11 dhaka adaptation vulnerability

Download 11 dhaka adaptation  vulnerability

Post on 26-May-2015

317 views

Category:

Technology

1 download

Embed Size (px)

TRANSCRIPT

  • 1. June 2, 2011 Sao PauloMir Mustafizur Rahman Private Secretary to Mayor Dhaka City Corporation Bangladesh

2. Population : Location : Latitude from 20 degree 34' to 26 degree 38' north. Longitude from 88 degree 01' to 92 degree 41' east. Estimated population 150 million. Area : Total: 144,000 sq km. Land: 133,910 sq km. Boundary : Bounded by India from the north, east Water: 10,090 sq km. and west, Myanmar (Burma) from the southGDP Growth rate : 6.21% (2007-08) east and the Bay of Bengal from the south. Population Growth rate : 2.02% Rainfall : Lowest 47" and highest 136". Climate : Tropical; cool, dry winter (October to March); hot, humid summer (March to June); Education : Literacy 62.49% cool, rainy monsoon (June to October). 3. Dhaka was established as capital during Mogol period in 1608. Till 1717, Dhaka was capital of Bangla, Bihar & Urissha. In 1905, Dhaka became capital of East Bengal & Asam. In 1947 Dhaka became the provincial capital of East Pakistan. In 1971, Dhaka became capital of Bangladesh.Dhaka in 1800East Bengal and Asam 1905 Chokbazar in 1908Dhaka in 2011Population of Dhaka is about 12 million Area of Dhaka City Corporation 360 sq. km. Total Building 3,26,000 nos. Total Road 6,200 nos. Annual population growth rate : about 6% . 4. Hazards of Bangladesh Disaster Characteristic in Bangladesh : Flood, Cyclone, Wind storm, droughts, Earthquake, Landslide, River erosion, Tsunami, Salinity, Water lodging, epidemic etc.FloodLand Slide Cattle death by Cyclone Tornado 5. Hazards of Bangladesh (Cont.)Bangladesh -Earthquake Risk Fire in SlumSundarban mangrove forest after Cyclone 6. 6 story building collapsed- died 21, 25/02/2006Shakhari Bazar-June 2004, died 19Begun Bari- 1 June 2010, died 25collapsed nine-story garment factory near Dhaka April 12, 2005. 73 bodies in the ruins of the nine-storey building. Around 100 people were rescued alive.26 February, 2007, fire in a 11 storied building, died 2 7. Feb. 2, 2006. thousands of people homelessDecember 15, 2007, slum south of Dhaka13 march. 2009, fire in a high rise commercial building, died 5November 21, 2008, Begunbari slum.June 3, 2010, Nimtoli, Dhaka, died 123. 8. (In Million) 9. DCC conducted six day workshop on "Disaster management in Dhaka city, 120 (One Hundred Twenty) ward commissioners, 40 representatives from different NGOs, 10 imams of different mosque, 20 officials of Fire Services Civil Defense and 20 other peoples attended. Dhaka City Corporation in association with Disaster Management Bureau arranged a day-long training workshop on search and rescue of earthquake disaster for the word commissioners, DCC Officials, journalists and volunteers. DCC take active role in the Mock Exercise at Dupkhola Play Ground, organised by Disaster Management Bureau. DCC took part in a Rally organised by Comprehensive Disaster Management Program (CDMP) to make awareness on Earth Quake among the city dwellers. DCC has taken part in Marine Air Ground Task Force Technical Warfare Simulation (MTWS) Command Post Exercise (CPX) Exercise Durjoge Durnibar 2008. DCC identified more than 500 risky buildings in Socio-economic survey. Disaster Management Volunteer Group in every ward is under process. Imposed National Building Code for construction every building. GIS based contingency plan, vulnerable assessment & rescue plan. Workshop on Use of Earthquake Risk Maps and Validation of Scenario Based Earthquake Contingency Plan for Dhaka City help on 24/08/09 at Nagar Bhaban Auditorium. Workshop on Climate Change & Disaster Management was held in Zone-1 office, DCC on 12/03/2010. 10. Technical survey for identification of vulnerable and risky 113 buildings in heritage and non-heritage areas of Dhaka City 11. GENERAL STATISTICS: (Number of Buildings=113 nos.) 12. Relation between Day and Night Stay by People in BuildingShakhari BazarBiren Bosh Street 13. APPARENT QUALITY OF BUILDINGSShakhari Bazar N=95Biren Bosh Street N=18 14. Correlation plot Building Age and Structural TypeShakhari BazarBiren Bosh Street 15. Risk Group VS. No. of Storey 16. CONTENTS: TOR of the project Out come of the vulnerability analysis and structural assessment Methodology of structural assessment Different Levels of Survey Structural Assessment Retrofitting and renovation decision making 17. Available Methodologies for structural assessment1. Rapid Visual Screening (RVS) FEMA154, FEMA155 2. FEMA 310 Detailed structural Analysis 3. IITK- GSDMA 3 Tier vulnerability assessment Checklist 4. Turkish Vulnerability assessment methodology 5. Rapid Screening of Masonry building Prof. Arya 6. Old Masonry Building Indexes J. Rouqe Other Ref and standards1. BNBC 2006 Seismic Code 2. Indian Standard Seismic Code, IS-1893 3. ASTM Material Testing 18. DESIGN OF THE ASSESSMENT LEVEL 3 SURVEYLEVEL 1 & 2 SURVEY 1.IITK-GSDMA(FEMA 310 )CHECKLISTRAPID VISUAL SCREENING SCOREGROUND FLOOR PLAN DEFECT AND EXTENT OF DAMAGE DETERMINATIONSTRUCTURAL INTEGRITY CHECKSDECISION & SCENARIO DEVELOPMENT REPORT2. 3. 4.COLLECTION OF APPROPRIATE SAMPLE FROM SITES MATERIAL STRENGTH DETEMINATION LITERATURE SURVEY NON DESTRUCTIVE STRENGTH DETERMINATION 19. Rapid Visual Screening of Masonry StructuresProf. Arya 20. FIELD SURVEY 21. Engineering Survey work 22. Structural Crack in URM building 23. Diaphragm Discontinuity (Courtyard) 24. Cracks in infill wall 25. Cracks in Structural Units of URM 26. Pounding PossibilityPounding 27. Deterioration of Masonry Units 28. Narrow Stair Case 29. Nonstructural Vulnerable components 30. Crack in Arch type lintel 31. Vulnerable supports on ground floor 32. Settlement of inclined brick foundationFORCE BALANCE IN FOUNDATION 33. Damage to stair way entrance 34. TEMPORARY RETROFITTING WITH BAMBOO 35. CORNER SEPERATION 36. Crack in arch lintel 37. Poor condition of Electrical system 38. Side view of the tiles floor contruction 39. Floor Construction style 40. RISK GROUP: Seismic ZoneBuilding ImportanceExisting DamageVulnerability FactorCONSTANTStructural StrengthRISK GROUP VERY LOW RISKLOW RISKMODERAT E RISKHIGH RISKVERY HIGH 41. Water bodies, Water hydrant Emergency Responses Fire Service Rescue activities Disaster supply kits Medical services Evacuation center (Temporary Shelter) Water & Food Delivery Temporary housing Recovery Plan (Infrastructure & Housing Reconstruction, Urban Planning, Economic Vitalization, Life Recovery) Land Readjustment Community participation Safety precautions, Awareness, School Level Education 42. General Recommendations Removal of the extended portion on old structures and restraining the owner from further construction on old structures Retrofitting of the failed masonry arches Supporting Heavy Overhang with Columns Prepare Action Plan for City Corporation Disaster Management Committee (CCDMC) where Mayor is the Chairperson of the Committee. 43. Conclusion Experts say that 72 thousand buildings will be distorted if earthquake occurs with rector scale 6.6 or 7 in Dhaka. 70 thousand people will die if it happens at night. 800 educational institutes will be collapsed. Earthquake cant predict and cant prevent. By managing we can minimize our loses. Pre-earthquake phase, preparedness, mitigation and prevention are concepts to work on. Post-disaster, immediate rescue and relief measures including temporary sheltering soon after an earthquake until about 3 months later and re-construction and re-habilitation measures for a period of about six months to three years need to follow. To summarize, the most effective measures of risk reduction are predisaster mitigation, preparedness and preventive measures to reduce vulnerability and expeditious, effective rescue and relief actions immediately after the occurrence of the earthquake. It is not the earthquake rather it is the building that kills people.Disaster preparedness for Safer Communities Safer Communities for Sustainable Development