670 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061259 ACAA61259 ATRP (011) CONSTRUCTION
RESURFACING
2016 $914 $229 $1,143
TOTAL COST: $914 $229 $1,143
Route I -65 ProjectDescription
RESURFACING I-65 FROM ONE MILE NORTH OF THE JEFFERSON COUNTY LINE TO THE NORTH END OF THE WARRIOR RIVER MULBERRY FORK BRIDGE AT THE CULLMAN COUNTY LINE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 11.915 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059745 RP-IM I065 (473) PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 1
2016 $128 $14 $142
100059801 RP-IM I065 (473) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2017 $2,825 $703 $3,528
TOTAL COST: $2,953 $718 $3,670
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
1 of 154
REGION HIGHWAY PROJECTS - BLOUNT
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN BLOUNT / ST CLAIR COUNTY
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061456 STPAA NR13 (934) CONSTRUCTION
SIDEWALK 2019 $103 $26 $129
TOTAL COST: $103 $26 $129
Route SR-53 ProjectDescription
REPLACE BRIDGE AND APPROACHES ON SR-53 (US-231) OVER THE BLACKBURN FORK OF THE LITTLE WARRIOR RIVER BIN 002844 STR #53-5-3.3
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064121 BR 0053 (559) PRELIMINARY ENGINEERING
BRIDGES AND APPROACHES
2018 $107 $27 $134
TOTAL COST: $107 $27 $134
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
2 of 154
REGION HIGHWAY PROJECTS - BLOUNT
STIP PLAN: 2016 - Original
Route SR-74 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES (BIN 004560) ON SR-74 (US-278) AT LOCUST FORK, GRADE, DRAIN, BASE, PAVE, BRIDGE, AND BRIDGE REMOVAL
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 2.272 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064177 BR 0074 (537) PRELIMINARY ENGINEERING
BRIDGES AND APPROACHES
2016 $1,408 $352 $1,760
100003565 BR 0074 () CONSTRUCTION
BRIDGES AND APPROACHES
2019 $2,897 $724 $3,622
TOTAL COST: $4,306 $1,076 $5,382
Route SR-79 ProjectDescription
REPL BIN#004658 ON SR-79 OVER BLACKBURN FORK OF LITTLE WARRIOR RIVER
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100044645 BR 0079 (500) UTILITIES
BRIDGE REPLACEMENT
2019 $285 $71 $356
TOTAL COST: $285 $71 $356
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
3 of 154
REGION HIGHWAY PROJECTS - BLOUNT
STIP PLAN: 2016 - Original
Route CR-192 ProjectDescription
GRADE, DRAIN, BASE, AND PAVE CR-192 (MCINTOSH ROAD) FROM CR-589 TO LEON SMITH PARKWAY CCP 08-82-07
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 1.120 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054925 STPOA 7457 (601) UTILITIES
GRADE, DRAIN, BASE AND PAVE
2017 $42 $10 $52
100054926 STPOA 7457 (601) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2017 $916 $229 $1,145
TOTAL COST: $958 $239 $1,197
Route CR-366 ProjectDescription
RESURFACE PORTIONS OF CR-366 (MAIN STREET, ASTOR AVENUE, ALEXANDRIA ROAD) IN THE CITY OF WEAVER
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.950 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058459 ACOA58459 ATRP (009) CONSTRUCTION
PAVEMENT REHABILITATION
2016 $473 $207 $680
TOTAL COST: $473 $207 $680
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
4 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Original
Route CR-389 ProjectDescription
INTERSECTION SIGNALS AND TURN LANESATCR-389 (LENLOCK LN) AND CR-324 (SAKS RD)
Type of Work TURN LANES
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100051026 STPOA 7425 (601) CONSTRUCTION
TURN LANES 2016 $1,030 $318 $1,348
TOTAL COST: $1,030 $318 $1,348
Route CR-440 ProjectDescription
CR-440 (64TH STREET) BRIDGE REPLACEMENTBIN # 6204 NEAR WEAVER
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.010 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054938 STPOA 7448 () UTILITIES
BRIDGE REPLACEMENT
2019 $19 $5 $23
TOTAL COST: $19 $5 $23
Route CR-533 ProjectDescription
BRIDGE REPLACEMENT CR-533 (GILBERT'S FERRY ROAD) BIN# 3358
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059417 ACBRZ59417 ATRP (010)
CONSTRUCTION
BRIDGE REPLACEMENT
2018 $1,676 $421 $2,097
TOTAL COST: $1,676 $421 $2,097
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
5 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Original
Route CR-567 ProjectDescription
BRIDGE REPLACEMENT ON CR-567(VERBON GEORGE ROAD) OVER OHATCHEE CREEK -BIN# 11481
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059414 ACBRZ59414 ATRP (010)
CONSTRUCTION
BRIDGE REPLACEMENT
2017 $967 $242 $1,208
TOTAL COST: $967 $242 $1,208
Route CR-631 ProjectDescription
BRIDGE REPLACEMENT ON CR-631 (BROWN BRIDGE ROAD) OVER CHOCCOLOCCO CREEK BIN # 3135
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059427 ACBRZ59427 ATRP (010)
CONSTRUCTION
BRIDGE REPLACEMENT
2017 $1,212 $303 $1,516
TOTAL COST: $1,212 $303 $1,516
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
6 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
REHABILITATE BOWL ROAD (RT 420), MOUNTAIN LONGLEAF WILDLIFE REFUGE (APPORTIONMENT FY 2017)
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065122 PFH 0816 () CONSTRUCTION
RESURFACING
2019 $235 $0 $235
TOTAL COST: $235 $0 $235
Route CR-NA ProjectDescription
RESURFACING AND DRAINAGE IMPROVEMENTS ON SNOW STREET FROM SR-21 TO SR-4 (US-78)
Type of Work RESURFACING
Project Length in Miles 0.741 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100052525 STPOA 7440 (600) CONSTRUCTION
RESURFACING
2017 $1,690 $422 $2,112
TOTAL COST: $1,690 $422 $2,112
Route CR-NA ProjectDescription
IRON MOUNTAIN ROAD EXTENSION FROM SR-21 TO PAPPY DUNN BOULEVARD
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059379 ACOA59379 ATRP (010) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2018 $4,730 $1,347 $6,077
TOTAL COST: $4,730 $1,347 $6,077
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
7 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
CHIEF LADIGA TRAIL RESURFACING WITH SIDEWALK CONNECTION CITY OF WEAVER
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062151 STPOA 0814 (251) CONSTRUCTION
RESURFACING
2016 $206 $56 $262
TOTAL COST: $206 $56 $262
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT NOBLE STREET AND 4TH STREET
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063208 STPOA 0815 (255) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $206 $52 $258
TOTAL COST: $206 $52 $258
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON ROCK SPRINGS ROAD OVER UNNAMED TRIBUTARY TO OHATCHEE CREEK BIN #4970
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063647 ACBRZ63647 ATRP (004)
CONSTRUCTION
BRIDGE REPLACEMENT
2018 $1,038 $272 $1,310
TOTAL COST: $1,038 $272 $1,310
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
8 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
RESURFACE COFFEE STREET FROM SR-21 TO ALEXANDRIA ROAD, IN JACKSONVILLE
Type of Work RESURFACING
Project Length in Miles 0.640 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100043808 STPOA 7434 (600) CONSTRUCTION
RESURFACING
2016 $285 $71 $357
TOTAL COST: $285 $71 $357
Route NA- ProjectDescription
EXPANSION OF ACCESS AND PARKING ADJACENT TO POST OFFICE IN THE CITY OF JACKSONVILLE (PHASE 2)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061470 HPP A172 () CONSTRUCTION
UNCLASSIFIED 2019 $25 $0 $25
TOTAL COST: $25 $0 $25
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
9 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
BICYCLE AND PEDESTRIAN IMPROVEMENTS AT W 10TH STREET FROM PIPE STREET TO CLYDESDALE AVENUE, AT CLYDESDALE AVENUE FROM W 10TH STREET TO 11TH STREET AND AT 11TH STREET FROM CLYDESDALE AVENUE TO COBB AVENUE, IN THE CITY OF ANNISTON
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063210 STPOA 0815 (252) CONSTRUCTION
SIDEWALK 2016 $35 $9 $44
TOTAL COST: $35 $9 $44
Route NA- ProjectDescription
BICYCLE AND PEDESTRIAN IMPROVEMENTS AT 14TH STREET, 11TH STREET, 18TH STREET, AND COBB AVENUE IN THE CITY OF ANNISTON
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063212 STPOA 0815 (251) CONSTRUCTION
SIDEWALK 2016 $118 $93 $212
TOTAL COST: $118 $93 $212
Route NA- ProjectDescription
CHIEF LADIGA TRAIL - FROM CANE CREEK TO 4TH STREET ANNISTON SEGMENT
Type of Work UNCLASSIFIED
Project Length in Miles 5.800 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060694 STPOA NR13 (938) RIGHT OF WAY
UNCLASSIFIED 2018 $1,777 $444 $2,221
TOTAL COST: $1,777 $444 $2,221
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
10 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Original
Route SR-204 ProjectDescription
BRIDGE REPLACEMENT OVER ABANDONED RAILROAD AND TALLAHATCHEE CREEK ON SR-204 (BIN 4684)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.050 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049969 BR 0204 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $277 $69 $346
TOTAL COST: $277 $69 $346
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
11 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Original
Route SR-21 ProjectDescription
SIGNAL UPGRADE SR-21 AT BALTZELL GATE ROAD
Type of Work SIGNALIZATION
Project Length in Miles 0.015 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047014 STPOA 0021 (516) CONSTRUCTION
SIGNALIZATION 2019 $107 $27 $133
TOTAL COST: $107 $27 $133
Route SR-21 ProjectDescription
TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF LENLOCK LANE AND SR-21 IN THE CITY OF ANNISTON
Type of Work SIGNALIZATION
Project Length in Miles 0.010 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047016 STPOA 0021 (543) CONSTRUCTION
SIGNALIZATION 2019 $135 $34 $169
TOTAL COST: $135 $34 $169
Route SR-21 ProjectDescription
INTERSECTION IMPROVEMENTS AT 10 INTERSECTIONS ALONG SR-21 IN THE CITY OF JACKSONVILLE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059378 ACOA59378 ATRP (010) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2016 $885 $221 $1,106
TOTAL COST: $885 $221 $1,106
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
12 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Original
Route SR-4 ProjectDescription
RE-CONFIGURE INTERSECTION SR-4 (US-78)ATCR-186 (BARRY STREET)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057405 STPOA 0004 (536) RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $791 $198 $989
100057406 STPOA 0004 (536) UTILITIES
INTERSECTION IMPROVEMENTS
2019 $94 $23 $117
100057407 STPOA 0004 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $529 $132 $661
TOTAL COST: $1,414 $353 $1,767
Route SR-9 ProjectDescription
REPLACE BRIDGE BIN 005152, SR-9 OVER SOUTHERN RR, 1.8 MILES N OF SR-4(US-78) NEAR IRON CITY (SUFF=43.1,STAT=FO, 2001 HBRRP LIST)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061463 BR 0009 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $130 $32 $162
TOTAL COST: $130 $32 $162
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
13 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Original
Route I -85 ProjectDescription
REPLACEMENT OF WELCOME CENTER ON I-85ATGEORGIA LINE SMALL URBAN LANETT. REST AREA
Type of Work REST AREA REHABILITATION
Project Length in Miles 0.100 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054187 IMF I085 (317) CONSTRUCTION
REST AREA REHABILITATION
2019 $14,567 $1,619 $16,185
TOTAL COST: $14,567 $1,619 $16,185
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
14 of 154
REGION HIGHWAY PROJECTS - CHAMBERS
STIP PLAN: 2016 - Original
Route CR-2 ProjectDescription
RESURFACE (CR-2) PARTRIDGE CREEK ROAD FROM CR-7 TO SR-9 (RAMP)
Type of Work RESURFACING
Project Length in Miles 2.800 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060375 ACNU60375 ATRP (013) CONSTRUCTION
RESURFACING
2016 $301 $75 $376
TOTAL COST: $301 $75 $376
Route CR-30 ProjectDescription
RESURFACE CR-30 (CRAGFORD ROAD) FROM SR-49 TO WESOBULGA CREEK ROAD (RAMP)
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060374 ACNU60374 ATRP (015) CONSTRUCTION
RESURFACING
2016 $521 $130 $651
TOTAL COST: $521 $130 $651
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
15 of 154
REGION HIGHWAY PROJECTS - CLAY
STIP PLAN: 2016 - Original
Route CR-118 ProjectDescription
BRIDGE REPLACEMENT ON CR-118 OVER DYNNE CREEK BIN # 12438
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060397 ACBRZ60397 ATRP (011)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $319 $80 $398
TOTAL COST: $319 $80 $398
Route CR-18 ProjectDescription
CR-18 BRIDGE REPLACEMENT OVER TALLAPOOSA RIVER BIN # 12270 (R.A.M.P.)
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060386 ACBRZ60386 ATRP (013)
CONSTRUCTION
BRIDGE 2019 $2,104 $526 $2,630
TOTAL COST: $2,104 $526 $2,630
Route CR-2 ProjectDescription
REPLACE BRIDGE AND APROACHES CR-2 OVER CARR CREEK BIN # 5073
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061698 ACBRZ61698 ATRP (014)
CONSTRUCTION
BRIDGES AND APPROACHES
2016 $325 $81 $406
TOTAL COST: $325 $81 $406
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
16 of 154
REGION HIGHWAY PROJECTS - CLEBURNE
STIP PLAN: 2016 - Original
Route CR-49 ProjectDescription
CR-49 BRIDGE REPLACEMENT OVER ROBERTS CREEK BIN #9157 (R.A.M.P.)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060388 ACBR60388 ATRP (011) CONSTRUCTION
BRIDGE REPLACEMENT
2017 $693 $173 $866
TOTAL COST: $693 $173 $866
Route CR-49 ProjectDescription
BRIDGE REPLACEMENT ON (CR-49) OVER BAILEY BRANCH BIN # 8845 (RAMP)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060389 ACBR60389 ATRP (011) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $361 $90 $451
TOTAL COST: $361 $90 $451
Route CR-49 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CR-49 OVER CAMP CREEK (BIN #2432) RAMP
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.100 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061701 ACBR61701 ATRP (012) CONSTRUCTION
BRIDGE REPLACEMENT
2017 $489 $122 $612
TOTAL COST: $489 $122 $612
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
17 of 154
REGION HIGHWAY PROJECTS - CLEBURNE
STIP PLAN: 2016 - Original
Route CR-5 ProjectDescription
REPLACE BRIDGE AND APPROACHES ON CR-5 OVER LOCKCHELOOGE CREEK BIN # 14128
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061700 ACBRZ61700 ATRP (006)
CONSTRUCTION
BRIDGES AND APPROACHES
2016 $364 $91 $455
TOTAL COST: $364 $91 $455
Route CR-533 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CAMPBELL STREET (CR-533) OVER CAHULGA CREEK BIN #10630 (RAMP)
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060377 ACBRZ60377 ATRP (014)
CONSTRUCTION
BRIDGES AND APPROACHES
2018 $0 $0 $0
TOTAL COST: $0 $0 $0
Route CR-96 ProjectDescription
CR-96 BRIDGE REPLACEMENT OVER SILAS CREEK BIN # 6193 (RAMP)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060393 ACBRZ60393 ATRP (005)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $304 $76 $380
TOTAL COST: $304 $76 $380
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
18 of 154
REGION HIGHWAY PROJECTS - CLEBURNE
STIP PLAN: 2016 - Original
Route SR-46 ProjectDescription
SR-46 BRIDGE REPLACEMENT OVER CANE CREEK (BIN# 2108) NORTH OF I-20
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.070 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049186 BR 0046 (503) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $2,957 $739 $3,696
TOTAL COST: $2,957 $739 $3,696
Route SR-9 ProjectDescription
SR-9 REPLACE BRG BIN 002666, OVER CAHULGA CREEK, SOUTH OF I-20 NEAR BELLTOWN (SUFF=11.9, STAT=SD, 2001 HBRRP LIST)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.363 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057841 BR 0009 (516) RIGHT OF WAY
BRIDGE REPLACEMENT
2016 $24 $6 $30
100057951 BR 0009 (516) UTILITIES
BRIDGE REPLACEMENT
2016 $350 $87 $437
100041616 BR 0009 (516) CONSTRUCTION
BRIDGE REPLACEMENT
2017 $3,487 $872 $4,359
TOTAL COST: $3,861 $965 $4,826
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
19 of 154
REGION HIGHWAY PROJECTS - CLEBURNE
STIP PLAN: 2016 - Original
Route CR-107 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CR-107 OVER JACK CREEK (BIN 2775) (RAMP)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060401 ACBRZ60401 ATRP (012)
CONSTRUCTION
BRIDGE REPLACEMENT
2017 $354 $88 $442
TOTAL COST: $354 $88 $442
Route CR-125 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CR-125 OVER PAINT CREEK (BIN 3009)(RAMP)
Type of Work BRIDGE
Project Length in Miles 0.112 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060408 ACBR60408 ATRP (011) CONSTRUCTION
BRIDGE 2017 $439 $110 $549
TOTAL COST: $439 $110 $549
Route CR-15 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CR-15 OVER WEOGUFKA CREEK (BIN 5175) (RAMP)
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060414 ACBRZ60414 ATRP (011)
CONSTRUCTION
BRIDGE 2018 $768 $192 $960
TOTAL COST: $768 $192 $960
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
20 of 154
REGION HIGHWAY PROJECTS - COOSA
STIP PLAN: 2016 - Original
Route CR-49 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CR-49 OVER NORFOLK SOUTHERN RAILROAD (BIN 002377)
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060413 ACBRZ60413 ATRP (014)
CONSTRUCTION
BRIDGE 2018 $1,213 $303 $1,516
TOTAL COST: $1,213 $303 $1,516
Route CR-56 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CR-56 OVER WEOGUFKA CREEK (BIN 005582)(RAMP)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060410 ACBRZ60410 ATRP (014)
CONSTRUCTION
BRIDGE REPLACEMENT
2018 $483 $139 $622
TOTAL COST: $483 $139 $622
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
21 of 154
REGION HIGHWAY PROJECTS - COOSA
STIP PLAN: 2016 - Original
Route CR-0099 ProjectDescription
RESURFACE CR-99(COLUMBIANA RD) FROM SR-3(US-31) TO GENTILLY DR, CR-42(TYLER RD) FROM SOUTHLAND DR TO COLUMBIANA RD, AND CR-62(OVERTON RD) FROM 441 FT WEST OF LIBERTY PARKWAY TO I-459 EX RAMP
Type of Work RESURFACING
Project Length in Miles 1.700 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059494 ACAA59494 ATRP (006) CONSTRUCTION
RESURFACING
2016 $909 $227 $1,137
TOTAL COST: $909 $227 $1,137
Route CR-118 ProjectDescription
TURN LANES ON CR-118 (FIELDSTOWN ROAD) AND NEW SIGNAL INSTALL AT CR-1523 (SHADY GROVE ROAD)
Type of Work TURN LANES
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059454 ACAA59454 ATRP (010) CONSTRUCTION
TURN LANES 2018 $853 $349 $1,202
TOTAL COST: $853 $349 $1,202
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
22 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route CR-18 ProjectDescription
EASTERN VALLEY ROAD (CR-18), WIDENING TO 3 LANES FROM MCASHAN DRIVE TO LETSON FARM PARKWAY
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064231 STPBH 3715 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2019 $480 $120 $600
TOTAL COST: $480 $120 $600
Route CR-2 ProjectDescription
INTERSECTION IMPROVEMENT ON CR-2 (SOUTH SHADES CREST ROAD) AND EDEN RIDGE DRIVE/SHADES RUN CIRCLE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059425 ACAA59425 ATRP (005) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2016 $1,173 $303 $1,476
TOTAL COST: $1,173 $303 $1,476
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
23 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route CR-337 ProjectDescription
RESURFACE AND DRAINAGE IMPROVEMENTS ON CR-337 (MCCALLA ROAD) FROM CR-20 (OLD TUSCALOOSA HIGHWAY) TO CR-18 (EASTERN VALLEY ROAD)
Type of Work RESURFACING
Project Length in Miles 1.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059497 ACAA59497 ATRP (007) CONSTRUCTION
RESURFACING
2019 $1,257 $314 $1,571
TOTAL COST: $1,257 $314 $1,571
Route CR-337 ProjectDescription
RESURFACING AND TURN LANES ON CR-337 (MCCALLA ROAD) FROM CR-18 (EASTERN VALLEY ROAD) TO CR-20 (OLD TUSCALOOSA HIGHWAY)
Type of Work TURN LANES
Project Length in Miles 1.920 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060502 STPBH 3713 () RIGHT OF WAY
TURN LANES 2019 $1,572 $393 $1,965
100060504 STPBH 3713 () UTILITIES
TURN LANES 2019 $560 $140 $700
TOTAL COST: $2,132 $533 $2,665
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
24 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route CR-46 ProjectDescription
CR-46 (HUEYTOWN ROAD) ADDITIONAL TURN LANES AND INTERSECTION IMPROVEMENTS FROM WALKER AVENUE TO NORTH OF HILLSIDE DRIVE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056288 STPBH 7021 (600) RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2017 $454 $114 $568
100056289 STPBH 7021 (600) UTILITIES
INTERSECTION IMPROVEMENTS
2019 $200 $50 $250
100056290 STPBH 7021 (600) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $1,200 $300 $1,500
TOTAL COST: $1,854 $464 $2,318
Route CR-52 ProjectDescription
DEMOLITION AND STRUCTURE REMOVAL AT VARIOUS LOCATIONS ALONG MORGAN ROAD FROM I-459 TO SOUTH SHADES CREST ROAD JEFFERSON COUNTY
Type of Work STRUCTURE REMOVAL
Project Length in Miles 4.470 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063665 STPBH 7002 (601) CONSTRUCTION
STRUCTURE REMOVAL
2016 $87 $22 $109
100007542 STPBH 7002 (600) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $9,907 $2,477 $12,383
TOTAL COST: $9,994 $2,498 $12,492
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
25 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route CR-77 ProjectDescription
BRIDGE REPLACEMENT ON CR-77 (MT. OLIVE ROAD) OVER LOCUST FORK OF THE BLACK WARRIOR RIVER
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059462 ACBRZ59462 ATRP (008)
CONSTRUCTION
BRIDGE 2017 $5,259 $2,800 $8,059
TOTAL COST: $5,259 $2,800 $8,059
Route CR-NA ProjectDescription
ROADWAY AND INTERSECTION IMPROVEMENTS ON CAHABA RIVER ROAD FROM SR-38 (US-280) TO KEY DRIVE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 6.700 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063244 STPBH 3716 (252) PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2016 $519 $130 $648
100063245 STPBH 3716 (252) RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2020 $800 $200 $1,000
TOTAL COST: $1,319 $330 $1,648
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
26 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS CAHABA RD/SR-38 (US-280)/CULVER RD/LANE PARK RD-CITY OF MOUNTAIN BROOK
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064199 CMAQ 3715 (266) PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2017 $412 $103 $515
100064200 CMAQ 3715 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $300 $75 $375
100064201 CMAQ 3715 () UTILITIES
INTERSECTION IMPROVEMENTS
2020 $420 $105 $526
100064202 CMAQ 3715 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $1,779 $445 $2,224
TOTAL COST: $2,911 $728 $3,639
Route CR-NA ProjectDescription
PAVEMENT REHABILITATION AND ADA UPGRADES ON LAKESHORE PARKWAY FROM VENICE ROAD TO THE BIRMINGHAM CITY LIMITS
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064224 STPBH 3715 (269) PRELIMINARY ENGINEERING
PAVEMENT REHABILITATION
2017 $80 $20 $100
100064225 STPBH 3715 () CONSTRUCTION
PAVEMENT REHABILITATION
2019 $800 $200 $1,000
TOTAL COST: $880 $220 $1,100
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
27 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT REX LAKE ROAD AND ZEIGLER ROAD
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064310 CMAQ 3715 () PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2019 $160 $40 $200
100064311 CMAQ 3715 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $160 $40 $200
TOTAL COST: $320 $80 $400
Route CR-NA ProjectDescription
HOOVER TOPICS PROJECT-PATTON CHAPEL RD, PHASE III FROM CRAYRICH DRIVE TO CHAPEL LANE. COORDINATE WITH JEFFERSON CO. PROJECT. ADD 3RD LANE.
Type of Work TURN LANES
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007555 STPBH 7020 (601) CONSTRUCTION
TURN LANES 2019 $2,017 $504 $2,521
TOTAL COST: $2,017 $504 $2,521
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
28 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
FINLEY BLVD. EXT FROM 26TH STREET (US-31) TO 27TH AVENUE NEAR 32ND STREET NORTH
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.700 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007603 STPBH-HPP 7173 (601) RIGHT OF WAY
GRADE, DRAIN, BASE, PAVE AND BRG
2018 $6,608 $1,652 $8,260
TOTAL COST: $6,608 $1,652 $8,260
Route CR-NA ProjectDescription
>VARIOUS INTERSECTIONS - PHASE 7 1. MT. OLIVE RD AT NEW FOUND RD./MT OLIVE-BROOKSIDE RD 2. UNION GROVE AT BANKHEAD HWY 3. HEFLIN AV AT RIDERWOOD TR 4. TARRANT RD AT PINEYWOOD RD /SKELTON AVE 5.TYLER LOOP RD AT SWEENEY HOLLOW RD 6.CHALKVILLE RD.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060490 STPBH 9802 (904) UTILITIES
INTERSECTION IMPROVEMENTS
2019 $80 $20 $100
TOTAL COST: $80 $20 $100
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT 2 LOCATIONS; SITE 1. MAYFIELD ROAD AND MONTEVALLO ROAD. SITE 3 CROSSHAVEN DRIVE AND GREEN VALLEY DRIVE.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060046 STPBH 9802 (924) UTILITIES
INTERSECTION IMPROVEMENTS
2019 $120 $30 $150
TOTAL COST: $120 $30 $150
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
29 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
OXMOOR BLVD-GREEN SPRINGS TO BARBER COURT. INTERSECTION IMPROVEMENTS AT BARBER CT. AND OXMOOR RD. AND I-65 AND CONTINUOUS TWO WAY TURN LANE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029563 STPBH 9802 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $243 $61 $304
TOTAL COST: $243 $61 $304
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT (BIN# 000282) ON PRATT HIGHWAY AT BLACK CREEK NEAR SANDUSKY IN BIRMINGHAM
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059893 STPBH 1602 (519) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $800 $200 $1,000
100033434 HPP-STPBH 1602 (519) UTILITIES
BRIDGE REPLACEMENT
2019 $424 $106 $530
TOTAL COST: $1,224 $306 $1,530
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
30 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
STREETSCAPE AND TRANSPORTATION IMPROVEMENTS ON 16TH STREET CORRIDOR FROM 11TH AVE NORTH TO I-65 WITHIN FOUNTAIN HEIGHTS NEIGHBORHOOD
Type of Work UTILITY ADJUSTMENT
Project Length in Miles 0.550 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056315 STPBH 7117 () UTILITIES
UTILITY ADJUSTMENT
2019 $200 $50 $250
TOTAL COST: $200 $50 $250
Route CR-NA ProjectDescription
GALLERIA BOULEVARD EXTENSION FROM CR-458 (LORNA ROAD) TO SR-150
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.350 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056487 STPBH 3715 (255) RIGHT OF WAY
GRADE, DRAIN, BASE AND PAVE
2017 $4,356 $1,089 $5,445
TOTAL COST: $4,356 $1,089 $5,445
Route CR-NA ProjectDescription
TRAFFIC SIGNAL SYSTEM UPGRADE ALONG US-31, LORNA RD, SR-150, GROVE BLVD, GALLERIA BLVD, CHAPEL LN, JIM WILSON JR PARKWAY AND CR-17 WITHIN THE CITY OF HOOVER.
Type of Work SIGNALIZATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056551 CMAQ NR13 (933) CONSTRUCTION
SIGNALIZATION 2017 $648 $162 $809
TOTAL COST: $648 $162 $809
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
31 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
RESURFACE RUTLEDGE DRIVE FROM CR-56(ALLISON BONNETT MEMORIAL DRIVE) TO WOODWARD ROAD AND RESURFACE WILKES ROAD FROM WOODWARD ROAD TO SR-5 (US-11) CITY OF MIDFIELD
Type of Work RESURFACING
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059488 ACAA59488 ATRP (006) CONSTRUCTION
RESURFACING
2019 $674 $169 $843
TOTAL COST: $674 $169 $843
Route CR-NA ProjectDescription
REPLACE BRIDGE ON 23RD STREET NORTH BIN# 825
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059493 ACBRZ59493 ATRP (012)
CONSTRUCTION
BRIDGE REPLACEMENT
2017 $282 $71 $353
TOTAL COST: $282 $71 $353
Route CR-NA ProjectDescription
RESURFACE 4TH AVENUE SOUTH WEST FROM MCADORY SCHOOL ROAD TO 18TH STREET NORTH DARTMOUTH AVENUE/MCASHAN DRIVE
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060987 ACAA60987 ATRP (010) CONSTRUCTION
RESURFACING
2016 $1,927 $482 $2,409
TOTAL COST: $1,927 $482 $2,409
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
32 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
5 RESURFACING PROJECTS, FIVE MILE RD FROM ORCHID RD TO BIRMINGHAM CITY LIMITS, LAKESHORE PKWY FROM VENICE RD TO INDUSTRIAL DR, LOMB AVE FROM CULLMAN AVE TO 12TH ST W., GEORGIA RD FROM 59TH ST S. TO ANTWERP AVE, 1ST AVE N. FROM 7TH ST N TO 9TH ST N
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060989 ACAA60989 ATRP (009) CONSTRUCTION
RESURFACING
2016 $2,886 $722 $3,608
TOTAL COST: $2,886 $722 $3,608
Route CR-NA ProjectDescription
RESURFACE MESSER AIRPORT ROAD FROM 31ST STREET NORTH TO 46TH STREET NORTH
Type of Work RESURFACING
Project Length in Miles 2.230 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060993 ACAA60993 ATRP (008) CONSTRUCTION
RESURFACING
2017 $1,162 $290 $1,452
TOTAL COST: $1,162 $290 $1,452
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
33 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
RESURFACE WEST VALLEY AVENUE FROM BARBER COURT TO GREENSPRINGS HIGHWAY AND VALLEY AVENUE FROM THE CITY LIMITS OF BIRMINGHAM TO RICHARD ARRINGTON JR BOULEVARD SOUTH
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061009 ACAA61009 ATRP (009) CONSTRUCTION
RESURFACING
2016 $1,406 $351 $1,757
TOTAL COST: $1,406 $351 $1,757
Route CR-NA ProjectDescription
RESURFACING AND INTERSECTION IMPROVEMENTS ON STADIUM TRACE PARKWAY AT BROCK'S GAP PARKWAY AND LEARNING LANE
Type of Work RESURFACING
Project Length in Miles 2.890 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061010 ACAA61010 ATRP (009) CONSTRUCTION
RESURFACING
2018 $1,601 $554 $2,156
TOTAL COST: $1,601 $554 $2,156
Route CR-NA ProjectDescription
RESURFACE AND REALIGNMENT OF GRANTS MILL ROAD FROM GRANTSWOOD ROAD TO OLD LEEDS ROAD
Type of Work RESURFACING
Project Length in Miles 0.640 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061014 ACAA61014 ATRP () CONSTRUCTION
RESURFACING
2019 $6,485 $1,621 $8,106
TOTAL COST: $6,485 $1,621 $8,106
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
34 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
UPGRADE AND REPLACE INTERSTATE LIGHTING AT VARIOUS LOCATION IN THE CITY OF BIRMINGHAM
Type of Work LIGHTING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064216 STPBH 3716 () CONSTRUCTION
LIGHTING 2019 $800 $200 $1,000
TOTAL COST: $800 $200 $1,000
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON SPRINGDALE ROAD OVER FIVE MILE CREEK BIN# 15837
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059460 STPBH 3717 (250) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,644 $411 $2,055
TOTAL COST: $1,644 $411 $2,055
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
35 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route I -20 ProjectDescription
DOWNTOWN BIRMINGHAM INTERSTATE AND EXPRESSWAY OPERATIONAL AND ACCESS MANAGEMENT STUDY
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058794 STPBH 3714 (252) SPECIAL
UNCLASSIFIED 2015 $240 $60 $300
TOTAL COST: $240 $60 $300
Route I -20 ProjectDescription
SIGN REHAB ON I-20 (MP 132.89 THROUGH 142.92) AND I-459 (MP 28.50 THROUGH 30.15)
Type of Work SIGN REHABILITATION
Project Length in Miles 10.030 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100044934 RP-IM I020 (348) CONSTRUCTION
SIGN REHABILITATION
2018 $1,401 $156 $1,557
TOTAL COST: $1,401 $156 $1,557
Route I -459 ProjectDescription
INCHG LGT ON I-459ATCR-18 (EXIT #1) AND CR-52 (EXIT #6)
Type of Work LIGHTING
Project Length in Miles 4.564 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100005123 IM I459 () PRELIMINARY ENGINEERING
LIGHTING 2019 $129 $14 $143
TOTAL COST: $129 $14 $143
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
36 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route I -59 ProjectDescription
RESURFACE I-59 FROM THE TUSCALOOSA COUNTY LINE (MP 100.867) TO JUST NORTH OF ACADEMY DRIVE (MP 109.658)
Type of Work PAVEMENT MINOR REHABILITATION
Project Length in Miles 14.164 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062069 RP-IM I059 (396) PRELIMINARY ENGINEERING
PAVEMENT MINOR REHABILITATION
2016 $249 $28 $277
100062070 RP-IM I059 (396) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2018 $5,880 $653 $6,533
TOTAL COST: $6,129 $681 $6,810
Route I -59 ProjectDescription
RECONSTRUCTION AND LANE ADDITION ON I-59 FROM I-459 TO CR-10 (CHALKVILLE MOUNTAIN ROAD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064600 IM-NH I059 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2019 $442 $78 $520
TOTAL COST: $442 $78 $520
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
37 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route I -59 ProjectDescription
I-20/I-59/I-65 ITS DEVICES AND INFRASTRUCTURE IN SUPPORT OF THE CBD BRIDGE REPLACEMENT PROJECT
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060200 ACIMF I059 (382) CONSTRUCTION
UNCLASSIFIED 2016 $7,417 $824 $8,241
TOTAL COST: $7,417 $824 $8,241
Route I -59 ProjectDescription
RESURFACE I-59 FROM 1ST AVENUE NORTH (MP 132.160) TO I-459 (MP 137.19) IN TRUSSVILLE
Type of Work RESURFACING
Project Length in Miles 9.980 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062067 IM I059 (398) PRELIMINARY ENGINEERING
RESURFACING
2016 $225 $25 $250
100062068 IM I059 () CONSTRUCTION
RESURFACING
2020 $12,593 $1,399 $13,993
TOTAL COST: $12,818 $1,424 $14,243
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
38 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route I -59 ProjectDescription
SIGN REHAB ON I-59 FROM TUSCALOOSA CL TO ST.CLAIR CL; I-65 FROM SHELBY CL TO EXIT 280 (WARRIOR); I-459 FROM I-59 S OF TRUSSVILLE (PHASE 3)
Type of Work SIGN REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100042475 IM I059 () CONSTRUCTION
SIGN REHABILITATION
2019 $3,766 $418 $4,184
TOTAL COST: $3,766 $418 $4,184
Route I -59 ProjectDescription
CBD BRIDGE INTERCHANGE MODIFICATIONS ON I-59/20 AT I-65
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063071 ACIMF I059 (383) UTILITIES
BRIDGES AND APPROACHES
2016 $8,031 $956 $8,987
100063331 ACIMF I059 (383) CONSTRUCTION
BRIDGES AND APPROACHES
2016 $189,212 $22,986
$212,198
TOTAL COST: $197,243 $23,942
$221,185
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
39 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route I -59 ProjectDescription
CBD I-20/59 BRIDGE REPLACEMENT AND APPROACHES FROM I-65 TO NORTH OF 31ST STREET NORTH AND INTERCHANGE MODIFICATIONS AT E. B. STEPHENS EXPRESSWAY. BIN # 10670,10671,14158,14154,14162,10492. (PHASE 3)
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063332 ACIMF I059 (385) CONSTRUCTION
BRIDGES AND APPROACHES
2016 $474,791 $52,755
$527,545
TOTAL COST: $474,791 $52,755
$527,545
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
40 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route I -65 ProjectDescription
INTERSTATE LIGHTING UPGRADE ON I-65 FROM 0.7 MILES NORTH OF CR-120 (WALKER CHAPEL ROAD) EXIT 267 TO 0.25 MILES NORTH OF RIDGEBROOK ROAD JEFFERSON COUNTY
Type of Work LIGHTING
Project Length in Miles 1.524 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063098 STPBH I065 (475) PRELIMINARY ENGINEERING
LIGHTING 2016 $240 $60 $300
100062542 STPBH I065 (475) CONSTRUCTION
LIGHTING 2018 $361 $90 $452
TOTAL COST: $601 $150 $752
Route I -65 ProjectDescription
CONCRETE PAVEMENT REHAB, UNDERSEAL, GRINDING, PAVERLAID SURFACE TREATMENT, UNDERDRAIN, SHOULDER PAVEMENT,GUARDRAIL ON I-65 FROM US-31 TO RALEIGH AVENUE. OVERPASS (PRIORITY #35)
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 3.760 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055415 IM I065 () CONSTRUCTION
PAVEMENT REHABILITATION
2019 $9,320 $1,036 $10,356
TOTAL COST: $9,320 $1,036 $10,356
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
41 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
SIDEWALKS ALONG CR-67 (HAZELWOOD ROAD), FROM BURGANDY DR TO HARRIS AVENUE
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048382 STPBH 7234 (600) CONSTRUCTION
SIDEWALK 2019 $86 $21 $107
TOTAL COST: $86 $21 $107
Route NA- ProjectDescription
SIDEWALKS IN IRONDALE ALONG PORTIONS OF 16TH STREET, 2ND AVENUE N, MONTEVALLO RD, MONTICELLO RD, AND MARION DR
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048389 STPBH CN07 (910) CONSTRUCTION
SIDEWALK 2017 $329 $82 $411
TOTAL COST: $329 $82 $411
Route NA- ProjectDescription
PEDESTRIAN IMPROVEMENTS FOR THE CITY OF GARDENDALE AT BELL STREET AND MAIN STREET
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100050724 CMAQF 3717 () CONSTRUCTION
UNCLASSIFIED 2019 $480 $120 $600
TOTAL COST: $480 $120 $600
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
42 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
NORFOLK SOUTHERN BIRMINGHAM REGIONAL INTERMODAL FACILITY, MCCALLA
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055374 CTGR-STPBH-FAUP 3714 ()
CONSTRUCTION
UNCLASSIFIED 2019 $2,673 $668 $3,342
TOTAL COST: $2,673 $668 $3,342
Route NA- ProjectDescription
NORFOLK SOUTHERN BIRMINGHAM REGIONAL INTERMODAL FACILITY, MCCALLA EASTERN FEDERAL LANDS PROJECT # 7111G00032
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055911 CTGR-CMAQ-FAUP 3714 ()
CONSTRUCTION
UNCLASSIFIED 2017 $52,500 $0 $52,500
TOTAL COST: $52,500 $0 $52,500
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
43 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
STREET IMPROVEMENTS ON 19TH STREET ENSLEY FROM ENSLEY AVENUE TO BUSH BOULEVARD PAVING, SIDEWALKS, CURB AND GUTTER, AND STORM DRAINAGE
Type of Work STREETSCAPE
Project Length in Miles 3.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058187 STPBH 3716 (251) PRELIMINARY ENGINEERING
STREETSCAPE
2016 $60 $15 $75
100033432 STPBH 3716 (251) CONSTRUCTION
STREETSCAPE
2019 $661 $165 $827
TOTAL COST: $721 $180 $902
Route NA- ProjectDescription
APPLE APRS PROGRAM FOR PROJECT FEASIBILITY STUDIES IN BIRMINGHAM, FY 2016 AND 2017
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063989 STPBH 3715 (265) SPECIAL
CORRIDOR STUDY
2016 $240 $60 $300
TOTAL COST: $240 $60 $300
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
44 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
TRANSPORTATION SYSTEMS MONITORING FOR CONGESTION MANAGEMENT SYSTEMS (CMS) - FY 2018, FY-2019
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063990 STPBH NR18 (900) SPECIAL
UNCLASSIFIED 2017 $360 $90 $450
TOTAL COST: $360 $90 $450
Route NA- ProjectDescription
OZONE AWARENESS PROGRAM JEFFERSON AND SHELBY COUNTIES FY 2017 AND 2018
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063991 CMAQ NR16 (914) SPECIAL
UNCLASSIFIED 2016 $500 $125 $625
TOTAL COST: $500 $125 $625
Route NA- ProjectDescription
UPGRADE AND REPLACE INTERSTATE LIGHTING AT VARIOUS LOCATION IN THE CITY OF BIRMINGHAM
Type of Work LIGHTING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064215 STPBH 3716 (253) PRELIMINARY ENGINEERING
LIGHTING 2016 $80 $20 $100
TOTAL COST: $80 $20 $100
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
45 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
VULCAN TRAIL EXTENSION FROM 11TH PLACE SOUTH TO GREEN SPRINGS HIGHWAY
Type of Work UNCLASSIFIED
Project Length in Miles 1.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064283 CMAQ 3715 (267) PRELIMINARY ENGINEERING
UNCLASSIFIED 2017 $60 $15 $75
100064288 CMAQ 3715 (267) RIGHT OF WAY
UNCLASSIFIED 2019 $40 $10 $50
TOTAL COST: $100 $25 $125
Route NA- ProjectDescription
PEDESTRIAN IMPROVEMENTS- BIKELANES, SIDEWALKS, AND CROSSWALKS- 2ND AVENUE SOUTH FROM 28TH STREET TO 30TH STREET, AND 29TH STREET FROM 2ND AVENUE TO 3RD AVENUE
Type of Work SIDEWALK
Project Length in Miles 2.400 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064291 CMAQ 3715 (262) PRELIMINARY ENGINEERING
SIDEWALK 2016 $120 $30 $150
100064292 CMAQ 3715 (262) RIGHT OF WAY
UNCLASSIFIED 2019 $75 $19 $94
100064293 CMAQ 3715 (262) UTILITIES
UNCLASSIFIED 2020 $83 $21 $104
100064294 CMAQ 3715 () CONSTRUCTION
UNCLASSIFIED 2020 $600 $150 $750
TOTAL COST: $878 $220 $1,098
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
46 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
41ST STREET STREETSCAPE- FROM 1ST AVENUE SOUTH TO 5TH AVENUE SOUTH
Type of Work STREETSCAPE
Project Length in Miles 1.200 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064295 CMAQ 3715 (261) PRELIMINARY ENGINEERING
STREETSCAPE
2016 $144 $36 $180
100064296 CMAQ 3715 (261) UTILITIES
STREETSCAPE
2019 $80 $20 $100
100064297 CMAQ 3715 () CONSTRUCTION
STREETSCAPE
2019 $816 $204 $1,020
TOTAL COST: $1,040 $260 $1,300
Route NA- ProjectDescription
ZOO SIDEWALK CONNECTOR BEGINNING AT PAMONA AVENUE ALONG HERMOSA DRIVE THEN ONTO POINCIANA DRIVE CONTINUING ALONG TO 20TH PLACE/ACCESS ROAD ENDING AT CAHABA ROAD
Type of Work SIDEWALK
Project Length in Miles 0.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064298 CMAQ 3715 (268) PRELIMINARY ENGINEERING
SIDEWALK 2017 $116 $29 $145
100064299 CMAQ 3715 (268) CONSTRUCTION
SIDEWALK 2019 $496 $124 $619
TOTAL COST: $612 $153 $764
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
47 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
SIDEWALKS AND STREETSCAPE ON GREENSPRINGS HIGHWAY FROM 8TH AVENUE SOUTH TO BIRMINGHAM CITY LIMITS
Type of Work SIDEWALK
Project Length in Miles 4.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064301 CMAQ 3715 (264) PRELIMINARY ENGINEERING
SIDEWALK 2016 $160 $40 $200
100064302 CMAQ 3715 (264) UTILITIES
SIDEWALK 2019 $40 $10 $50
100064303 CMAQ 3715 () CONSTRUCTION
SIDEWALK 2019 $1,600 $400 $2,000
TOTAL COST: $1,800 $450 $2,250
Route NA- ProjectDescription
SIDEWALKS, BICYCLE LANES, CROSSWALKS, LANDSCAPE AND SIGNAGE INSTALLATION ALONG 22ND ST. N., 12TH AVE. N., 20TH ST. N., AND SHUTTLESWORTH DRIVE/HUNTSVILLE ROAD
Type of Work SIDEWALK
Project Length in Miles 7.200 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064309 CMAQ 3715 (263) PRELIMINARY ENGINEERING
SIDEWALK 2016 $100 $25 $125
100064315 CMAQ 3715 (263) RIGHT OF WAY
SIDEWALK 2019 $40 $10 $50
100064316 CMAQ 3715 (263) UTILITIES
SIDEWALK 2020 $40 $10 $50
100064317 CMAQ 3715 () CONSTRUCTION
SIDEWALK 2020 $960 $240 $1,200
TOTAL COST: $1,140 $285 $1,425
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
48 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
BICYCLE AND PEDESTRIAN PLAN CITYWIDE HOOVER
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064314 CMAQ NR17 (902) SPECIAL
UNCLASSIFIED 2017 $200 $50 $250
TOTAL COST: $200 $50 $250
Route NA- ProjectDescription
TRANSPORTATION DEVELOPMENT PROGRAM FOR THE CITY OF BIRMINGHAM (TDPCB)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064326 STPBH NR16 (903) SPECIAL
UNCLASSIFIED 2016 $280 $70 $350
TOTAL COST: $280 $70 $350
Route NA- ProjectDescription
SERVICE PATROL OPERATIONS FOR FY 2016 AND 2017 FOR JEFFERSON AND SHELBY COUNTIES
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064480 STPBH 3715 (258) SPECIAL
UNCLASSIFIED 2016 $3,118 $779 $3,897
TOTAL COST: $3,118 $779 $3,897
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
49 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
CORRIDOR FEASIBILITY STUDY OR APPLE APRS, FOR BIRMINGHAM AREA, FY-2018 AND FY-2019
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064486 STPBH NR18 (904) SPECIAL
CORRIDOR STUDY
2017 $400 $100 $500
TOTAL COST: $400 $100 $500
Route NA- ProjectDescription
OZONE AWARENESS PROGRAM FOR JEFFERSON AND SHELBY COUNTIES FY 2019 AND FY 2020
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064488 CMAQ NR19 (900) SPECIAL
UNCLASSIFIED 2018 $400 $100 $500
TOTAL COST: $400 $100 $500
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
50 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
HOMEWOOD-SHADES CR GREENWAY PROJECT SPONSOR: CITY OF HOMEWOOD.
Type of Work UNCLASSIFIED
Project Length in Miles 13.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100043449 CMAQ 9802 (911) RIGHT OF WAY
UNCLASSIFIED 2016 $1,724 $431 $2,155
100029525 CMAQ 9802 (911) CONSTRUCTION
UNCLASSIFIED 2019 $2,945 $736 $3,682
TOTAL COST: $4,669 $1,167 $5,837
Route NA- ProjectDescription
TRUSSVILLE GREENWAY AND WALKWAY MULTI-USE TRAIL-GREENWAY FROM CHALKVILLE MTN RD (CR-10) TO CALUMET PARKWAY NEAR SR-7 (US-11), (PHASE 1)
Type of Work UNCLASSIFIED
Project Length in Miles 5.900 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100052630 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $1,151 $288 $1,439
TOTAL COST: $1,151 $288 $1,439
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
51 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
>SHADES CREEK GREENWAY MULTI-USE TRAIL SHADES CREEK GREENWAY - 1. ON-ROAD CONNECTION VIA ELDER STREET MONCLAIR ROAD AND CRESTWOOD BLVD FROM 15TH STREET TO 20TH ST. 2. OFF-ROAD TRAIL ALONG SHADESCREEK. CONNECTORS ALONG GREENWAY TRAIL INCLUD
Type of Work UNCLASSIFIED
Project Length in Miles 2.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100032397 CMAQ 9802 () RIGHT OF WAY
UNCLASSIFIED 2019 $63 $16 $78
TOTAL COST: $63 $16 $78
Route NA- ProjectDescription
VILLAGE CREEK GREENWAY (PHASE 2) FROM 3RD STREET TO TALLAPOOSA STREET
Type of Work UNCLASSIFIED
Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039846 CMAQ NR02 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2019 $513 $128 $641
TOTAL COST: $513 $128 $641
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
52 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
RAILROAD RESERVATION/1ST AVENUE SOUTH PHASE 2 AND 3 ENGINEERING: 1ST AVENUE SOUTH FROM 18TH STREET TO 32ND STREET AND NORTH TO SLOSS FURNACE.
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056176 CMAQ 3700 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2019 $253 $63 $316
TOTAL COST: $253 $63 $316
Route NA- ProjectDescription
CONSTRUCT SIDEWALKS IN THE CITY OF LEEDS ALONG SR-119 (MONTEVALLO ROAD) FROM LEEDS HISTORICAL PARK TO LEEDS ELEMENTARY SCHOOL
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048880 HPP A133 (900) CONSTRUCTION
SIDEWALK 2019 $150 $37 $187
TOTAL COST: $150 $37 $187
Route NA- ProjectDescription
PEDESTRIAN WALKWAY OVER US-31 IN VESTAVIA HILLS NEAR CITY HALL
Type of Work PEDESTRIAN OVERPASS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100051157 DE-HPP-TAPBH A124 () CONSTRUCTION
PEDESTRIAN OVERPASS
2019 $1,067 $266 $1,333
TOTAL COST: $1,067 $266 $1,333
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
53 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
STREETSCAPE AND TRANSPORTATION IMPROVEMENTS ON 16TH STREET CORRIDOR FROM 11TH AVE NORTH TO I-65 WITHIN FOUNTAIN HEIGHTS NEIGHBORHOOD
Type of Work STREETSCAPE
Project Length in Miles 0.550 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056316 STPBH 7117 () CONSTRUCTION
STREETSCAPE
2019 $2,613 $653 $3,266
TOTAL COST: $2,613 $653 $3,266
Route NA- ProjectDescription
SIDEWALK AND RAMP IMPROVEMENTS THROUGHOUT THE CITY OF BIRMINGHAM
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056323 STPBH UR13 (603) CONSTRUCTION
SIDEWALK 2017 $1,014 $253 $1,267
TOTAL COST: $1,014 $253 $1,267
Route NA- ProjectDescription
WOODLAWN NEIGHBORHOOD STREETSCAPE PHASE 1 (CITY OF BIRMINGHAM)
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056330 STPBH 3715 (251) CONSTRUCTION
STREETSCAPE
2016 $1,281 $320 $1,601
TOTAL COST: $1,281 $320 $1,601
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
54 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
MOUNTAIN BROOK SIDEWALKS PHASE 9 ALONG BROOKWOOD ROAD, CROSSHILL ROAD AND OAKDALE DRIVE
Type of Work SIDEWALK
Project Length in Miles 4.760 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064353 CMAQ NR13 (908) UTILITIES
SIDEWALK 2016 $212 $53 $264
100056494 CMAQ NR13 (908) CONSTRUCTION
SIDEWALK 2016 $1,472 $368 $1,840
TOTAL COST: $1,683 $421 $2,104
Route NA- ProjectDescription
SIDEWALKS ON PARTS OF 24 TH STREET NORTH, BERKLEY AVENUE, ARLINGTON AVENUE AND OWEN AVENUE IN BESSEMER
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056508 CMAQ NR13 (954) RIGHT OF WAY
SIDEWALK 2018 $80 $20 $100
100056509 CMAQ NR13 (954) UTILITIES
SIDEWALK 2019 $83 $21 $104
100056510 CMAQ NR13 (954) CONSTRUCTION
SIDEWALK 2019 $546 $137 $683
TOTAL COST: $709 $177 $886
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
55 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
REED HARVEY GREENWAY ALONG FIVE MILE CREEK FROM BOBOLINK LANE TO CENTER POINT BALL PARK
Type of Work UNCLASSIFIED
Project Length in Miles 6.300 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056520 CMAQ RW13 () RIGHT OF WAY
UNCLASSIFIED 2019 $90 $23 $113
100056521 CMAQ UT14 () UTILITIES
UNCLASSIFIED 2019 $87 $22 $108
100056522 CMAQ CN14 () CONSTRUCTION
UNCLASSIFIED 2019 $568 $142 $710
TOTAL COST: $745 $186 $931
Route NA- ProjectDescription
SIDEWALK ALONG CR-1142 (CHAPEL ROAD) FROM PARK AVE TO STONE BROOK PKWY (CITY OF HOOVER)
Type of Work SIDEWALK
Project Length in Miles 3.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056539 CMAQ 7282 (600) RIGHT OF WAY
SIDEWALK 2017 $303 $76 $378
100056540 CMAQ 7282 (600) UTILITIES
SIDEWALK 2019 $89 $22 $111
100056541 CMAQ 7282 (600) CONSTRUCTION
SIDEWALK 2019 $824 $206 $1,030
TOTAL COST: $1,216 $304 $1,520
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
56 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
SIDEWALK ALONG PRESERVE PARKWAY FROM CR-1140 (SULPHUR SPRINGS RD) TO PRESERVE TOWN CENTER (CITY OF HOOVER)
Type of Work SIDEWALK
Project Length in Miles 1.020 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056543 CMAQ 3715 (253) CONSTRUCTION
SIDEWALK 2016 $470 $138 $609
TOTAL COST: $470 $138 $609
Route NA- ProjectDescription
SIDEWALK ON VALLEY STREET, TYLER ROAD, CLOUDLAND DRIVE, SAVOY STREET AND CLEARVIEW ROAD IN BLUFF PARK GRADE, DRAIN, CURB AND GUTTER, AND SIDEWALK
Type of Work SIDEWALK
Project Length in Miles 4.260 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056545 CMAQ 3715 (254) RIGHT OF WAY
SIDEWALK 2017 $252 $63 $315
100056546 CMAQ 3715 (254) UTILITIES
SIDEWALK 2019 $52 $13 $65
100056547 CMAQ 3715 (254) CONSTRUCTION
SIDEWALK 2019 $742 $185 $927
TOTAL COST: $1,046 $261 $1,307
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
57 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
SIDEWALKS ALONG ROSS BRIDGE PARKWAY FROM DEER TRAIL TO DEER VALLEY ELEMENTARY SCHOOL (CITY OF HOOVER)
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056549 CMAQ 3715 (250) CONSTRUCTION
SIDEWALK 2016 $779 $195 $974
TOTAL COST: $779 $195 $974
Route NA- ProjectDescription
SIDEWALKS ALONG CR-42 (MASSEY ROAD) FROM SR-3 (US-31, MONTGOMERY HIGHWAY) TO CR-99 (COLUMBIANA ROAD) IN VESTAVIA HILLS
Type of Work SIDEWALK
Project Length in Miles 2.280 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057172 CMAQ 7030 (600) RIGHT OF WAY
SIDEWALK 2019 $72 $18 $90
100057173 CMAQ 7030 (600) UTILITIES
UTILITY ADJUSTMENT
2020 $73 $18 $91
100057174 CMAQ 7030 (600) CONSTRUCTION
SIDEWALK 2020 $752 $188 $940
TOTAL COST: $897 $224 $1,121
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
58 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
RESURFACING, SIDEWALK ADDITIONS AND DRAINAGE IMPROVEMENTS ALONG POLLY REED ROAD FROM SR-75 TO REED ROAD NE
Type of Work UNCLASSIFIED
Project Length in Miles 1.200 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058032 STPBH 3716 (250) RIGHT OF WAY
UNCLASSIFIED 2016 $117 $29 $146
100058033 STPBH 3716 (250) UTILITIES
UNCLASSIFIED 2019 $160 $40 $200
100054521 STPBH 3716 (250) CONSTRUCTION
UNCLASSIFIED 2019 $2,724 $681 $3,405
TOTAL COST: $3,001 $750 $3,751
Route NA- ProjectDescription
IMPROVEMENTS TO INCLUDE SIDEWALKS, CURBS, GUTTERS, AND STORM DRAINS ALONG CR-1498 (ENSLEY AVENUE) FROM SR-269 (20TH STREET) TO WARRIOR ROAD
Type of Work STREETSCAPE
Project Length in Miles 1.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100033433 STPBH UR14 (605) CONSTRUCTION
STREETSCAPE
2017 $1,949 $487 $2,436
TOTAL COST: $1,949 $487 $2,436
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
59 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
DRAINAGE, SIDEWALKS, LIGHTING AND LANDSCAPING ALONG 12TH STREET WEST FROM LOMB AVENUE TO SR-7 (3RD AVENUE WEST) AND 2ND AVENUE WEST FROM 12TH STREET WEST TO 11TH STREET WEST
Type of Work STREETSCAPE
Project Length in Miles 1.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100033430 STPBH 3714 (250) CONSTRUCTION
STREETSCAPE
2017 $1,179 $295 $1,473
TOTAL COST: $1,179 $295 $1,473
Route NA- ProjectDescription
BRIDGE REPLACEMENT ON 3RD AVENUE OVER HALLS CREEK BIN# 1316
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059491 ACBRZ59491 ATRP (008)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $251 $63 $314
TOTAL COST: $251 $63 $314
Route NA- ProjectDescription
BRIDGE REPLACEMENT ON 8TH AVENUE NORTH OVER HALLS CREEK BIN # 1312
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059492 ACBRZ59492 ATRP (008)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $358 $89 $447
TOTAL COST: $358 $89 $447
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
60 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
RESURFACE ALONG MARTIN LUTHER KING JR. DRIVE(6TH STREET SW) (LOMB AVENUE) FROM THE INTERSECTION OF DENNISION AVENUE SW TO THE INTERSECTION OF TUSCALOOSA AVENUE
Type of Work RESURFACING
Project Length in Miles 1.700 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060992 ACAA60992 ATRP (009) CONSTRUCTION
RESURFACING
2016 $953 $238 $1,191
TOTAL COST: $953 $238 $1,191
Route NA- ProjectDescription
RESURFACE CLAIRMONT AVENUE FROM ESSEX ROAD TO ROCKFORD ROAD
Type of Work RESURFACING
Project Length in Miles 0.930 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060997 ACAA60997 ATRP (009) CONSTRUCTION
RESURFACING
2016 $459 $115 $573
TOTAL COST: $459 $115 $573
Route NA- ProjectDescription
RESURFACING AND PERMANENT STRIPE ALONG 1ST AVENUE NORTH FROM CENTER STREET TO 4TH PLACE NORTH
Type of Work RESURFACING
Project Length in Miles 0.535 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061001 ACAA61001 ATRP (009) CONSTRUCTION
RESURFACING
2016 $337 $84 $421
TOTAL COST: $337 $84 $421
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
61 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
BUILDING COMMUNITIES PROGRAMS AT VARIOUS LOCATIONS IN BIRMINGHAM FY-2018 AND FY-2019
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056476 STPBH NR18 (903) SPECIAL
UNCLASSIFIED 2017 $550 $138 $688
100062376 STPBH NR19 () SPECIAL
UNCLASSIFIED 2019 $550 $138 $688
TOTAL COST: $1,100 $275 $1,375
Route NA- ProjectDescription
NORWOOD NEIGHBORHOOD STREETSCAPE ALONG 12TH AVE NORTH FROM 24TH STREET NORTH TO 31ST STREET NORTH
Type of Work STREETSCAPE
Project Length in Miles 0.630 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059190 CMAQ 3715 (257) CONSTRUCTION
STREETSCAPE
2020 $520 $130 $650
TOTAL COST: $520 $130 $650
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
62 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
JEMISON TRAIL/SHADES CREEK GREENWAY CONNECTION - JEMISON PARK TO BROOKWOOD VILLAGE
Type of Work UNCLASSIFIED
Project Length in Miles 0.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054593 STPBH CN13 (907) CONSTRUCTION
UNCLASSIFIED 2016 $710 $180 $889
TOTAL COST: $710 $180 $889
Route SR-119 ProjectDescription
REPLACE BRIDGE, BIN 001308, SR-119 OVER UNNAMED BRANCH, 1.3 MILES NORTH SHELBY COUNTY LINE (SUFF=56.3, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.200 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049954 BR 0119 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $228 $57 $285
100049986 BR 0119 () RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $57 $14 $71
TOTAL COST: $285 $71 $356
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
63 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route SR-150 ProjectDescription
PEDESTRIAN BRIDGE OVER SR-150 BETWEEN BERKLEY AVE AND CLARENDON AVE - CITY OF BESSEMER
Type of Work PEDESTRIAN OVERPASS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064226 CMAQ 3715 () PRELIMINARY ENGINEERING
PEDESTRIAN OVERPASS
2019 $250 $62 $312
100064228 CMAQ 3715 () RIGHT OF WAY
PEDESTRIAN OVERPASS
2019 $83 $21 $104
TOTAL COST: $333 $83 $416
Route SR-150 ProjectDescription
BRIDGE REPLACEMENT AND RELOCATION ON SR-150 AT SHADES CREEK (BIN # 1502) AND THE CSX RAILROAD FROM MP 6.4 WEST OF SHADES CREEK TO MP 7.0 EAST OF SHADES CREEK (BIN # 1503)
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.700 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100003804 BR 7009 (600) CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2016 $17,867 $4,467 $22,334
TOTAL COST: $17,867 $4,467 $22,334
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
64 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route SR-269 ProjectDescription
BRIDGE RAIL RETROFIT ON SR-269 BRIDGE OVER BAYVIEW LAKE (BIN 004980) AND BRIDGE OVER BIRMINGHAM TERMINAL RAILROAD (BIN 002870)
Type of Work BRIDGE REPAIR
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100053763 NH 0269 (506) CONSTRUCTION
BRIDGE REPAIR
2017 $288 $73 $362
TOTAL COST: $288 $73 $362
Route SR-3 ProjectDescription
SR-3 (US-31) LIGHTING SYSTEM FROM PATTON CHAPEL ROAD TO I-65 CITY OF HOOVER
Type of Work LIGHTING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064203 STPBH 3715 () PRELIMINARY ENGINEERING
LIGHTING 2019 $80 $20 $100
TOTAL COST: $80 $20 $100
Route SR-3 ProjectDescription
SR-3 (US-31)ATSR-150 UPGRADE TRAFFIC CAMERAS AND INSTALL FIBER OPTIC CABLE
Type of Work SIGNALIZATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056560 CMAQF NR13 () PRELIMINARY ENGINEERING
SIGNALIZATION 2019 $90 $23 $113
TOTAL COST: $90 $23 $113
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
65 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route SR-3 ProjectDescription
AUXILIARY LANES ON SR-3(US-31/RED MOUNTAIN EXPRESSWAY) BETWEEN HIGHLAND AVE AND 21ST AVE.
Type of Work STREETSCAPE
Project Length in Miles 3.196 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064506 CMAQ 0003 () PRELIMINARY ENGINEERING
STREETSCAPE
2019 $83 $21 $104
100064507 CMAQ 0003 () CONSTRUCTION
STREETSCAPE
2019 $2,602 $650 $3,252
TOTAL COST: $2,685 $671 $3,356
Route SR-3 ProjectDescription
SR-3(US-31) FROM COLUMBIANA RD TO SHADES CREST RD VESTAVIA HILLS, TRAFFIC CONTROL SYSTEM / TRAFFIC CONTROL CENTER
Type of Work UNCLASSIFIED
Project Length in Miles 6.530 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039841 CMAQ 7012 () UTILITIES
UNCLASSIFIED 2019 $9 $2 $12
100039842 CMAQ 7012 () CONSTRUCTION
UNCLASSIFIED 2020 $636 $159 $796
TOTAL COST: $646 $161 $807
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
66 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route SR-3 ProjectDescription
REPLACE AND UPGRADE STREET LIGHTING ON SR-3 (US-31) FROM THE CAHABA RIVER TO PATTON CHAPEL ROAD-CITY OF HOOVER
Type of Work LIGHTING
Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063365 STPBH 0003 (593) CONSTRUCTION
LIGHTING 2017 $950 $237 $1,187
TOTAL COST: $950 $237 $1,187
Route SR-5 ProjectDescription
BRIDGE REPLACEMENT (BIN 007627) ON SR-5 OVER LOCUST FORK OF BLACK WARRIOR RIVER
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 1.362 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100050015 BR 0005 (517) UTILITIES
BRIDGE REPLACEMENT
2019 $91 $23 $114
100002809 BR 0005 (517) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $5,135 $1,284 $6,418
TOTAL COST: $5,226 $1,306 $6,532
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
67 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route SR-7 ProjectDescription
WIDEN SR-7(US-11) FR END OF 5-LANE FACILITY, EAST OF CHALKVILLE RD TO THE CAHABA RIVER BRIDGE
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.441 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039839 STPBH 7073 (602) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2019 $2,049 $512 $2,562
TOTAL COST: $2,049 $512 $2,562
Route SR-79 ProjectDescription
SR-79 UPGRADE SIGNALS AND FIBER OPTIC FROM CR-124 (PINE HILL ROAD) TO SR-151 (NARROWS ROAD)
Type of Work SIGNALIZATION
Project Length in Miles 16.440 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056534 CMAQ 0079 (515) PRELIMINARY ENGINEERING
SIGNALIZATION 2016 $246 $62 $308
100056535 CMAQ 0079 (515) CONSTRUCTION
SIGNALIZATION 2018 $3,990 $997 $4,987
TOTAL COST: $4,236 $1,059 $5,295
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
68 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SELF CREEK AT STATIONS 2183+00 TO 2199+00, DUAL MAINLINE BRIDGES AT STATION 2208+50 TO 2218+50, AND SINGLE BRIDGES ON RAMPS B AND D AT SR-79.
Type of Work BRIDGE
Project Length in Miles 2.780 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048413 ACAPDF 1602 (550) CONSTRUCTION
BRIDGE 2023 $52,718 $0 $52,718
TOTAL COST: $52,718 $0 $52,718
Route SR-959 ProjectDescription
FY 2018 AND 2019 BIRMINGHAM NORTHERN BELTLINE WETLAND AND STREAM MITIGATION CREDITS
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063383 APDF 1602 (562) SPECIAL
UNCLASSIFIED 2018 $1,851 $441 $2,292
100063381 APDF 1602 () SPECIAL
UNCLASSIFIED 2019 $3,290 $0 $3,290
TOTAL COST: $5,141 $441 $5,582
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
69 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Original
Route CR-20 ProjectDescription
RESURFACE CR-20 FROM SR-22 TO GEORGIA LINE (R.A.M.P.)
Type of Work RESURFACING
Project Length in Miles 2.945 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060426 ACNU60426 ATRP (013) CONSTRUCTION
RESURFACING
2016 $508 $131 $639
TOTAL COST: $508 $131 $639
Route CR-425 ProjectDescription
REPLACE BRIDGE ON CR-425 OVER COHOBADIAH CREEK BIN # 11951 (R.A.M.P.)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060421 ACBRZ60421 ATRP (003)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $381 $95 $477
TOTAL COST: $381 $95 $477
Route CR-427 ProjectDescription
REPLACE BRIDGE CR-427 OVER COHOBADIAH CREEK BIN # 11909 (R.A.M.P.)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060420 ACBRZ60420 ATRP (003)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $327 $82 $409
TOTAL COST: $327 $82 $409
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
70 of 154
REGION HIGHWAY PROJECTS - RANDOLPH
STIP PLAN: 2016 - Original
Route CR-51 ProjectDescription
RESURFACE AND TRAFFIC STRIPE CR-51 FROM A POINT 895 FEET NORTH OF THE INTERSECTION OF CR-59 TO THE CLEBURNE COUNTY LINE
Type of Work RESURFACING
Project Length in Miles 8.815 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060425 ACNU60425 ATRP (013) CONSTRUCTION
RESURFACING
2016 $1,283 $321 $1,603
TOTAL COST: $1,283 $321 $1,603
Route CR-65 ProjectDescription
RESURFACE CR-65 FROM CR-61 TO CR-26 (R.A.M.P.)
Type of Work RESURFACING
Project Length in Miles 2.990 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060429 ACNU60429 ATRP (013) CONSTRUCTION
RESURFACING
2016 $397 $99 $496
TOTAL COST: $397 $99 $496
Route CR-821 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CR-821 OVER FIXICO CREEK BIN 002193 (RAMP)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060419 ACBRZ60419 ATRP (003)
CONSTRUCTION
BRIDGE REPLACEMENT
2016 $188 $47 $235
TOTAL COST: $188 $47 $235
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
71 of 154
REGION HIGHWAY PROJECTS - RANDOLPH
STIP PLAN: 2016 - Original
Route CR-845 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CR-845 OVER CEDAR CREEK (BIN 16840)(RAMP)
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060422 ACBRZ60422 ATRP (013)
CONSTRUCTION
BRIDGE 2017 $432 $108 $540
TOTAL COST: $432 $108 $540
Route CR-887 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CR-887 OVER HIGHPINE CREEK (BIN 955)(RAMP)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060418 ACBRZ60418 ATRP (013)
CONSTRUCTION
BRIDGE REPLACEMENT
2017 $460 $115 $574
TOTAL COST: $460 $115 $574
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
72 of 154
REGION HIGHWAY PROJECTS - RANDOLPH
STIP PLAN: 2016 - Original
Route CR-12 ProjectDescription
INTERSECTION IMPROVEMENTS AT CR-12 AND CR-22
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.020 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064319 CMAQ 5915 () PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2019 $120 $30 $150
100064320 CMAQ 5915 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $200 $50 $250
TOTAL COST: $320 $80 $400
Route CR-13 ProjectDescription
RESURFACING CR-13 FROM CR-52 TO THE BIBB COUNTY LINE
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064327 STPBH 5915 (253) PRELIMINARY ENGINEERING
RESURFACING
2016 $10 $2 $12
100064328 STPBH 5915 (253) CONSTRUCTION
RESURFACING
2017 $1,328 $332 $1,659
TOTAL COST: $1,337 $334 $1,671
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
73 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route CR-1396 ProjectDescription
CR-1396 (CAHABA BEACH ROAD), EXTENSION FROM CR-346 (SWAN DRIVE) TO CR-60 (SICARD HOLLOW ROAD) INCLUDING A BRIDGE OVER THE LITTLE CAHABA RIVER
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059534 ACAA59534 ATRP (015) CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2019 $3,200 $800 $4,000
TOTAL COST: $3,200 $800 $4,000
Route CR-17 ProjectDescription
ADDITIONAL LANES ON CR-17 (VALLEYDALE RD) FROM SR-3 (US-31) TO RIVERCHASE PARKWAY EAST
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.750 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100046237 IMD-STPBH 7112 (602) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2016 $4,925 $975 $5,900
TOTAL COST: $4,925 $975 $5,900
Route CR-17 ProjectDescription
RESURFACE CR-17 FROM CR-22 TO CR-26 (KENT DAIRY ROAD)
Type of Work RESURFACING
Project Length in Miles 4.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059513 ACAA59513 ATRP (010) CONSTRUCTION
RESURFACING
2018 $1,136 $284 $1,420
TOTAL COST: $1,136 $284 $1,420
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
74 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route CR-264 ProjectDescription
BRIDGE REPLACEMENT OF BIN 11015 OVER BUCK CREEK, TURN LANES, AND RESURFACING OF CR-264 (THOMPSON ROAD) FROM 1300 FEET WEST OF WARRIOR DRIVE TO SR-119.
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059499 ACBRAA59499 ATRP (006)
CONSTRUCTION
BRIDGES AND APPROACHES
2016 $2,961 $759 $3,721
TOTAL COST: $2,961 $759 $3,721
Route CR-28 ProjectDescription
RESURFACE CR-28 FROM COLUMBIANA CITY LIMITS TO SR-145
Type of Work RESURFACING
Project Length in Miles 3.310 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061025 ACAA61025 ATRP (012) CONSTRUCTION
RESURFACING
2017 $1,482 $371 $1,853
TOTAL COST: $1,482 $371 $1,853
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
75 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route CR-29 ProjectDescription
WIDEN CR-29\1277 FROM CR-370(HEATHERWOOD DR.) TO CR-2311 (ACTON ROAD) AND BRG REPLACEMENT OVER CAHABA RIVER.
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 8.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100045964 STPBH 5939 (200) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $4,274 $1,069 $5,343
100007540 STPBH 5939 (200) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,589 $397 $1,986
TOTAL COST: $5,863 $1,466 $7,329
Route CR-30 ProjectDescription
RESURFACE CR-30 FROM COLUMBIANA TO SR-145
Type of Work RESURFACING
Project Length in Miles 3.144 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061026 ACAA61026 ATRP (012) CONSTRUCTION
RESURFACING
2016 $763 $191 $954
TOTAL COST: $763 $191 $954
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
76 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route CR-441 ProjectDescription
REPLACE BRIDGE ON CR-441 OVER FOUR MILE CREEK BIN # 5369
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059506 ACBRZ59506 ATRP (013)
CONSTRUCTION
BRIDGE REPLACEMENT
2017 $1,527 $382 $1,908
TOTAL COST: $1,527 $382 $1,908
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
77 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route CR-52 ProjectDescription
INTERSECTION IMPROVEMENTS AT CR-52 AND CR-13
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059508 ACAA59508 ATRP (013) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2017 $492 $123 $615
TOTAL COST: $492 $123 $615
Route CR-52 ProjectDescription
BRIDGE WIDENING (BIN 003267) ON CR-52 (4TH AVENUE) OVER BUCK CREEK
Type of Work BRIDGE WIDENING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059502 ACBR59502 ATRP (009) CONSTRUCTION
BRIDGE WIDENING
2019 $1,816 $454 $2,269
TOTAL COST: $1,816 $454 $2,269
Route CR-52 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES ON CR-52 OVER CAHABA RIVER (BIN 2380) FROM OLD CAHABA LANE TO OAK VIEW LANE
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059503 STPBH-ACBR59503 ATRP (012)
CONSTRUCTION
BRIDGES AND APPROACHES
2019 $3,702 $926 $4,628
TOTAL COST: $3,702 $926 $4,628
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
78 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route CR-55 ProjectDescription
BRIDGE REPLACEMENT ON CR-55 OVER NORFOLK SOUTHERN RAILROAD NEAR STERRETT BIN # 10357
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.900 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056309 STPBH 5914 (250) RIGHT OF WAY
BRIDGES AND APPROACHES
2019 $772 $193 $965
100056310 STPBH 5914 (250) UTILITIES
UTILITY ADJUSTMENT
2020 $200 $50 $250
100056311 STPBH 5914 () CONSTRUCTION
BRIDGES AND APPROACHES
2020 $1,000 $250 $1,250
TOTAL COST: $1,972 $493 $2,465
Route CR-99 ProjectDescription
RESURFACE CR-99 FROM CR-47 TO SR-145
Type of Work RESURFACING
Project Length in Miles 2.084 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061023 ACAA61023 ATRP (012) CONSTRUCTION
RESURFACING
2016 $298 $74 $372
TOTAL COST: $298 $74 $372
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
79 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
>VALLEYDALE RD FR CALDWELL MILL RD TO INVERNESS CENTER CITY OF HOOVER
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100033067 STPBH 9802 (905) UTILITIES
ADDITIONAL ROADWAY LANES
2019 $2,596 $649 $3,245
TOTAL COST: $2,596 $649 $3,245
Route CR-NA ProjectDescription
SAFETY AND INTERSECTION IMPROVEMENTS ON STATE PARK ROAD FROM JOHN FINDLAY DRIVE TO STATE ROUTE 119 TO INCLUDE THE ADDITION OF BIKE LANES IN THE CITY OF PELHAM
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 5.206 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063241 CMAQ 5915 (250) RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2018 $520 $130 $649
100063242 STPBH-CMAQ 5915 (250)
UTILITIES
INTERSECTION IMPROVEMENTS
2019 $60 $15 $75
100063243 STPBH-CMAQ 5915 (250)
CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $1,359 $340 $1,699
TOTAL COST: $1,938 $485 $2,423
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
80 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route I -65 ProjectDescription
INTERCHANGE IMPROVEMENTS I-65 AT SR-3 (US-31) EXIT 231 GRADE, DRAIN, BASE, PAVE AND BRIDGE IN THE CITY OF CALERA
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063670 STPBH I065 (404) RIGHT OF WAY
GRADE, DRAIN, BASE, PAVE AND BRG
2016 $2,112 $528 $2,640
TOTAL COST: $2,112 $528 $2,640
Route I -65 ProjectDescription
INTERCHANGE IMPROVEMENTS I-65 AT SR-3 (US-31) EXIT 231 GRADE, DRAIN, BASE, PAVE AND BRIDGE IN THE CITY OF CALERA
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055554 ACAA55554 ATRP (013) CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2017 $17,515 $3,747 $21,263
TOTAL COST: $17,515 $3,747 $21,263
Route NA- ProjectDescription
BIKE LANES ON JOHN FINDLEY DRIVE FROM STATE PARK ROAD TO NORTH TRAIL HEAD INCLUDING TERRACE DRIVE
Type of Work UNCLASSIFIED
Project Length in Miles 5.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064227 CMAQ 5916 (252) PRELIMINARY ENGINEERING
UNCLASSIFIED 2016 $549 $137 $686
TOTAL COST: $549 $137 $686
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
81 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
SHELBY COUNTY BICYCLE/PEDESTRIAN PLAN
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064329 CMAQ NR16 (913) SPECIAL
UNCLASSIFIED 2016 $242 $61 $303
TOTAL COST: $242 $61 $303
Route NA- ProjectDescription
HELENA BUCK CREEK, TACOA, AND RUFFIN TRAIL SYSTEMS MULTIUSE TRAIL AND BRIDGES NEAR CSX RAILROAD
Type of Work UNCLASSIFIED
Project Length in Miles 3.670 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100032383 CMAQ 9802 (925) CONSTRUCTION
UNCLASSIFIED 2019 $2,261 $565 $2,826
TOTAL COST: $2,261 $565 $2,826
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
82 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
SIDEWALKS ALONG INDUSTRIAL PARK DR AND BEARDEN RD FROM SR-3 (US-31) TO PELHAM HIGH SCHOOL
Type of Work SIDEWALK
Project Length in Miles 2.840 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056503 CMAQ 5916 (250) UTILITIES
SIDEWALK 2016 $448 $146 $594
100056504 CMAQ 5916 (250) CONSTRUCTION
SIDEWALK 2016 $1,971 $501 $2,472
TOTAL COST: $2,419 $647 $3,066
Route NA- ProjectDescription
RESURFACE OLD HIGHWAY 25 FROM SR-25 TO CR-47
Type of Work RESURFACING
Project Length in Miles 1.582 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061019 ACAA61019 ATRP (012) CONSTRUCTION
RESURFACING
2016 $249 $94 $343
TOTAL COST: $249 $94 $343
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
83 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route NA- ProjectDescription
NON-COMPLIANT CURB RAMP REPLACEMENT ON STATE ROUTES WITHIN JEFFERSON, SHELBY AND WALKER COUNTIES
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060174 STPAA NR13 (909) CONSTRUCTION
SIDEWALK 2019 $1,432 $358 $1,790
TOTAL COST: $1,432 $358 $1,790
Route NA- ProjectDescription
ADD BIKE/PED LANES ALONG JOHN FINDLAY DRIVE FROM THE NORTH TRAILHEAD PARKING LOT TO SR-119 PARK ENTRANCE
Type of Work UNCLASSIFIED
Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063219 CMAQ 5915 (251) CONSTRUCTION
UNCLASSIFIED 2017 $1,547 $387 $1,934
TOTAL COST: $1,547 $387 $1,934
Route NA- ProjectDescription
INVERNESS COMMUNITY GREENWAY FROM INVERNESS FIRE STATION TO HOOVER'S NATURE PARK
Type of Work UNCLASSIFIED
Project Length in Miles 1.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054519 CMAQ 5917 (904) CONSTRUCTION
UNCLASSIFIED 2019 $1,032 $258 $1,290
TOTAL COST: $1,032 $258 $1,290
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
84 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route SR-119 ProjectDescription
ROADWAY IMPROVEMENTS ON SR-119 (MAIN STREET) FROM LITTLE CAHABA RIVER BRIDGE TO BLOCH STREET RESURFACING, SIGNALS, SIDEWALKS, LANDSCAPING, LIGHTING AND DRAINAGE IMPROVEMENTS
Type of Work RESURFACING
Project Length in Miles 0.427 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059152 STPBH 0119 (507) CONSTRUCTION
RESURFACING
2016 $3,733 $1,217 $4,950
TOTAL COST: $3,733 $1,217 $4,950
Route SR-119 ProjectDescription
ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 5.082 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061285 STPBH 0119 (510) PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2016 $200 $50 $250
100061286 STPBH 0119 (510) RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2019 $426 $106 $532
100063109 STPBH 0119 (510) UTILITIES
ADDITIONAL ROADWAY LANES
2019 $600 $150 $750
TOTAL COST: $1,226 $306 $1,532
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
85 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route SR-25 ProjectDescription
ADD TURN LANES AND TRAFFIC SIGNALS AT INTERSECTION OF SR-25 AND 10TH STREET
Type of Work TURN LANES
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061018 ACAA61018 ATRP (008) CONSTRUCTION
TURN LANES 2018 $513 $128 $641
TOTAL COST: $513 $128 $641
Route SR-3 ProjectDescription
SR-3 (US-31) BRIDGE (BIN NO. 2091) OVER PEVINE CREEK AND CSX RR, BRIDGE REPLACEMENT
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.090 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057649 BR 0003 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $432 $108 $540
TOTAL COST: $432 $108 $540
Route SR-3 ProjectDescription
PELHAM TOPICS, SR-3(US-31) FROM CR-52 TO A POINT 0.25 MILES NORTH OF CR-105 (PHASE II)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.125 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039450 STPBH 7012 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $449 $112 $561
TOTAL COST: $449 $112 $561
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
86 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route SR-38 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-38 (US-280) AT OLD US-280 / WAL-MART.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061703 NH 0038 (534) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2018 $931 $233 $1,164
TOTAL COST: $931 $233 $1,164
Route SR-53 ProjectDescription
BRIDGE REPLACEMENT ON SR-53 (US-231) OVER KELLY CREEK (BIN # 2588)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.549 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100003344 BR 0053 (529) CONSTRUCTION
BRIDGE REPLACEMENT
2016 $4,964 $1,241 $6,204
TOTAL COST: $4,964 $1,241 $6,204
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
87 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Original
Route CR-26 ProjectDescription
RESURFACE CR-26 FROM SR-25 (US-231) WEST OF (CR-335) DAYS DRIVE
Type of Work RESURFACING
Project Length in Miles 5.700 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061388 ACNU61388 ATRP (004) CONSTRUCTION
RESURFACING
2016 $1,026 $257 $1,283
TOTAL COST: $1,026 $257 $1,283
Route CR-45 ProjectDescription
RESURFACING CR-45 (OLD COAL CITY ROAD) FROM SR-53 (US-231) TO SR-53 (US-231)
Type of Work RESURFACING
Project Length in Miles 7.040 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061393 ACNU61393 ATRP (008) CONSTRUCTION
RESURFACING
2016 $1,168 $292 $1,460
TOTAL COST: $1,168 $292 $1,460
Route CR-NA ProjectDescription
RESURFACE DOUBLE BRIDGE ROAD FROM 5TH AVENUE TO SR-7 (US-11) IN ASHVILLE
Type of Work RESURFACING
Project Length in Miles 4.460 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061386 ACNU61386 ATRP (011) CONSTRUCTION
RESURFACING
2016 $456 $114 $571
TOTAL COST: $456 $114 $571
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
88 of 154
REGION HIGHWAY PROJECTS - ST. CLAIR
STIP PLAN: 2016 - Original
Route I -59 ProjectDescription
I-59 PAVEMENT REHAB, MILL, PATCH, RESURFACE, SHOULDER TREATMENT, GUARDRAIL, CROSS SLOPE CORRECTION, AND BRIDGE RAIL RETROFIT FROM NORTH OF SR-23 TO NORTH OF SR-53 (US-231) AT WHITNEY
Type of Work PAVEMENT MINOR REHABILITATION
Project Length in Miles 20.434 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055217 RP-IM I059 (395) PRELIMINARY ENGINEERING
PAVEMENT MINOR REHABILITATION
2016 $299 $33 $332
100055218 RP-IM I059 (395) CONSTRUCTION
PAVEMENT MINOR REHABILITATION
2017 $12,107 $1,345 $13,452
TOTAL COST: $12,405 $1,378 $13,784
Route I -59 ProjectDescription
I-59 REPLACE BRIDGES, BIN 007238 (SUFF=40.1, STATUS=SD) AND BIN 007239 (SUFF=65.4, STATUS=FO), OVER MUCKLEROY CREEK, SOUTH OF SR-53 (US-231)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.400 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049965 BRF I059 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $285 $71 $357
100049999 BRF I059 () RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $57 $14 $71
TOTAL COST: $342 $86 $428
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
89 of 154
REGION HIGHWAY PROJECTS - ST. CLAIR
STIP PLAN: 2016 - Original
Route I -59 ProjectDescription
I-59 PAVEMENT REHAB, MILL, PATCH, RESURFACE, REST AREA PARKING REHAB, GUARDRAIL, CROSS SLOPE CORRECTION, AND BRIDGE RAIL RETROFIT FROM NORTH OF SR-53 (US-231) AT WHITNEY TO THE ETOWAH COUNTY LINE
Type of Work PAVEMENT MINOR REHABILITATION
Project Length in Miles 8.885 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055221 RP-IM I059 (366) CONSTRUCTION
PAVEMENT MINOR REHABILITATION
2017 $12,015 $1,335 $13,350
TOTAL COST: $12,015 $1,335 $13,350
Route NA- ProjectDescription
PEDESTRIAN IMPROVEMENTS IN PELL CITY, TO CONSTRUCT SIDEWALKS IN VARIOUS LOCATIONS WITHIN THE CITY
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047636 STPTE-HPP A145 (900) CONSTRUCTION
SIDEWALK 2018 $286 $71 $357
TOTAL COST: $286 $71 $357
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
90 of 154
REGION HIGHWAY PROJECTS - ST. CLAIR
STIP PLAN: 2016 - Original
Route SR-23 ProjectDescription
BR REPL AND APP ON SR-23 OVER BRANCH #000226 STR #23-58-0.7
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040861 BR 5815 () UTILITIES
BRIDGE REPLACEMENT
2019 $23 $6 $28
TOTAL COST: $23 $6 $28
Route SR-25 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-25(US-411) AT PARK AVENUE AND AT CR-6 (SANIE ROAD/SIMPSON ROAD)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.030 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064323 CMAQ 0025 (547) PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2017 $121 $30 $152
100064324 CMAQ 0025 (547) UTILITIES
INTERSECTION IMPROVEMENTS
2019 $291 $73 $364
100064325 CMAQ 0025 (547) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $1,513 $378 $1,892
TOTAL COST: $1,926 $482 $2,408
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
91 of 154
REGION HIGHWAY PROJECTS - ST. CLAIR
STIP PLAN: 2016 - Original
Route SR-7 ProjectDescription
DRAINAGE IMPROVEMENTS ON SR-7 (US-11) FROM ROBINSON ST. TO NEAR TERRY ST. AND DOWNTOWN SPRINGVILLE STREET
Type of Work DRAINAGE CORRECTION
Project Length in Miles 0.789 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055162 HPP 10AL (002) CONSTRUCTION
DRAINAGE CORRECTION
2019 $633 $158 $791
TOTAL COST: $633 $158 $791
Route SR-7 ProjectDescription
REPLACE BIN 001071, SR-7 (US-11) OVER MUCKLEROY CK (SUFF=18.3, STAT=SD) AND BIN 001072, SR-7 (US-11) OVER GULF CREEK (SUFF=52.1,STAT=SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.060 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064490 BR 0007 (513) UTILITIES
BRIDGE REPLACEMENT
2016 $171 $76 $248
100042650 BR 0007 (513) CONSTRUCTION
BRIDGE REPLACEMENT
2016 $5,886 $1,472 $7,358
TOTAL COST: $6,058 $1,548 $7,605
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
92 of 154
REGION HIGHWAY PROJECTS - ST. CLAIR
STIP PLAN: 2016 - Original
Route SR-7 ProjectDescription
ROADWAY AND DRAINAGE IMPROVEMENTS ON SR-7(US-11) AT SPRINGVILLE MIDDLE SCHOOL
Type of Work DRAINAGE CORRECTION
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100052627 HPP-TCSP A187 (900) UTILITIES
DRAINAGE CORRECTION
2019 $40 $10 $50
100052628 HPP A187 (900) CONSTRUCTION
DRAINAGE CORRECTION
2019 $640 $160 $800
TOTAL COST: $680 $170 $850
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
93 of 154
REGION HIGHWAY PROJECTS - ST. CLAIR
STIP PLAN: 2016 - Original
Route CR-207 ProjectDescription
BRIDGE REPLACEMENT AND APPROACH WORK ON CR-207 (STEMLEY ROAD) OVER CHOCCOLOCCO CREEK BIN #008456
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058447 ACBR58447 ATRP (002) CONSTRUCTION
BRIDGE REPLACEMENT
2017 $5,262 $1,316 $6,578
TOTAL COST: $5,262 $1,316 $6,578
Route CR-47 ProjectDescription
EXTENSION OF CR-047 (PRIEBES MILL ROAD) FROM CR-058 (JENIFER ROAD) NEAR JENIFER TO SR-21
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059434 ACNU59434 ATRP (007) CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2019 $4,944 $1,236 $6,180
TOTAL COST: $4,944 $1,236 $6,180
Route CR-47 ProjectDescription
EXTENSION OF CR-47 (PRIEBES MILL ROAD) FROM CR-58 (JENIFER ROAD) TO SR-21
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 1.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062015 STPAA-STPNU-HPP A175 (900)
RIGHT OF WAY
GRADE, DRAIN, BASE AND PAVE
2017 $312 $78 $390
TOTAL COST: $312 $78 $390
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
94 of 154
REGION HIGHWAY PROJECTS - TALLADEGA
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
REPLACE BRIDGE AT ISBELL CIRCLE OVER TOWN CREEK BIN# 16495
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059436 ACBRZ59436 ATRP (005)
CONSTRUCTION
BRIDGE REPLACEMENT
2017 $342 $292 $634
TOTAL COST: $342 $292 $634
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON COOSA STREET AND WEST STREET OVER ISBELL BRANCH BIN'S # 2251 AND # 2260
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059439 ACBRZ59439 ATRP (005)
CONSTRUCTION
BRIDGE REPLACEMENT
2017 $500 $371 $872
TOTAL COST: $500 $371 $872
Route CR-NA ProjectDescription
MAGNOLIA STREET IMPROVEMENTS FROM SR-77 TO SR-4 (US-78) IN LINCOLN
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.830 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062174 ACNU62174 ATRP (005) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2019 $1,822 $455 $2,277
TOTAL COST: $1,822 $455 $2,277
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
95 of 154
REGION HIGHWAY PROJECTS - TALLADEGA
STIP PLAN: 2016 - Original
Route I -20 ProjectDescription
RESURFACING I-20 FROM THE COOSA RIVER MP 164.748 TO MP 173.218 (BEGINNING OF FULL 3 LANE)
Type of Work PAVEMENT MINOR REHABILITATION
Project Length in Miles 8.470 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060114 FRT-RP-IM I020 (350) CONSTRUCTION
PAVEMENT MINOR REHABILITATION
2017 $11,932 $1,326 $13,258
TOTAL COST: $11,932 $1,326 $13,258
Route SR-21 ProjectDescription
SR-21 BIN # 2634 BRIDGE REPLACEMENT OVER CHEAHA CREEK
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.700 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060129 BR 0021 (554) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2016 $113 $28 $141
TOTAL COST: $113 $28 $141
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
96 of 154
REGION HIGHWAY PROJECTS - TALLADEGA
STIP PLAN: 2016 - Original
Route SR-34 ProjectDescription
REPL BIN 003153, SR-34 OVER POOR HOUSE BRANCH, NEAR CR-366. (SUFF=47.8, STAT=FO, 2001 HBRRP LIST)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.026 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100041644 BR 0034 (501) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2016 $74 $19 $93
100041617 BR 0034 () CONSTRUCTION
BRIDGE REPLACEMENT
2019 $1,573 $393 $1,966
TOTAL COST: $1,647 $412 $2,059
Route SR-38 ProjectDescription
SR-38 (US-280) BR REPLACEMENT BIN #009367 OVER SOUTHERN RR STR #038-61-01.0 SUFF
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.636 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100002937 BR 0038 (520) CONSTRUCTION
BRIDGE REPLACEMENT
2017 $10,792 $2,698 $13,491
TOTAL COST: $10,792 $2,698 $13,491
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
97 of 154
REGION HIGHWAY PROJECTS - TALLADEGA
STIP PLAN: 2016 - Original
Route SR-77 ProjectDescription
SR-77 BRIDGE REPLACEMENT OVER BLUE EYE CREEK (BIN 5992) NORTH OF LINCOLN
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 1.788 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057891 BR 0077 (512) RIGHT OF WAY
BRIDGE REPLACEMENT
2016 $1,091 $273 $1,364
100057944 BR 0077 (512) UTILITIES
BRIDGE REPLACEMENT
2018 $140 $35 $175
100049997 BR 0077 (512) CONSTRUCTION
BRIDGE REPLACEMENT
2018 $3,401 $850 $4,252
TOTAL COST: $4,632 $1,158 $5,790
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
98 of 154
REGION HIGHWAY PROJECTS - TALLADEGA
STIP PLAN: 2016 - Original
Route CR-NA ProjectDescription
PARTIAL BRIDGE REMOVAL AND APPROACH IMPROVEMENTS ON SPORTPLEX BOULEVARD SOUTHEAST OF SR-22 BIN# 16025
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061056 ACBRZ61056 ATRP (017)
CONSTRUCTION
BRIDGE REPLACEMENT
2018 $404 $109 $513
TOTAL COST: $404 $109 $513
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT AND RESURFACING ON SCOTT ROAD FROM COLEY CREEK ROAD TO CONFEDERATE DRIVE BIN # 1181
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061057 ACBR61057 ATRP (017) CONSTRUCTION
BRIDGE 2017 $1,405 $351 $1,757
TOTAL COST: $1,405 $351 $1,757
Route CR-NA ProjectDescription
LEE STREET IMPROVEMENTS FROM THE INTERSECTION OF SR-38(US-280) TO 5TH WAY AT RAILROAD CROSSING AND RESURFACE WASHINGTON STREET FROM CITY LIMITS TO 5TH WAY AT RAILROAD CROSSING
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061059 ACOA61059 ATRP (016) CONSTRUCTION
RESURFACING
2016 $1,988 $497 $2,484
TOTAL COST: $1,988 $497 $2,484
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
99 of 154
REGION HIGHWAY PROJECTS - TALLAPOOSA
STIP PLAN: 2016 - Original
Route SR-63 ProjectDescription
BRIDGE REPLACEMENT (BIN 014307) ON SR-63 OVER SUGAR CREEK #63-62-11.9
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067663 BR 0063 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,224 $306 $1,530
TOTAL COST: $1,224 $306 $1,530
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
100 of 154
REGION HIGHWAY PROJECTS - TALLAPOOSA
STIP PLAN: 2016 - Original
Route CR-109 ProjectDescription
NEW SIGNAL AND LANE INSTALLATION IMPROVEMENTS AT BYNUM LEATHERWOOD (CR-109) AND OLD GADSDEN ROAD
Type of Work SIGNALIZATION
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064896 STPOA 0815 (263) PRELIMINARY ENGINEERING
SIGNALIZATION 2018 $235 $59 $294
TOTAL COST: $235 $59 $294
Route CR-440 ProjectDescription
CR-440 (64TH STREET) BRIDGE REPLACEMENTBIN # 6204 NEAR WEAVER
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.010 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054937 STPOA 7448 () RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $29 $7 $36
TOTAL COST: $29 $7 $36
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
101 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Amendment # 1
Route CR-NA ProjectDescription
RESURFACING, STRIPING, AND DRAINAGE IMPROVEMENTS ON MOUNTAIN STREET NE FROM SR-21 TO 8TH AVENUE NE CITY OF JACKSONVILLE
Type of Work RESURFACING
Project Length in Miles 1.167 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064883 STPOA 0815 (258) PRELIMINARY ENGINEERING
RESURFACING
2017 $33 $8 $41
100064884 STPOA 0815 (258) CONSTRUCTION
RESURFACING
2019 $309 $77 $386
TOTAL COST: $341 $85 $427
Route CR-NA ProjectDescription
RESURFACING CHURCH AVENUE FROM 11TH STREET TO SR-21
Type of Work RESURFACING
Project Length in Miles 6.700 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064885 STPOA 0815 (261) PRELIMINARY ENGINEERING
RESURFACING
2018 $95 $24 $119
100064886 STPOA 0815 () CONSTRUCTION
RESURFACING
2019 $893 $223 $1,116
TOTAL COST: $988 $247 $1,235
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
102 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Amendment # 1
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON AIRPORT ROAD AT COLDWATER CREEK BIN # 11215 CITY OF OXFORD
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064887 STPOA 0815 (260) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2018 $180 $45 $225
100064888 STPOA 0815 (260) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $8 $2 $10
100064889 STPOA 0815 (260) UTILITIES
BRIDGE REPLACEMENT
2019 $61 $15 $77
100064890 STPOA 0815 () CONSTRUCTION
BRIDGE REPLACEMENT
2019 $727 $182 $909
TOTAL COST: $977 $244 $1,221
Route CR-NA ProjectDescription
RESURFACE WEST 9TH STREET AND CAFFEY DRIVE FROM SR-78 TO BARRY STREET CITY OF OXFORD
Type of Work RESURFACING
Project Length in Miles 4.360 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064891 STPOA 0815 () PRELIMINARY ENGINEERING
RESURFACING
2019 $49 $12 $61
100064892 STPOA 0815 () CONSTRUCTION
RESURFACING
2019 $323 $81 $404
TOTAL COST: $372 $93 $465
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
103 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Amendment # 1
Route CR-NA ProjectDescription
RESURFACE RUSSELL DRIVE FROM ALEXANDRIA ROAD TO PEACEBURG ROAD CITY OF WEAVER
Type of Work RESURFACING
Project Length in Miles 1.320 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064898 STPOA 0818 (250) PRELIMINARY ENGINEERING
RESURFACING
2018 $38 $10 $48
100064899 STPOA 0818 () CONSTRUCTION
RESURFACING
2020 $327 $82 $409
TOTAL COST: $365 $91 $456
Route CR-NA ProjectDescription
RESURFACING ALEXANDRIA/JACKSONVILLE HIGHWAY FROM JACKSONVILLE CITY LIMITS TO MCCLELLAN ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064930 STPOA 0815 () CONSTRUCTION
RESURFACING
2019 $1,143 $286 $1,428
TOTAL COST: $1,143 $286 $1,428
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
104 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Amendment # 1
Route CR-NA ProjectDescription
RESURFACE, PAVE SHOULDERS AND TRAFFIC STRIPE ON LENLOCK LANE FROM SR-1 (US-431) EASTERLY TO THE ANNISTON CITY LIMITS
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.908 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064895 STPOA 0815 (257) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2016 $495 $124 $619
TOTAL COST: $495 $124 $619
Route CR-NA ProjectDescription
NEW SIGNAL AND LANE INSTALLATION IMPROVEMENTS AT BYNUM LEATHERWOOD (CR-109) AND OLD GADSDEN ROAD
Type of Work SIGNALIZATION
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064897 STPOA 0815 () CONSTRUCTION
SIGNALIZATION 2020 $727 $182 $909
TOTAL COST: $727 $182 $909
Route SR-202 ProjectDescription
INSTALL INTERSECTION LIGHTING ON SR-202 AND BYNUM LEATHERWOOD ROAD (CR-109)
Type of Work LIGHTING
Project Length in Miles 0.378 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064882 STPOA 0202 (522) CONSTRUCTION
LIGHTING 2017 $263 $66 $329
TOTAL COST: $263 $66 $329
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
105 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Amendment # 1
Route CR-NA ProjectDescription
RESURFACE (PARTIAL RECONSTRUCTION) MCASHAN DRIVE FROM BESSEMER CITY LIMITS TO ROCK MOUNTAIN LAKE ROAD
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065001 ACAA65001 ATRP (016) CONSTRUCTION
RESURFACING
2017 $1,454 $830 $2,284
TOTAL COST: $1,454 $830 $2,284
Route NA- ProjectDescription
18TH STREET REVITALIZATION FROM 28TH AVENUE SOUTH TO A POINT APPROXIMATELY 1000' NORTH OF ROSEDALE DRIVE IN THE CITY OF HOMEWOOD
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065218 CMAQ TA15 (903) PRELIMINARY ENGINEERING
STREETSCAPE
2019 $247 $62 $309
100065219 CMAQ TA15 (903) RIGHT OF WAY
STREETSCAPE
2019 $82 $21 $103
100065220 CMAQ TA15 (903) UTILITIES
STREETSCAPE
2019 $82 $21 $103
100064505 TAPAA-CMAQ TA15 (903)
CONSTRUCTION
STREETSCAPE
2019 $1,200 $300 $1,500
TOTAL COST: $1,612 $403 $2,015
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
106 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 1
Route NA- ProjectDescription
TRAIL DESIGN AND CONSTRUCTION PELHAM GREENWAY ALONG BISHOP CREEK FROM PELHAM CITY PARK TO OAK MOUNTAIN PARK ROAD.
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065161 CMAQ 5916 (253) PRELIMINARY ENGINEERING
SIDEWALK 2017 $323 $81 $404
100065162 CMAQ 5916 (253) RIGHT OF WAY
SIDEWALK 2019 $82 $21 $103
100065163 CMAQ 5916 (253) UTILITIES
SIDEWALK 2019 $82 $21 $103
TOTAL COST: $488 $122 $610
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
107 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Amendment # 1
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT NOBLE STREET AND 4TH STREET
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065454 STPOA 0815 (255) UTILITIES
INTERSECTION IMPROVEMENTS
2019 $7 $2 $8
TOTAL COST: $7 $2 $8
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
108 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Amendment # 2
Route NA- ProjectDescription
BESSEMER MULTI-USE TRAIL, PHASE I ALONG SR-150 BETWEEN FAIRFAX AVENUE AND BERKLEY AVENUE IN THE CITY OF BESSEMER
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061585 TAPBH-CMAQ TA13 (949)
CONSTRUCTION
UNCLASSIFIED 2017 $560 $140 $700
TOTAL COST: $560 $140 $700
Route NA- ProjectDescription
DOWNTOWN STREETSCAPE AND SIDEWALKS ALONG B.Y. WILLIAMS SR. DRIVE IN THE CITY OF MIDFIELD.
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062999 TAPAA-CMAQ TA14 (930)
CONSTRUCTION
SIDEWALK 2019 $899 $225 $1,123
TOTAL COST: $899 $225 $1,123
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
109 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 2
Route NA- ProjectDescription
PAVEMENT MANAGEMENT STUDY FOR CITY OF BIRMINGHAM
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065318 STPBH NR16 (912) SPECIAL
UNCLASSIFIED 2016 $400 $100 $500
TOTAL COST: $400 $100 $500
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
110 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 4
Route I -20 ProjectDescription
I-20 CONTINUED MONITORING FOR PRIOR PROJECT 100033404 (FY 2016 - FY 2018)
Type of Work UNCLASSIFIED
Project Length in Miles 12.000 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065670 IM I020 (351) SPECIAL
UNCLASSIFIED 2016 $113 $13 $125
TOTAL COST: $113 $13 $125
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
111 of 154
REGION HIGHWAY PROJECTS - CALHOUN
STIP PLAN: 2016 - Amendment # 8
Route CR-94 ProjectDescription
CR-94 (DANIEL PAYNE DRIVE) ADD CONTINUOUS TWO-WAY LEFT TURN LANE FROM CR-105 (CHERRY AVE) TO I-65 (PROJECT SPONSOR THE CITY OF BIRMINGHAM)
Type of Work TURN LANES
Project Length in Miles 2.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065501 STPBH 3716 (254) PRELIMINARY ENGINEERING
TURN LANES 2016 $280 $70 $350
TOTAL COST: $280 $70 $350
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
112 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 8
Route NA- ProjectDescription
DOWNTOWN STREETSCAPE AND SIDEWALKS ALONG B.Y. WILLIAMS SR. DRIVE IN THE CITY OF MIDFIELD.
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065502 CMAQ TA14 (930) PRELIMINARY ENGINEERING
SIDEWALK 2017 $81 $20 $101
100065503 CMAQ TA14 (930) RIGHT OF WAY
SIDEWALK 2019 $82 $21 $103
100065504 CMAQ TA14 (930) UTILITIES
SIDEWALK 2019 $82 $21 $103
TOTAL COST: $246 $61 $307
Route NA- ProjectDescription
ADVANCED TRAFFIC MANAGEMENT SYSTEM ASSESSMENT
Type of Work TRAFFIC CONTROL MARKING & LEGN
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065798 CMAQ 3716 () SPECIAL
TRAFFIC CONTROL MARKING & LEGN
2019 $330 $82 $412
TOTAL COST: $330 $82 $412
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
113 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 8
Route SR-4 ProjectDescription
INTERSECTION IMPROVEMENTS AT PARKWAY DRIVE SR-4 (US-78) AND PRESIDENT STREET IN THE CITY OF LEEDS
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.520 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065388 STPAA 0004 (543) PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2017 $283 $71 $354
100065396 STPAA 0004 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $412 $103 $515
TOTAL COST: $695 $174 $869
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
114 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 8
Route SR-160 ProjectDescription
SR-160 INTERSECTION IMPROVEMENTS AT MOUNTAIN WOODS LAKE ROAD AND DRAINAGE CORRECTION AT STANDHOLTON DRIVE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065799 CMAQ 0516 (250) UTILITIES
INTERSECTION IMPROVEMENTS
2018 $1,291 $385 $1,676
TOTAL COST: $1,291 $385 $1,676
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
115 of 154
REGION HIGHWAY PROJECTS - BLOUNT
STIP PLAN: 2016 - Amendment # 9
Route CR-NA ProjectDescription
BRIDGE RECONSTRUCTION AND REHABILITATION FOR OLD BROOK TRAIL BRIDGE (BIN # 012869) OVER LITTLE SHADES CREEK AND CANTERBURY ROAD BRIDGE (BIN # 002873) OVER WATKINS CREEK ,CITY OF MOUNTAIN BROOK
Type of Work BRIDGE REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066110 STPBH 3716 (256) PRELIMINARY ENGINEERING
BRIDGE REHABILITATION
2017 $200 $50 $250
TOTAL COST: $200 $50 $250
Route I -59 ProjectDescription
DRAINAGE IMPROVEMENTS AND STREETSCAPE FOR CBD I-20/59 BRIDGE REPLACEMENT ALONG BIRMINGHAM CENTRAL BUSINESS DISTRICT 9TH AVE N FROM 15TH ST N TO 23RD ST N AND CROSS STREETS (15TH ST N THROUGH 25TH ST N).
Type of Work DRAINAGE CORRECTION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065792 ACIMF I059 (394) CONSTRUCTION
DRAINAGE CORRECTION
2016 $17,460 $1,940 $19,400
TOTAL COST: $17,460 $1,940 $19,400
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
116 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 9
Route NA- ProjectDescription
IRONDALE PAVEMENT MANAGEMENT STUDY CITY OF IRONDALE SPONSOR.
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066114 STPBH 3716 (257) SPECIAL
UNCLASSIFIED 2017 $56 $14 $70
TOTAL COST: $56 $14 $70
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
117 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 9
Route I -459 ProjectDescription
I-459 PAVEMENT REHAB, RESURFACE, CROSS SLOPE CORRECTION, GUARDRAIL, AND PAVEMENT STRIPING AND MARKINGS FROM I-59/20 INTERCHANGE TO SOUTH OF CR-52
Type of Work PAVEMENT MINOR REHABILITATION
Project Length in Miles 11.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056261 RP-IM I459 (311) PRELIMINARY ENGINEERING
PAVEMENT MINOR REHABILITATION
2017 $185 $21 $205
100056262 RP-IM I459 (311) CONSTRUCTION
PAVEMENT MINOR REHABILITATION
2018 $13,542 $1,505 $15,047
TOTAL COST: $13,727 $1,525 $15,252
Route I -59 ProjectDescription
CORRIDOR ALTERNATIVES IDENTIFICATION AND ANALYSIS FOR I-59/20 IN DOWNTOWN BIRMINGHAM'S CENTRAL BUSINESS DISTRICT (CBD)
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066176 TTDG 3716 (255) SPECIAL
CORRIDOR STUDY
2016 $0 $0 $0
TOTAL COST: $0 $0 $0
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
118 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 13
Route SR-46 ProjectDescription
SR-46 BRIDGE REPLACEMENT OVER CANE CREEK (BIN#2108) NORTH OF I-20
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.070 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066574 BR 0046 (503) RIGHT OF WAY
BRIDGE REPLACEMENT
2018 $28 $7 $35
TOTAL COST: $28 $7 $35
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
119 of 154
REGION HIGHWAY PROJECTS - CLEBURNE
STIP PLAN: 2016 - Amendment # 15
Route I -20 ProjectDescription
INTERCHANGE LIGHTING REHABILITATION ON I-20 AT SR-77 INTERCHANGE (EXIT 168)
Type of Work LIGHTING
Project Length in Miles 0.776 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066551 ACNU66551 ATRP (006) CONSTRUCTION
LIGHTING 2017 $212 $221 $433
TOTAL COST: $212 $221 $433
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
120 of 154
REGION HIGHWAY PROJECTS - TALLADEGA
STIP PLAN: 2016 - Amendment # 15
Route I -459 ProjectDescription
I-459 PAVEMENT REHAB, RESURFACE, CROSS SLOPE CORRECTION, GUARDRAIL REPLACEMENT, AND PAVEMENT STRIPING AND MARKINGS FROM SOUTH OF CR-52 TO SR-150
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 10.861 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058050 IM I459 (315) PRELIMINARY ENGINEERING
PAVEMENT REHABILITATION
2017 $189 $21 $210
100058051 IM I459 (315) CONSTRUCTION
PAVEMENT REHABILITATION
2018 $20,359 $2,262 $22,621
TOTAL COST: $20,548 $2,283 $22,831
Route I -65 ProjectDescription
PLANING, RESURFACING, STRIPING, MARKINGS AND SAFETY IMPROVEMENTS TO GUARDRAILS AND GUARDRAIL END ANCHORS ON I-65 FROM MOUNT OLIVE INTERCHANGE TO .78 MILE NORTH OF SR-160
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 26.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060141 IM-HSIP I065 (484) PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 2
2017 $90 $10 $100
100060142 IM-HSIP I065 (484) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $20,036 $2,226 $22,262
TOTAL COST: $20,126 $2,236 $22,362
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
121 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 17
Route NA- ProjectDescription
SIDEWALKS ALONG SR-150 (JOHN HAWKINS PKWY) FROM CAHABA RIVER ESTATES RD. TO SR-3 (US-31, MONTGOMERY HWY) CITY OF HOOVER
Type of Work SIDEWALK
Project Length in Miles 3.620 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056556 CMAQ NR13 (961) PRELIMINARY ENGINEERING
SIDEWALK 2018 $248 $62 $310
100056557 CMAQ NR13 (961) RIGHT OF WAY
SIDEWALK 2020 $109 $27 $137
TOTAL COST: $358 $89 $447
Route NA- ProjectDescription
BIKESHARE WAYFINDING SIGNS AT VARIOUS LOCATIONS IN DOWNTOWN BIRMINGHAM
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066621 CMAQ 3717 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2019 $190 $48 $238
100066622 CMAQ 3717 () CONSTRUCTION
UNCLASSIFIED 2019 $1,120 $280 $1,400
TOTAL COST: $1,310 $328 $1,638
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
122 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 17
Route SR-25 ProjectDescription
CORRIDOR FEASIBILITY STUDY FOR MULTILANE FACILITY ON SR-25 (US-411) FROM PARK AVENUE TO SANIE ROAD
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066555 STPAA 0025 (549) SPECIAL
CORRIDOR STUDY
2017 $400 $100 $500
TOTAL COST: $400 $100 $500
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
123 of 154
REGION HIGHWAY PROJECTS - ST. CLAIR
STIP PLAN: 2016 - Amendment # 17
Route NA- ProjectDescription
WOODLAWN NEIGHBORHOOD STREETSCAPE PHASE 2 (CITY OF BIRMINGHAM)
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066708 CMAQ 3717 () PRELIMINARY ENGINEERING
STREETSCAPE
2019 $204 $51 $255
100066710 CMAQ 3717 () UTILITIES
STREETSCAPE
2019 $204 $51 $255
100066709 CMAQ 3717 () CONSTRUCTION
STREETSCAPE
2019 $1,224 $306 $1,530
TOTAL COST: $1,632 $408 $2,040
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
124 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 19
Route I -20 ProjectDescription
RESURFACING I-20 FROM MP 173.218 (BEGINNING 6 LANES) TO MP 181.747 (0.07 MILES WEST OF H J BENTLEY JR PARKWAY)
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 17.058 Urban Area ANNISTON COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066466 IM I020 (352) PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 1
2017 $18 $2 $20
100066469 IM I020 (352) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2017 $4,156 $462 $4,617
TOTAL COST: $4,174 $464 $4,637
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
125 of 154
REGION HIGHWAY PROJECTS - TALLADEGA
STIP PLAN: 2016 - Amendment # 19
Route SR-25 ProjectDescription
BRIDGE REPLACEMENT ON SR-25 OVER BULLEY CREEK BIN # 000769
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.022 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066531 BR 0025 (550) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2017 $80 $20 $100
100066556 BR 0025 (550) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $500 $500 $1,000
TOTAL COST: $580 $520 $1,100
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
126 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Amendment # 20
Route NA- ProjectDescription
INTERSECTION IMPROVEMENT STUDY THROUGHOUT THE CITY OF HOMEWOOD FOR IDENTIFICATION OF POTENTIAL ROADWAY IMPROVEMENTS.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066930 STPBH 3717 () SPECIAL
INTERSECTION IMPROVEMENTS
2019 $80 $20 $100
TOTAL COST: $80 $20 $100
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
127 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 21
Route SR-34 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-34 AT CROPWELL DRIVE AND HARDWICK ROAD (CR-45), INCLUDING ROUNDABOUT CONSTRUCTION IN PELL CITY
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.002 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066388 STPAA-HSIP 0034 (502) PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2017 $206 $44 $250
TOTAL COST: $206 $44 $250
Route SR-34 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-34 AT CROPWELL DRIVE AND HARDWICK ROAD (CR-45), INCLUDING ROUNDABOUT CONSTRUCTION IN PELL CITY
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.002 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066390 STPAA-HSIP 0034 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $312 $45 $357
TOTAL COST: $312 $45 $357
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
128 of 154
REGION HIGHWAY PROJECTS - ST. CLAIR
STIP PLAN: 2016 - Amendment # 21
Route I -85 ProjectDescription
PAVEMENT REHABILITATION ON I-85 FROM THE LEE COUNTY LINE TO THE GEORGIA STATE LINE (MP 80.00)
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 13.896 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066476 IM I085 (360) PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 2
2017 $227 $25 $253
100066477 IM I085 (360) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2019 $1,845 $205 $2,050
TOTAL COST: $2,072 $230 $2,302
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
129 of 154
REGION HIGHWAY PROJECTS - CHAMBERS
STIP PLAN: 2016 - Amendment # 22
Route NA- ProjectDescription
STREETSCAPE AND OTHER PEDESTRIAN IMPROVEMENTS ALONG THE FOLLOWING BLOCKS IN DOWNTOWN BIRMINGHAM: 4TH AVE. N FROM 15TH N TO 17TH N, 5TH AVE. N FROM 15TH N TO 17TH N,15TH ST. N FROM 4TH AVE. N TO 5TH AVE. N, 16TH ST. N FROM 4TH AVE. N TO 5TH AVE. N.
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067026 CMAQ 3717 () PRELIMINARY ENGINEERING
STREETSCAPE
2019 $98 $24 $122
100067027 CMAQ 3717 () UTILITIES
STREETSCAPE
2019 $122 $31 $153
100067028 CMAQ 3717 () CONSTRUCTION
STREETSCAPE
2019 $408 $102 $510
TOTAL COST: $628 $157 $785
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
130 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 22
Route I -65 ProjectDescription
I-65 ADD LANES FROM SR-3 (US-31) TO CR-52 (8-LN)(PHASE 2)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 3.531 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100044672 NHF-IMF I065 (354) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2018 $71,705 $17,039
$88,744
TOTAL COST: $71,705 $17,039
$88,744
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
131 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Amendment # 22
Route CR-2303 ProjectDescription
CR-2303 (LAKESHORE PKWY) AT I-65 INTERCHANGE MODIFICATIONS.
Type of Work RAMP REVISIONS
Project Length in Miles 1.120 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040770 STPBHF 7026 () UTILITIES
RAMP REVISIONS
2019 $180 $45 $225
100040771 STPBHF 7026 (601) CONSTRUCTION
RAMP REVISIONS
2020 $10,723 $2,681 $13,403
TOTAL COST: $10,903 $2,726 $13,628
Route I -459 ProjectDescription
I-459 INTERCHANGE IMPROVEMENTS AT SR-38 (US-280) INCLUDING BRAIDED EXIT RAMP FROM I-459 NB
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.675 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062216 IMF-STPBHF I459 (316) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2017 $4,449 $913 $5,362
TOTAL COST: $4,449 $913 $5,362
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
132 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 25
Route SR-150 ProjectDescription
BRIDGE REPLACEMENT ON SR-150 OVER LITTLE SHADES CREEK BIN # 2866
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066942 BR 0150 (505) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2018 $81 $20 $101
100066943 BR 0150 (505) UTILITIES
BRIDGE REPLACEMENT
2019 $245 $61 $306
100066944 BR 0150 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,236 $309 $1,545
TOTAL COST: $1,562 $390 $1,952
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
133 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 27
Route SR-48 ProjectDescription
REPLACE BRIDGE, BIN 000798, SR-48 OVER FOX CREEK (SUFF = 3.6, STATUS = SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.020 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067658 BR 0048 (502) RIGHT OF WAY
BRIDGE REPLACEMENT
2018 $241 $60 $301
TOTAL COST: $241 $60 $301
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
134 of 154
REGION HIGHWAY PROJECTS - RANDOLPH
STIP PLAN: 2016 - Amendment # 27
Route CR-17 ProjectDescription
RESURFACING ON CR-17 (VALLEYDALE ROAD) FROM I-65 TO CR-29 (CALDWELL MILL ROAD) AND ON CR-43 (BEAR CREEK ROAD) FROM SR-38 (US-280) TO SR-25
Type of Work RESURFACING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067603 STPBH 5918 () PRELIMINARY ENGINEERING
RESURFACING
2019 $80 $20 $100
TOTAL COST: $80 $20 $100
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
135 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Amendment # 27
Route NA- ProjectDescription
SERVICE PATROL OPERATIONS FOR FY 2018 AND 2019 FOR JEFFERSON AND SHELBY COUNTIES
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067758 STPBH NR18 (912) SPECIAL
UNCLASSIFIED 2018 $600 $150 $750
TOTAL COST: $600 $150 $750
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
136 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 30
Route SR-261 ProjectDescription
INTERSECTION IMPROVEMENTS AT SR-261 AND CR-52E IN THE CITY OF HELENA
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.028 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067711 CMAQ 0261 (501) PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2018 $280 $70 $350
100067712 CMAQ 0261 (501) RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $323 $81 $404
TOTAL COST: $603 $151 $754
Route SR-38 ProjectDescription
INTERSECTION IMPROVEMENTS ON SR-38 (US-280) AT OLD US-280 / WAL-MART.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067753 NH 0038 (534) UTILITIES
INTERSECTION IMPROVEMENTS
2018 $410 $151 $561
TOTAL COST: $410 $151 $561
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
137 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Amendment # 30
Route I -20 ProjectDescription
PAVEMENT REHABILITATION, MILLING, AND REPLACEMENT OF OPEN GRADED FRICTION COURSE (OGFC) ON I-20 FROM 0.70 MILES WEST OF SR-4 (US-78) TO 0.15 MILES EAST OF OLD COAL CITY ROAD
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 3.915 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067742 IM I020 (354) PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 1
2018 $32 $4 $36
TOTAL COST: $32 $4 $36
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
138 of 154
REGION HIGHWAY PROJECTS - ST. CLAIR
STIP PLAN: 2016 - Amendment # 30
Route I -20 ProjectDescription
PAVEMENT REHABILITATION, MILLING, AND REPLACEMENT OF OPEN GRADED FRICTION COURSE (OGFC) ON I-20 FROM 0.70 MILES WEST OF SR-4 (US-78) TO 0.15 MILES EAST OF OLD COAL CITY ROAD
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 3.915 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067743 IM I020 (354) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2018 $2,471 $275 $2,746
TOTAL COST: $2,471 $275 $2,746
Route I -20 ProjectDescription
PAVEMENT REHABILITATION, MILLING AND REPLACEMENT OF OPEN GRADED FRICTION COURSE (OGFC) ON I-20 FROM .15 MILE EAST OF OLD COAL CITY ROAD MP 159.783 TO TALLADEGA COUNTY LINE MP 164.410
Type of Work PREVENTATIVE MAINTENANCE LEVEL 1
Project Length in Miles 9.254 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068017 IM I020 (355) PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 1
2018 $3 $0 $3
100068034 IM I020 (355) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 1
2018 $2,665 $296 $2,961
TOTAL COST: $2,667 $296 $2,964
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
139 of 154
REGION HIGHWAY PROJECTS - ST. CLAIR
STIP PLAN: 2016 - Amendment # 31
Route SR-74 ProjectDescription
BRIDGE REPLACEMENT AND APPROACHES (BIN 004560) ON SR-74 (US-278) AT LOCUST FORK, GRADE, DRAIN, BASE, PAVE, BRIDGE, AND BRIDGE REMOVAL
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 1.136 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067595 BR 0074 (537) RIGHT OF WAY
BRIDGES AND APPROACHES
2019 $808 $202 $1,010
TOTAL COST: $808 $202 $1,010
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
140 of 154
REGION HIGHWAY PROJECTS - BLOUNT
STIP PLAN: 2016 - Amendment # 33
Route I -85 ProjectDescription
PAVEMENT REHABILITATION ON I-85 FROM 1.5 MILES NORTH OF CR-388 (MP 71.964) TO THE GEORGIA STATE LINE (MP 80.000)
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 8.036 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067306 IM I085 (363) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $6,363 $707 $7,070
TOTAL COST: $6,363 $707 $7,070
Route SR-77 ProjectDescription
BRIDGE REPLACEMENT ON SR-77 AT HOOTALOOCO CREEK 4.8 MILES NORTH WEST OF SR-1 (US-431) BIN 2600
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.015 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067064 BR 0077 (522) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2018 $240 $60 $300
TOTAL COST: $240 $60 $300
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
141 of 154
REGION HIGHWAY PROJECTS - CHAMBERS
STIP PLAN: 2016 - Amendment # 33
Route CR-NA ProjectDescription
REPAIR SCOUR / EROSION DAMAGE, RESURFACE PATCH AND MINOR DRAINAGE IMPROVEMENTS ON CHEAHA ROAD NEAR CHEAHA LAKE DRIVE
Type of Work EROSION CONTROL
Project Length in Miles 0.100 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067953 FLAP FLAP (022) CONSTRUCTION
EROSION CONTROL
2019 $653 $163 $816
TOTAL COST: $653 $163 $816
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
142 of 154
REGION HIGHWAY PROJECTS - CLEBURNE
STIP PLAN: 2016 - Amendment # 33
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT (BIN 000090) ON 21ST STREET NORTH (RICHARD ARRINGTON JR BOULEVARD) BETWEEN 1ST AVENUE SOUTH AND 1ST AVENUE NORTH OVER NORFOLK SOUTHERN AND CSX RAILROAD - CITY OF BIRMINGHAM
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067934 STPBH 3718 (250) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $640 $160 $800
TOTAL COST: $640 $160 $800
Route CR-NA ProjectDescription
13TH STREET SOUTH - ADD BIKE LANES AND STREETSCAPE IMPROVEMENTS FROM 1ST AVE SOUTH TO 10TH AVE SOUTH
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068127 CMAQ 3718 () PRELIMINARY ENGINEERING
STREETSCAPE
2019 $299 $75 $374
TOTAL COST: $299 $75 $374
Route CR-NA ProjectDescription
GREENWAY AND ROAD DIET ON RICHARD ARRINGTON JR BOULEVARD FROM 15TH AVENUE SOUTH TO VALLEY AVENUE
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068467 CMAQ 3718 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2019 $242 $61 $303
TOTAL COST: $242 $61 $303
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
143 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 33
Route NA- ProjectDescription
SIDEWALKS ALONG PINE RIDGE ROAD FROM OVERBROOK ROAD TO OLD LEEDS ROAD
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068123 CMAQ 3718 () PRELIMINARY ENGINEERING
SIDEWALK 2019 $162 $40 $202
TOTAL COST: $162 $40 $202
Route NA- ProjectDescription
BIRMINGHAM RIDE SHARE PROGRAMS APPORTIONMENT FY 2019 - FY 2020
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068135 STPBH TR18 () SPECIAL
UNCLASSIFIED 2019 $1,300 $0 $1,300
TOTAL COST: $1,300 $0 $1,300
Route NA- ProjectDescription
PROJECT TO RECORD AND BILL CBD PHASE III DEBT SERVICE INTEREST COST
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068397 FRT-IM I059 (385) SPECIAL
UNCLASSIFIED 2018 $18,299 $2,033 $20,332
TOTAL COST: $18,299 $2,033 $20,332
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
144 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 33
Route SR-48 ProjectDescription
REPLACE BRIDGE, BIN 000798, SR-48 OVER FOX CREEK (SUFF = 3.6, STATUS = SD)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.020 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047362 BR 0048 () CONSTRUCTION
BRIDGE REPLACEMENT
2019 $3,368 $842 $4,210
TOTAL COST: $3,368 $842 $4,210
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
145 of 154
REGION HIGHWAY PROJECTS - RANDOLPH
STIP PLAN: 2016 - Amendment # 33
Route CR-52 ProjectDescription
INTERSECTION IMPROVEMENTS AT CR-52 AND CR-93
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059509 CMAQ 5918 (250) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $760 $190 $950
TOTAL COST: $760 $190 $950
Route NA- ProjectDescription
PROPOSED BIKE LANES ALONG JOHN FINDLAY DRIVE FROM NORTH OF STATE PARK ROAD TO THE NORTH TRAILHEAD AT OAK MOUNTAIN STATE PARK
Type of Work UNCLASSIFIED
Project Length in Miles 6.008 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064282 CMAQ 5916 (252) CONSTRUCTION
UNCLASSIFIED 2018 $4,390 $1,097 $5,487
TOTAL COST: $4,390 $1,097 $5,487
Route SR-119 ProjectDescription
ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.694 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100061118 ACAA61118 ATRP (012) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $9,839 $2,460 $12,298
TOTAL COST: $9,839 $2,460 $12,298
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
146 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Amendment # 33
Route CR-303 ProjectDescription
BRIDGE REPLACEMENT (BIN 008086) ON CR-303 (BERNEY STATION ROAD) OVER DRY CREEK - TCP 61-303-19
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067954 FLAP FLAP (010) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $334 $84 $418
TOTAL COST: $334 $84 $418
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
147 of 154
REGION HIGHWAY PROJECTS - TALLADEGA
STIP PLAN: 2016 - Amendment # 33
Route SR-50 ProjectDescription
REPLACE BRIDGE ON SR-50 OVER WIND CREEK BIN 004389
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.003 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067062 BR 0050 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $202 $51 $253
TOTAL COST: $202 $51 $253
Route SR-63 ProjectDescription
BRIDGE REPLACEMENT (BIN 014307) ON SR-63 OVER SUGAR CREEK #63-62-11.9
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068200 BR 0063 (507) PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2018 $120 $30 $150
TOTAL COST: $120 $30 $150
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
148 of 154
REGION HIGHWAY PROJECTS - TALLAPOOSA
STIP PLAN: 2016 - Amendment # 33
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON SPRINGDALE ROAD OVER FIVE MILE CREEK BIN# 15837
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068651 STPBH 3717 (250) UTILITIES
BRIDGE REPLACEMENT
2019 $404 $101 $505
TOTAL COST: $404 $101 $505
Route NA- ProjectDescription
BICYCLE/PEDESTRIAN PLAN FOR JEFFERSON COUNTY, SPONSOR IS JEFFERSON COUNTY
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068759 CMAQ NR18 () SPECIAL
UNCLASSIFIED 2019 $120 $30 $150
TOTAL COST: $120 $30 $150
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
149 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 36
Route I -20 ProjectDescription
PAVEMENT REHABILITATION ON I-20 FROM EXIT 140 TO THE JEFFERSON/ST CLAIR COUNTY LINE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 5.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068064 IM I020 (356) PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $136 $15 $152
100068066 IM I020 () CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $6,300 $700 $7,000
TOTAL COST: $6,436 $715 $7,152
Route I -59 ProjectDescription
PAVEMENT REHABILITATION ON I-20/59 FROM ARKADELPHIA ROAD TO THE SOUTH END OF THE CENTRAL BUSINESS DISTRICT BRIDGE NEAR 15TH STREET AND ON I-65 FROM SOUTH OF 1 ST. AVENUE NORTH TO 16TH STREET NORTH
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063656 IM I059 (410) CONSTRUCTION
PAVEMENT REHABILITATION
2019 $13,909 $1,545 $15,455
TOTAL COST: $13,909 $1,545 $15,455
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
150 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 38
Route I -65 ProjectDescription
CONCRETE PAVEMENT REHAB, UNDERSEAL, GRINDING, PAVERLAID SURFACE TREATMENT, UNDERDRAIN, SHOULDER PAVEMENT,GUARDRAIL ON I-65 FROM SR-3(US-31) TO RALEIGH AVENUE OVERPASS (PRIORITY #35)
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 3.760 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066473 IM I065 () PRELIMINARY ENGINEERING
PAVEMENT REHABILITATION
2019 $227 $25 $253
TOTAL COST: $227 $25 $253
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
151 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 38
Route NA- ProjectDescription
MULTI-USE TRAIL AND GREENWAY SYSTEM ALONG THE SR-3 (US-31) CORRIDOR ADJACENT TO BISHOP CREEK IN PELHAM; PHASES 3 AND 4
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067294 TAPAA-CMAQ TA17 (904)
CONSTRUCTION
UNCLASSIFIED 2019 $1,183 $296 $1,479
TOTAL COST: $1,183 $296 $1,479
Route NA- ProjectDescription
PELHAM TRAILS AND GREENWAYS LOCATED ALONG THE SR-3 (US-31) CORRIDOR IN PELHAM ADJACENT TO BISHOP CREEK FROM CR-105 TO SR-119 AND EVENTUALLY CROSSING UNDER I-65 AND CONTINUING TO THE ENTRANCE OF OAK MOUNTAIN STATE PARK: PHASE 1 AND 2
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065519 TAPAA-CMAQ TA16 (901)
CONSTRUCTION
UNCLASSIFIED 2019 $1,159 $290 $1,448
TOTAL COST: $1,159 $290 $1,448
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
152 of 154
REGION HIGHWAY PROJECTS - SHELBY
STIP PLAN: 2016 - Amendment # 38
Route I -20 ProjectDescription
PAVEMENT REHABILITATION ON I-20 FROM THE JEFFERSON COUNTY LINE TO 0.87 MILE EAST OF KELLY CREEK ROAD
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 9.966 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068217 IM I020 (357) PRELIMINARY ENGINEERING
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $227 $25 $253
100068218 IM I020 () CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $6,818 $758 $7,575
TOTAL COST: $7,045 $783 $7,828
Route I -59 ProjectDescription
CONCRETE PAVEMENT REHAB ON I-59 FROM JEFFERSON COUNTY LINE TO NORTH OF SR-23
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 17.320 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066471 IM I059 (411) PRELIMINARY ENGINEERING
PAVEMENT REHABILITATION
2019 $227 $25 $253
100066472 IM I059 () CONSTRUCTION
PAVEMENT REHABILITATION
2019 $14,169 $1,574 $15,744
TOTAL COST: $14,397 $1,600 $15,996
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
153 of 154
REGION HIGHWAY PROJECTS - ST. CLAIR
STIP PLAN: 2016 - Amendment # 38
Route I -59 ProjectDescription
RESURFACE I-59 FROM I-459 TO 1.23 MILES NORTH OF ACADEMY DRIVE (EXIT 108) PLANNING, RESURFACING, CROSS SLOPE/SUPERELEVATION CORRECTION, TRAFFIC STRIPING AND MARKINGS, GUARDRAIL AND GUARDRAIL END ANCHORS
Type of Work PAVEMENT MINOR REHABILITATION
Project Length in Miles 3.357 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr
FA Number Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067734 IM I059 (408) CONSTRUCTION
PAVEMENT MINOR REHABILITATION
2019 $8,958 $995 $9,953
TOTAL COST: $8,958 $995 $9,953
11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
STIP YEARS from 10/1/2014-9/30/2019
154 of 154
REGION HIGHWAY PROJECTS - JEFFERSON
STIP PLAN: 2016 - Amendment # 39