UIG inc. I Observation Report  i urban infrastructure group, inc. www.uigtexas.com I 956.464.4710 I [email protected] November 05, 2015 Geri Escobar 51 0 S. Main St reet Donna, Texas 78537 Re: Punch List The following is a punch list of outstanding work to be completed as observed on the renovation of Ms. Escobar’s residence on November 04, 2015: Exterior All of the exterior siding requires a close inspection to fully drive in all nail heads All of the exterior siding requires a close inspection to t ouch up with paint all areas that have been repaired. All of the exterior siding requires a close inspection to fully seal the siding to trim boards. All of the exterior siding requires a close inspection to seal around all penetrations with backer rod and sealant. Trim boards and front and rear decks require repainting and to i nclude the top and bottom edges. The posts on the front deck are to be sealed and the base and 4x4 wood angle brackets added to the tops. Add cedar trim t o the corner of the front deck near the entry stairs. Add wood colored sealant to all front and rear deck railing that does not meet ush. The roof ashing on the north side of the building requires a seam to be added and drip edge. The electric serv ice head pipe is insu ciently anchored to the building, requires properly sized screws. The ashing around the roof penetration is incorrectly installed. All termite shields need to veri ed that the sheet metal is correctly placed and neatly folded downward to piers. Hose bib piping on the northwes t corner of the building requires f oam insulation. Verify that rigid insulation for underside of oor deck is in-place and rmly secured to framing. Interior All surfaces need to be wiped of construc tion dust. Pipe penetration in oor of mechanical closet requires backrod and sealant. Wall paint requires touch-up through out the building. All case work and millwork requires paint touch-up. Sealant at joint with wall. Two areas of the oor in the dining area require additional bracing to the structure. Regrout tile work in the master bathroom on the backside of the shower curb and the left side of the shower wall. Add sealant to the head of the wall. Add exterior exhaust for range hood. . Mario Garza Jr. Urban Infrastructure Group Cc: Jim Limon  

Upload: iunm26386

Post on 09-Mar-2016

221 views

Category:

Documents


0 download

DESCRIPTION

list

TRANSCRIPT

Page 1: 11.05.15 Punch List

 

UIG inc. I Observation Report   i

urban infrastructure group, inc. www.uigtexas.com I 956.464.4710 I [email protected]

November 05, 2015

Geri Escobar510 S. Main StreetDonna, Texas 78537

Re: Punch List

The following is a punch list of outstanding work to be completed as observed on the renovation of Ms.Escobar’s residence on November 04, 2015:

Exterior

• All of the exterior siding requires a close inspection to fully drive in all nail heads• All of the exterior siding requires a close inspection to touch up with paint all areas

that have been repaired.• All of the exterior siding requires a close inspection to fully seal the siding to trim

boards.• All of the exterior siding requires a close inspection to seal around all penetrations

with backer rod and sealant.• Trim boards and front and rear decks require repainting and to include the top and

bottom edges.• The posts on the front deck are to be sealed and the base and 4x4 wood angle

brackets added to the tops.• Add cedar trim to the corner of the front deck near the entry stairs.• Add wood colored sealant to all front and rear deck railing that does not meet flush.• The roof flashing on the north side of the building requires a seam to be added and

drip edge.• The electric service head pipe is insuffi ciently anchored to the building, requires

properly sized screws. The flashing around the roof penetration is incorrectly installed.• All termite shields need to verified that the sheet metal is correctly placed and neatly

folded downward to piers.• Hose bib piping on the northwest corner of the building requires foam insulation.• Verify that rigid insulation for underside of floor deck is in-place and firmly secured to

framing.

Interior

• All surfaces need to be wiped of construction dust.• Pipe penetration in floor of mechanical closet requires backrod and sealant.• Wall paint requires touch-up through out the building.• All case work and millwork requires paint touch-up. Sealant at joint with wall.• Two areas of the floor in the dining area require additional bracing to the structure.• Regrout tile work in the master bathroom on the backside of the shower curb and the

left side of the shower wall. Add sealant to the head of the wall.• Add exterior exhaust for range hood.

.