11 hub solutions for multi-site collaboration christopher kim june 4, 2008
TRANSCRIPT
11
HUB Solutions for Multi-Site Collaboration
Christopher KimJune 4, 2008
2
Project Plan
Project Goal: One Teamcenter Connectivity
Project Duration: 9 Months
Project Baseline: TCE V9.1.7a
Project Team: Three (3) Siemens PLM Software Consultants
Seven (7) Hamilton Sundstrand IT Staff
33
Project Scope
Implement Hub Architecture
Data Security
Data Integrity
Domestic Site Collaboration
External Site Collaboration
Auditing Capability
Data Migration
4
Project Schedule
Major Milestones Project Planning
Project Requirement Gathering
Analysis & Design
Implementation
Validation
Data Migration
Go-Live
5
Multi-Site Network Essential
Object Directory Services (ODS) : Object Locator
Integrated Distributed Services Manager (IDSM) : Object Transporter Export an object from the owning site
Transmit it over the network
Import it into the destination site
6
Before HUB Implementation
Multi-Site Connectivity
ODS Connectivity
Auto-publication & registration only affects Domestic sites
US 3
US 2
US 1
FN 1
FN 2
FN 3FN 2T2
ODS 1
ODS 2 ODS 3
IDSM Connectivity
Synchronization between all connected sites
7
After Hub Implementation
Hub Connectivity
ODS Connectivity
Auto-publication only affects Domestic sites
US 2
US 1
HUB
FN 2
FN 1
FN 3
FN 2T2
HUBODS
FNODS
IDSM Connectivity
Synchronization between all connected sites
US 3
8
New Partner Site Addition
Hub Connectivity
ODS Connectivity
Auto-publication only affects Domestic sites
US 2
US 1
HUB
FN 2
FN 1
FN 3
FN 2T2
HUBODS
FNODS
IDSM Connectivity
Synchronization between all connected sites
US 3
NewPartner
Site
9
Data Security - Project
Project Based Security
External Access Project
External Work Project
Common Parts Project
10
Projects in HUB
US 1 HUB
FN 1
Partner
FN Projects
PartnerProjects
11
Data Security – Propagation Rule
Exportable Data Options
Entire BOM / Top Level Item Only
Transfer / Export - Protected Components
All Versions / All Files
12
Data Security – Rule Tree
Common Rule Tree
Domestic Sites
HUB
13
Workflows for Data Transfer
Grant Access to Foreign / Partner Site
Grant Ownership to Foreign / Partner Site
Data Replication to Domestic Site
Data Ownership Transfer to Domestic Site
Data Security - Workflow
14
Import Remote…
Dynamic Import (Pull) Replication between Domestic Sites
o Domestic Site Domestic Site
External Site Transaction (Replica & Ownership Change)
o Hub External Site
15
Data Integrity
Item ID Registration Eliminate Duplicated Item
Publication for Domestic Sites Data Search for Published Data
Data Synchronization Hourly Synch. (Sites to HUB)
Daily Synch. (HUB to Sites)
Dynamic Synch. (Need Based)
16
Auditing Data
Audit Reports Currently Accessible to Foreign Sites
Currently Accessed by Foreign Sites
Exported Data to Other Sites
Workflows Data Ownership Transfer History
17
Implementation - Configuration
Configuration Preferences (iman_env)
Project (Read Only / Read-Write)
Role (Export / Outsource Control)
Rule Tree
18
Workflow for Data Export
Workflow for Data Transaction Domestic Site Ownership Change
o Domestic Site Domestic Site
External Site Transaction (Replica & Ownership Change)
o Domestic Site HUB
o HUB External Site
EPM-send-target-objects (Action Handler)
IDSM exports from Current Site
IDSM imports to Target Site
19
Applied Rule Tree Example
Data when Designer initiates Workflow
Outsource Controller assigns Data to Project
20
Implementation - Data Migration
Export Records among Sites
Import Export Record (IXR)
Remove Old IXR between Sites
Build New IXR with HUB
21
References
Teamcenter Engineering Multi-Site Collaboration Help
Teamcenter Engineering Utilities Reference
Teamcenter Engineering Workflow Designer Help
2222
Q & A