101 HOV Project. Community Coalition Alternative October 18, 2012. Caltrans Community. Presentation Outline. Compare - Community Alternative and Caltrans plans for two time periods: Construction Phase Final Product. Community Coalition Goals. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 101 HOV Project

101 HOV ProjectCommunity Coalition Alternative

October 18, 2012

Page 2: 101 HOV Project

Caltrans Community

Page 3: 101 HOV Project

Presentation OutlineCompare - Community Alternative

and Caltrans plans for two time periods:

Construction Phase

Final Product

Page 4: 101 HOV Project

Community Coalition GoalsMinimize time required for

construction

Minimize disruption to local roads & regional businesses

Spend the money wisely

Solve the Congestion Problem

Page 5: 101 HOV Project

Caltr

ans

Reco

nstr

uctio

nCa

brill

o/Ho

t Spr

ings

Inte

rcha

nge

Com

mun

ity A

ltern

ative

Cabr

illo/

Hot S

prin

gs In

terc

hang

e

Page 6: 101 HOV Project

Caltrans ReconstructionSheffield Drive

Com

mun

ity C

oaliti

on A

ltern

ative

Sh

effiel

d Dr

ive

Page 7: 101 HOV Project

Construction Phase ComparisonCaltrans Community Alternative

DURATION 51 MONTHS 19 MONTHS

DISRUPTION –Impact business

OFF RAMP & LANE CLOSURES

NONE WORK OFF FRWY

COST – Cabrillo/Hot Springs

$50 MILLION $15 MILLION

COST – PROJECT $185 MILLION $135 MILLION – Save 27%

Page 8: 101 HOV Project

Left Side Ramp SafetyAccident data shows superior safety

compared to 5 right hand ramps –Milpas, Garden, Castillo, Carrillo, Mission

Familiarity & virtually exclusive local use keep it safe

Page 9: 101 HOV Project

Caltrans HOV (Carpool) Lanes

STARTS at the most constrained point

Requires a forced merge and lane elimination in less than ½ mile on a curve going into a narrow underpass

Page 10: 101 HOV Project

Operational AnalysisCaltrans Community Alternative

CARPOOL LANE FORCED MERGE AT OLIVE MILL

HOV START EAST OF CORRIDOR

SIGNAL AT ROUNDABOUT

DEFEAT PURPOSE ROUNDABOUT, CONGESTION

CAPACITY & FLOW INCREASED

3 REMAINING CONGESTION ISSUES

OLIVE MILL ONSAN YSIDRO OFF &

ON

IMPEDIMENTS REMOVED

Page 11: 101 HOV Project

Caltr

ans

Reco

nstr

uctio

nCa

brill

o/Ho

t Spr

ings

Inte

rcha

nge

Com

mun

ity C

oaliti

on A

ltern

ative

Cabr

illo/

Hot S

prin

gs In

terc

hang

e

Page 12: 101 HOV Project

Unaddressed Safety and Congestion Issues

Olive Mill southbound on ramp short merge

San Ysidro southbound off ramp congestion

San Ysidro/Posilipo southbound on ramp safety

Page 13: 101 HOV Project

Community Coalition Questions – Does it:

Minimize time required for construction?

Minimize disruption to local roads & regional businesses?

Spend the money wisely?

Solve the congestion problem?

Page 14: 101 HOV Project

Next StepsCaltrans plan has significant and

unanswered questions – cannot go forward as presented

Request Caltrans include a full analysis of the alternative in a recirculated Draft EIR

If justified, support design exceptions for:Retention of southbound left side ramps

Relocation of the start of the HOV lane

Page 15: 101 HOV Project

Thank you for considering community input