MGM SPRINGFIELD CONSTRUCTION ACTIVITIES - 11/08/16-11/22/16
WORK HOURS: 7:00 AM - 7:00 PM
FOR CONSTRUCTION-RELATED INQUIRES PLEASE CONTACT: [email protected]
FULL CONSTRUCTION BUILD OUT
ZONE LOCATION STATUS
1 95 and 101 State StreetPreparation for work inside 95 State Street, as well as select demolition and abatement is ongoing, along with boiler piping and winterization. Demolition of the of pedestrian bridges between 95 State and 101 State is tentatively scheduled for Saturday November 19th. State Street will be closed from Main Street to E. Columbus Avenue while this work is being performed. Detour signage and a police detail will be present.
2 Hotel Installation of rock anchors, spread footings, and underslab MEP is underway, along with slab placements. Structural steel erection is underway. Second level slab on metal deck placements are anticipated to begin in late November.
3Casino
Structural steel erection is underway. Second level slab on metal deck placements are anticipated to begin in late November.
4 Da Vinci Park No work anticipated
5 Dave's Furniture Preparation for pavement and setting up craft labor badge check point is ongoing.
6 Armory Interior gutting is underway.
7 Plaza No work anticipated
8 Church No work anticipated
9 Entertainment Foundation work is underway. Underslab MEP is underway, along with slab placements.
10 Parking Garage Precast concrete erection is underway. Garage lighting prefabrication and temporary power installation is underway. Prepping the garage site for overhead plumbing.
11 Support Area Central electric facility (CEF) foundation work is underway, along with installation of area drains and conduits to CEF.
12 MGM Way Staging and picking steel from MGM Way with construction crane.
STREET WORK
State StreetPatching of the gas service trench is underway. Demolition of the of pedestrian bridges between 95 State and 101 State is tentatively scheduled for Saturday November 19th. State Street will be closed from Main Street to E. Columbus Avenue while this work is being performed. Detour signage and a police detail will be present.
11/9/1610:43AM Page2of2
Main StreetReflectorized drums will be placed in the south bound lane to shift traffic from 6am-6pm through Friday November 11th to allow for the unloading of certain materials onto the construction site. The barrels will be moved out of the road at the end of each day to allow parking during non-working hours. Two way traffic will be maintained at all times and two police details will be present. This traffic shift is currently underway.
Union Street No work anticipated
East Columbus Avenue Gas service installation from E. Columbus gas main to Howard Street is anticipated to begin in mid November. A police detail is anticipated.
Bliss Street No work anticipated
Howard Street Turn Around No work anticipated
Howard Street No work anticipated
UTILITY ACTIVITY
UTILITY PROVIDER WORK TO BE PERFORMED
Eversource No work anticipated
Verizon No work anticipated
Comcast No work anticipated
Columbia Gas No work anticipated
Springfield Water & Sewer No work anticipated
MISCELLANEOUS ACTIVITY
LOCATION WORK TO BE PERFORMED
MGM Springfield Site Soil removal work is underway.
York Street Lot Precast and crane equipment staging is underway.
Zorzi Lot Established as parking for craft labor.
Upcoming PLA Holidays (No work onsite) Veteran's Day (Friday November 11th)Thanksgiving (Thursday November 24th)
MAIN STREET
STAT
E ST
REET
EAST COLUMBUS AVENUE
UNIO
N ST
REET
HOW
ARD
TURN
ARO
UND
195/101 STATE
2HOTEL
3CASINO
12MGM WAY
7PLAZA
6ARMORY
8CHURCH
5DAVE’S
FURNITURE
4DA VINCI
PARK
9ENTERTAINMENT
10PARKING GARAGE
11SUPPORT
AREA
BLIS
S ST
REET
NEW GAS SERVICE INSTALLATION TO TAKE PLACE IN MID NOVEMBER.
TWO WAY ALTERNATING TRAFFIC WITH POLICE DETAIL IS ANTICIPATED DURING THE WORK.
HOW
ARD
STRE
ET
DEMOLITION OF THE BRIDGES BETWEEN 95 AND 101 STATE IS TENTATIVELY SCHREDULED FOR SAT. NOV 19.
STATE ST WILL BE CLOSED FROM MAIN ST TO E. COLUMBUS AVE WHILE THIS WORK IS BEING PERFORMED. DETOUR SIGNAGE AND A POLICE DETAIL WILL BE PRESENT.