K&M ENGINEERING AND CONSULTING
This document contains proprietary information of METKA S.A. and is to be used solely for the Project and the purpose for which it is furnished. It may not be disclosed to others for a different use without the written permission of METKA S.A.
Project:
SAMRA POWER STATION PHASE III ADD ON COMBINED CYCLE PROJECT
Title:
ERECTION OF HVAC INSPECTION AND TEST PLAN
KKS Document No: 111205-30- YG-QPH-MET-010 Rev: 1
METKA Document No:
SEPCO Document No:
Purpose of issue: General Use Date: 2014-2-3
Prepared: QA/QC DEPARTMENT
Reviewed: DIMITRIS KOUKLAKIS
Approved: DIMITRIS POULAKIS
![Page 2: 111205-30-Yg-qph-met-010 Erection of Hvac Itp Rev 01](https://reader035.vdocuments.us/reader035/viewer/2022080506/577cc9c31a28aba711a48eda/html5/thumbnails/2.jpg)
SAMRAPOWERSTATIONPHASEIIIADDONCOMBINEDCYCLEPROJECT
c
This document contains proprietary information of METKA S.A. and is subject to the restrictions set forth on the title page
CLASSIFICATION
Contains information for the design of structures, systems or components: Yes No
Design verification : Not applicable Head of OU/Supervisor Verifier Level 1 Level 2
CONTROL OF MODIFICATIONS
Revision Modifications
1
First issue
PRELIMINARY OR PENDING INFORMATION
Revision Paragraphs Subject Status
1
Fields identified as pending or blank
DISTRIBUTION
External Internal No. copies/Format
![Page 3: 111205-30-Yg-qph-met-010 Erection of Hvac Itp Rev 01](https://reader035.vdocuments.us/reader035/viewer/2022080506/577cc9c31a28aba711a48eda/html5/thumbnails/3.jpg)
SAMRAPOWERSTATIONPHASEIIIADDONCOMBINEDCYCLEPROJECT
c
This document contains proprietary information of METKA S.A. and is subject to the restrictions set forth on the title page
TABLE OF CONTENTS
ERECTION OF HVAC
INSPECTION AND TEST PLAN
![Page 4: 111205-30-Yg-qph-met-010 Erection of Hvac Itp Rev 01](https://reader035.vdocuments.us/reader035/viewer/2022080506/577cc9c31a28aba711a48eda/html5/thumbnails/4.jpg)
KKS No: 111205-30-YG-QPH-MET-010
Revision: 1
Date: 3/2/2014
Point Standards / Specifications
/ Procedures Document / Record Subcontractor METKA SEPCO Notes
1
1.1 Drawings / Packing List E
1.2 Certificates R R
2
2.1 Drawings, Erection Manual E SW SW
2.1.1 Drawings, Erection Manual E SW SW
2.1.2 Drawings, Erection Manual E SW SW
2.1.3 Drawings, Erection Manual E SW SW
2.1.4 Drawings, Erection Manual E SW SW
2.2 Drawings, Erection Manual E SW SW
2.2.1 Drawings, Erection Manual E SW SW
2.2.2 Drawings, Erection Manual E SW SW
INSPECTION AND TEST PLAN
SAMRA POWER STATION PHASE III ADD ON COMBINED CYCLE PROJECT: Erection of HVAC
Αctivity
Materials Certificates Control
Site Delivery and incoming inspection
Visual inspection/Quantity inspection
Casing insatllation
Motor installation
Installation of equipment
Air Handling Units
Casing (installation, fixing, sealing)
Axial Fans
Centrifugal fans installation
Air heating coils installation
Pre filters, Filters, dampers
![Page 5: 111205-30-Yg-qph-met-010 Erection of Hvac Itp Rev 01](https://reader035.vdocuments.us/reader035/viewer/2022080506/577cc9c31a28aba711a48eda/html5/thumbnails/5.jpg)
KKS No: 111205-30-YG-QPH-MET-010
Revision: 1
Date: 3/2/2014
Point Standards / Specifications
/ Procedures Document / Record Subcontractor METKA SEPCO Notes
INSPECTION AND TEST PLAN
SAMRA POWER STATION PHASE III ADD ON COMBINED CYCLE PROJECT: Erection of HVAC
Αctivity
2.3 Drawings, Erection Manual E SW SW
2.3.1 Drawings, Erection Manual E SW SW
2.3.2 Drawings, Erection Manual E SW SW
2.4 Drawings, Erection Manual E SW SW
2.5 Drawings, Erection Manual E SW SW
2.6 Drawings, Erection Manual E SW SW
2.6.1 Drawings, Erection Manual E SW SW
2.7 Drawings, Erection Manual E SW SW
2.8 Drawings, Erection Manual E SW SW
2.9 Drawings, Erection Manual E SW SW
Installation , fixing, fittings
Natural Smoke & Heat Ventilators Installation
VRV Units Installation
Heat Exchanger Units Installation
Packaged Units Installation
Ductwork and Accessories
Casing installation
Enclosure smoke & Heat Exhaust Centrifugal Fans
Motor installation
Grilles / Smoke Dampers Installation
![Page 6: 111205-30-Yg-qph-met-010 Erection of Hvac Itp Rev 01](https://reader035.vdocuments.us/reader035/viewer/2022080506/577cc9c31a28aba711a48eda/html5/thumbnails/6.jpg)
KKS No: 111205-30-YG-QPH-MET-010
Revision: 1
Date: 3/2/2014
Point Standards / Specifications
/ Procedures Document / Record Subcontractor METKA SEPCO Notes
INSPECTION AND TEST PLAN
SAMRA POWER STATION PHASE III ADD ON COMBINED CYCLE PROJECT: Erection of HVAC
Αctivity
3
3.1 Drawings E SW SW
3.2 Drawings E SW SW
4
4.1 Drawings E W W
4.2 Inspection & Test Plan Final Erection Quality Dossier E H R
Νotes
AbbreviationsE : Works Exexution W : Witness point SW : Spot Witness point
R : Records review Η : Hold point
Prepared byDKOU
4
3
Modifications Approved by Date
Final inspection
Walk down / System Verification
Revision
2
1 DPOU 3/2/2014
Alignment - Adjustment -Slope
Installation
Supports
Technical File