1.0executive summary 1.1 introductionenvironmentclearance.nic.in/writereaddata/district/pfr/... ·...

13
M/s. NCL Alltek & Seccolor Limited Pre-Feasibility Report Tangeda Village, Dachepalli Mandal, Guntur District, A. P. 1 1.0 EXECUTIVE SUMMARY 1.1 Introduction M/s. NCL Alltek & Seccolor Limited was granted two quarry leases for Mosaic Chipsover an extent of 1.0 Ha. each located at Sy. No. 75/21 of Tangeda Village, Dachepalli Mandal, Guntur District, Andhra Pradesh The quarry lease area has been granted for 10 years. The Deputy Director of Mines & geology, Guntur has given permission to amalgamate the leases vide proceedings no. 6841/Q2/2016, dated 19.01.2017. Mining Plan was approved by Deputy Director of Mines and Geology, Guntur vide Letter No. 5433/MP/RM/DCP/2016, dated 04.07.2017. The salient features of the project are given Table 1.1. Table 1.1:Salient features of the project Project Name Mosaic Chips Quarry of M/s. NCL Alltek & Seccolor Limited Mining Lease Area 1.0 Ha. Location of mine Sy. No. 75/21, Tangeda village, Dachepalli Mandal, Guntur District, Andhra Pradesh. Minerals of mine Mosaic Chips Quarry Proposed production of mine 29,065.50 M Tons/annum of Mosaic Chips Method of mining Open cast Semi Mechanized method. Drilling/Blasting Drilling & Blasting is required in production of boulders. No of working days 300 days Water demand Nil Sources of water Quarry lease area is surrounded by water bodies Man power Total: 25 Solid Waste Nil Nearest railway station Nadukudi Railway Station – 13.68 km SSW from the lease area Nearest airport Gannavaram Airport – 104 km Project Cost Rs. 15 Lakhs

Upload: others

Post on 18-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1.0EXECUTIVE SUMMARY 1.1 Introductionenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-10-12 · NCL Alltek & Seccolor Limited was granted two quarry leases for Mosaic

M/s. NCL Alltek & Seccolor Limited Pre-Feasibility Report Tangeda Village, Dachepalli Mandal, Guntur District, A. P.

1

1.0 EXECUTIVE SUMMARY

1.1 Introduction M/s. NCL Alltek & Seccolor Limited was granted two quarry leases for Mosaic Chipsover an extent of 1.0 Ha. each located at Sy. No. 75/21 of Tangeda Village, Dachepalli Mandal, Guntur District, Andhra Pradesh The quarry lease area has been granted for 10 years. The Deputy Director of Mines & geology, Guntur has given permission to amalgamate the leases vide proceedings no. 6841/Q2/2016, dated 19.01.2017. Mining Plan was approved by Deputy Director of Mines and Geology, Guntur vide Letter No. 5433/MP/RM/DCP/2016, dated 04.07.2017. The salient features of the project are given Table 1.1.

Table 1.1:Salient features of the project

Project Name Mosaic Chips Quarry of M/s. NCL Alltek & Seccolor Limited

Mining Lease Area 1.0 Ha.

Location of mine Sy. No. 75/21, Tangeda village, Dachepalli Mandal, Guntur District, Andhra Pradesh.

Minerals of mine Mosaic Chips Quarry

Proposed production of mine

29,065.50 M Tons/annum of Mosaic Chips

Method of mining Open cast Semi Mechanized method.

Drilling/Blasting Drilling & Blasting is required in production of boulders.

No of working days 300 days

Water demand Nil

Sources of water Quarry lease area is surrounded by water bodies Man power Total: 25

Solid Waste Nil

Nearest railway station Nadukudi Railway Station – 13.68 km SSW from the lease area

Nearest airport Gannavaram Airport – 104 km Project Cost Rs. 15 Lakhs

Page 2: 1.0EXECUTIVE SUMMARY 1.1 Introductionenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-10-12 · NCL Alltek & Seccolor Limited was granted two quarry leases for Mosaic

M/s. NCL Alltek & Seccolor Limited Pre-Feasibility Report Tangeda Village, Dachepalli Mandal, Guntur District, A. P.

2

2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION 2.1 Identification of Project and Project Proponent The proposed project area is found to have good deposits of Mosaic Chips. It is used in infrastructure development. 2.2 Brief Information about the Project The mining lease area of 1.00 Ha.is located in Non-forest, Government land. Open cast mining is followed and it has been proposed to produce approximately 29065.50

MT/annum of Mosaic Chips. The nearest habitation is Tangeda Village located at a distance of 0.22 Km due South of Quarry Lease. 2.3 Need for the Project and Its Importance to the Country or Region The demand for Mosaic Chips has increased due to rapid industrialization and growth in infrastructure. So the number of Mosaic Chips producing quarries is increasing in India. Due to bifurcation of State, there is a huge demand for Mosaic Chips. As per EIA notification 2006 project proponent is submitting the proposal to get Environment Clearance for QL area of 1.00 Ha. from District Level Environmental Appraisal Committee/District level Impact Assessment Authority of Guntur constituted by MOEF, GOI for the purpose of operating the quarry lease for which Notification is issued. 2.4 Demands-Supply Gap There is huge demand since the material is used extensively in building construction infrastructure development. This project will help in reducing the Demand-Supply gap in the area. 2.5 Domestic/ Export Markets The material is used in the domestic market and in there is no scope for exporting the material. 2.6 Employment Generation Proposed mining is semi-mechanized method and this project operation will provide livelihood to the 25 workers. It will provide employment to the people residing in vicinity.

Page 3: 1.0EXECUTIVE SUMMARY 1.1 Introductionenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-10-12 · NCL Alltek & Seccolor Limited was granted two quarry leases for Mosaic

M/s. NCL Alltek & Seccolor Limited Pre-Feasibility Report Tangeda Village, Dachepalli Mandal, Guntur District, A. P.

3

3.0 PROJECT DESCRIPTION 3.1 Type of Project Including Interlinked and Interdependent Projects, If Any The proposed Mosaic Chips Quarry is of 1.00 Ha. No interlinked projects were associated with this project. 3.2 Location The Quarry lease area is located at Sy. No. 75/21 of Tangeda Village, Dachepalli Mandal, Guntur District, Guntur District, Andhra Pradesh. The mining lease area falls in Survey of India topo sheet No.56P14. The latitude & longitudes of the Quarry lease area are: Location of the mining lease in Guntur District is shown in Figure – 1.Google Image of Mine lease area is enclosed as Figure-2.10 km radius map around the quarry lease area is shown in Figure -3.

S. No. Latitude Longitude 1. 16°40'28.87"N 79°49'1.77"E 2. 16°40'25.16"N 79°49'9.05"E 3. 16°40'23.64"N 79°49'8.97"E 4. 16°40'27.53"N 79°49'1.67"E

Page 4: 1.0EXECUTIVE SUMMARY 1.1 Introductionenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-10-12 · NCL Alltek & Seccolor Limited was granted two quarry leases for Mosaic

M/s. NCL Alltek & Seccolor Limited Pre-Feasibility Report Tangeda Village, Dachepalli Mandal, Guntur District, A. P.

4

FIGURE – 1 LOCATION MAP

QUARRY LEASE AREA

Page 5: 1.0EXECUTIVE SUMMARY 1.1 Introductionenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-10-12 · NCL Alltek & Seccolor Limited was granted two quarry leases for Mosaic

M/s. NCL Alltek & Seccolor Limited Pre-Feasibility Report Tangeda Village, Dachepalli Mandal, Guntur District, A. P.

5

FIGURE – 2 GOOGLE IMAGE OF QUARRY LEASE AREA

Page 6: 1.0EXECUTIVE SUMMARY 1.1 Introductionenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-10-12 · NCL Alltek & Seccolor Limited was granted two quarry leases for Mosaic

M/s. NCL Alltek & Seccolor Limited Pre-Feasibility Report Tangeda Village, Dachepalli Mandal, Guntur District, A. P.

6

FIGURE – 3: 10 KM RADIUS MAP

Page 7: 1.0EXECUTIVE SUMMARY 1.1 Introductionenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-10-12 · NCL Alltek & Seccolor Limited was granted two quarry leases for Mosaic

M/s. NCL Alltek & Seccolor Limited Pre-Feasibility Report Tangeda Village, Dachepalli Mandal, Guntur District, A. P.

7

3.3 Details of Alternate Sites

No alternate site was considered as the project is mineral specific and site specific.

3.4 Size or magnitude of operation The proposed mine has lease over an area of 1.00 Ha. and the production rate is 29065.50 MT/annum. The lessee follows open cast semi mechanized mining.

Production parameters The Mineral production target for five years is given in Table 3.1.

Table 3.1: Year wise Production Programme

Year Area (m2) Bench Height

(m)

Volume 100% (m3)

TF

ROM (MT)

90%

Recovery (Tons)

10% Wastage

(Tons)

I 4,306.00 3.00 12,918.00 2.50 32,295.00 29,065.50 3,229.50 II 3,722.00 3.00 11,166.00 2.50 27,915.00 25,123.50 2,791.50 III 3,157.00 3.00 9,471.00 2.50 23677.50 21,309.75 2,367.75 IV 2,611.00 3.00 7,833.00 2.50 19582.50 17,624.25 1,958.25 V 2,084.00 3.00 6,252.00 2.50 15,630.00 14,067.00 1,563.00 Total 47,640.00 1,19,100.00 1,07,190.00 11,910.00 Average 9,528.00 23,820.00 21,438.00 2,382.00

3.5 Geology and Reserves 3.5.1 Regional Geological setup

Limestone, Shale and Quartzites of the kurnool Super Group are exposed in the planad are, these are locally known as palnad formations. The stratigraphic succession of the palnad series is as follows.

Algonkean

Palnad Series

Nandyal Shale

Koikuntla Limestone

Panyam Quartzite's

Owk Shale

Narji Limestone

Banganapalli Quartzite

------Thrust------

KADAPA SUPER GROUP

Page 8: 1.0EXECUTIVE SUMMARY 1.1 Introductionenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-10-12 · NCL Alltek & Seccolor Limited was granted two quarry leases for Mosaic

M/s. NCL Alltek & Seccolor Limited Pre-Feasibility Report Tangeda Village, Dachepalli Mandal, Guntur District, A. P.

8

3.5.2 Local Geology

Narji Limestone formation of Kurnool group exposed in this area is well bedded, gray to white in colour and of flaggy to massive in nature. The trend of lime beds varying considerably in this area due to structural disturbance. Fine laminae of argillaceous and silt found in limestone of this area. There are two types of limestone seen in the area 1) Siliceous Limestone 2) Argillaceous Limestone In this area siliceous limestone occupy in Huge Quantity. Mostly composed of calcite with minor constituents of quartz, sericite, pyrite, anatase and goethite minerals. Structurally, Palnadu limestone hosts number of faults in different direction mainly of NNW- ESE, ENE - WSW, NNE - SSW trends. Vertical joints in limestone are trending in N - S, N 20° E - S 20° W, N 60° - 80° W - S 60° - 80° E, out of these joints some are open and some are filled with calcite and quartz veins. Siliceous, flaggy limestones are hard, compact and massive which are being mined for Mosaic Chips and Lime powder.

3.5.3 Exploration a) Quarry opening: Benches of each 3m height will be excavated with bench width of 1.5m. The presence of ore is proved up to 10m above ground level b) Core Bore holes: core bore hole drilling is not required. One DTH bore hole is sufficient under general exploration to ascertain the depth persistence of the deposit 3.5.4 Reserves Reserves of Mosaic Chips are estimated by Cross Sectional Area method. One cross section was drawn in the lease area and the summary of reserves are given in the below table:

Page 9: 1.0EXECUTIVE SUMMARY 1.1 Introductionenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-10-12 · NCL Alltek & Seccolor Limited was granted two quarry leases for Mosaic

M/s. NCL Alltek & Seccolor Limited Pre-Feasibility Report Tangeda Village, Dachepalli Mandal, Guntur District, A. P.

9

Summary of Geological Reserves (a) Total Geological Reserves (Proved) 4,15,008.00

(b) Reserves blocked under safety slopes (Total Reserves Blocked)

46,827.00

(C) Reserves Available for Mining (A-B) 3,68,181.00 Average Annual production 21,438.00

Life of the Mine 3,68,181.00 / 21,438.00 = 17.17 years Say 17 years

90% recovery of the Mosaic Chips is considered from the quarry. 3.6 PROJECT DESCRIPTION WITH PROCESS DETAILS 3.6.1 Method of Mining

The Mosaic Chips in the quarry lease area is exposed on the surface with sheet. Hence.it is proposed to quarry the sheet by open cast. Manual method.by developing the benches of 3 M height and 1.5 M bench width with shallow drilling and blasting. The development of benches in the sheet rock will be maintained @ 60° safety slopes Drilling Drill holes of 1.5 – 3.0 m depth will be drilled in a staggered pattern at 6 m. interval:

i) Drill hole diameter : 32 mm up to 1.5 – 3.0 m long ii) Depth and inclination of drill

hole : Generally drilled vertically in an

alignment iii) Explosive type : Detonator Fuse/Anfo with

detonators It is proposed to produce 1,07,190 MT of Mosaic Chips during next five years plan period with an average annual production of 21438.00 MTons from an area of 15880.00 M2. Benches of 3 M height and 1.5 M Width will be developed during the plan period in depth of previous year workings successively.

a) Removal / Excavation of O.B. and other Quarry Waste:

10 % of Waste is generated in Mosaic Chips quarry.

Page 10: 1.0EXECUTIVE SUMMARY 1.1 Introductionenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-10-12 · NCL Alltek & Seccolor Limited was granted two quarry leases for Mosaic

M/s. NCL Alltek & Seccolor Limited Pre-Feasibility Report Tangeda Village, Dachepalli Mandal, Guntur District, A. P.

10

3.7 Raw Material Required Along With Estimated Quantity, Likely Source,

Marketing Area of Final Product/S, Mode of Transport of Raw Material and Finished Product No raw material will be required in the proposed project. The operation involves the extraction of Mosaic Chips and dumping in stock yard.

3.7.1 Use of Mineral

The Rock Quarried out will be utilized for construction of structures and for formation of roads. No mineral rejects are anticipated.

3.7.2 Processing

The Rock excavated in large sizes will be subjected to crushing and sizing to various sizes as suitable construction and road formation.

3.8 Resource Optimization/ Recycling and Reuse

Not envisaged.

3.9.1 Availability of Water Its Source, Energy/ Power Requirement and Source 3.9.1 Water Requirement

Water is required only for drinking purposes, green belt and dust suppression. The number of working people is around 25, so the total water requirement will be around 2.5KLD. This water will be supplied through tankers from nearby area.

Table 3.3: Water Requirement

S. No. Description Water Requirement

(KLD) 1. Domestic 0.7 2. Dust suppression 1.3 3. Greenbelt 0.5

Total 2.5

Page 11: 1.0EXECUTIVE SUMMARY 1.1 Introductionenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-10-12 · NCL Alltek & Seccolor Limited was granted two quarry leases for Mosaic

M/s. NCL Alltek & Seccolor Limited Pre-Feasibility Report Tangeda Village, Dachepalli Mandal, Guntur District, A. P.

11

3.10 QUANTITY OF WASTES TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT/ DISPOSAL

3.10.1 Solid Waste Generation& its Disposal

10% of Solid waste will be generated from Mosaic Chips Mine 3.10.2 Liquid Effluent

No liquid effluent will be generated at the mine site. The domestic wastewater generated will be sent to septic tanks followed by soak pits.

4.0 SITE ANALYSIS 4.1 Connectivity 4.1.1 Nearest Railway Station

Nadikudi Railway Station – 13.68 km SSW due from the Quarry lease area. 4.1.2 Nearest Port Facility

Krishnapatnam port is 269.29 km SSW from the quarry lease area. 4.2 LANDFORM, LANDUSE AND LAND OWNERSHIP

The mining lease is located in Non-Forest, Government land. Already mining was taken up in this quarry lease area.

4.3 Topography

The quarry lease area is located in a gently sloping with sparse vegetation. The maximum RL is 67 m seen in NW of the Lease area and Minimum RL of 64m. is found in western side of the Lease area with topo relief of 3 M.

5.0 PLANNING BRIEF 5.1 Planning Concept

It is proposed to produce 29065.50 MT/annum of Mosaic Chips from the Quarry lease.

5.2 Population projection

The project will employ mostly workers from nearby villages. There will not be any increase in population due to the project.

5.3 Land use planning

Page 12: 1.0EXECUTIVE SUMMARY 1.1 Introductionenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-10-12 · NCL Alltek & Seccolor Limited was granted two quarry leases for Mosaic

M/s. NCL Alltek & Seccolor Limited Pre-Feasibility Report Tangeda Village, Dachepalli Mandal, Guntur District, A. P.

12

The project is located in1.0 Ha. of Non-Forest, Government land. There will be change in land use as the Mosaic Chips will be excavated. After the exhaustion of materials, the pit will be left as sloping terrain.

5.4 Assessment of Infrastructure Demand (Physical & Social)

On the basis of the preliminary site visit, the infrastructure demand in the villages was assessed on the basis of need and priority. The assessment will be made in the socio economic survey &will be submitted at the time of final presentation regarding EC.

5.5 Amenities/Facilities

Mines Office, Rest shelter, first aid station and drinking water facilities will be constructed.

6.0 PROPOSED INFRASTRUCTURE 6.1 Industrial Area (Processing Area)

No infrastructure is proposed. 6.2 Residential Area (Non Processing Area)

As the local persons will be given employment, no residential area/housing is proposed within the mining lease area.

6.3 Green Belt

Green belt will be developed along the along the approach road to the mine lease area.

6.4 Water Management

About 1.3 KLD will be required for dust suppression, 0.5 KLD for greenbelt purpose, and about 0.7 KLD for domestic therefore total water requirement is 2.5 KLD. This water will be supplied through tankers from nearby villages.

6.5 Sewerage System

The domestic wastewater generated will be sent to septic tanks followed by soak pits.

6.6 Industrial Waste Management

Not applicable.

Page 13: 1.0EXECUTIVE SUMMARY 1.1 Introductionenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-10-12 · NCL Alltek & Seccolor Limited was granted two quarry leases for Mosaic

M/s. NCL Alltek & Seccolor Limited Pre-Feasibility Report Tangeda Village, Dachepalli Mandal, Guntur District, A. P.

13

6.7 Solid Waste management There is 10% of waste of either topsoil or mineral rejects to be stacked separately. Hence, management does not arise.

7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN

There will be no displacement of houses. Hence rehabilitation and resettlement is not envisaged.

8.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) 8.1 Financial and Social Benefits with Special Emphasis on the Benefit tothe

Local People Including Tribal Population, If Any, In the Area. This project will help in providing employment to local people and help them to earn livelihood. It also increases state revenue in by paying royalty and taxes.

-----------xxxx----------