Alfa Laval Aalborg A/S
A changed approach for product/service development
Søren Petry MortensenBusiness Development ManagerService, Marine & Diesel Division
![Page 3: 11 alfa laval-aalborg_proteus_1](https://reader038.vdocuments.us/reader038/viewer/2022103000/554e534db4c905b2178b4b26/html5/thumbnails/3.jpg)
www.alfalaval.com
© Alfa Laval Slide 3
Alfa Laval products to be installed, cont.:
Electric heaterDiesel engine
HFO tank
DO tank
StackAlfa Laval Test & Training CentreOfficial oppening15 January 2014
Fresh water generator
Heat exchangers
WHR boilerSCR
Scrubber
Ballast water treatment
Separator
FCM
Crankcase gas cleaning
![Page 4: 11 alfa laval-aalborg_proteus_1](https://reader038.vdocuments.us/reader038/viewer/2022103000/554e534db4c905b2178b4b26/html5/thumbnails/4.jpg)
www.alfalaval.com
Agenda
• Company introduction & organizational change
• Example I – Supplier driven innovation
• Example II – Project ”steam balance”
• Example III – Operation condition based sales tool
A changed approach for product/service development
Focusing on our customers and their unique needs while operating our equipment, has resulted in a changed organization, changed development
approaches and created a strengthen relationship with our customers.
![Page 5: 11 alfa laval-aalborg_proteus_1](https://reader038.vdocuments.us/reader038/viewer/2022103000/554e534db4c905b2178b4b26/html5/thumbnails/5.jpg)
www.alfalaval.com
Three business divisions
Process technology
Marine & Diesel
Equipment
![Page 6: 11 alfa laval-aalborg_proteus_1](https://reader038.vdocuments.us/reader038/viewer/2022103000/554e534db4c905b2178b4b26/html5/thumbnails/6.jpg)
www.alfalaval.com
Three business divisions
Process technologyMarine & DieselEquipment
Organizational change
Service – Marine & Diesel Systems
Par
ts
Rep
air
/ R
etro
fit
Ser
vice
R&
D
Cap
ital
Sal
es
Cus
tom
ers
*Business Development
*New department
![Page 7: 11 alfa laval-aalborg_proteus_1](https://reader038.vdocuments.us/reader038/viewer/2022103000/554e534db4c905b2178b4b26/html5/thumbnails/7.jpg)
www.alfalaval.com
Market approach and lifecycle management
Slide 7
Request for quotation
Evalu
ate
Order
Receive
MaintenanceSupport
Impr
ovemen
ts
Monitoring
Alfa Laval Capital Sales Alfa Laval Service
New Installation
Start U
p
Execute
Contribute
Preparation
Installed Base
![Page 8: 11 alfa laval-aalborg_proteus_1](https://reader038.vdocuments.us/reader038/viewer/2022103000/554e534db4c905b2178b4b26/html5/thumbnails/8.jpg)
www.alfalaval.com
Alfa Laval on board
Desalination
Cooling and heating
Ballast water treatment
Fuel conditioning
Filtration
Inert gas generationExhaust gas cleaning
Waste heat recovery
Steam generation
Thermal fluidheating
Cargo heating
Crankcase gas cleaning
Oil treatment
Bilge water treatmentTank cleaning
www.alfalaval.com
Aalborg product
![Page 9: 11 alfa laval-aalborg_proteus_1](https://reader038.vdocuments.us/reader038/viewer/2022103000/554e534db4c905b2178b4b26/html5/thumbnails/9.jpg)
www.alfalaval.com
Example I - Supplier driven Innovation
R&DCapital SalesService
Technical AdvicerFleet Group ManagerFuel optimization Manager
Global Procurement
Innovation Portfolio M.Strategic R&DProject Managers
Supplier driven Innovation – work shops participants
![Page 10: 11 alfa laval-aalborg_proteus_1](https://reader038.vdocuments.us/reader038/viewer/2022103000/554e534db4c905b2178b4b26/html5/thumbnails/10.jpg)
www.alfalaval.com
Example I - The Process
Three groups => challengesMixing groups => challengesClustering challengesGroups => potential solutions
![Page 11: 11 alfa laval-aalborg_proteus_1](https://reader038.vdocuments.us/reader038/viewer/2022103000/554e534db4c905b2178b4b26/html5/thumbnails/11.jpg)
www.alfalaval.com
Example I - The Process
Homework: Prepare solutions
Present and discuss solutions
![Page 12: 11 alfa laval-aalborg_proteus_1](https://reader038.vdocuments.us/reader038/viewer/2022103000/554e534db4c905b2178b4b26/html5/thumbnails/12.jpg)
www.alfalaval.com
Example I - The Process
c
c
c c“Filter”
Business cases
NO GO GO
Ideas
![Page 13: 11 alfa laval-aalborg_proteus_1](https://reader038.vdocuments.us/reader038/viewer/2022103000/554e534db4c905b2178b4b26/html5/thumbnails/13.jpg)
www.alfalaval.com
Example II - Project ”steam balance”
Norwegian
Vessel owner
Marine Engineer
University
Alfa Laval
Aalborg
Steam balance- Theoretical requirement (designed)- Actual requirement- Actual produced steam
Project start 2014
KnowledgeAdviseUpgradeService Etc.
![Page 14: 11 alfa laval-aalborg_proteus_1](https://reader038.vdocuments.us/reader038/viewer/2022103000/554e534db4c905b2178b4b26/html5/thumbnails/14.jpg)
www.alfalaval.comwww.alfalaval.com/marine
Optimizing the fuel line
Go to steam line
Example II - Project ”steam balance”
![Page 15: 11 alfa laval-aalborg_proteus_1](https://reader038.vdocuments.us/reader038/viewer/2022103000/554e534db4c905b2178b4b26/html5/thumbnails/15.jpg)
www.alfalaval.comwww.alfalaval.com/marine
Optimizing the steam line
Go to fuel line
Example II - Project ”steam balance”
![Page 16: 11 alfa laval-aalborg_proteus_1](https://reader038.vdocuments.us/reader038/viewer/2022103000/554e534db4c905b2178b4b26/html5/thumbnails/16.jpg)
www.alfalaval.com
Example III – Operation condition based sales tool
![Page 17: 11 alfa laval-aalborg_proteus_1](https://reader038.vdocuments.us/reader038/viewer/2022103000/554e534db4c905b2178b4b26/html5/thumbnails/17.jpg)
www.alfalaval.com