11/3/2018 alabama department of transportation … · total cost: $4,306 $1,076 $5,382 ......

154
Route CR-15 Project Description RESURFACING CR-15 FROM SR-75 NORTH WEST TO SR-79 Type of Work RESURFACING Project Length in Miles 5.670 Urban Area BIRMINGHAM COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State- Other TOTAL 100061259 ACAA61259 ATRP (011) CONSTRUCTION RESURFACING 2016 $914 $229 $1,143 TOTAL COST: $914 $229 $1,143 Route I -65 Project Description RESURFACING I-65 FROM ONE MILE NORTH OF THE JEFFERSON COUNTY LINE TO THE NORTH END OF THE WARRIOR RIVER MULBERRY FORK BRIDGE AT THE CULLMAN COUNTY LINE Type of Work PREVENTATIVE MAINTENANCE LEVEL 1 Project Length in Miles 11.915 Urban Area BIRMINGHAM COST IN THOUSANDS Project Reference Nbr FA Number Scope of Work Type of Work Fiscal Year Federal State- Other TOTAL 100059745 RP-IM I065 (473) PRELIMINARY ENGINEERING PREVENTATIVE MAINTENANCE LEVEL 1 2016 $128 $14 $142 100059801 RP-IM I065 (473) CONSTRUCTION PREVENTATIVE MAINTENANCE LEVEL 1 2017 $2,825 $703 $3,528 TOTAL COST: $2,953 $718 $3,670 11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM STIP YEARS from 10/1/2014-9/30/2019 1 of 154 REGION HIGHWAY PROJECTS - BLOUNT STIP PLAN: 2016 - Original

Upload: vodan

Post on 10-Nov-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Route CR-15 ProjectDescription

RESURFACING CR-15 FROM SR-75 NORTH WEST TO SR-79

Type of Work RESURFACING

Project Length in Miles 5.670 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061259 ACAA61259 ATRP (011) CONSTRUCTION

RESURFACING

2016 $914 $229 $1,143

TOTAL COST: $914 $229 $1,143

Route I -65 ProjectDescription

RESURFACING I-65 FROM ONE MILE NORTH OF THE JEFFERSON COUNTY LINE TO THE NORTH END OF THE WARRIOR RIVER MULBERRY FORK BRIDGE AT THE CULLMAN COUNTY LINE

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 11.915 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059745 RP-IM I065 (473) PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 1

2016 $128 $14 $142

100059801 RP-IM I065 (473) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2017 $2,825 $703 $3,528

TOTAL COST: $2,953 $718 $3,670

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

1 of 154

REGION HIGHWAY PROJECTS - BLOUNT

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

CURB AND RAMP INSTALLATION ONLY ON STATE ROUTES AT VARIOUS LOCATIONS IN BLOUNT / ST CLAIR COUNTY

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061456 STPAA NR13 (934) CONSTRUCTION

SIDEWALK 2019 $103 $26 $129

TOTAL COST: $103 $26 $129

Route SR-53 ProjectDescription

REPLACE BRIDGE AND APPROACHES ON SR-53 (US-231) OVER THE BLACKBURN FORK OF THE LITTLE WARRIOR RIVER BIN 002844 STR #53-5-3.3

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064121 BR 0053 (559) PRELIMINARY ENGINEERING

BRIDGES AND APPROACHES

2018 $107 $27 $134

TOTAL COST: $107 $27 $134

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

2 of 154

REGION HIGHWAY PROJECTS - BLOUNT

STIP PLAN: 2016 - Original

Route SR-74 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES (BIN 004560) ON SR-74 (US-278) AT LOCUST FORK, GRADE, DRAIN, BASE, PAVE, BRIDGE, AND BRIDGE REMOVAL

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 2.272 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064177 BR 0074 (537) PRELIMINARY ENGINEERING

BRIDGES AND APPROACHES

2016 $1,408 $352 $1,760

100003565 BR 0074 () CONSTRUCTION

BRIDGES AND APPROACHES

2019 $2,897 $724 $3,622

TOTAL COST: $4,306 $1,076 $5,382

Route SR-79 ProjectDescription

REPL BIN#004658 ON SR-79 OVER BLACKBURN FORK OF LITTLE WARRIOR RIVER

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100044645 BR 0079 (500) UTILITIES

BRIDGE REPLACEMENT

2019 $285 $71 $356

TOTAL COST: $285 $71 $356

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

3 of 154

REGION HIGHWAY PROJECTS - BLOUNT

STIP PLAN: 2016 - Original

Route CR-192 ProjectDescription

GRADE, DRAIN, BASE, AND PAVE CR-192 (MCINTOSH ROAD) FROM CR-589 TO LEON SMITH PARKWAY CCP 08-82-07

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 1.120 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054925 STPOA 7457 (601) UTILITIES

GRADE, DRAIN, BASE AND PAVE

2017 $42 $10 $52

100054926 STPOA 7457 (601) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2017 $916 $229 $1,145

TOTAL COST: $958 $239 $1,197

Route CR-366 ProjectDescription

RESURFACE PORTIONS OF CR-366 (MAIN STREET, ASTOR AVENUE, ALEXANDRIA ROAD) IN THE CITY OF WEAVER

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 0.950 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058459 ACOA58459 ATRP (009) CONSTRUCTION

PAVEMENT REHABILITATION

2016 $473 $207 $680

TOTAL COST: $473 $207 $680

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

4 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Original

Route CR-389 ProjectDescription

INTERSECTION SIGNALS AND TURN LANESATCR-389 (LENLOCK LN) AND CR-324 (SAKS RD)

Type of Work TURN LANES

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100051026 STPOA 7425 (601) CONSTRUCTION

TURN LANES 2016 $1,030 $318 $1,348

TOTAL COST: $1,030 $318 $1,348

Route CR-440 ProjectDescription

CR-440 (64TH STREET) BRIDGE REPLACEMENTBIN # 6204 NEAR WEAVER

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.010 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054938 STPOA 7448 () UTILITIES

BRIDGE REPLACEMENT

2019 $19 $5 $23

TOTAL COST: $19 $5 $23

Route CR-533 ProjectDescription

BRIDGE REPLACEMENT CR-533 (GILBERT'S FERRY ROAD) BIN# 3358

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area GADSDEN COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059417 ACBRZ59417 ATRP (010)

CONSTRUCTION

BRIDGE REPLACEMENT

2018 $1,676 $421 $2,097

TOTAL COST: $1,676 $421 $2,097

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

5 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Original

Route CR-567 ProjectDescription

BRIDGE REPLACEMENT ON CR-567(VERBON GEORGE ROAD) OVER OHATCHEE CREEK -BIN# 11481

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059414 ACBRZ59414 ATRP (010)

CONSTRUCTION

BRIDGE REPLACEMENT

2017 $967 $242 $1,208

TOTAL COST: $967 $242 $1,208

Route CR-631 ProjectDescription

BRIDGE REPLACEMENT ON CR-631 (BROWN BRIDGE ROAD) OVER CHOCCOLOCCO CREEK BIN # 3135

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059427 ACBRZ59427 ATRP (010)

CONSTRUCTION

BRIDGE REPLACEMENT

2017 $1,212 $303 $1,516

TOTAL COST: $1,212 $303 $1,516

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

6 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

REHABILITATE BOWL ROAD (RT 420), MOUNTAIN LONGLEAF WILDLIFE REFUGE (APPORTIONMENT FY 2017)

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065122 PFH 0816 () CONSTRUCTION

RESURFACING

2019 $235 $0 $235

TOTAL COST: $235 $0 $235

Route CR-NA ProjectDescription

RESURFACING AND DRAINAGE IMPROVEMENTS ON SNOW STREET FROM SR-21 TO SR-4 (US-78)

Type of Work RESURFACING

Project Length in Miles 0.741 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052525 STPOA 7440 (600) CONSTRUCTION

RESURFACING

2017 $1,690 $422 $2,112

TOTAL COST: $1,690 $422 $2,112

Route CR-NA ProjectDescription

IRON MOUNTAIN ROAD EXTENSION FROM SR-21 TO PAPPY DUNN BOULEVARD

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059379 ACOA59379 ATRP (010) CONSTRUCTION

GRADE, DRAIN, BASE AND PAVE

2018 $4,730 $1,347 $6,077

TOTAL COST: $4,730 $1,347 $6,077

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

7 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

CHIEF LADIGA TRAIL RESURFACING WITH SIDEWALK CONNECTION CITY OF WEAVER

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062151 STPOA 0814 (251) CONSTRUCTION

RESURFACING

2016 $206 $56 $262

TOTAL COST: $206 $56 $262

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT NOBLE STREET AND 4TH STREET

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063208 STPOA 0815 (255) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $206 $52 $258

TOTAL COST: $206 $52 $258

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON ROCK SPRINGS ROAD OVER UNNAMED TRIBUTARY TO OHATCHEE CREEK BIN #4970

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063647 ACBRZ63647 ATRP (004)

CONSTRUCTION

BRIDGE REPLACEMENT

2018 $1,038 $272 $1,310

TOTAL COST: $1,038 $272 $1,310

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

8 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

RESURFACE COFFEE STREET FROM SR-21 TO ALEXANDRIA ROAD, IN JACKSONVILLE

Type of Work RESURFACING

Project Length in Miles 0.640 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100043808 STPOA 7434 (600) CONSTRUCTION

RESURFACING

2016 $285 $71 $357

TOTAL COST: $285 $71 $357

Route NA- ProjectDescription

EXPANSION OF ACCESS AND PARKING ADJACENT TO POST OFFICE IN THE CITY OF JACKSONVILLE (PHASE 2)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061470 HPP A172 () CONSTRUCTION

UNCLASSIFIED 2019 $25 $0 $25

TOTAL COST: $25 $0 $25

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

9 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

BICYCLE AND PEDESTRIAN IMPROVEMENTS AT W 10TH STREET FROM PIPE STREET TO CLYDESDALE AVENUE, AT CLYDESDALE AVENUE FROM W 10TH STREET TO 11TH STREET AND AT 11TH STREET FROM CLYDESDALE AVENUE TO COBB AVENUE, IN THE CITY OF ANNISTON

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063210 STPOA 0815 (252) CONSTRUCTION

SIDEWALK 2016 $35 $9 $44

TOTAL COST: $35 $9 $44

Route NA- ProjectDescription

BICYCLE AND PEDESTRIAN IMPROVEMENTS AT 14TH STREET, 11TH STREET, 18TH STREET, AND COBB AVENUE IN THE CITY OF ANNISTON

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063212 STPOA 0815 (251) CONSTRUCTION

SIDEWALK 2016 $118 $93 $212

TOTAL COST: $118 $93 $212

Route NA- ProjectDescription

CHIEF LADIGA TRAIL - FROM CANE CREEK TO 4TH STREET ANNISTON SEGMENT

Type of Work UNCLASSIFIED

Project Length in Miles 5.800 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060694 STPOA NR13 (938) RIGHT OF WAY

UNCLASSIFIED 2018 $1,777 $444 $2,221

TOTAL COST: $1,777 $444 $2,221

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

10 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Original

Route SR-204 ProjectDescription

BRIDGE REPLACEMENT OVER ABANDONED RAILROAD AND TALLAHATCHEE CREEK ON SR-204 (BIN 4684)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.050 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049969 BR 0204 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $277 $69 $346

TOTAL COST: $277 $69 $346

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

11 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Original

Route SR-21 ProjectDescription

SIGNAL UPGRADE SR-21 AT BALTZELL GATE ROAD

Type of Work SIGNALIZATION

Project Length in Miles 0.015 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100047014 STPOA 0021 (516) CONSTRUCTION

SIGNALIZATION 2019 $107 $27 $133

TOTAL COST: $107 $27 $133

Route SR-21 ProjectDescription

TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF LENLOCK LANE AND SR-21 IN THE CITY OF ANNISTON

Type of Work SIGNALIZATION

Project Length in Miles 0.010 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100047016 STPOA 0021 (543) CONSTRUCTION

SIGNALIZATION 2019 $135 $34 $169

TOTAL COST: $135 $34 $169

Route SR-21 ProjectDescription

INTERSECTION IMPROVEMENTS AT 10 INTERSECTIONS ALONG SR-21 IN THE CITY OF JACKSONVILLE

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059378 ACOA59378 ATRP (010) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2016 $885 $221 $1,106

TOTAL COST: $885 $221 $1,106

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

12 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Original

Route SR-4 ProjectDescription

RE-CONFIGURE INTERSECTION SR-4 (US-78)ATCR-186 (BARRY STREET)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057405 STPOA 0004 (536) RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $791 $198 $989

100057406 STPOA 0004 (536) UTILITIES

INTERSECTION IMPROVEMENTS

2019 $94 $23 $117

100057407 STPOA 0004 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $529 $132 $661

TOTAL COST: $1,414 $353 $1,767

Route SR-9 ProjectDescription

REPLACE BRIDGE BIN 005152, SR-9 OVER SOUTHERN RR, 1.8 MILES N OF SR-4(US-78) NEAR IRON CITY (SUFF=43.1,STAT=FO, 2001 HBRRP LIST)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061463 BR 0009 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $130 $32 $162

TOTAL COST: $130 $32 $162

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

13 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Original

Route I -85 ProjectDescription

REPLACEMENT OF WELCOME CENTER ON I-85ATGEORGIA LINE SMALL URBAN LANETT. REST AREA

Type of Work REST AREA REHABILITATION

Project Length in Miles 0.100 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054187 IMF I085 (317) CONSTRUCTION

REST AREA REHABILITATION

2019 $14,567 $1,619 $16,185

TOTAL COST: $14,567 $1,619 $16,185

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

14 of 154

REGION HIGHWAY PROJECTS - CHAMBERS

STIP PLAN: 2016 - Original

Route CR-2 ProjectDescription

RESURFACE (CR-2) PARTRIDGE CREEK ROAD FROM CR-7 TO SR-9 (RAMP)

Type of Work RESURFACING

Project Length in Miles 2.800 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060375 ACNU60375 ATRP (013) CONSTRUCTION

RESURFACING

2016 $301 $75 $376

TOTAL COST: $301 $75 $376

Route CR-30 ProjectDescription

RESURFACE CR-30 (CRAGFORD ROAD) FROM SR-49 TO WESOBULGA CREEK ROAD (RAMP)

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060374 ACNU60374 ATRP (015) CONSTRUCTION

RESURFACING

2016 $521 $130 $651

TOTAL COST: $521 $130 $651

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

15 of 154

REGION HIGHWAY PROJECTS - CLAY

STIP PLAN: 2016 - Original

Route CR-118 ProjectDescription

BRIDGE REPLACEMENT ON CR-118 OVER DYNNE CREEK BIN # 12438

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060397 ACBRZ60397 ATRP (011)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $319 $80 $398

TOTAL COST: $319 $80 $398

Route CR-18 ProjectDescription

CR-18 BRIDGE REPLACEMENT OVER TALLAPOOSA RIVER BIN # 12270 (R.A.M.P.)

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060386 ACBRZ60386 ATRP (013)

CONSTRUCTION

BRIDGE 2019 $2,104 $526 $2,630

TOTAL COST: $2,104 $526 $2,630

Route CR-2 ProjectDescription

REPLACE BRIDGE AND APROACHES CR-2 OVER CARR CREEK BIN # 5073

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061698 ACBRZ61698 ATRP (014)

CONSTRUCTION

BRIDGES AND APPROACHES

2016 $325 $81 $406

TOTAL COST: $325 $81 $406

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

16 of 154

REGION HIGHWAY PROJECTS - CLEBURNE

STIP PLAN: 2016 - Original

Route CR-49 ProjectDescription

CR-49 BRIDGE REPLACEMENT OVER ROBERTS CREEK BIN #9157 (R.A.M.P.)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060388 ACBR60388 ATRP (011) CONSTRUCTION

BRIDGE REPLACEMENT

2017 $693 $173 $866

TOTAL COST: $693 $173 $866

Route CR-49 ProjectDescription

BRIDGE REPLACEMENT ON (CR-49) OVER BAILEY BRANCH BIN # 8845 (RAMP)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060389 ACBR60389 ATRP (011) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $361 $90 $451

TOTAL COST: $361 $90 $451

Route CR-49 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CR-49 OVER CAMP CREEK (BIN #2432) RAMP

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.100 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061701 ACBR61701 ATRP (012) CONSTRUCTION

BRIDGE REPLACEMENT

2017 $489 $122 $612

TOTAL COST: $489 $122 $612

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

17 of 154

REGION HIGHWAY PROJECTS - CLEBURNE

STIP PLAN: 2016 - Original

Route CR-5 ProjectDescription

REPLACE BRIDGE AND APPROACHES ON CR-5 OVER LOCKCHELOOGE CREEK BIN # 14128

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061700 ACBRZ61700 ATRP (006)

CONSTRUCTION

BRIDGES AND APPROACHES

2016 $364 $91 $455

TOTAL COST: $364 $91 $455

Route CR-533 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CAMPBELL STREET (CR-533) OVER CAHULGA CREEK BIN #10630 (RAMP)

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060377 ACBRZ60377 ATRP (014)

CONSTRUCTION

BRIDGES AND APPROACHES

2018 $0 $0 $0

TOTAL COST: $0 $0 $0

Route CR-96 ProjectDescription

CR-96 BRIDGE REPLACEMENT OVER SILAS CREEK BIN # 6193 (RAMP)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060393 ACBRZ60393 ATRP (005)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $304 $76 $380

TOTAL COST: $304 $76 $380

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

18 of 154

REGION HIGHWAY PROJECTS - CLEBURNE

STIP PLAN: 2016 - Original

Route SR-46 ProjectDescription

SR-46 BRIDGE REPLACEMENT OVER CANE CREEK (BIN# 2108) NORTH OF I-20

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.070 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049186 BR 0046 (503) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $2,957 $739 $3,696

TOTAL COST: $2,957 $739 $3,696

Route SR-9 ProjectDescription

SR-9 REPLACE BRG BIN 002666, OVER CAHULGA CREEK, SOUTH OF I-20 NEAR BELLTOWN (SUFF=11.9, STAT=SD, 2001 HBRRP LIST)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.363 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057841 BR 0009 (516) RIGHT OF WAY

BRIDGE REPLACEMENT

2016 $24 $6 $30

100057951 BR 0009 (516) UTILITIES

BRIDGE REPLACEMENT

2016 $350 $87 $437

100041616 BR 0009 (516) CONSTRUCTION

BRIDGE REPLACEMENT

2017 $3,487 $872 $4,359

TOTAL COST: $3,861 $965 $4,826

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

19 of 154

REGION HIGHWAY PROJECTS - CLEBURNE

STIP PLAN: 2016 - Original

Route CR-107 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CR-107 OVER JACK CREEK (BIN 2775) (RAMP)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060401 ACBRZ60401 ATRP (012)

CONSTRUCTION

BRIDGE REPLACEMENT

2017 $354 $88 $442

TOTAL COST: $354 $88 $442

Route CR-125 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CR-125 OVER PAINT CREEK (BIN 3009)(RAMP)

Type of Work BRIDGE

Project Length in Miles 0.112 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060408 ACBR60408 ATRP (011) CONSTRUCTION

BRIDGE 2017 $439 $110 $549

TOTAL COST: $439 $110 $549

Route CR-15 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CR-15 OVER WEOGUFKA CREEK (BIN 5175) (RAMP)

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060414 ACBRZ60414 ATRP (011)

CONSTRUCTION

BRIDGE 2018 $768 $192 $960

TOTAL COST: $768 $192 $960

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

20 of 154

REGION HIGHWAY PROJECTS - COOSA

STIP PLAN: 2016 - Original

Route CR-49 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CR-49 OVER NORFOLK SOUTHERN RAILROAD (BIN 002377)

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060413 ACBRZ60413 ATRP (014)

CONSTRUCTION

BRIDGE 2018 $1,213 $303 $1,516

TOTAL COST: $1,213 $303 $1,516

Route CR-56 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CR-56 OVER WEOGUFKA CREEK (BIN 005582)(RAMP)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060410 ACBRZ60410 ATRP (014)

CONSTRUCTION

BRIDGE REPLACEMENT

2018 $483 $139 $622

TOTAL COST: $483 $139 $622

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

21 of 154

REGION HIGHWAY PROJECTS - COOSA

STIP PLAN: 2016 - Original

Route CR-0099 ProjectDescription

RESURFACE CR-99(COLUMBIANA RD) FROM SR-3(US-31) TO GENTILLY DR, CR-42(TYLER RD) FROM SOUTHLAND DR TO COLUMBIANA RD, AND CR-62(OVERTON RD) FROM 441 FT WEST OF LIBERTY PARKWAY TO I-459 EX RAMP

Type of Work RESURFACING

Project Length in Miles 1.700 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059494 ACAA59494 ATRP (006) CONSTRUCTION

RESURFACING

2016 $909 $227 $1,137

TOTAL COST: $909 $227 $1,137

Route CR-118 ProjectDescription

TURN LANES ON CR-118 (FIELDSTOWN ROAD) AND NEW SIGNAL INSTALL AT CR-1523 (SHADY GROVE ROAD)

Type of Work TURN LANES

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059454 ACAA59454 ATRP (010) CONSTRUCTION

TURN LANES 2018 $853 $349 $1,202

TOTAL COST: $853 $349 $1,202

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

22 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route CR-18 ProjectDescription

EASTERN VALLEY ROAD (CR-18), WIDENING TO 3 LANES FROM MCASHAN DRIVE TO LETSON FARM PARKWAY

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064231 STPBH 3715 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2019 $480 $120 $600

TOTAL COST: $480 $120 $600

Route CR-2 ProjectDescription

INTERSECTION IMPROVEMENT ON CR-2 (SOUTH SHADES CREST ROAD) AND EDEN RIDGE DRIVE/SHADES RUN CIRCLE

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059425 ACAA59425 ATRP (005) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2016 $1,173 $303 $1,476

TOTAL COST: $1,173 $303 $1,476

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

23 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route CR-337 ProjectDescription

RESURFACE AND DRAINAGE IMPROVEMENTS ON CR-337 (MCCALLA ROAD) FROM CR-20 (OLD TUSCALOOSA HIGHWAY) TO CR-18 (EASTERN VALLEY ROAD)

Type of Work RESURFACING

Project Length in Miles 1.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059497 ACAA59497 ATRP (007) CONSTRUCTION

RESURFACING

2019 $1,257 $314 $1,571

TOTAL COST: $1,257 $314 $1,571

Route CR-337 ProjectDescription

RESURFACING AND TURN LANES ON CR-337 (MCCALLA ROAD) FROM CR-18 (EASTERN VALLEY ROAD) TO CR-20 (OLD TUSCALOOSA HIGHWAY)

Type of Work TURN LANES

Project Length in Miles 1.920 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060502 STPBH 3713 () RIGHT OF WAY

TURN LANES 2019 $1,572 $393 $1,965

100060504 STPBH 3713 () UTILITIES

TURN LANES 2019 $560 $140 $700

TOTAL COST: $2,132 $533 $2,665

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

24 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route CR-46 ProjectDescription

CR-46 (HUEYTOWN ROAD) ADDITIONAL TURN LANES AND INTERSECTION IMPROVEMENTS FROM WALKER AVENUE TO NORTH OF HILLSIDE DRIVE

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056288 STPBH 7021 (600) RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2017 $454 $114 $568

100056289 STPBH 7021 (600) UTILITIES

INTERSECTION IMPROVEMENTS

2019 $200 $50 $250

100056290 STPBH 7021 (600) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $1,200 $300 $1,500

TOTAL COST: $1,854 $464 $2,318

Route CR-52 ProjectDescription

DEMOLITION AND STRUCTURE REMOVAL AT VARIOUS LOCATIONS ALONG MORGAN ROAD FROM I-459 TO SOUTH SHADES CREST ROAD JEFFERSON COUNTY

Type of Work STRUCTURE REMOVAL

Project Length in Miles 4.470 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063665 STPBH 7002 (601) CONSTRUCTION

STRUCTURE REMOVAL

2016 $87 $22 $109

100007542 STPBH 7002 (600) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $9,907 $2,477 $12,383

TOTAL COST: $9,994 $2,498 $12,492

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

25 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route CR-77 ProjectDescription

BRIDGE REPLACEMENT ON CR-77 (MT. OLIVE ROAD) OVER LOCUST FORK OF THE BLACK WARRIOR RIVER

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059462 ACBRZ59462 ATRP (008)

CONSTRUCTION

BRIDGE 2017 $5,259 $2,800 $8,059

TOTAL COST: $5,259 $2,800 $8,059

Route CR-NA ProjectDescription

ROADWAY AND INTERSECTION IMPROVEMENTS ON CAHABA RIVER ROAD FROM SR-38 (US-280) TO KEY DRIVE

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 6.700 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063244 STPBH 3716 (252) PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2016 $519 $130 $648

100063245 STPBH 3716 (252) RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2020 $800 $200 $1,000

TOTAL COST: $1,319 $330 $1,648

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

26 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS CAHABA RD/SR-38 (US-280)/CULVER RD/LANE PARK RD-CITY OF MOUNTAIN BROOK

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064199 CMAQ 3715 (266) PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2017 $412 $103 $515

100064200 CMAQ 3715 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $300 $75 $375

100064201 CMAQ 3715 () UTILITIES

INTERSECTION IMPROVEMENTS

2020 $420 $105 $526

100064202 CMAQ 3715 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $1,779 $445 $2,224

TOTAL COST: $2,911 $728 $3,639

Route CR-NA ProjectDescription

PAVEMENT REHABILITATION AND ADA UPGRADES ON LAKESHORE PARKWAY FROM VENICE ROAD TO THE BIRMINGHAM CITY LIMITS

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064224 STPBH 3715 (269) PRELIMINARY ENGINEERING

PAVEMENT REHABILITATION

2017 $80 $20 $100

100064225 STPBH 3715 () CONSTRUCTION

PAVEMENT REHABILITATION

2019 $800 $200 $1,000

TOTAL COST: $880 $220 $1,100

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

27 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT REX LAKE ROAD AND ZEIGLER ROAD

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064310 CMAQ 3715 () PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2019 $160 $40 $200

100064311 CMAQ 3715 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $160 $40 $200

TOTAL COST: $320 $80 $400

Route CR-NA ProjectDescription

HOOVER TOPICS PROJECT-PATTON CHAPEL RD, PHASE III FROM CRAYRICH DRIVE TO CHAPEL LANE. COORDINATE WITH JEFFERSON CO. PROJECT. ADD 3RD LANE.

Type of Work TURN LANES

Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100007555 STPBH 7020 (601) CONSTRUCTION

TURN LANES 2019 $2,017 $504 $2,521

TOTAL COST: $2,017 $504 $2,521

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

28 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

FINLEY BLVD. EXT FROM 26TH STREET (US-31) TO 27TH AVENUE NEAR 32ND STREET NORTH

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.700 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100007603 STPBH-HPP 7173 (601) RIGHT OF WAY

GRADE, DRAIN, BASE, PAVE AND BRG

2018 $6,608 $1,652 $8,260

TOTAL COST: $6,608 $1,652 $8,260

Route CR-NA ProjectDescription

>VARIOUS INTERSECTIONS - PHASE 7 1. MT. OLIVE RD AT NEW FOUND RD./MT OLIVE-BROOKSIDE RD 2. UNION GROVE AT BANKHEAD HWY 3. HEFLIN AV AT RIDERWOOD TR 4. TARRANT RD AT PINEYWOOD RD /SKELTON AVE 5.TYLER LOOP RD AT SWEENEY HOLLOW RD 6.CHALKVILLE RD.

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060490 STPBH 9802 (904) UTILITIES

INTERSECTION IMPROVEMENTS

2019 $80 $20 $100

TOTAL COST: $80 $20 $100

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT 2 LOCATIONS; SITE 1. MAYFIELD ROAD AND MONTEVALLO ROAD. SITE 3 CROSSHAVEN DRIVE AND GREEN VALLEY DRIVE.

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060046 STPBH 9802 (924) UTILITIES

INTERSECTION IMPROVEMENTS

2019 $120 $30 $150

TOTAL COST: $120 $30 $150

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

29 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

OXMOOR BLVD-GREEN SPRINGS TO BARBER COURT. INTERSECTION IMPROVEMENTS AT BARBER CT. AND OXMOOR RD. AND I-65 AND CONTINUOUS TWO WAY TURN LANE

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100029563 STPBH 9802 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $243 $61 $304

TOTAL COST: $243 $61 $304

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT (BIN# 000282) ON PRATT HIGHWAY AT BLACK CREEK NEAR SANDUSKY IN BIRMINGHAM

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059893 STPBH 1602 (519) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $800 $200 $1,000

100033434 HPP-STPBH 1602 (519) UTILITIES

BRIDGE REPLACEMENT

2019 $424 $106 $530

TOTAL COST: $1,224 $306 $1,530

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

30 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

STREETSCAPE AND TRANSPORTATION IMPROVEMENTS ON 16TH STREET CORRIDOR FROM 11TH AVE NORTH TO I-65 WITHIN FOUNTAIN HEIGHTS NEIGHBORHOOD

Type of Work UTILITY ADJUSTMENT

Project Length in Miles 0.550 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056315 STPBH 7117 () UTILITIES

UTILITY ADJUSTMENT

2019 $200 $50 $250

TOTAL COST: $200 $50 $250

Route CR-NA ProjectDescription

GALLERIA BOULEVARD EXTENSION FROM CR-458 (LORNA ROAD) TO SR-150

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 0.350 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056487 STPBH 3715 (255) RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2017 $4,356 $1,089 $5,445

TOTAL COST: $4,356 $1,089 $5,445

Route CR-NA ProjectDescription

TRAFFIC SIGNAL SYSTEM UPGRADE ALONG US-31, LORNA RD, SR-150, GROVE BLVD, GALLERIA BLVD, CHAPEL LN, JIM WILSON JR PARKWAY AND CR-17 WITHIN THE CITY OF HOOVER.

Type of Work SIGNALIZATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056551 CMAQ NR13 (933) CONSTRUCTION

SIGNALIZATION 2017 $648 $162 $809

TOTAL COST: $648 $162 $809

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

31 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

RESURFACE RUTLEDGE DRIVE FROM CR-56(ALLISON BONNETT MEMORIAL DRIVE) TO WOODWARD ROAD AND RESURFACE WILKES ROAD FROM WOODWARD ROAD TO SR-5 (US-11) CITY OF MIDFIELD

Type of Work RESURFACING

Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059488 ACAA59488 ATRP (006) CONSTRUCTION

RESURFACING

2019 $674 $169 $843

TOTAL COST: $674 $169 $843

Route CR-NA ProjectDescription

REPLACE BRIDGE ON 23RD STREET NORTH BIN# 825

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059493 ACBRZ59493 ATRP (012)

CONSTRUCTION

BRIDGE REPLACEMENT

2017 $282 $71 $353

TOTAL COST: $282 $71 $353

Route CR-NA ProjectDescription

RESURFACE 4TH AVENUE SOUTH WEST FROM MCADORY SCHOOL ROAD TO 18TH STREET NORTH DARTMOUTH AVENUE/MCASHAN DRIVE

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060987 ACAA60987 ATRP (010) CONSTRUCTION

RESURFACING

2016 $1,927 $482 $2,409

TOTAL COST: $1,927 $482 $2,409

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

32 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

5 RESURFACING PROJECTS, FIVE MILE RD FROM ORCHID RD TO BIRMINGHAM CITY LIMITS, LAKESHORE PKWY FROM VENICE RD TO INDUSTRIAL DR, LOMB AVE FROM CULLMAN AVE TO 12TH ST W., GEORGIA RD FROM 59TH ST S. TO ANTWERP AVE, 1ST AVE N. FROM 7TH ST N TO 9TH ST N

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060989 ACAA60989 ATRP (009) CONSTRUCTION

RESURFACING

2016 $2,886 $722 $3,608

TOTAL COST: $2,886 $722 $3,608

Route CR-NA ProjectDescription

RESURFACE MESSER AIRPORT ROAD FROM 31ST STREET NORTH TO 46TH STREET NORTH

Type of Work RESURFACING

Project Length in Miles 2.230 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060993 ACAA60993 ATRP (008) CONSTRUCTION

RESURFACING

2017 $1,162 $290 $1,452

TOTAL COST: $1,162 $290 $1,452

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

33 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

RESURFACE WEST VALLEY AVENUE FROM BARBER COURT TO GREENSPRINGS HIGHWAY AND VALLEY AVENUE FROM THE CITY LIMITS OF BIRMINGHAM TO RICHARD ARRINGTON JR BOULEVARD SOUTH

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061009 ACAA61009 ATRP (009) CONSTRUCTION

RESURFACING

2016 $1,406 $351 $1,757

TOTAL COST: $1,406 $351 $1,757

Route CR-NA ProjectDescription

RESURFACING AND INTERSECTION IMPROVEMENTS ON STADIUM TRACE PARKWAY AT BROCK'S GAP PARKWAY AND LEARNING LANE

Type of Work RESURFACING

Project Length in Miles 2.890 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061010 ACAA61010 ATRP (009) CONSTRUCTION

RESURFACING

2018 $1,601 $554 $2,156

TOTAL COST: $1,601 $554 $2,156

Route CR-NA ProjectDescription

RESURFACE AND REALIGNMENT OF GRANTS MILL ROAD FROM GRANTSWOOD ROAD TO OLD LEEDS ROAD

Type of Work RESURFACING

Project Length in Miles 0.640 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061014 ACAA61014 ATRP () CONSTRUCTION

RESURFACING

2019 $6,485 $1,621 $8,106

TOTAL COST: $6,485 $1,621 $8,106

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

34 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

UPGRADE AND REPLACE INTERSTATE LIGHTING AT VARIOUS LOCATION IN THE CITY OF BIRMINGHAM

Type of Work LIGHTING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064216 STPBH 3716 () CONSTRUCTION

LIGHTING 2019 $800 $200 $1,000

TOTAL COST: $800 $200 $1,000

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON SPRINGDALE ROAD OVER FIVE MILE CREEK BIN# 15837

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059460 STPBH 3717 (250) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,644 $411 $2,055

TOTAL COST: $1,644 $411 $2,055

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

35 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route I -20 ProjectDescription

DOWNTOWN BIRMINGHAM INTERSTATE AND EXPRESSWAY OPERATIONAL AND ACCESS MANAGEMENT STUDY

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058794 STPBH 3714 (252) SPECIAL

UNCLASSIFIED 2015 $240 $60 $300

TOTAL COST: $240 $60 $300

Route I -20 ProjectDescription

SIGN REHAB ON I-20 (MP 132.89 THROUGH 142.92) AND I-459 (MP 28.50 THROUGH 30.15)

Type of Work SIGN REHABILITATION

Project Length in Miles 10.030 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100044934 RP-IM I020 (348) CONSTRUCTION

SIGN REHABILITATION

2018 $1,401 $156 $1,557

TOTAL COST: $1,401 $156 $1,557

Route I -459 ProjectDescription

INCHG LGT ON I-459ATCR-18 (EXIT #1) AND CR-52 (EXIT #6)

Type of Work LIGHTING

Project Length in Miles 4.564 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100005123 IM I459 () PRELIMINARY ENGINEERING

LIGHTING 2019 $129 $14 $143

TOTAL COST: $129 $14 $143

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

36 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route I -59 ProjectDescription

RESURFACE I-59 FROM THE TUSCALOOSA COUNTY LINE (MP 100.867) TO JUST NORTH OF ACADEMY DRIVE (MP 109.658)

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 14.164 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062069 RP-IM I059 (396) PRELIMINARY ENGINEERING

PAVEMENT MINOR REHABILITATION

2016 $249 $28 $277

100062070 RP-IM I059 (396) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2018 $5,880 $653 $6,533

TOTAL COST: $6,129 $681 $6,810

Route I -59 ProjectDescription

RECONSTRUCTION AND LANE ADDITION ON I-59 FROM I-459 TO CR-10 (CHALKVILLE MOUNTAIN ROAD)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 2.800 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064600 IM-NH I059 () PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2019 $442 $78 $520

TOTAL COST: $442 $78 $520

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

37 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route I -59 ProjectDescription

I-20/I-59/I-65 ITS DEVICES AND INFRASTRUCTURE IN SUPPORT OF THE CBD BRIDGE REPLACEMENT PROJECT

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060200 ACIMF I059 (382) CONSTRUCTION

UNCLASSIFIED 2016 $7,417 $824 $8,241

TOTAL COST: $7,417 $824 $8,241

Route I -59 ProjectDescription

RESURFACE I-59 FROM 1ST AVENUE NORTH (MP 132.160) TO I-459 (MP 137.19) IN TRUSSVILLE

Type of Work RESURFACING

Project Length in Miles 9.980 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062067 IM I059 (398) PRELIMINARY ENGINEERING

RESURFACING

2016 $225 $25 $250

100062068 IM I059 () CONSTRUCTION

RESURFACING

2020 $12,593 $1,399 $13,993

TOTAL COST: $12,818 $1,424 $14,243

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

38 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route I -59 ProjectDescription

SIGN REHAB ON I-59 FROM TUSCALOOSA CL TO ST.CLAIR CL; I-65 FROM SHELBY CL TO EXIT 280 (WARRIOR); I-459 FROM I-59 S OF TRUSSVILLE (PHASE 3)

Type of Work SIGN REHABILITATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100042475 IM I059 () CONSTRUCTION

SIGN REHABILITATION

2019 $3,766 $418 $4,184

TOTAL COST: $3,766 $418 $4,184

Route I -59 ProjectDescription

CBD BRIDGE INTERCHANGE MODIFICATIONS ON I-59/20 AT I-65

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063071 ACIMF I059 (383) UTILITIES

BRIDGES AND APPROACHES

2016 $8,031 $956 $8,987

100063331 ACIMF I059 (383) CONSTRUCTION

BRIDGES AND APPROACHES

2016 $189,212 $22,986

$212,198

TOTAL COST: $197,243 $23,942

$221,185

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

39 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route I -59 ProjectDescription

CBD I-20/59 BRIDGE REPLACEMENT AND APPROACHES FROM I-65 TO NORTH OF 31ST STREET NORTH AND INTERCHANGE MODIFICATIONS AT E. B. STEPHENS EXPRESSWAY. BIN # 10670,10671,14158,14154,14162,10492. (PHASE 3)

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063332 ACIMF I059 (385) CONSTRUCTION

BRIDGES AND APPROACHES

2016 $474,791 $52,755

$527,545

TOTAL COST: $474,791 $52,755

$527,545

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

40 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route I -65 ProjectDescription

INTERSTATE LIGHTING UPGRADE ON I-65 FROM 0.7 MILES NORTH OF CR-120 (WALKER CHAPEL ROAD) EXIT 267 TO 0.25 MILES NORTH OF RIDGEBROOK ROAD JEFFERSON COUNTY

Type of Work LIGHTING

Project Length in Miles 1.524 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063098 STPBH I065 (475) PRELIMINARY ENGINEERING

LIGHTING 2016 $240 $60 $300

100062542 STPBH I065 (475) CONSTRUCTION

LIGHTING 2018 $361 $90 $452

TOTAL COST: $601 $150 $752

Route I -65 ProjectDescription

CONCRETE PAVEMENT REHAB, UNDERSEAL, GRINDING, PAVERLAID SURFACE TREATMENT, UNDERDRAIN, SHOULDER PAVEMENT,GUARDRAIL ON I-65 FROM US-31 TO RALEIGH AVENUE. OVERPASS (PRIORITY #35)

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 3.760 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055415 IM I065 () CONSTRUCTION

PAVEMENT REHABILITATION

2019 $9,320 $1,036 $10,356

TOTAL COST: $9,320 $1,036 $10,356

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

41 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

SIDEWALKS ALONG CR-67 (HAZELWOOD ROAD), FROM BURGANDY DR TO HARRIS AVENUE

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100048382 STPBH 7234 (600) CONSTRUCTION

SIDEWALK 2019 $86 $21 $107

TOTAL COST: $86 $21 $107

Route NA- ProjectDescription

SIDEWALKS IN IRONDALE ALONG PORTIONS OF 16TH STREET, 2ND AVENUE N, MONTEVALLO RD, MONTICELLO RD, AND MARION DR

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100048389 STPBH CN07 (910) CONSTRUCTION

SIDEWALK 2017 $329 $82 $411

TOTAL COST: $329 $82 $411

Route NA- ProjectDescription

PEDESTRIAN IMPROVEMENTS FOR THE CITY OF GARDENDALE AT BELL STREET AND MAIN STREET

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100050724 CMAQF 3717 () CONSTRUCTION

UNCLASSIFIED 2019 $480 $120 $600

TOTAL COST: $480 $120 $600

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

42 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

NORFOLK SOUTHERN BIRMINGHAM REGIONAL INTERMODAL FACILITY, MCCALLA

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055374 CTGR-STPBH-FAUP 3714 ()

CONSTRUCTION

UNCLASSIFIED 2019 $2,673 $668 $3,342

TOTAL COST: $2,673 $668 $3,342

Route NA- ProjectDescription

NORFOLK SOUTHERN BIRMINGHAM REGIONAL INTERMODAL FACILITY, MCCALLA EASTERN FEDERAL LANDS PROJECT # 7111G00032

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055911 CTGR-CMAQ-FAUP 3714 ()

CONSTRUCTION

UNCLASSIFIED 2017 $52,500 $0 $52,500

TOTAL COST: $52,500 $0 $52,500

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

43 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

STREET IMPROVEMENTS ON 19TH STREET ENSLEY FROM ENSLEY AVENUE TO BUSH BOULEVARD PAVING, SIDEWALKS, CURB AND GUTTER, AND STORM DRAINAGE

Type of Work STREETSCAPE

Project Length in Miles 3.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058187 STPBH 3716 (251) PRELIMINARY ENGINEERING

STREETSCAPE

2016 $60 $15 $75

100033432 STPBH 3716 (251) CONSTRUCTION

STREETSCAPE

2019 $661 $165 $827

TOTAL COST: $721 $180 $902

Route NA- ProjectDescription

APPLE APRS PROGRAM FOR PROJECT FEASIBILITY STUDIES IN BIRMINGHAM, FY 2016 AND 2017

Type of Work CORRIDOR STUDY

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063989 STPBH 3715 (265) SPECIAL

CORRIDOR STUDY

2016 $240 $60 $300

TOTAL COST: $240 $60 $300

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

44 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

TRANSPORTATION SYSTEMS MONITORING FOR CONGESTION MANAGEMENT SYSTEMS (CMS) - FY 2018, FY-2019

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063990 STPBH NR18 (900) SPECIAL

UNCLASSIFIED 2017 $360 $90 $450

TOTAL COST: $360 $90 $450

Route NA- ProjectDescription

OZONE AWARENESS PROGRAM JEFFERSON AND SHELBY COUNTIES FY 2017 AND 2018

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063991 CMAQ NR16 (914) SPECIAL

UNCLASSIFIED 2016 $500 $125 $625

TOTAL COST: $500 $125 $625

Route NA- ProjectDescription

UPGRADE AND REPLACE INTERSTATE LIGHTING AT VARIOUS LOCATION IN THE CITY OF BIRMINGHAM

Type of Work LIGHTING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064215 STPBH 3716 (253) PRELIMINARY ENGINEERING

LIGHTING 2016 $80 $20 $100

TOTAL COST: $80 $20 $100

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

45 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

VULCAN TRAIL EXTENSION FROM 11TH PLACE SOUTH TO GREEN SPRINGS HIGHWAY

Type of Work UNCLASSIFIED

Project Length in Miles 1.800 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064283 CMAQ 3715 (267) PRELIMINARY ENGINEERING

UNCLASSIFIED 2017 $60 $15 $75

100064288 CMAQ 3715 (267) RIGHT OF WAY

UNCLASSIFIED 2019 $40 $10 $50

TOTAL COST: $100 $25 $125

Route NA- ProjectDescription

PEDESTRIAN IMPROVEMENTS- BIKELANES, SIDEWALKS, AND CROSSWALKS- 2ND AVENUE SOUTH FROM 28TH STREET TO 30TH STREET, AND 29TH STREET FROM 2ND AVENUE TO 3RD AVENUE

Type of Work SIDEWALK

Project Length in Miles 2.400 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064291 CMAQ 3715 (262) PRELIMINARY ENGINEERING

SIDEWALK 2016 $120 $30 $150

100064292 CMAQ 3715 (262) RIGHT OF WAY

UNCLASSIFIED 2019 $75 $19 $94

100064293 CMAQ 3715 (262) UTILITIES

UNCLASSIFIED 2020 $83 $21 $104

100064294 CMAQ 3715 () CONSTRUCTION

UNCLASSIFIED 2020 $600 $150 $750

TOTAL COST: $878 $220 $1,098

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

46 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

41ST STREET STREETSCAPE- FROM 1ST AVENUE SOUTH TO 5TH AVENUE SOUTH

Type of Work STREETSCAPE

Project Length in Miles 1.200 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064295 CMAQ 3715 (261) PRELIMINARY ENGINEERING

STREETSCAPE

2016 $144 $36 $180

100064296 CMAQ 3715 (261) UTILITIES

STREETSCAPE

2019 $80 $20 $100

100064297 CMAQ 3715 () CONSTRUCTION

STREETSCAPE

2019 $816 $204 $1,020

TOTAL COST: $1,040 $260 $1,300

Route NA- ProjectDescription

ZOO SIDEWALK CONNECTOR BEGINNING AT PAMONA AVENUE ALONG HERMOSA DRIVE THEN ONTO POINCIANA DRIVE CONTINUING ALONG TO 20TH PLACE/ACCESS ROAD ENDING AT CAHABA ROAD

Type of Work SIDEWALK

Project Length in Miles 0.600 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064298 CMAQ 3715 (268) PRELIMINARY ENGINEERING

SIDEWALK 2017 $116 $29 $145

100064299 CMAQ 3715 (268) CONSTRUCTION

SIDEWALK 2019 $496 $124 $619

TOTAL COST: $612 $153 $764

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

47 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

SIDEWALKS AND STREETSCAPE ON GREENSPRINGS HIGHWAY FROM 8TH AVENUE SOUTH TO BIRMINGHAM CITY LIMITS

Type of Work SIDEWALK

Project Length in Miles 4.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064301 CMAQ 3715 (264) PRELIMINARY ENGINEERING

SIDEWALK 2016 $160 $40 $200

100064302 CMAQ 3715 (264) UTILITIES

SIDEWALK 2019 $40 $10 $50

100064303 CMAQ 3715 () CONSTRUCTION

SIDEWALK 2019 $1,600 $400 $2,000

TOTAL COST: $1,800 $450 $2,250

Route NA- ProjectDescription

SIDEWALKS, BICYCLE LANES, CROSSWALKS, LANDSCAPE AND SIGNAGE INSTALLATION ALONG 22ND ST. N., 12TH AVE. N., 20TH ST. N., AND SHUTTLESWORTH DRIVE/HUNTSVILLE ROAD

Type of Work SIDEWALK

Project Length in Miles 7.200 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064309 CMAQ 3715 (263) PRELIMINARY ENGINEERING

SIDEWALK 2016 $100 $25 $125

100064315 CMAQ 3715 (263) RIGHT OF WAY

SIDEWALK 2019 $40 $10 $50

100064316 CMAQ 3715 (263) UTILITIES

SIDEWALK 2020 $40 $10 $50

100064317 CMAQ 3715 () CONSTRUCTION

SIDEWALK 2020 $960 $240 $1,200

TOTAL COST: $1,140 $285 $1,425

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

48 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

BICYCLE AND PEDESTRIAN PLAN CITYWIDE HOOVER

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064314 CMAQ NR17 (902) SPECIAL

UNCLASSIFIED 2017 $200 $50 $250

TOTAL COST: $200 $50 $250

Route NA- ProjectDescription

TRANSPORTATION DEVELOPMENT PROGRAM FOR THE CITY OF BIRMINGHAM (TDPCB)

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064326 STPBH NR16 (903) SPECIAL

UNCLASSIFIED 2016 $280 $70 $350

TOTAL COST: $280 $70 $350

Route NA- ProjectDescription

SERVICE PATROL OPERATIONS FOR FY 2016 AND 2017 FOR JEFFERSON AND SHELBY COUNTIES

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064480 STPBH 3715 (258) SPECIAL

UNCLASSIFIED 2016 $3,118 $779 $3,897

TOTAL COST: $3,118 $779 $3,897

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

49 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

CORRIDOR FEASIBILITY STUDY OR APPLE APRS, FOR BIRMINGHAM AREA, FY-2018 AND FY-2019

Type of Work CORRIDOR STUDY

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064486 STPBH NR18 (904) SPECIAL

CORRIDOR STUDY

2017 $400 $100 $500

TOTAL COST: $400 $100 $500

Route NA- ProjectDescription

OZONE AWARENESS PROGRAM FOR JEFFERSON AND SHELBY COUNTIES FY 2019 AND FY 2020

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064488 CMAQ NR19 (900) SPECIAL

UNCLASSIFIED 2018 $400 $100 $500

TOTAL COST: $400 $100 $500

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

50 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

HOMEWOOD-SHADES CR GREENWAY PROJECT SPONSOR: CITY OF HOMEWOOD.

Type of Work UNCLASSIFIED

Project Length in Miles 13.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100043449 CMAQ 9802 (911) RIGHT OF WAY

UNCLASSIFIED 2016 $1,724 $431 $2,155

100029525 CMAQ 9802 (911) CONSTRUCTION

UNCLASSIFIED 2019 $2,945 $736 $3,682

TOTAL COST: $4,669 $1,167 $5,837

Route NA- ProjectDescription

TRUSSVILLE GREENWAY AND WALKWAY MULTI-USE TRAIL-GREENWAY FROM CHALKVILLE MTN RD (CR-10) TO CALUMET PARKWAY NEAR SR-7 (US-11), (PHASE 1)

Type of Work UNCLASSIFIED

Project Length in Miles 5.900 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052630 CMAQ 9802 () CONSTRUCTION

UNCLASSIFIED 2020 $1,151 $288 $1,439

TOTAL COST: $1,151 $288 $1,439

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

51 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

>SHADES CREEK GREENWAY MULTI-USE TRAIL SHADES CREEK GREENWAY - 1. ON-ROAD CONNECTION VIA ELDER STREET MONCLAIR ROAD AND CRESTWOOD BLVD FROM 15TH STREET TO 20TH ST. 2. OFF-ROAD TRAIL ALONG SHADESCREEK. CONNECTORS ALONG GREENWAY TRAIL INCLUD

Type of Work UNCLASSIFIED

Project Length in Miles 2.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100032397 CMAQ 9802 () RIGHT OF WAY

UNCLASSIFIED 2019 $63 $16 $78

TOTAL COST: $63 $16 $78

Route NA- ProjectDescription

VILLAGE CREEK GREENWAY (PHASE 2) FROM 3RD STREET TO TALLAPOOSA STREET

Type of Work UNCLASSIFIED

Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039846 CMAQ NR02 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2019 $513 $128 $641

TOTAL COST: $513 $128 $641

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

52 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

RAILROAD RESERVATION/1ST AVENUE SOUTH PHASE 2 AND 3 ENGINEERING: 1ST AVENUE SOUTH FROM 18TH STREET TO 32ND STREET AND NORTH TO SLOSS FURNACE.

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056176 CMAQ 3700 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2019 $253 $63 $316

TOTAL COST: $253 $63 $316

Route NA- ProjectDescription

CONSTRUCT SIDEWALKS IN THE CITY OF LEEDS ALONG SR-119 (MONTEVALLO ROAD) FROM LEEDS HISTORICAL PARK TO LEEDS ELEMENTARY SCHOOL

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100048880 HPP A133 (900) CONSTRUCTION

SIDEWALK 2019 $150 $37 $187

TOTAL COST: $150 $37 $187

Route NA- ProjectDescription

PEDESTRIAN WALKWAY OVER US-31 IN VESTAVIA HILLS NEAR CITY HALL

Type of Work PEDESTRIAN OVERPASS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100051157 DE-HPP-TAPBH A124 () CONSTRUCTION

PEDESTRIAN OVERPASS

2019 $1,067 $266 $1,333

TOTAL COST: $1,067 $266 $1,333

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

53 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

STREETSCAPE AND TRANSPORTATION IMPROVEMENTS ON 16TH STREET CORRIDOR FROM 11TH AVE NORTH TO I-65 WITHIN FOUNTAIN HEIGHTS NEIGHBORHOOD

Type of Work STREETSCAPE

Project Length in Miles 0.550 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056316 STPBH 7117 () CONSTRUCTION

STREETSCAPE

2019 $2,613 $653 $3,266

TOTAL COST: $2,613 $653 $3,266

Route NA- ProjectDescription

SIDEWALK AND RAMP IMPROVEMENTS THROUGHOUT THE CITY OF BIRMINGHAM

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056323 STPBH UR13 (603) CONSTRUCTION

SIDEWALK 2017 $1,014 $253 $1,267

TOTAL COST: $1,014 $253 $1,267

Route NA- ProjectDescription

WOODLAWN NEIGHBORHOOD STREETSCAPE PHASE 1 (CITY OF BIRMINGHAM)

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056330 STPBH 3715 (251) CONSTRUCTION

STREETSCAPE

2016 $1,281 $320 $1,601

TOTAL COST: $1,281 $320 $1,601

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

54 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

MOUNTAIN BROOK SIDEWALKS PHASE 9 ALONG BROOKWOOD ROAD, CROSSHILL ROAD AND OAKDALE DRIVE

Type of Work SIDEWALK

Project Length in Miles 4.760 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064353 CMAQ NR13 (908) UTILITIES

SIDEWALK 2016 $212 $53 $264

100056494 CMAQ NR13 (908) CONSTRUCTION

SIDEWALK 2016 $1,472 $368 $1,840

TOTAL COST: $1,683 $421 $2,104

Route NA- ProjectDescription

SIDEWALKS ON PARTS OF 24 TH STREET NORTH, BERKLEY AVENUE, ARLINGTON AVENUE AND OWEN AVENUE IN BESSEMER

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056508 CMAQ NR13 (954) RIGHT OF WAY

SIDEWALK 2018 $80 $20 $100

100056509 CMAQ NR13 (954) UTILITIES

SIDEWALK 2019 $83 $21 $104

100056510 CMAQ NR13 (954) CONSTRUCTION

SIDEWALK 2019 $546 $137 $683

TOTAL COST: $709 $177 $886

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

55 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

REED HARVEY GREENWAY ALONG FIVE MILE CREEK FROM BOBOLINK LANE TO CENTER POINT BALL PARK

Type of Work UNCLASSIFIED

Project Length in Miles 6.300 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056520 CMAQ RW13 () RIGHT OF WAY

UNCLASSIFIED 2019 $90 $23 $113

100056521 CMAQ UT14 () UTILITIES

UNCLASSIFIED 2019 $87 $22 $108

100056522 CMAQ CN14 () CONSTRUCTION

UNCLASSIFIED 2019 $568 $142 $710

TOTAL COST: $745 $186 $931

Route NA- ProjectDescription

SIDEWALK ALONG CR-1142 (CHAPEL ROAD) FROM PARK AVE TO STONE BROOK PKWY (CITY OF HOOVER)

Type of Work SIDEWALK

Project Length in Miles 3.600 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056539 CMAQ 7282 (600) RIGHT OF WAY

SIDEWALK 2017 $303 $76 $378

100056540 CMAQ 7282 (600) UTILITIES

SIDEWALK 2019 $89 $22 $111

100056541 CMAQ 7282 (600) CONSTRUCTION

SIDEWALK 2019 $824 $206 $1,030

TOTAL COST: $1,216 $304 $1,520

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

56 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

SIDEWALK ALONG PRESERVE PARKWAY FROM CR-1140 (SULPHUR SPRINGS RD) TO PRESERVE TOWN CENTER (CITY OF HOOVER)

Type of Work SIDEWALK

Project Length in Miles 1.020 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056543 CMAQ 3715 (253) CONSTRUCTION

SIDEWALK 2016 $470 $138 $609

TOTAL COST: $470 $138 $609

Route NA- ProjectDescription

SIDEWALK ON VALLEY STREET, TYLER ROAD, CLOUDLAND DRIVE, SAVOY STREET AND CLEARVIEW ROAD IN BLUFF PARK GRADE, DRAIN, CURB AND GUTTER, AND SIDEWALK

Type of Work SIDEWALK

Project Length in Miles 4.260 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056545 CMAQ 3715 (254) RIGHT OF WAY

SIDEWALK 2017 $252 $63 $315

100056546 CMAQ 3715 (254) UTILITIES

SIDEWALK 2019 $52 $13 $65

100056547 CMAQ 3715 (254) CONSTRUCTION

SIDEWALK 2019 $742 $185 $927

TOTAL COST: $1,046 $261 $1,307

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

57 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

SIDEWALKS ALONG ROSS BRIDGE PARKWAY FROM DEER TRAIL TO DEER VALLEY ELEMENTARY SCHOOL (CITY OF HOOVER)

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056549 CMAQ 3715 (250) CONSTRUCTION

SIDEWALK 2016 $779 $195 $974

TOTAL COST: $779 $195 $974

Route NA- ProjectDescription

SIDEWALKS ALONG CR-42 (MASSEY ROAD) FROM SR-3 (US-31, MONTGOMERY HIGHWAY) TO CR-99 (COLUMBIANA ROAD) IN VESTAVIA HILLS

Type of Work SIDEWALK

Project Length in Miles 2.280 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057172 CMAQ 7030 (600) RIGHT OF WAY

SIDEWALK 2019 $72 $18 $90

100057173 CMAQ 7030 (600) UTILITIES

UTILITY ADJUSTMENT

2020 $73 $18 $91

100057174 CMAQ 7030 (600) CONSTRUCTION

SIDEWALK 2020 $752 $188 $940

TOTAL COST: $897 $224 $1,121

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

58 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

RESURFACING, SIDEWALK ADDITIONS AND DRAINAGE IMPROVEMENTS ALONG POLLY REED ROAD FROM SR-75 TO REED ROAD NE

Type of Work UNCLASSIFIED

Project Length in Miles 1.200 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058032 STPBH 3716 (250) RIGHT OF WAY

UNCLASSIFIED 2016 $117 $29 $146

100058033 STPBH 3716 (250) UTILITIES

UNCLASSIFIED 2019 $160 $40 $200

100054521 STPBH 3716 (250) CONSTRUCTION

UNCLASSIFIED 2019 $2,724 $681 $3,405

TOTAL COST: $3,001 $750 $3,751

Route NA- ProjectDescription

IMPROVEMENTS TO INCLUDE SIDEWALKS, CURBS, GUTTERS, AND STORM DRAINS ALONG CR-1498 (ENSLEY AVENUE) FROM SR-269 (20TH STREET) TO WARRIOR ROAD

Type of Work STREETSCAPE

Project Length in Miles 1.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100033433 STPBH UR14 (605) CONSTRUCTION

STREETSCAPE

2017 $1,949 $487 $2,436

TOTAL COST: $1,949 $487 $2,436

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

59 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

DRAINAGE, SIDEWALKS, LIGHTING AND LANDSCAPING ALONG 12TH STREET WEST FROM LOMB AVENUE TO SR-7 (3RD AVENUE WEST) AND 2ND AVENUE WEST FROM 12TH STREET WEST TO 11TH STREET WEST

Type of Work STREETSCAPE

Project Length in Miles 1.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100033430 STPBH 3714 (250) CONSTRUCTION

STREETSCAPE

2017 $1,179 $295 $1,473

TOTAL COST: $1,179 $295 $1,473

Route NA- ProjectDescription

BRIDGE REPLACEMENT ON 3RD AVENUE OVER HALLS CREEK BIN# 1316

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059491 ACBRZ59491 ATRP (008)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $251 $63 $314

TOTAL COST: $251 $63 $314

Route NA- ProjectDescription

BRIDGE REPLACEMENT ON 8TH AVENUE NORTH OVER HALLS CREEK BIN # 1312

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059492 ACBRZ59492 ATRP (008)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $358 $89 $447

TOTAL COST: $358 $89 $447

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

60 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

RESURFACE ALONG MARTIN LUTHER KING JR. DRIVE(6TH STREET SW) (LOMB AVENUE) FROM THE INTERSECTION OF DENNISION AVENUE SW TO THE INTERSECTION OF TUSCALOOSA AVENUE

Type of Work RESURFACING

Project Length in Miles 1.700 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060992 ACAA60992 ATRP (009) CONSTRUCTION

RESURFACING

2016 $953 $238 $1,191

TOTAL COST: $953 $238 $1,191

Route NA- ProjectDescription

RESURFACE CLAIRMONT AVENUE FROM ESSEX ROAD TO ROCKFORD ROAD

Type of Work RESURFACING

Project Length in Miles 0.930 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060997 ACAA60997 ATRP (009) CONSTRUCTION

RESURFACING

2016 $459 $115 $573

TOTAL COST: $459 $115 $573

Route NA- ProjectDescription

RESURFACING AND PERMANENT STRIPE ALONG 1ST AVENUE NORTH FROM CENTER STREET TO 4TH PLACE NORTH

Type of Work RESURFACING

Project Length in Miles 0.535 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061001 ACAA61001 ATRP (009) CONSTRUCTION

RESURFACING

2016 $337 $84 $421

TOTAL COST: $337 $84 $421

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

61 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

BUILDING COMMUNITIES PROGRAMS AT VARIOUS LOCATIONS IN BIRMINGHAM FY-2018 AND FY-2019

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056476 STPBH NR18 (903) SPECIAL

UNCLASSIFIED 2017 $550 $138 $688

100062376 STPBH NR19 () SPECIAL

UNCLASSIFIED 2019 $550 $138 $688

TOTAL COST: $1,100 $275 $1,375

Route NA- ProjectDescription

NORWOOD NEIGHBORHOOD STREETSCAPE ALONG 12TH AVE NORTH FROM 24TH STREET NORTH TO 31ST STREET NORTH

Type of Work STREETSCAPE

Project Length in Miles 0.630 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059190 CMAQ 3715 (257) CONSTRUCTION

STREETSCAPE

2020 $520 $130 $650

TOTAL COST: $520 $130 $650

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

62 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

JEMISON TRAIL/SHADES CREEK GREENWAY CONNECTION - JEMISON PARK TO BROOKWOOD VILLAGE

Type of Work UNCLASSIFIED

Project Length in Miles 0.600 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054593 STPBH CN13 (907) CONSTRUCTION

UNCLASSIFIED 2016 $710 $180 $889

TOTAL COST: $710 $180 $889

Route SR-119 ProjectDescription

REPLACE BRIDGE, BIN 001308, SR-119 OVER UNNAMED BRANCH, 1.3 MILES NORTH SHELBY COUNTY LINE (SUFF=56.3, STATUS=FO)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.200 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049954 BR 0119 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $228 $57 $285

100049986 BR 0119 () RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $57 $14 $71

TOTAL COST: $285 $71 $356

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

63 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route SR-150 ProjectDescription

PEDESTRIAN BRIDGE OVER SR-150 BETWEEN BERKLEY AVE AND CLARENDON AVE - CITY OF BESSEMER

Type of Work PEDESTRIAN OVERPASS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064226 CMAQ 3715 () PRELIMINARY ENGINEERING

PEDESTRIAN OVERPASS

2019 $250 $62 $312

100064228 CMAQ 3715 () RIGHT OF WAY

PEDESTRIAN OVERPASS

2019 $83 $21 $104

TOTAL COST: $333 $83 $416

Route SR-150 ProjectDescription

BRIDGE REPLACEMENT AND RELOCATION ON SR-150 AT SHADES CREEK (BIN # 1502) AND THE CSX RAILROAD FROM MP 6.4 WEST OF SHADES CREEK TO MP 7.0 EAST OF SHADES CREEK (BIN # 1503)

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.700 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100003804 BR 7009 (600) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2016 $17,867 $4,467 $22,334

TOTAL COST: $17,867 $4,467 $22,334

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

64 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route SR-269 ProjectDescription

BRIDGE RAIL RETROFIT ON SR-269 BRIDGE OVER BAYVIEW LAKE (BIN 004980) AND BRIDGE OVER BIRMINGHAM TERMINAL RAILROAD (BIN 002870)

Type of Work BRIDGE REPAIR

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100053763 NH 0269 (506) CONSTRUCTION

BRIDGE REPAIR

2017 $288 $73 $362

TOTAL COST: $288 $73 $362

Route SR-3 ProjectDescription

SR-3 (US-31) LIGHTING SYSTEM FROM PATTON CHAPEL ROAD TO I-65 CITY OF HOOVER

Type of Work LIGHTING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064203 STPBH 3715 () PRELIMINARY ENGINEERING

LIGHTING 2019 $80 $20 $100

TOTAL COST: $80 $20 $100

Route SR-3 ProjectDescription

SR-3 (US-31)ATSR-150 UPGRADE TRAFFIC CAMERAS AND INSTALL FIBER OPTIC CABLE

Type of Work SIGNALIZATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056560 CMAQF NR13 () PRELIMINARY ENGINEERING

SIGNALIZATION 2019 $90 $23 $113

TOTAL COST: $90 $23 $113

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

65 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route SR-3 ProjectDescription

AUXILIARY LANES ON SR-3(US-31/RED MOUNTAIN EXPRESSWAY) BETWEEN HIGHLAND AVE AND 21ST AVE.

Type of Work STREETSCAPE

Project Length in Miles 3.196 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064506 CMAQ 0003 () PRELIMINARY ENGINEERING

STREETSCAPE

2019 $83 $21 $104

100064507 CMAQ 0003 () CONSTRUCTION

STREETSCAPE

2019 $2,602 $650 $3,252

TOTAL COST: $2,685 $671 $3,356

Route SR-3 ProjectDescription

SR-3(US-31) FROM COLUMBIANA RD TO SHADES CREST RD VESTAVIA HILLS, TRAFFIC CONTROL SYSTEM / TRAFFIC CONTROL CENTER

Type of Work UNCLASSIFIED

Project Length in Miles 6.530 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039841 CMAQ 7012 () UTILITIES

UNCLASSIFIED 2019 $9 $2 $12

100039842 CMAQ 7012 () CONSTRUCTION

UNCLASSIFIED 2020 $636 $159 $796

TOTAL COST: $646 $161 $807

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

66 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route SR-3 ProjectDescription

REPLACE AND UPGRADE STREET LIGHTING ON SR-3 (US-31) FROM THE CAHABA RIVER TO PATTON CHAPEL ROAD-CITY OF HOOVER

Type of Work LIGHTING

Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063365 STPBH 0003 (593) CONSTRUCTION

LIGHTING 2017 $950 $237 $1,187

TOTAL COST: $950 $237 $1,187

Route SR-5 ProjectDescription

BRIDGE REPLACEMENT (BIN 007627) ON SR-5 OVER LOCUST FORK OF BLACK WARRIOR RIVER

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 1.362 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100050015 BR 0005 (517) UTILITIES

BRIDGE REPLACEMENT

2019 $91 $23 $114

100002809 BR 0005 (517) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $5,135 $1,284 $6,418

TOTAL COST: $5,226 $1,306 $6,532

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

67 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route SR-7 ProjectDescription

WIDEN SR-7(US-11) FR END OF 5-LANE FACILITY, EAST OF CHALKVILLE RD TO THE CAHABA RIVER BRIDGE

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.441 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039839 STPBH 7073 (602) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2019 $2,049 $512 $2,562

TOTAL COST: $2,049 $512 $2,562

Route SR-79 ProjectDescription

SR-79 UPGRADE SIGNALS AND FIBER OPTIC FROM CR-124 (PINE HILL ROAD) TO SR-151 (NARROWS ROAD)

Type of Work SIGNALIZATION

Project Length in Miles 16.440 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056534 CMAQ 0079 (515) PRELIMINARY ENGINEERING

SIGNALIZATION 2016 $246 $62 $308

100056535 CMAQ 0079 (515) CONSTRUCTION

SIGNALIZATION 2018 $3,990 $997 $4,987

TOTAL COST: $4,236 $1,059 $5,295

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

68 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route SR-959 ProjectDescription

BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SELF CREEK AT STATIONS 2183+00 TO 2199+00, DUAL MAINLINE BRIDGES AT STATION 2208+50 TO 2218+50, AND SINGLE BRIDGES ON RAMPS B AND D AT SR-79.

Type of Work BRIDGE

Project Length in Miles 2.780 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100048413 ACAPDF 1602 (550) CONSTRUCTION

BRIDGE 2023 $52,718 $0 $52,718

TOTAL COST: $52,718 $0 $52,718

Route SR-959 ProjectDescription

FY 2018 AND 2019 BIRMINGHAM NORTHERN BELTLINE WETLAND AND STREAM MITIGATION CREDITS

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063383 APDF 1602 (562) SPECIAL

UNCLASSIFIED 2018 $1,851 $441 $2,292

100063381 APDF 1602 () SPECIAL

UNCLASSIFIED 2019 $3,290 $0 $3,290

TOTAL COST: $5,141 $441 $5,582

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

69 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Original

Route CR-20 ProjectDescription

RESURFACE CR-20 FROM SR-22 TO GEORGIA LINE (R.A.M.P.)

Type of Work RESURFACING

Project Length in Miles 2.945 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060426 ACNU60426 ATRP (013) CONSTRUCTION

RESURFACING

2016 $508 $131 $639

TOTAL COST: $508 $131 $639

Route CR-425 ProjectDescription

REPLACE BRIDGE ON CR-425 OVER COHOBADIAH CREEK BIN # 11951 (R.A.M.P.)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060421 ACBRZ60421 ATRP (003)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $381 $95 $477

TOTAL COST: $381 $95 $477

Route CR-427 ProjectDescription

REPLACE BRIDGE CR-427 OVER COHOBADIAH CREEK BIN # 11909 (R.A.M.P.)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060420 ACBRZ60420 ATRP (003)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $327 $82 $409

TOTAL COST: $327 $82 $409

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

70 of 154

REGION HIGHWAY PROJECTS - RANDOLPH

STIP PLAN: 2016 - Original

Route CR-51 ProjectDescription

RESURFACE AND TRAFFIC STRIPE CR-51 FROM A POINT 895 FEET NORTH OF THE INTERSECTION OF CR-59 TO THE CLEBURNE COUNTY LINE

Type of Work RESURFACING

Project Length in Miles 8.815 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060425 ACNU60425 ATRP (013) CONSTRUCTION

RESURFACING

2016 $1,283 $321 $1,603

TOTAL COST: $1,283 $321 $1,603

Route CR-65 ProjectDescription

RESURFACE CR-65 FROM CR-61 TO CR-26 (R.A.M.P.)

Type of Work RESURFACING

Project Length in Miles 2.990 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060429 ACNU60429 ATRP (013) CONSTRUCTION

RESURFACING

2016 $397 $99 $496

TOTAL COST: $397 $99 $496

Route CR-821 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CR-821 OVER FIXICO CREEK BIN 002193 (RAMP)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060419 ACBRZ60419 ATRP (003)

CONSTRUCTION

BRIDGE REPLACEMENT

2016 $188 $47 $235

TOTAL COST: $188 $47 $235

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

71 of 154

REGION HIGHWAY PROJECTS - RANDOLPH

STIP PLAN: 2016 - Original

Route CR-845 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CR-845 OVER CEDAR CREEK (BIN 16840)(RAMP)

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060422 ACBRZ60422 ATRP (013)

CONSTRUCTION

BRIDGE 2017 $432 $108 $540

TOTAL COST: $432 $108 $540

Route CR-887 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CR-887 OVER HIGHPINE CREEK (BIN 955)(RAMP)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060418 ACBRZ60418 ATRP (013)

CONSTRUCTION

BRIDGE REPLACEMENT

2017 $460 $115 $574

TOTAL COST: $460 $115 $574

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

72 of 154

REGION HIGHWAY PROJECTS - RANDOLPH

STIP PLAN: 2016 - Original

Route CR-12 ProjectDescription

INTERSECTION IMPROVEMENTS AT CR-12 AND CR-22

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.020 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064319 CMAQ 5915 () PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2019 $120 $30 $150

100064320 CMAQ 5915 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $200 $50 $250

TOTAL COST: $320 $80 $400

Route CR-13 ProjectDescription

RESURFACING CR-13 FROM CR-52 TO THE BIBB COUNTY LINE

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064327 STPBH 5915 (253) PRELIMINARY ENGINEERING

RESURFACING

2016 $10 $2 $12

100064328 STPBH 5915 (253) CONSTRUCTION

RESURFACING

2017 $1,328 $332 $1,659

TOTAL COST: $1,337 $334 $1,671

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

73 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route CR-1396 ProjectDescription

CR-1396 (CAHABA BEACH ROAD), EXTENSION FROM CR-346 (SWAN DRIVE) TO CR-60 (SICARD HOLLOW ROAD) INCLUDING A BRIDGE OVER THE LITTLE CAHABA RIVER

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059534 ACAA59534 ATRP (015) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $3,200 $800 $4,000

TOTAL COST: $3,200 $800 $4,000

Route CR-17 ProjectDescription

ADDITIONAL LANES ON CR-17 (VALLEYDALE RD) FROM SR-3 (US-31) TO RIVERCHASE PARKWAY EAST

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 0.750 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100046237 IMD-STPBH 7112 (602) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2016 $4,925 $975 $5,900

TOTAL COST: $4,925 $975 $5,900

Route CR-17 ProjectDescription

RESURFACE CR-17 FROM CR-22 TO CR-26 (KENT DAIRY ROAD)

Type of Work RESURFACING

Project Length in Miles 4.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059513 ACAA59513 ATRP (010) CONSTRUCTION

RESURFACING

2018 $1,136 $284 $1,420

TOTAL COST: $1,136 $284 $1,420

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

74 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route CR-264 ProjectDescription

BRIDGE REPLACEMENT OF BIN 11015 OVER BUCK CREEK, TURN LANES, AND RESURFACING OF CR-264 (THOMPSON ROAD) FROM 1300 FEET WEST OF WARRIOR DRIVE TO SR-119.

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059499 ACBRAA59499 ATRP (006)

CONSTRUCTION

BRIDGES AND APPROACHES

2016 $2,961 $759 $3,721

TOTAL COST: $2,961 $759 $3,721

Route CR-28 ProjectDescription

RESURFACE CR-28 FROM COLUMBIANA CITY LIMITS TO SR-145

Type of Work RESURFACING

Project Length in Miles 3.310 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061025 ACAA61025 ATRP (012) CONSTRUCTION

RESURFACING

2017 $1,482 $371 $1,853

TOTAL COST: $1,482 $371 $1,853

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

75 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route CR-29 ProjectDescription

WIDEN CR-29\1277 FROM CR-370(HEATHERWOOD DR.) TO CR-2311 (ACTON ROAD) AND BRG REPLACEMENT OVER CAHABA RIVER.

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 8.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100045964 STPBH 5939 (200) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $4,274 $1,069 $5,343

100007540 STPBH 5939 (200) CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,589 $397 $1,986

TOTAL COST: $5,863 $1,466 $7,329

Route CR-30 ProjectDescription

RESURFACE CR-30 FROM COLUMBIANA TO SR-145

Type of Work RESURFACING

Project Length in Miles 3.144 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061026 ACAA61026 ATRP (012) CONSTRUCTION

RESURFACING

2016 $763 $191 $954

TOTAL COST: $763 $191 $954

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

76 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route CR-441 ProjectDescription

REPLACE BRIDGE ON CR-441 OVER FOUR MILE CREEK BIN # 5369

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059506 ACBRZ59506 ATRP (013)

CONSTRUCTION

BRIDGE REPLACEMENT

2017 $1,527 $382 $1,908

TOTAL COST: $1,527 $382 $1,908

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

77 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route CR-52 ProjectDescription

INTERSECTION IMPROVEMENTS AT CR-52 AND CR-13

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059508 ACAA59508 ATRP (013) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2017 $492 $123 $615

TOTAL COST: $492 $123 $615

Route CR-52 ProjectDescription

BRIDGE WIDENING (BIN 003267) ON CR-52 (4TH AVENUE) OVER BUCK CREEK

Type of Work BRIDGE WIDENING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059502 ACBR59502 ATRP (009) CONSTRUCTION

BRIDGE WIDENING

2019 $1,816 $454 $2,269

TOTAL COST: $1,816 $454 $2,269

Route CR-52 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES ON CR-52 OVER CAHABA RIVER (BIN 2380) FROM OLD CAHABA LANE TO OAK VIEW LANE

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059503 STPBH-ACBR59503 ATRP (012)

CONSTRUCTION

BRIDGES AND APPROACHES

2019 $3,702 $926 $4,628

TOTAL COST: $3,702 $926 $4,628

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

78 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route CR-55 ProjectDescription

BRIDGE REPLACEMENT ON CR-55 OVER NORFOLK SOUTHERN RAILROAD NEAR STERRETT BIN # 10357

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 0.900 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056309 STPBH 5914 (250) RIGHT OF WAY

BRIDGES AND APPROACHES

2019 $772 $193 $965

100056310 STPBH 5914 (250) UTILITIES

UTILITY ADJUSTMENT

2020 $200 $50 $250

100056311 STPBH 5914 () CONSTRUCTION

BRIDGES AND APPROACHES

2020 $1,000 $250 $1,250

TOTAL COST: $1,972 $493 $2,465

Route CR-99 ProjectDescription

RESURFACE CR-99 FROM CR-47 TO SR-145

Type of Work RESURFACING

Project Length in Miles 2.084 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061023 ACAA61023 ATRP (012) CONSTRUCTION

RESURFACING

2016 $298 $74 $372

TOTAL COST: $298 $74 $372

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

79 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

>VALLEYDALE RD FR CALDWELL MILL RD TO INVERNESS CENTER CITY OF HOOVER

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 3.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100033067 STPBH 9802 (905) UTILITIES

ADDITIONAL ROADWAY LANES

2019 $2,596 $649 $3,245

TOTAL COST: $2,596 $649 $3,245

Route CR-NA ProjectDescription

SAFETY AND INTERSECTION IMPROVEMENTS ON STATE PARK ROAD FROM JOHN FINDLAY DRIVE TO STATE ROUTE 119 TO INCLUDE THE ADDITION OF BIKE LANES IN THE CITY OF PELHAM

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 5.206 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063241 CMAQ 5915 (250) RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2018 $520 $130 $649

100063242 STPBH-CMAQ 5915 (250)

UTILITIES

INTERSECTION IMPROVEMENTS

2019 $60 $15 $75

100063243 STPBH-CMAQ 5915 (250)

CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $1,359 $340 $1,699

TOTAL COST: $1,938 $485 $2,423

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

80 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route I -65 ProjectDescription

INTERCHANGE IMPROVEMENTS I-65 AT SR-3 (US-31) EXIT 231 GRADE, DRAIN, BASE, PAVE AND BRIDGE IN THE CITY OF CALERA

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063670 STPBH I065 (404) RIGHT OF WAY

GRADE, DRAIN, BASE, PAVE AND BRG

2016 $2,112 $528 $2,640

TOTAL COST: $2,112 $528 $2,640

Route I -65 ProjectDescription

INTERCHANGE IMPROVEMENTS I-65 AT SR-3 (US-31) EXIT 231 GRADE, DRAIN, BASE, PAVE AND BRIDGE IN THE CITY OF CALERA

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.010 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055554 ACAA55554 ATRP (013) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2017 $17,515 $3,747 $21,263

TOTAL COST: $17,515 $3,747 $21,263

Route NA- ProjectDescription

BIKE LANES ON JOHN FINDLEY DRIVE FROM STATE PARK ROAD TO NORTH TRAIL HEAD INCLUDING TERRACE DRIVE

Type of Work UNCLASSIFIED

Project Length in Miles 5.600 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064227 CMAQ 5916 (252) PRELIMINARY ENGINEERING

UNCLASSIFIED 2016 $549 $137 $686

TOTAL COST: $549 $137 $686

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

81 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

SHELBY COUNTY BICYCLE/PEDESTRIAN PLAN

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064329 CMAQ NR16 (913) SPECIAL

UNCLASSIFIED 2016 $242 $61 $303

TOTAL COST: $242 $61 $303

Route NA- ProjectDescription

HELENA BUCK CREEK, TACOA, AND RUFFIN TRAIL SYSTEMS MULTIUSE TRAIL AND BRIDGES NEAR CSX RAILROAD

Type of Work UNCLASSIFIED

Project Length in Miles 3.670 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100032383 CMAQ 9802 (925) CONSTRUCTION

UNCLASSIFIED 2019 $2,261 $565 $2,826

TOTAL COST: $2,261 $565 $2,826

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

82 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

SIDEWALKS ALONG INDUSTRIAL PARK DR AND BEARDEN RD FROM SR-3 (US-31) TO PELHAM HIGH SCHOOL

Type of Work SIDEWALK

Project Length in Miles 2.840 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056503 CMAQ 5916 (250) UTILITIES

SIDEWALK 2016 $448 $146 $594

100056504 CMAQ 5916 (250) CONSTRUCTION

SIDEWALK 2016 $1,971 $501 $2,472

TOTAL COST: $2,419 $647 $3,066

Route NA- ProjectDescription

RESURFACE OLD HIGHWAY 25 FROM SR-25 TO CR-47

Type of Work RESURFACING

Project Length in Miles 1.582 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061019 ACAA61019 ATRP (012) CONSTRUCTION

RESURFACING

2016 $249 $94 $343

TOTAL COST: $249 $94 $343

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

83 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route NA- ProjectDescription

NON-COMPLIANT CURB RAMP REPLACEMENT ON STATE ROUTES WITHIN JEFFERSON, SHELBY AND WALKER COUNTIES

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060174 STPAA NR13 (909) CONSTRUCTION

SIDEWALK 2019 $1,432 $358 $1,790

TOTAL COST: $1,432 $358 $1,790

Route NA- ProjectDescription

ADD BIKE/PED LANES ALONG JOHN FINDLAY DRIVE FROM THE NORTH TRAILHEAD PARKING LOT TO SR-119 PARK ENTRANCE

Type of Work UNCLASSIFIED

Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063219 CMAQ 5915 (251) CONSTRUCTION

UNCLASSIFIED 2017 $1,547 $387 $1,934

TOTAL COST: $1,547 $387 $1,934

Route NA- ProjectDescription

INVERNESS COMMUNITY GREENWAY FROM INVERNESS FIRE STATION TO HOOVER'S NATURE PARK

Type of Work UNCLASSIFIED

Project Length in Miles 1.800 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054519 CMAQ 5917 (904) CONSTRUCTION

UNCLASSIFIED 2019 $1,032 $258 $1,290

TOTAL COST: $1,032 $258 $1,290

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

84 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route SR-119 ProjectDescription

ROADWAY IMPROVEMENTS ON SR-119 (MAIN STREET) FROM LITTLE CAHABA RIVER BRIDGE TO BLOCH STREET RESURFACING, SIGNALS, SIDEWALKS, LANDSCAPING, LIGHTING AND DRAINAGE IMPROVEMENTS

Type of Work RESURFACING

Project Length in Miles 0.427 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059152 STPBH 0119 (507) CONSTRUCTION

RESURFACING

2016 $3,733 $1,217 $4,950

TOTAL COST: $3,733 $1,217 $4,950

Route SR-119 ProjectDescription

ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 5.082 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061285 STPBH 0119 (510) PRELIMINARY ENGINEERING

ADDITIONAL ROADWAY LANES

2016 $200 $50 $250

100061286 STPBH 0119 (510) RIGHT OF WAY

ADDITIONAL ROADWAY LANES

2019 $426 $106 $532

100063109 STPBH 0119 (510) UTILITIES

ADDITIONAL ROADWAY LANES

2019 $600 $150 $750

TOTAL COST: $1,226 $306 $1,532

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

85 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route SR-25 ProjectDescription

ADD TURN LANES AND TRAFFIC SIGNALS AT INTERSECTION OF SR-25 AND 10TH STREET

Type of Work TURN LANES

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061018 ACAA61018 ATRP (008) CONSTRUCTION

TURN LANES 2018 $513 $128 $641

TOTAL COST: $513 $128 $641

Route SR-3 ProjectDescription

SR-3 (US-31) BRIDGE (BIN NO. 2091) OVER PEVINE CREEK AND CSX RR, BRIDGE REPLACEMENT

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.090 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057649 BR 0003 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $432 $108 $540

TOTAL COST: $432 $108 $540

Route SR-3 ProjectDescription

PELHAM TOPICS, SR-3(US-31) FROM CR-52 TO A POINT 0.25 MILES NORTH OF CR-105 (PHASE II)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 1.125 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100039450 STPBH 7012 () CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $449 $112 $561

TOTAL COST: $449 $112 $561

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

86 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route SR-38 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-38 (US-280) AT OLD US-280 / WAL-MART.

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061703 NH 0038 (534) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2018 $931 $233 $1,164

TOTAL COST: $931 $233 $1,164

Route SR-53 ProjectDescription

BRIDGE REPLACEMENT ON SR-53 (US-231) OVER KELLY CREEK (BIN # 2588)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.549 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100003344 BR 0053 (529) CONSTRUCTION

BRIDGE REPLACEMENT

2016 $4,964 $1,241 $6,204

TOTAL COST: $4,964 $1,241 $6,204

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

87 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Original

Route CR-26 ProjectDescription

RESURFACE CR-26 FROM SR-25 (US-231) WEST OF (CR-335) DAYS DRIVE

Type of Work RESURFACING

Project Length in Miles 5.700 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061388 ACNU61388 ATRP (004) CONSTRUCTION

RESURFACING

2016 $1,026 $257 $1,283

TOTAL COST: $1,026 $257 $1,283

Route CR-45 ProjectDescription

RESURFACING CR-45 (OLD COAL CITY ROAD) FROM SR-53 (US-231) TO SR-53 (US-231)

Type of Work RESURFACING

Project Length in Miles 7.040 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061393 ACNU61393 ATRP (008) CONSTRUCTION

RESURFACING

2016 $1,168 $292 $1,460

TOTAL COST: $1,168 $292 $1,460

Route CR-NA ProjectDescription

RESURFACE DOUBLE BRIDGE ROAD FROM 5TH AVENUE TO SR-7 (US-11) IN ASHVILLE

Type of Work RESURFACING

Project Length in Miles 4.460 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061386 ACNU61386 ATRP (011) CONSTRUCTION

RESURFACING

2016 $456 $114 $571

TOTAL COST: $456 $114 $571

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

88 of 154

REGION HIGHWAY PROJECTS - ST. CLAIR

STIP PLAN: 2016 - Original

Route I -59 ProjectDescription

I-59 PAVEMENT REHAB, MILL, PATCH, RESURFACE, SHOULDER TREATMENT, GUARDRAIL, CROSS SLOPE CORRECTION, AND BRIDGE RAIL RETROFIT FROM NORTH OF SR-23 TO NORTH OF SR-53 (US-231) AT WHITNEY

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 20.434 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055217 RP-IM I059 (395) PRELIMINARY ENGINEERING

PAVEMENT MINOR REHABILITATION

2016 $299 $33 $332

100055218 RP-IM I059 (395) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2017 $12,107 $1,345 $13,452

TOTAL COST: $12,405 $1,378 $13,784

Route I -59 ProjectDescription

I-59 REPLACE BRIDGES, BIN 007238 (SUFF=40.1, STATUS=SD) AND BIN 007239 (SUFF=65.4, STATUS=FO), OVER MUCKLEROY CREEK, SOUTH OF SR-53 (US-231)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.400 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100049965 BRF I059 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $285 $71 $357

100049999 BRF I059 () RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $57 $14 $71

TOTAL COST: $342 $86 $428

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

89 of 154

REGION HIGHWAY PROJECTS - ST. CLAIR

STIP PLAN: 2016 - Original

Route I -59 ProjectDescription

I-59 PAVEMENT REHAB, MILL, PATCH, RESURFACE, REST AREA PARKING REHAB, GUARDRAIL, CROSS SLOPE CORRECTION, AND BRIDGE RAIL RETROFIT FROM NORTH OF SR-53 (US-231) AT WHITNEY TO THE ETOWAH COUNTY LINE

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 8.885 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055221 RP-IM I059 (366) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2017 $12,015 $1,335 $13,350

TOTAL COST: $12,015 $1,335 $13,350

Route NA- ProjectDescription

PEDESTRIAN IMPROVEMENTS IN PELL CITY, TO CONSTRUCT SIDEWALKS IN VARIOUS LOCATIONS WITHIN THE CITY

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100047636 STPTE-HPP A145 (900) CONSTRUCTION

SIDEWALK 2018 $286 $71 $357

TOTAL COST: $286 $71 $357

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

90 of 154

REGION HIGHWAY PROJECTS - ST. CLAIR

STIP PLAN: 2016 - Original

Route SR-23 ProjectDescription

BR REPL AND APP ON SR-23 OVER BRANCH #000226 STR #23-58-0.7

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040861 BR 5815 () UTILITIES

BRIDGE REPLACEMENT

2019 $23 $6 $28

TOTAL COST: $23 $6 $28

Route SR-25 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-25(US-411) AT PARK AVENUE AND AT CR-6 (SANIE ROAD/SIMPSON ROAD)

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.030 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064323 CMAQ 0025 (547) PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2017 $121 $30 $152

100064324 CMAQ 0025 (547) UTILITIES

INTERSECTION IMPROVEMENTS

2019 $291 $73 $364

100064325 CMAQ 0025 (547) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2020 $1,513 $378 $1,892

TOTAL COST: $1,926 $482 $2,408

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

91 of 154

REGION HIGHWAY PROJECTS - ST. CLAIR

STIP PLAN: 2016 - Original

Route SR-7 ProjectDescription

DRAINAGE IMPROVEMENTS ON SR-7 (US-11) FROM ROBINSON ST. TO NEAR TERRY ST. AND DOWNTOWN SPRINGVILLE STREET

Type of Work DRAINAGE CORRECTION

Project Length in Miles 0.789 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100055162 HPP 10AL (002) CONSTRUCTION

DRAINAGE CORRECTION

2019 $633 $158 $791

TOTAL COST: $633 $158 $791

Route SR-7 ProjectDescription

REPLACE BIN 001071, SR-7 (US-11) OVER MUCKLEROY CK (SUFF=18.3, STAT=SD) AND BIN 001072, SR-7 (US-11) OVER GULF CREEK (SUFF=52.1,STAT=SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.060 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064490 BR 0007 (513) UTILITIES

BRIDGE REPLACEMENT

2016 $171 $76 $248

100042650 BR 0007 (513) CONSTRUCTION

BRIDGE REPLACEMENT

2016 $5,886 $1,472 $7,358

TOTAL COST: $6,058 $1,548 $7,605

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

92 of 154

REGION HIGHWAY PROJECTS - ST. CLAIR

STIP PLAN: 2016 - Original

Route SR-7 ProjectDescription

ROADWAY AND DRAINAGE IMPROVEMENTS ON SR-7(US-11) AT SPRINGVILLE MIDDLE SCHOOL

Type of Work DRAINAGE CORRECTION

Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100052627 HPP-TCSP A187 (900) UTILITIES

DRAINAGE CORRECTION

2019 $40 $10 $50

100052628 HPP A187 (900) CONSTRUCTION

DRAINAGE CORRECTION

2019 $640 $160 $800

TOTAL COST: $680 $170 $850

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

93 of 154

REGION HIGHWAY PROJECTS - ST. CLAIR

STIP PLAN: 2016 - Original

Route CR-207 ProjectDescription

BRIDGE REPLACEMENT AND APPROACH WORK ON CR-207 (STEMLEY ROAD) OVER CHOCCOLOCCO CREEK BIN #008456

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058447 ACBR58447 ATRP (002) CONSTRUCTION

BRIDGE REPLACEMENT

2017 $5,262 $1,316 $6,578

TOTAL COST: $5,262 $1,316 $6,578

Route CR-47 ProjectDescription

EXTENSION OF CR-047 (PRIEBES MILL ROAD) FROM CR-058 (JENIFER ROAD) NEAR JENIFER TO SR-21

Type of Work GRADE, DRAIN, BASE, PAVE AND BRG

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059434 ACNU59434 ATRP (007) CONSTRUCTION

GRADE, DRAIN, BASE, PAVE AND BRG

2019 $4,944 $1,236 $6,180

TOTAL COST: $4,944 $1,236 $6,180

Route CR-47 ProjectDescription

EXTENSION OF CR-47 (PRIEBES MILL ROAD) FROM CR-58 (JENIFER ROAD) TO SR-21

Type of Work GRADE, DRAIN, BASE AND PAVE

Project Length in Miles 1.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062015 STPAA-STPNU-HPP A175 (900)

RIGHT OF WAY

GRADE, DRAIN, BASE AND PAVE

2017 $312 $78 $390

TOTAL COST: $312 $78 $390

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

94 of 154

REGION HIGHWAY PROJECTS - TALLADEGA

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

REPLACE BRIDGE AT ISBELL CIRCLE OVER TOWN CREEK BIN# 16495

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059436 ACBRZ59436 ATRP (005)

CONSTRUCTION

BRIDGE REPLACEMENT

2017 $342 $292 $634

TOTAL COST: $342 $292 $634

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON COOSA STREET AND WEST STREET OVER ISBELL BRANCH BIN'S # 2251 AND # 2260

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059439 ACBRZ59439 ATRP (005)

CONSTRUCTION

BRIDGE REPLACEMENT

2017 $500 $371 $872

TOTAL COST: $500 $371 $872

Route CR-NA ProjectDescription

MAGNOLIA STREET IMPROVEMENTS FROM SR-77 TO SR-4 (US-78) IN LINCOLN

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 0.830 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062174 ACNU62174 ATRP (005) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2019 $1,822 $455 $2,277

TOTAL COST: $1,822 $455 $2,277

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

95 of 154

REGION HIGHWAY PROJECTS - TALLADEGA

STIP PLAN: 2016 - Original

Route I -20 ProjectDescription

RESURFACING I-20 FROM THE COOSA RIVER MP 164.748 TO MP 173.218 (BEGINNING OF FULL 3 LANE)

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 8.470 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060114 FRT-RP-IM I020 (350) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2017 $11,932 $1,326 $13,258

TOTAL COST: $11,932 $1,326 $13,258

Route SR-21 ProjectDescription

SR-21 BIN # 2634 BRIDGE REPLACEMENT OVER CHEAHA CREEK

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.700 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060129 BR 0021 (554) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2016 $113 $28 $141

TOTAL COST: $113 $28 $141

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

96 of 154

REGION HIGHWAY PROJECTS - TALLADEGA

STIP PLAN: 2016 - Original

Route SR-34 ProjectDescription

REPL BIN 003153, SR-34 OVER POOR HOUSE BRANCH, NEAR CR-366. (SUFF=47.8, STAT=FO, 2001 HBRRP LIST)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.026 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100041644 BR 0034 (501) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2016 $74 $19 $93

100041617 BR 0034 () CONSTRUCTION

BRIDGE REPLACEMENT

2019 $1,573 $393 $1,966

TOTAL COST: $1,647 $412 $2,059

Route SR-38 ProjectDescription

SR-38 (US-280) BR REPLACEMENT BIN #009367 OVER SOUTHERN RR STR #038-61-01.0 SUFF

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.636 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100002937 BR 0038 (520) CONSTRUCTION

BRIDGE REPLACEMENT

2017 $10,792 $2,698 $13,491

TOTAL COST: $10,792 $2,698 $13,491

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

97 of 154

REGION HIGHWAY PROJECTS - TALLADEGA

STIP PLAN: 2016 - Original

Route SR-77 ProjectDescription

SR-77 BRIDGE REPLACEMENT OVER BLUE EYE CREEK (BIN 5992) NORTH OF LINCOLN

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 1.788 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100057891 BR 0077 (512) RIGHT OF WAY

BRIDGE REPLACEMENT

2016 $1,091 $273 $1,364

100057944 BR 0077 (512) UTILITIES

BRIDGE REPLACEMENT

2018 $140 $35 $175

100049997 BR 0077 (512) CONSTRUCTION

BRIDGE REPLACEMENT

2018 $3,401 $850 $4,252

TOTAL COST: $4,632 $1,158 $5,790

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

98 of 154

REGION HIGHWAY PROJECTS - TALLADEGA

STIP PLAN: 2016 - Original

Route CR-NA ProjectDescription

PARTIAL BRIDGE REMOVAL AND APPROACH IMPROVEMENTS ON SPORTPLEX BOULEVARD SOUTHEAST OF SR-22 BIN# 16025

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061056 ACBRZ61056 ATRP (017)

CONSTRUCTION

BRIDGE REPLACEMENT

2018 $404 $109 $513

TOTAL COST: $404 $109 $513

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT AND RESURFACING ON SCOTT ROAD FROM COLEY CREEK ROAD TO CONFEDERATE DRIVE BIN # 1181

Type of Work BRIDGE

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061057 ACBR61057 ATRP (017) CONSTRUCTION

BRIDGE 2017 $1,405 $351 $1,757

TOTAL COST: $1,405 $351 $1,757

Route CR-NA ProjectDescription

LEE STREET IMPROVEMENTS FROM THE INTERSECTION OF SR-38(US-280) TO 5TH WAY AT RAILROAD CROSSING AND RESURFACE WASHINGTON STREET FROM CITY LIMITS TO 5TH WAY AT RAILROAD CROSSING

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061059 ACOA61059 ATRP (016) CONSTRUCTION

RESURFACING

2016 $1,988 $497 $2,484

TOTAL COST: $1,988 $497 $2,484

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

99 of 154

REGION HIGHWAY PROJECTS - TALLAPOOSA

STIP PLAN: 2016 - Original

Route SR-63 ProjectDescription

BRIDGE REPLACEMENT (BIN 014307) ON SR-63 OVER SUGAR CREEK #63-62-11.9

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067663 BR 0063 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,224 $306 $1,530

TOTAL COST: $1,224 $306 $1,530

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

100 of 154

REGION HIGHWAY PROJECTS - TALLAPOOSA

STIP PLAN: 2016 - Original

Route CR-109 ProjectDescription

NEW SIGNAL AND LANE INSTALLATION IMPROVEMENTS AT BYNUM LEATHERWOOD (CR-109) AND OLD GADSDEN ROAD

Type of Work SIGNALIZATION

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064896 STPOA 0815 (263) PRELIMINARY ENGINEERING

SIGNALIZATION 2018 $235 $59 $294

TOTAL COST: $235 $59 $294

Route CR-440 ProjectDescription

CR-440 (64TH STREET) BRIDGE REPLACEMENTBIN # 6204 NEAR WEAVER

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.010 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100054937 STPOA 7448 () RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $29 $7 $36

TOTAL COST: $29 $7 $36

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

101 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Amendment # 1

Route CR-NA ProjectDescription

RESURFACING, STRIPING, AND DRAINAGE IMPROVEMENTS ON MOUNTAIN STREET NE FROM SR-21 TO 8TH AVENUE NE CITY OF JACKSONVILLE

Type of Work RESURFACING

Project Length in Miles 1.167 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064883 STPOA 0815 (258) PRELIMINARY ENGINEERING

RESURFACING

2017 $33 $8 $41

100064884 STPOA 0815 (258) CONSTRUCTION

RESURFACING

2019 $309 $77 $386

TOTAL COST: $341 $85 $427

Route CR-NA ProjectDescription

RESURFACING CHURCH AVENUE FROM 11TH STREET TO SR-21

Type of Work RESURFACING

Project Length in Miles 6.700 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064885 STPOA 0815 (261) PRELIMINARY ENGINEERING

RESURFACING

2018 $95 $24 $119

100064886 STPOA 0815 () CONSTRUCTION

RESURFACING

2019 $893 $223 $1,116

TOTAL COST: $988 $247 $1,235

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

102 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Amendment # 1

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON AIRPORT ROAD AT COLDWATER CREEK BIN # 11215 CITY OF OXFORD

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064887 STPOA 0815 (260) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2018 $180 $45 $225

100064888 STPOA 0815 (260) RIGHT OF WAY

BRIDGE REPLACEMENT

2019 $8 $2 $10

100064889 STPOA 0815 (260) UTILITIES

BRIDGE REPLACEMENT

2019 $61 $15 $77

100064890 STPOA 0815 () CONSTRUCTION

BRIDGE REPLACEMENT

2019 $727 $182 $909

TOTAL COST: $977 $244 $1,221

Route CR-NA ProjectDescription

RESURFACE WEST 9TH STREET AND CAFFEY DRIVE FROM SR-78 TO BARRY STREET CITY OF OXFORD

Type of Work RESURFACING

Project Length in Miles 4.360 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064891 STPOA 0815 () PRELIMINARY ENGINEERING

RESURFACING

2019 $49 $12 $61

100064892 STPOA 0815 () CONSTRUCTION

RESURFACING

2019 $323 $81 $404

TOTAL COST: $372 $93 $465

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

103 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Amendment # 1

Route CR-NA ProjectDescription

RESURFACE RUSSELL DRIVE FROM ALEXANDRIA ROAD TO PEACEBURG ROAD CITY OF WEAVER

Type of Work RESURFACING

Project Length in Miles 1.320 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064898 STPOA 0818 (250) PRELIMINARY ENGINEERING

RESURFACING

2018 $38 $10 $48

100064899 STPOA 0818 () CONSTRUCTION

RESURFACING

2020 $327 $82 $409

TOTAL COST: $365 $91 $456

Route CR-NA ProjectDescription

RESURFACING ALEXANDRIA/JACKSONVILLE HIGHWAY FROM JACKSONVILLE CITY LIMITS TO MCCLELLAN ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064930 STPOA 0815 () CONSTRUCTION

RESURFACING

2019 $1,143 $286 $1,428

TOTAL COST: $1,143 $286 $1,428

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

104 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Amendment # 1

Route CR-NA ProjectDescription

RESURFACE, PAVE SHOULDERS AND TRAFFIC STRIPE ON LENLOCK LANE FROM SR-1 (US-431) EASTERLY TO THE ANNISTON CITY LIMITS

Type of Work WIDENING AND RESURFACING (RDWY)

Project Length in Miles 1.908 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064895 STPOA 0815 (257) CONSTRUCTION

WIDENING AND RESURFACING (RDWY)

2016 $495 $124 $619

TOTAL COST: $495 $124 $619

Route CR-NA ProjectDescription

NEW SIGNAL AND LANE INSTALLATION IMPROVEMENTS AT BYNUM LEATHERWOOD (CR-109) AND OLD GADSDEN ROAD

Type of Work SIGNALIZATION

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064897 STPOA 0815 () CONSTRUCTION

SIGNALIZATION 2020 $727 $182 $909

TOTAL COST: $727 $182 $909

Route SR-202 ProjectDescription

INSTALL INTERSECTION LIGHTING ON SR-202 AND BYNUM LEATHERWOOD ROAD (CR-109)

Type of Work LIGHTING

Project Length in Miles 0.378 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064882 STPOA 0202 (522) CONSTRUCTION

LIGHTING 2017 $263 $66 $329

TOTAL COST: $263 $66 $329

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

105 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Amendment # 1

Route CR-NA ProjectDescription

RESURFACE (PARTIAL RECONSTRUCTION) MCASHAN DRIVE FROM BESSEMER CITY LIMITS TO ROCK MOUNTAIN LAKE ROAD

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065001 ACAA65001 ATRP (016) CONSTRUCTION

RESURFACING

2017 $1,454 $830 $2,284

TOTAL COST: $1,454 $830 $2,284

Route NA- ProjectDescription

18TH STREET REVITALIZATION FROM 28TH AVENUE SOUTH TO A POINT APPROXIMATELY 1000' NORTH OF ROSEDALE DRIVE IN THE CITY OF HOMEWOOD

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065218 CMAQ TA15 (903) PRELIMINARY ENGINEERING

STREETSCAPE

2019 $247 $62 $309

100065219 CMAQ TA15 (903) RIGHT OF WAY

STREETSCAPE

2019 $82 $21 $103

100065220 CMAQ TA15 (903) UTILITIES

STREETSCAPE

2019 $82 $21 $103

100064505 TAPAA-CMAQ TA15 (903)

CONSTRUCTION

STREETSCAPE

2019 $1,200 $300 $1,500

TOTAL COST: $1,612 $403 $2,015

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

106 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 1

Route NA- ProjectDescription

TRAIL DESIGN AND CONSTRUCTION PELHAM GREENWAY ALONG BISHOP CREEK FROM PELHAM CITY PARK TO OAK MOUNTAIN PARK ROAD.

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065161 CMAQ 5916 (253) PRELIMINARY ENGINEERING

SIDEWALK 2017 $323 $81 $404

100065162 CMAQ 5916 (253) RIGHT OF WAY

SIDEWALK 2019 $82 $21 $103

100065163 CMAQ 5916 (253) UTILITIES

SIDEWALK 2019 $82 $21 $103

TOTAL COST: $488 $122 $610

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

107 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Amendment # 1

Route CR-NA ProjectDescription

INTERSECTION IMPROVEMENTS AT NOBLE STREET AND 4TH STREET

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065454 STPOA 0815 (255) UTILITIES

INTERSECTION IMPROVEMENTS

2019 $7 $2 $8

TOTAL COST: $7 $2 $8

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

108 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Amendment # 2

Route NA- ProjectDescription

BESSEMER MULTI-USE TRAIL, PHASE I ALONG SR-150 BETWEEN FAIRFAX AVENUE AND BERKLEY AVENUE IN THE CITY OF BESSEMER

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061585 TAPBH-CMAQ TA13 (949)

CONSTRUCTION

UNCLASSIFIED 2017 $560 $140 $700

TOTAL COST: $560 $140 $700

Route NA- ProjectDescription

DOWNTOWN STREETSCAPE AND SIDEWALKS ALONG B.Y. WILLIAMS SR. DRIVE IN THE CITY OF MIDFIELD.

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062999 TAPAA-CMAQ TA14 (930)

CONSTRUCTION

SIDEWALK 2019 $899 $225 $1,123

TOTAL COST: $899 $225 $1,123

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

109 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 2

Route NA- ProjectDescription

PAVEMENT MANAGEMENT STUDY FOR CITY OF BIRMINGHAM

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065318 STPBH NR16 (912) SPECIAL

UNCLASSIFIED 2016 $400 $100 $500

TOTAL COST: $400 $100 $500

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

110 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 4

Route I -20 ProjectDescription

I-20 CONTINUED MONITORING FOR PRIOR PROJECT 100033404 (FY 2016 - FY 2018)

Type of Work UNCLASSIFIED

Project Length in Miles 12.000 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065670 IM I020 (351) SPECIAL

UNCLASSIFIED 2016 $113 $13 $125

TOTAL COST: $113 $13 $125

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

111 of 154

REGION HIGHWAY PROJECTS - CALHOUN

STIP PLAN: 2016 - Amendment # 8

Route CR-94 ProjectDescription

CR-94 (DANIEL PAYNE DRIVE) ADD CONTINUOUS TWO-WAY LEFT TURN LANE FROM CR-105 (CHERRY AVE) TO I-65 (PROJECT SPONSOR THE CITY OF BIRMINGHAM)

Type of Work TURN LANES

Project Length in Miles 2.600 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065501 STPBH 3716 (254) PRELIMINARY ENGINEERING

TURN LANES 2016 $280 $70 $350

TOTAL COST: $280 $70 $350

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

112 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 8

Route NA- ProjectDescription

DOWNTOWN STREETSCAPE AND SIDEWALKS ALONG B.Y. WILLIAMS SR. DRIVE IN THE CITY OF MIDFIELD.

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065502 CMAQ TA14 (930) PRELIMINARY ENGINEERING

SIDEWALK 2017 $81 $20 $101

100065503 CMAQ TA14 (930) RIGHT OF WAY

SIDEWALK 2019 $82 $21 $103

100065504 CMAQ TA14 (930) UTILITIES

SIDEWALK 2019 $82 $21 $103

TOTAL COST: $246 $61 $307

Route NA- ProjectDescription

ADVANCED TRAFFIC MANAGEMENT SYSTEM ASSESSMENT

Type of Work TRAFFIC CONTROL MARKING & LEGN

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065798 CMAQ 3716 () SPECIAL

TRAFFIC CONTROL MARKING & LEGN

2019 $330 $82 $412

TOTAL COST: $330 $82 $412

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

113 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 8

Route SR-4 ProjectDescription

INTERSECTION IMPROVEMENTS AT PARKWAY DRIVE SR-4 (US-78) AND PRESIDENT STREET IN THE CITY OF LEEDS

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.520 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065388 STPAA 0004 (543) PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2017 $283 $71 $354

100065396 STPAA 0004 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $412 $103 $515

TOTAL COST: $695 $174 $869

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

114 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 8

Route SR-160 ProjectDescription

SR-160 INTERSECTION IMPROVEMENTS AT MOUNTAIN WOODS LAKE ROAD AND DRAINAGE CORRECTION AT STANDHOLTON DRIVE

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065799 CMAQ 0516 (250) UTILITIES

INTERSECTION IMPROVEMENTS

2018 $1,291 $385 $1,676

TOTAL COST: $1,291 $385 $1,676

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

115 of 154

REGION HIGHWAY PROJECTS - BLOUNT

STIP PLAN: 2016 - Amendment # 9

Route CR-NA ProjectDescription

BRIDGE RECONSTRUCTION AND REHABILITATION FOR OLD BROOK TRAIL BRIDGE (BIN # 012869) OVER LITTLE SHADES CREEK AND CANTERBURY ROAD BRIDGE (BIN # 002873) OVER WATKINS CREEK ,CITY OF MOUNTAIN BROOK

Type of Work BRIDGE REHABILITATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066110 STPBH 3716 (256) PRELIMINARY ENGINEERING

BRIDGE REHABILITATION

2017 $200 $50 $250

TOTAL COST: $200 $50 $250

Route I -59 ProjectDescription

DRAINAGE IMPROVEMENTS AND STREETSCAPE FOR CBD I-20/59 BRIDGE REPLACEMENT ALONG BIRMINGHAM CENTRAL BUSINESS DISTRICT 9TH AVE N FROM 15TH ST N TO 23RD ST N AND CROSS STREETS (15TH ST N THROUGH 25TH ST N).

Type of Work DRAINAGE CORRECTION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065792 ACIMF I059 (394) CONSTRUCTION

DRAINAGE CORRECTION

2016 $17,460 $1,940 $19,400

TOTAL COST: $17,460 $1,940 $19,400

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

116 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 9

Route NA- ProjectDescription

IRONDALE PAVEMENT MANAGEMENT STUDY CITY OF IRONDALE SPONSOR.

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066114 STPBH 3716 (257) SPECIAL

UNCLASSIFIED 2017 $56 $14 $70

TOTAL COST: $56 $14 $70

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

117 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 9

Route I -459 ProjectDescription

I-459 PAVEMENT REHAB, RESURFACE, CROSS SLOPE CORRECTION, GUARDRAIL, AND PAVEMENT STRIPING AND MARKINGS FROM I-59/20 INTERCHANGE TO SOUTH OF CR-52

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 11.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056261 RP-IM I459 (311) PRELIMINARY ENGINEERING

PAVEMENT MINOR REHABILITATION

2017 $185 $21 $205

100056262 RP-IM I459 (311) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2018 $13,542 $1,505 $15,047

TOTAL COST: $13,727 $1,525 $15,252

Route I -59 ProjectDescription

CORRIDOR ALTERNATIVES IDENTIFICATION AND ANALYSIS FOR I-59/20 IN DOWNTOWN BIRMINGHAM'S CENTRAL BUSINESS DISTRICT (CBD)

Type of Work CORRIDOR STUDY

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066176 TTDG 3716 (255) SPECIAL

CORRIDOR STUDY

2016 $0 $0 $0

TOTAL COST: $0 $0 $0

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

118 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 13

Route SR-46 ProjectDescription

SR-46 BRIDGE REPLACEMENT OVER CANE CREEK (BIN#2108) NORTH OF I-20

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.070 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066574 BR 0046 (503) RIGHT OF WAY

BRIDGE REPLACEMENT

2018 $28 $7 $35

TOTAL COST: $28 $7 $35

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

119 of 154

REGION HIGHWAY PROJECTS - CLEBURNE

STIP PLAN: 2016 - Amendment # 15

Route I -20 ProjectDescription

INTERCHANGE LIGHTING REHABILITATION ON I-20 AT SR-77 INTERCHANGE (EXIT 168)

Type of Work LIGHTING

Project Length in Miles 0.776 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066551 ACNU66551 ATRP (006) CONSTRUCTION

LIGHTING 2017 $212 $221 $433

TOTAL COST: $212 $221 $433

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

120 of 154

REGION HIGHWAY PROJECTS - TALLADEGA

STIP PLAN: 2016 - Amendment # 15

Route I -459 ProjectDescription

I-459 PAVEMENT REHAB, RESURFACE, CROSS SLOPE CORRECTION, GUARDRAIL REPLACEMENT, AND PAVEMENT STRIPING AND MARKINGS FROM SOUTH OF CR-52 TO SR-150

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 10.861 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100058050 IM I459 (315) PRELIMINARY ENGINEERING

PAVEMENT REHABILITATION

2017 $189 $21 $210

100058051 IM I459 (315) CONSTRUCTION

PAVEMENT REHABILITATION

2018 $20,359 $2,262 $22,621

TOTAL COST: $20,548 $2,283 $22,831

Route I -65 ProjectDescription

PLANING, RESURFACING, STRIPING, MARKINGS AND SAFETY IMPROVEMENTS TO GUARDRAILS AND GUARDRAIL END ANCHORS ON I-65 FROM MOUNT OLIVE INTERCHANGE TO .78 MILE NORTH OF SR-160

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 26.800 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100060141 IM-HSIP I065 (484) PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 2

2017 $90 $10 $100

100060142 IM-HSIP I065 (484) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $20,036 $2,226 $22,262

TOTAL COST: $20,126 $2,236 $22,362

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

121 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 17

Route NA- ProjectDescription

SIDEWALKS ALONG SR-150 (JOHN HAWKINS PKWY) FROM CAHABA RIVER ESTATES RD. TO SR-3 (US-31, MONTGOMERY HWY) CITY OF HOOVER

Type of Work SIDEWALK

Project Length in Miles 3.620 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100056556 CMAQ NR13 (961) PRELIMINARY ENGINEERING

SIDEWALK 2018 $248 $62 $310

100056557 CMAQ NR13 (961) RIGHT OF WAY

SIDEWALK 2020 $109 $27 $137

TOTAL COST: $358 $89 $447

Route NA- ProjectDescription

BIKESHARE WAYFINDING SIGNS AT VARIOUS LOCATIONS IN DOWNTOWN BIRMINGHAM

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066621 CMAQ 3717 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2019 $190 $48 $238

100066622 CMAQ 3717 () CONSTRUCTION

UNCLASSIFIED 2019 $1,120 $280 $1,400

TOTAL COST: $1,310 $328 $1,638

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

122 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 17

Route SR-25 ProjectDescription

CORRIDOR FEASIBILITY STUDY FOR MULTILANE FACILITY ON SR-25 (US-411) FROM PARK AVENUE TO SANIE ROAD

Type of Work CORRIDOR STUDY

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066555 STPAA 0025 (549) SPECIAL

CORRIDOR STUDY

2017 $400 $100 $500

TOTAL COST: $400 $100 $500

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

123 of 154

REGION HIGHWAY PROJECTS - ST. CLAIR

STIP PLAN: 2016 - Amendment # 17

Route NA- ProjectDescription

WOODLAWN NEIGHBORHOOD STREETSCAPE PHASE 2 (CITY OF BIRMINGHAM)

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066708 CMAQ 3717 () PRELIMINARY ENGINEERING

STREETSCAPE

2019 $204 $51 $255

100066710 CMAQ 3717 () UTILITIES

STREETSCAPE

2019 $204 $51 $255

100066709 CMAQ 3717 () CONSTRUCTION

STREETSCAPE

2019 $1,224 $306 $1,530

TOTAL COST: $1,632 $408 $2,040

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

124 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 19

Route I -20 ProjectDescription

RESURFACING I-20 FROM MP 173.218 (BEGINNING 6 LANES) TO MP 181.747 (0.07 MILES WEST OF H J BENTLEY JR PARKWAY)

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 17.058 Urban Area ANNISTON COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066466 IM I020 (352) PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 1

2017 $18 $2 $20

100066469 IM I020 (352) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2017 $4,156 $462 $4,617

TOTAL COST: $4,174 $464 $4,637

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

125 of 154

REGION HIGHWAY PROJECTS - TALLADEGA

STIP PLAN: 2016 - Amendment # 19

Route SR-25 ProjectDescription

BRIDGE REPLACEMENT ON SR-25 OVER BULLEY CREEK BIN # 000769

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.022 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066531 BR 0025 (550) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2017 $80 $20 $100

100066556 BR 0025 (550) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $500 $500 $1,000

TOTAL COST: $580 $520 $1,100

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

126 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Amendment # 20

Route NA- ProjectDescription

INTERSECTION IMPROVEMENT STUDY THROUGHOUT THE CITY OF HOMEWOOD FOR IDENTIFICATION OF POTENTIAL ROADWAY IMPROVEMENTS.

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066930 STPBH 3717 () SPECIAL

INTERSECTION IMPROVEMENTS

2019 $80 $20 $100

TOTAL COST: $80 $20 $100

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

127 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 21

Route SR-34 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-34 AT CROPWELL DRIVE AND HARDWICK ROAD (CR-45), INCLUDING ROUNDABOUT CONSTRUCTION IN PELL CITY

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.002 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066388 STPAA-HSIP 0034 (502) PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2017 $206 $44 $250

TOTAL COST: $206 $44 $250

Route SR-34 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-34 AT CROPWELL DRIVE AND HARDWICK ROAD (CR-45), INCLUDING ROUNDABOUT CONSTRUCTION IN PELL CITY

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.002 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066390 STPAA-HSIP 0034 () RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $312 $45 $357

TOTAL COST: $312 $45 $357

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

128 of 154

REGION HIGHWAY PROJECTS - ST. CLAIR

STIP PLAN: 2016 - Amendment # 21

Route I -85 ProjectDescription

PAVEMENT REHABILITATION ON I-85 FROM THE LEE COUNTY LINE TO THE GEORGIA STATE LINE (MP 80.00)

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 13.896 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066476 IM I085 (360) PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 2

2017 $227 $25 $253

100066477 IM I085 (360) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2019 $1,845 $205 $2,050

TOTAL COST: $2,072 $230 $2,302

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

129 of 154

REGION HIGHWAY PROJECTS - CHAMBERS

STIP PLAN: 2016 - Amendment # 22

Route NA- ProjectDescription

STREETSCAPE AND OTHER PEDESTRIAN IMPROVEMENTS ALONG THE FOLLOWING BLOCKS IN DOWNTOWN BIRMINGHAM: 4TH AVE. N FROM 15TH N TO 17TH N, 5TH AVE. N FROM 15TH N TO 17TH N,15TH ST. N FROM 4TH AVE. N TO 5TH AVE. N, 16TH ST. N FROM 4TH AVE. N TO 5TH AVE. N.

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067026 CMAQ 3717 () PRELIMINARY ENGINEERING

STREETSCAPE

2019 $98 $24 $122

100067027 CMAQ 3717 () UTILITIES

STREETSCAPE

2019 $122 $31 $153

100067028 CMAQ 3717 () CONSTRUCTION

STREETSCAPE

2019 $408 $102 $510

TOTAL COST: $628 $157 $785

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

130 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 22

Route I -65 ProjectDescription

I-65 ADD LANES FROM SR-3 (US-31) TO CR-52 (8-LN)(PHASE 2)

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 3.531 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100044672 NHF-IMF I065 (354) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2018 $71,705 $17,039

$88,744

TOTAL COST: $71,705 $17,039

$88,744

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

131 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Amendment # 22

Route CR-2303 ProjectDescription

CR-2303 (LAKESHORE PKWY) AT I-65 INTERCHANGE MODIFICATIONS.

Type of Work RAMP REVISIONS

Project Length in Miles 1.120 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100040770 STPBHF 7026 () UTILITIES

RAMP REVISIONS

2019 $180 $45 $225

100040771 STPBHF 7026 (601) CONSTRUCTION

RAMP REVISIONS

2020 $10,723 $2,681 $13,403

TOTAL COST: $10,903 $2,726 $13,628

Route I -459 ProjectDescription

I-459 INTERCHANGE IMPROVEMENTS AT SR-38 (US-280) INCLUDING BRAIDED EXIT RAMP FROM I-459 NB

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.675 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100062216 IMF-STPBHF I459 (316) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2017 $4,449 $913 $5,362

TOTAL COST: $4,449 $913 $5,362

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

132 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 25

Route SR-150 ProjectDescription

BRIDGE REPLACEMENT ON SR-150 OVER LITTLE SHADES CREEK BIN # 2866

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066942 BR 0150 (505) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2018 $81 $20 $101

100066943 BR 0150 (505) UTILITIES

BRIDGE REPLACEMENT

2019 $245 $61 $306

100066944 BR 0150 () CONSTRUCTION

BRIDGE REPLACEMENT

2020 $1,236 $309 $1,545

TOTAL COST: $1,562 $390 $1,952

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

133 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 27

Route SR-48 ProjectDescription

REPLACE BRIDGE, BIN 000798, SR-48 OVER FOX CREEK (SUFF = 3.6, STATUS = SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.020 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067658 BR 0048 (502) RIGHT OF WAY

BRIDGE REPLACEMENT

2018 $241 $60 $301

TOTAL COST: $241 $60 $301

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

134 of 154

REGION HIGHWAY PROJECTS - RANDOLPH

STIP PLAN: 2016 - Amendment # 27

Route CR-17 ProjectDescription

RESURFACING ON CR-17 (VALLEYDALE ROAD) FROM I-65 TO CR-29 (CALDWELL MILL ROAD) AND ON CR-43 (BEAR CREEK ROAD) FROM SR-38 (US-280) TO SR-25

Type of Work RESURFACING

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067603 STPBH 5918 () PRELIMINARY ENGINEERING

RESURFACING

2019 $80 $20 $100

TOTAL COST: $80 $20 $100

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

135 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Amendment # 27

Route NA- ProjectDescription

SERVICE PATROL OPERATIONS FOR FY 2018 AND 2019 FOR JEFFERSON AND SHELBY COUNTIES

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067758 STPBH NR18 (912) SPECIAL

UNCLASSIFIED 2018 $600 $150 $750

TOTAL COST: $600 $150 $750

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

136 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 30

Route SR-261 ProjectDescription

INTERSECTION IMPROVEMENTS AT SR-261 AND CR-52E IN THE CITY OF HELENA

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.028 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067711 CMAQ 0261 (501) PRELIMINARY ENGINEERING

INTERSECTION IMPROVEMENTS

2018 $280 $70 $350

100067712 CMAQ 0261 (501) RIGHT OF WAY

INTERSECTION IMPROVEMENTS

2019 $323 $81 $404

TOTAL COST: $603 $151 $754

Route SR-38 ProjectDescription

INTERSECTION IMPROVEMENTS ON SR-38 (US-280) AT OLD US-280 / WAL-MART.

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067753 NH 0038 (534) UTILITIES

INTERSECTION IMPROVEMENTS

2018 $410 $151 $561

TOTAL COST: $410 $151 $561

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

137 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Amendment # 30

Route I -20 ProjectDescription

PAVEMENT REHABILITATION, MILLING, AND REPLACEMENT OF OPEN GRADED FRICTION COURSE (OGFC) ON I-20 FROM 0.70 MILES WEST OF SR-4 (US-78) TO 0.15 MILES EAST OF OLD COAL CITY ROAD

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 3.915 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067742 IM I020 (354) PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 1

2018 $32 $4 $36

TOTAL COST: $32 $4 $36

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

138 of 154

REGION HIGHWAY PROJECTS - ST. CLAIR

STIP PLAN: 2016 - Amendment # 30

Route I -20 ProjectDescription

PAVEMENT REHABILITATION, MILLING, AND REPLACEMENT OF OPEN GRADED FRICTION COURSE (OGFC) ON I-20 FROM 0.70 MILES WEST OF SR-4 (US-78) TO 0.15 MILES EAST OF OLD COAL CITY ROAD

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 3.915 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067743 IM I020 (354) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2018 $2,471 $275 $2,746

TOTAL COST: $2,471 $275 $2,746

Route I -20 ProjectDescription

PAVEMENT REHABILITATION, MILLING AND REPLACEMENT OF OPEN GRADED FRICTION COURSE (OGFC) ON I-20 FROM .15 MILE EAST OF OLD COAL CITY ROAD MP 159.783 TO TALLADEGA COUNTY LINE MP 164.410

Type of Work PREVENTATIVE MAINTENANCE LEVEL 1

Project Length in Miles 9.254 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068017 IM I020 (355) PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 1

2018 $3 $0 $3

100068034 IM I020 (355) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 1

2018 $2,665 $296 $2,961

TOTAL COST: $2,667 $296 $2,964

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

139 of 154

REGION HIGHWAY PROJECTS - ST. CLAIR

STIP PLAN: 2016 - Amendment # 31

Route SR-74 ProjectDescription

BRIDGE REPLACEMENT AND APPROACHES (BIN 004560) ON SR-74 (US-278) AT LOCUST FORK, GRADE, DRAIN, BASE, PAVE, BRIDGE, AND BRIDGE REMOVAL

Type of Work BRIDGES AND APPROACHES

Project Length in Miles 1.136 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067595 BR 0074 (537) RIGHT OF WAY

BRIDGES AND APPROACHES

2019 $808 $202 $1,010

TOTAL COST: $808 $202 $1,010

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

140 of 154

REGION HIGHWAY PROJECTS - BLOUNT

STIP PLAN: 2016 - Amendment # 33

Route I -85 ProjectDescription

PAVEMENT REHABILITATION ON I-85 FROM 1.5 MILES NORTH OF CR-388 (MP 71.964) TO THE GEORGIA STATE LINE (MP 80.000)

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 8.036 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067306 IM I085 (363) CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $6,363 $707 $7,070

TOTAL COST: $6,363 $707 $7,070

Route SR-77 ProjectDescription

BRIDGE REPLACEMENT ON SR-77 AT HOOTALOOCO CREEK 4.8 MILES NORTH WEST OF SR-1 (US-431) BIN 2600

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.015 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067064 BR 0077 (522) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2018 $240 $60 $300

TOTAL COST: $240 $60 $300

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

141 of 154

REGION HIGHWAY PROJECTS - CHAMBERS

STIP PLAN: 2016 - Amendment # 33

Route CR-NA ProjectDescription

REPAIR SCOUR / EROSION DAMAGE, RESURFACE PATCH AND MINOR DRAINAGE IMPROVEMENTS ON CHEAHA ROAD NEAR CHEAHA LAKE DRIVE

Type of Work EROSION CONTROL

Project Length in Miles 0.100 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067953 FLAP FLAP (022) CONSTRUCTION

EROSION CONTROL

2019 $653 $163 $816

TOTAL COST: $653 $163 $816

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

142 of 154

REGION HIGHWAY PROJECTS - CLEBURNE

STIP PLAN: 2016 - Amendment # 33

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT (BIN 000090) ON 21ST STREET NORTH (RICHARD ARRINGTON JR BOULEVARD) BETWEEN 1ST AVENUE SOUTH AND 1ST AVENUE NORTH OVER NORFOLK SOUTHERN AND CSX RAILROAD - CITY OF BIRMINGHAM

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067934 STPBH 3718 (250) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $640 $160 $800

TOTAL COST: $640 $160 $800

Route CR-NA ProjectDescription

13TH STREET SOUTH - ADD BIKE LANES AND STREETSCAPE IMPROVEMENTS FROM 1ST AVE SOUTH TO 10TH AVE SOUTH

Type of Work STREETSCAPE

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068127 CMAQ 3718 () PRELIMINARY ENGINEERING

STREETSCAPE

2019 $299 $75 $374

TOTAL COST: $299 $75 $374

Route CR-NA ProjectDescription

GREENWAY AND ROAD DIET ON RICHARD ARRINGTON JR BOULEVARD FROM 15TH AVENUE SOUTH TO VALLEY AVENUE

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068467 CMAQ 3718 () PRELIMINARY ENGINEERING

UNCLASSIFIED 2019 $242 $61 $303

TOTAL COST: $242 $61 $303

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

143 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 33

Route NA- ProjectDescription

SIDEWALKS ALONG PINE RIDGE ROAD FROM OVERBROOK ROAD TO OLD LEEDS ROAD

Type of Work SIDEWALK

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068123 CMAQ 3718 () PRELIMINARY ENGINEERING

SIDEWALK 2019 $162 $40 $202

TOTAL COST: $162 $40 $202

Route NA- ProjectDescription

BIRMINGHAM RIDE SHARE PROGRAMS APPORTIONMENT FY 2019 - FY 2020

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068135 STPBH TR18 () SPECIAL

UNCLASSIFIED 2019 $1,300 $0 $1,300

TOTAL COST: $1,300 $0 $1,300

Route NA- ProjectDescription

PROJECT TO RECORD AND BILL CBD PHASE III DEBT SERVICE INTEREST COST

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068397 FRT-IM I059 (385) SPECIAL

UNCLASSIFIED 2018 $18,299 $2,033 $20,332

TOTAL COST: $18,299 $2,033 $20,332

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

144 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 33

Route SR-48 ProjectDescription

REPLACE BRIDGE, BIN 000798, SR-48 OVER FOX CREEK (SUFF = 3.6, STATUS = SD)

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.020 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100047362 BR 0048 () CONSTRUCTION

BRIDGE REPLACEMENT

2019 $3,368 $842 $4,210

TOTAL COST: $3,368 $842 $4,210

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

145 of 154

REGION HIGHWAY PROJECTS - RANDOLPH

STIP PLAN: 2016 - Amendment # 33

Route CR-52 ProjectDescription

INTERSECTION IMPROVEMENTS AT CR-52 AND CR-93

Type of Work INTERSECTION IMPROVEMENTS

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100059509 CMAQ 5918 (250) CONSTRUCTION

INTERSECTION IMPROVEMENTS

2019 $760 $190 $950

TOTAL COST: $760 $190 $950

Route NA- ProjectDescription

PROPOSED BIKE LANES ALONG JOHN FINDLAY DRIVE FROM NORTH OF STATE PARK ROAD TO THE NORTH TRAILHEAD AT OAK MOUNTAIN STATE PARK

Type of Work UNCLASSIFIED

Project Length in Miles 6.008 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100064282 CMAQ 5916 (252) CONSTRUCTION

UNCLASSIFIED 2018 $4,390 $1,097 $5,487

TOTAL COST: $4,390 $1,097 $5,487

Route SR-119 ProjectDescription

ADDITIONAL LANES ON SR-119 FROM CR-80 TO CR-26

Type of Work ADDITIONAL ROADWAY LANES

Project Length in Miles 1.694 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100061118 ACAA61118 ATRP (012) CONSTRUCTION

ADDITIONAL ROADWAY LANES

2020 $9,839 $2,460 $12,298

TOTAL COST: $9,839 $2,460 $12,298

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

146 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Amendment # 33

Route CR-303 ProjectDescription

BRIDGE REPLACEMENT (BIN 008086) ON CR-303 (BERNEY STATION ROAD) OVER DRY CREEK - TCP 61-303-19

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067954 FLAP FLAP (010) CONSTRUCTION

BRIDGE REPLACEMENT

2019 $334 $84 $418

TOTAL COST: $334 $84 $418

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

147 of 154

REGION HIGHWAY PROJECTS - TALLADEGA

STIP PLAN: 2016 - Amendment # 33

Route SR-50 ProjectDescription

REPLACE BRIDGE ON SR-50 OVER WIND CREEK BIN 004389

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.003 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067062 BR 0050 () PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2019 $202 $51 $253

TOTAL COST: $202 $51 $253

Route SR-63 ProjectDescription

BRIDGE REPLACEMENT (BIN 014307) ON SR-63 OVER SUGAR CREEK #63-62-11.9

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068200 BR 0063 (507) PRELIMINARY ENGINEERING

BRIDGE REPLACEMENT

2018 $120 $30 $150

TOTAL COST: $120 $30 $150

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

148 of 154

REGION HIGHWAY PROJECTS - TALLAPOOSA

STIP PLAN: 2016 - Amendment # 33

Route CR-NA ProjectDescription

BRIDGE REPLACEMENT ON SPRINGDALE ROAD OVER FIVE MILE CREEK BIN# 15837

Type of Work BRIDGE REPLACEMENT

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068651 STPBH 3717 (250) UTILITIES

BRIDGE REPLACEMENT

2019 $404 $101 $505

TOTAL COST: $404 $101 $505

Route NA- ProjectDescription

BICYCLE/PEDESTRIAN PLAN FOR JEFFERSON COUNTY, SPONSOR IS JEFFERSON COUNTY

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068759 CMAQ NR18 () SPECIAL

UNCLASSIFIED 2019 $120 $30 $150

TOTAL COST: $120 $30 $150

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

149 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 36

Route I -20 ProjectDescription

PAVEMENT REHABILITATION ON I-20 FROM EXIT 140 TO THE JEFFERSON/ST CLAIR COUNTY LINE

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 5.600 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068064 IM I020 (356) PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $136 $15 $152

100068066 IM I020 () CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $6,300 $700 $7,000

TOTAL COST: $6,436 $715 $7,152

Route I -59 ProjectDescription

PAVEMENT REHABILITATION ON I-20/59 FROM ARKADELPHIA ROAD TO THE SOUTH END OF THE CENTRAL BUSINESS DISTRICT BRIDGE NEAR 15TH STREET AND ON I-65 FROM SOUTH OF 1 ST. AVENUE NORTH TO 16TH STREET NORTH

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100063656 IM I059 (410) CONSTRUCTION

PAVEMENT REHABILITATION

2019 $13,909 $1,545 $15,455

TOTAL COST: $13,909 $1,545 $15,455

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

150 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 38

Route I -65 ProjectDescription

CONCRETE PAVEMENT REHAB, UNDERSEAL, GRINDING, PAVERLAID SURFACE TREATMENT, UNDERDRAIN, SHOULDER PAVEMENT,GUARDRAIL ON I-65 FROM SR-3(US-31) TO RALEIGH AVENUE OVERPASS (PRIORITY #35)

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 3.760 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066473 IM I065 () PRELIMINARY ENGINEERING

PAVEMENT REHABILITATION

2019 $227 $25 $253

TOTAL COST: $227 $25 $253

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

151 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 38

Route NA- ProjectDescription

MULTI-USE TRAIL AND GREENWAY SYSTEM ALONG THE SR-3 (US-31) CORRIDOR ADJACENT TO BISHOP CREEK IN PELHAM; PHASES 3 AND 4

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067294 TAPAA-CMAQ TA17 (904)

CONSTRUCTION

UNCLASSIFIED 2019 $1,183 $296 $1,479

TOTAL COST: $1,183 $296 $1,479

Route NA- ProjectDescription

PELHAM TRAILS AND GREENWAYS LOCATED ALONG THE SR-3 (US-31) CORRIDOR IN PELHAM ADJACENT TO BISHOP CREEK FROM CR-105 TO SR-119 AND EVENTUALLY CROSSING UNDER I-65 AND CONTINUING TO THE ENTRANCE OF OAK MOUNTAIN STATE PARK: PHASE 1 AND 2

Type of Work UNCLASSIFIED

Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100065519 TAPAA-CMAQ TA16 (901)

CONSTRUCTION

UNCLASSIFIED 2019 $1,159 $290 $1,448

TOTAL COST: $1,159 $290 $1,448

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

152 of 154

REGION HIGHWAY PROJECTS - SHELBY

STIP PLAN: 2016 - Amendment # 38

Route I -20 ProjectDescription

PAVEMENT REHABILITATION ON I-20 FROM THE JEFFERSON COUNTY LINE TO 0.87 MILE EAST OF KELLY CREEK ROAD

Type of Work PREVENTATIVE MAINTENANCE LEVEL 2

Project Length in Miles 9.966 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100068217 IM I020 (357) PRELIMINARY ENGINEERING

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $227 $25 $253

100068218 IM I020 () CONSTRUCTION

PREVENTATIVE MAINTENANCE LEVEL 2

2019 $6,818 $758 $7,575

TOTAL COST: $7,045 $783 $7,828

Route I -59 ProjectDescription

CONCRETE PAVEMENT REHAB ON I-59 FROM JEFFERSON COUNTY LINE TO NORTH OF SR-23

Type of Work PAVEMENT REHABILITATION

Project Length in Miles 17.320 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100066471 IM I059 (411) PRELIMINARY ENGINEERING

PAVEMENT REHABILITATION

2019 $227 $25 $253

100066472 IM I059 () CONSTRUCTION

PAVEMENT REHABILITATION

2019 $14,169 $1,574 $15,744

TOTAL COST: $14,397 $1,600 $15,996

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

153 of 154

REGION HIGHWAY PROJECTS - ST. CLAIR

STIP PLAN: 2016 - Amendment # 38

Route I -59 ProjectDescription

RESURFACE I-59 FROM I-459 TO 1.23 MILES NORTH OF ACADEMY DRIVE (EXIT 108) PLANNING, RESURFACING, CROSS SLOPE/SUPERELEVATION CORRECTION, TRAFFIC STRIPING AND MARKINGS, GUARDRAIL AND GUARDRAIL END ANCHORS

Type of Work PAVEMENT MINOR REHABILITATION

Project Length in Miles 3.357 Urban Area BIRMINGHAM COST IN THOUSANDS

Project Reference Nbr

FA Number Scope of Work Type of Work Fiscal Year Federal

State-Other TOTAL

100067734 IM I059 (408) CONSTRUCTION

PAVEMENT MINOR REHABILITATION

2019 $8,958 $995 $9,953

TOTAL COST: $8,958 $995 $9,953

11/10/2018 ALABAMA DEPARTMENT OF TRANSPORTATION STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

STIP YEARS from 10/1/2014-9/30/2019

154 of 154

REGION HIGHWAY PROJECTS - JEFFERSON

STIP PLAN: 2016 - Amendment # 39