  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    1/70

    US Army Corps of Engineers

    Jimmy Brasch (Support)

    Omaha District

    Omaha, Nebraska

    PETRO 2011

    Craig Margrave

    Updates to the DoD Standard Design for

    Pressurized Hydrant Fueling Systems

    Type III, IV, V, and Cut and Cover

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    2/70

    Type III (July 2010) Design No. 078-24-28

    Type IV and V (July 2010) Design No. 078-24-29

    Cut and Cover (July 2010) Design No. 078-24-33

    AST (to be discussed by others)

    These standards and more are available from:

    US Army Corps of Engineers

    Engineering and Support Center, HuntsvilleFacilities Standardization Program

    http://www.hnd.usace.army.mil/stddgn

    (click on Library Search then Find All Designs)

    Updated Standards

    http://www.hnd.usace.army.mil/stddgnhttp://www.hnd.usace.army.mil/stddgn
  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    3/70

    Design Number 078-24-28

    Latest update dated July 2010, previous update 1998.

    Forty drawings were added mostly because of the change in

    drawing size, but there are many additional details.

    DEPARTMENT OF DEFENSE

    PRESSURIZED HYDRANT FUELING SYSTEM

    TYPE III

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    4/70

    TYPE III

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    5/70

    TYPE III

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    6/70

    TYPE III - Updates Site Flow Indicators

    deleted from most of

    the system.

    The Filter Separator

    pressure relief piping

    was rerouted from the

    product recovery tank

    (PRT) to a day tank.

    Control Room wall

    revised from 1 to 2 hr

    Fire Rating.

    Fire shutter and

    observation windows

    replaced with fire

    rated glass systems.

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    7/70

    TYPE III Fire Rated Assembly

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    8/70

    TYPE III - Updates A Fire Detection/

    Suppression System

    requirement note wasadded.

    FSR-1 hinge location

    changed from the right

    to the left side to

    eliminate conflict with

    pipe support.

    Surge Tanks were

    added.

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    9/70

    TYPE III FSR-1

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    10/70

    TYPE III FSR-1

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    11/70

    TYPE III Surge Tanks

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    12/70

    TYPE III Surge Tanks

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    13/70

    TYPE III Micronic Pre-Filter Added

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    14/70

    TYPE III Micronic Pre-Filter Added

    Basket Strainer

    60 Mesh254 Micron

    Twice the size of a

    grain of salt

    Micronic Pre-Filter

    5 Micron

    Receipt Filter

    Separator

    0.4 Micron

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    15/70

    Cold Water

    Hot Water

    Shower

    Mixing Valve

    Eye Wash

    Circulation Pump (not shown)

    Emergency Shower, Tempered Water

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    16/70

    Tightness Test Mode

    (Leak Detection)

    Type III Leak Detection Added

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    17/70

    TYPE III Leak Detection Added

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    18/70

    TYPE III Computer Upgrade

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    19/70

    TYPE III Graphics Display

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    20/70

    TYPE III Annunciator Panel

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    21/70

    TYPE III Four Valve Supervision

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    22/70

    TYPE III Shut Down Sequence

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    23/70

    TYPE III ATG (Automatic Tank Gauge)

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    24/70

    TYPE III Additive Injector

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    25/70

    TYPE III Additive Injector

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    26/70

    TYPE III Site

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    27/70

    TYPE III Trench Drain

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    28/70

    TYPE III Site

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    29/70

    TYPE III Site

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    30/70

    TYPE III Site

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    31/70

    TYPE III Site

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    32/70

    TYPE III Site

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    33/70

    TYPE III Site

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    34/70

    TYPE III Site

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    35/70

    TYPE III - Site

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    36/70

    TYPE III Signage

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    37/70

    TYPE III Truck Offload

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    38/70

    TYPE III Truck Offload

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    39/70

    Design Number 078-24-29

    Latest update dated July 2010, previous update 1991.

    Forty two drawings were added mostly because of the change in

    drawing size, but there are many additional details.

    DEPARTMENT OF DEFENSE STANDARD

    PRESSURIZED HYDRANT DIRECT FUELING SYSTEM

    TYPE IV AND V

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    40/70

    TYPE IV

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    41/70

    TYPE IV

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    42/70

    TYPE V

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    43/70

    Design Number 078-24-33

    Provided for the first time as a standard in July 2010.

    DEPARTMENT OF DEFENSE

    CUTNCOVER STANDARDS

    STORAGE TANK/PUMPHOUSE

    AND FILTER BUILDING

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    44/70

    Cut and Cover

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    45/70

    Cut and Cover

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    46/70

    Cut and Cover

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    47/70

    Cut and Cover

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    48/70

    Cut and Cover

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    49/70

    Cut and Cover

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    50/70

    Cut and Cover

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    51/70

    Cut and Cover

    C d C

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    52/70

    Cut and Cover

    C t d C

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    53/70

    Cut and Cover

    C t d C

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    54/70

    Cut and Cover

    C t d C

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    55/70

    Cut and Cover

    C t d C

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    56/70

    Cut and Cover

    C t d C

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    57/70

    Cut and Cover

    C t d C

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    58/70

    Cut and Cover

    C t d C

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    59/70

    Cut and Cover

    C t d C

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    60/70

    Cut and Cover

    C t and Co er

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    61/70

    Cut and Cover

    Cut and Cover

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    62/70

    Cut and Cover

    Cut and Cover

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    63/70

    Cut and Cover

    Cut and Cover

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    64/70

    Cut and Cover

    Cut and Cover

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    65/70

    Cut and Cover

    Cut and Cover

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    66/70

    Cut and Cover

    Cut and Cover

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    67/70

    Cut and Cover

    Cut and Cover

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    68/70

    Cut and Cover

    Specifications

  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    69/70

    00 22 00 Proposal Instructions, Submission Requirements and Evaluation

    01 33 00 Submittal Procedures (June 2010)

    01 33 23.33 Aviation Fuel System Specific Submittal Requirements (Feb 2010) 01 42 00 Sources For Reference Publications (May 2009)

    01 78 23.33 Operation And Maintenance Manuals for Aviation Fuel Systems (Feb 2010)

    05 59 10 Rolling Cover for Aviation Refueling Vaults (Feb 2010)

    33 01 50.01 Cleaning Fuel Storage Tanks (Feb 2010)

    33 08 53 Aviation Fuel Distribution System Start-Up (Feb 2010)

    33 08 53at Checklist for Equipment Test (Feb 2010)

    33 09 53 Aviation Fuel Pump Control and Annunciation System (Feb 2010) 33 09 54 Aviation Fuel Pump Control and Annunciation System (Type [IV][V]) (Feb 2010)

    33 09 55 Aviation Fuel Pump Control and Annunciation Sys (Cut-N-Cover Tanks) (Feb 2010)

    33 52 43.11 Aviation Fuel Mechanical Equipment (Feb 2010)

    33 52 43.12 Aviation Fuel Pantographs (Feb 2010)

    33 52 43.13 Aviation Fuel Piping (Feb 2010)

    33 52 43.14 Aviation Fuel Control Valves (Feb 2010)

    33 52 43.23 Aviation Fuel Pumps (Feb 2010) 33 52 43.28 Filter Separator, Aviation Fueling System (Feb 2010)

    The specifications are available from the Whole Building Design Guide (WBDG) at:

    www.wbdg.org/ccb

    Click on Unified Facilities Guide Specifications (UFGS) under the Specifications Library

    Specifications

    Conclusion

    http://www.wbdg.org/ccbhttp://www.wbdg.org/ccb
  • 7/27/2019 11 Margrave UpdatestotheDoDStandardDesignforPressurizedHydrantFuelingSystemTypeIII

    70/70

    Type III (July 2010) Design No. 078-24-28

    Type IV and V (July 2010) Design No. 078-24-29

    Cut and Cover (July 2010) Design No. 078-24-33

    http://www.hnd.usace.army.mil/stddgn

    (Click on Library Search then Find All Designs)

    The specifications are available from the Whole Building Design Guide(WBDG) at:

    www.wbdg.org/ccb

    (Click on Unified Fac Guide Specs (UFGS) under the Specs Library)

    Thank You,

    [email protected] [email protected]

    Omaha District Corps of Engineers Omaha District Corps of Engineers

    POL-DX POL-DX

    Conclusion

    http://www.hnd.usace.army.mil/stddgnhttp://www.wbdg.org/ccbhttp://www.wbdg.org/ccbhttp://www.hnd.usace.army.mil/stddgn