1
Time Management
![Page 2: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/2.jpg)
2
Learning Objectives
• When you have completed this module you will be able to define the key concepts associated with Time Management and you will be able to:
• Identify the main obstacles to effective Time Management in your daily role
• Understand the nature of Time Management
![Page 3: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/3.jpg)
3
Learning Objectives
• Understand a range of tools, techniques and concepts for Time Management
• Use these techniques to build an effective Time Management process that will enhance your productivity and lower your stress
• Explain the benefits of having an effective Time Management process
![Page 4: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/4.jpg)
4
Introduction
![Page 5: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/5.jpg)
5
Time Management & The Organization
• Looking at time management from the perspective of the organization what are the benefits:
– Improved productivity through improved use of time by the personnel
– Better performance in terms of on time delivery to customers
– Increased profitability through better use of the human and non-human resources
![Page 6: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/6.jpg)
6
– Improved planning and control of business systems through time based management
– Better alignment of activities by incorporating a time bound system for co-ordination of tasks and projects in the business
– Reduction of stress that arises due to crisis management by reducing the incidence of crises by better planning
Time Management & The Organization
![Page 7: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/7.jpg)
7
Introduction
What is TimeManagement?
Time as a Commodity
Essential Habits
Types of Time
Over & UnderEstimation of Time
![Page 8: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/8.jpg)
8
What is Time Management?
• Time management has five main aspects:
– Planning & Goal Setting– Managing Yourself
– Dealing with Other People– Your Time– Getting Results
– The first 4 all interconnect and interact to generate the fifth - results
![Page 9: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/9.jpg)
9
Time as a Commodity
• Time is the most precious thing we have
• Time is ultimately the most valuable resource
• Time and how we spend it within the organization must be managed effectively
• Time is totally perishable
• Time cannot be stored up for use later
![Page 10: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/10.jpg)
10
Essential Habits
• Essential habits for good time management are:– Know where the hours are going – Keep focused on the end result – Work to defined priorities
– Schedule time for important issues – Delegate routine tasks and responsibility for them – Confront your own indecision and delay – Take the stress out of work – Keep applying the essential habits!
![Page 11: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/11.jpg)
11
Types of Time
• Time can be categorized into two types:
– Fast time• when absorbed in, or enjoying an activity
– Slow time• when bored with an activity or having a bad
time • when scared
![Page 12: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/12.jpg)
12
Over- & Under-estimating Time
• Time for tasks or activities can be over- or under-estimated due to
– Intensity of activity – Level of brain function – Length of gaps between enjoyments
– Fear or ecstasy
![Page 13: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/13.jpg)
13
Effects of Estimating Time Incorrectly
• Under-estimation of time • Stress due to committing to too many tasks • Poor quality output
• Deadlines may be missed
• Over-estimation of time• Stress due to people pressing to have
activities completed • Poor quality output
• Deadlines set may not match requirements
![Page 14: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/14.jpg)
14
Time Management Principles
![Page 15: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/15.jpg)
15
Time Management Principles
Time Management Principles
Spent Time Matrix
Quadrant 2
Time-Based Management
![Page 16: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/16.jpg)
16
Time Management• Covey identified 4 waves in time
management
– 1 Notes and Checklists– Recognition of the demands on energy & time
– 2 Calendars and appointment books– Scheduling with some focus on the future
– 3 Prioritization – Comparison of the relative worth of activities
– 4 Self management– Realization that time cannot be managed - it is ourselves
that we have to manage!
The Seven Habits of Highly Effective People: Covey,1989
![Page 17: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/17.jpg)
17
Spent Time Matrix
Q1
Q3
Q2
Q4
CrisesDeadlines
PreventionRelationship BuildingPlanningRecreation
InterruptionsSome MeetingsPopular Activities
Pleasant ActivitiesBusy WorkTime WastersTrivia
Urgent Not Urgent
Important
NotImportant
![Page 18: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/18.jpg)
18
Quadrant 1
• Being in Quadrant 1 brings
– Stress
– Burnout
– Crises management
– Firefighting
– Focus on the immediate
![Page 19: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/19.jpg)
19
Quadrant 3
• Being in Quadrant 3 brings
– Short term focus
– Crises management
– Low value on goals
– Feeling of victimization / lack of control
– Shallow relationships
![Page 20: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/20.jpg)
20
Quadrants 3 & 4
• Cycling between Quadrants 3 & 4 brings:
– Total irresponsibility
– High dependency on others for basics
– Short career path in the organization
![Page 21: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/21.jpg)
21
Quadrant 2
• Being in Quadrant 2 brings:– Vision
– Perspective
– Balance
– Discipline
– ControlThe Seven Habits of Highly Effective People: Covey,1989
![Page 22: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/22.jpg)
22
Characteristics of a Quadrant 2 Person
• There are six basic criteria to allow a person to function in Quadrant 2:
– Coherence– Balance– Focus
– An ability to get on with people – Flexibility – Portability
![Page 23: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/23.jpg)
23
Quadrant 2 Requirements
The basic requirements to reach Quadrant 2 are:
• Clear definition of organizational roles and specifically your own role
• Selection of and focus on SMART goals
• Development and utilization of schedules
• The practice of daily adapting in work role
![Page 24: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/24.jpg)
24
Saying No and Quadrant 2
• To stay within Quadrant 2, there is a requirement that you must say no:
– In a professional manner
– When items are associated with Quadrant 3 or Quadrant 4 activities
• Not important not urgent• Not important but urgent • Will not deliver competitive advantage
![Page 25: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/25.jpg)
25
Time-Based Management
• Fundamentals:– Focus is on time and resources
– Pre-analysis of performance
– Analysis of goals and objectives
– Systemization of processes
![Page 26: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/26.jpg)
26
Focus on Time & Resources
• For effective management of time there needs to be a reasonable attempt made to look at the time and resources required to complete a task:
• The quality of the outcome is directly influenced by the resources and time constraints involved
Quality
TimeResources
![Page 27: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/27.jpg)
27
Pre-Analysis Of Performance
• The ability to learn from past experience allows time management to improve performance
• The discipline of reviewing past performance allows the organization to:– Debug projects before initiation and subsequent waste of
resources – Define critical points in processes which need to have
particular attention paid to them – Improve the overall utilization of resources by capturing and
implementing best practice
![Page 28: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/28.jpg)
28
Analysis of Goals & Objectives
• By setting goals that relate to business performance and conform to SMART criteria the organization will improve productivity:
– S -- specific and well defined objectives– M -- measurable outputs and inputs – A -- achievable in terms of resources available
and expectations– R -- relevant to the overall business strategy
– T -- time bound with an operational schedule
![Page 29: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/29.jpg)
29
Systemization of Processes
• The ability to design and implement processes that allow consistency of
– Input– Output– Training and skill transfer
– Consistency allows for time to be gauged accurately for activities which assists in the scheduling aspect of capacity planning in the organization
![Page 30: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/30.jpg)
30
Time-based Management
• Need to look at
– Is the allotted time for completion of plans realistic for the person / team?
– In the effort to achieve results, is efficient use made of the available time?
– For teams - how can the time available be used to generate the optimal results?
– Is task-related time management appropriate and realistic in the situation?
![Page 31: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/31.jpg)
31
Productive Work
![Page 32: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/32.jpg)
32
Productive Work
Busy V’s Productive
Indecision & Delay
Overwork
Urgency V Importance
Prioritization
![Page 33: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/33.jpg)
33
Busy Work
• Just because you are busy does not mean that you are productive
• Differentiate between
– Effectiveness -- doing the right things
– Efficiency -- doing the right things correctly
![Page 34: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/34.jpg)
34
Busy v Productive Work
• Problem No 1: Procrastination• Putting off doing the things that you should be
doing at this point!
• Solution• List all tasks that you are currently putting off • Remove two from the list by doing them now!• Plan and set a schedule for dealing with the rest • Reward when tasks are completed • Punish when tasks are not completed on schedule
![Page 35: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/35.jpg)
35
Dealing with Indecision or Delay
• When faced with a task - decide to deal with it according to one of the following actions:
– Do it
– Delegate it
– Dump it
– Deadline it
– Dissect it
![Page 36: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/36.jpg)
36
Busy v Productive Work
• Problem No 2: Paralyzing perfectionism – This is a failure to recognize the difference between
excellence and perfection
• Excellence• Achievable• Healthy
• Satisfying
• Realistic
• Perfection• Unattainable• Frustrating
• Unrealistic
![Page 37: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/37.jpg)
37
Busy v Productive Work
• Problem No 3: Setting unchallenging objectives – Objectives need to be set that challenge you in a realistic
manner and take heed of resource availability Otherwise you are busy without any possibility of success
• Use SMARTS criteria where the objectives are:– Specific– Measurable– Attainable– Realistic– Time-bound– Supported by the organization
![Page 38: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/38.jpg)
38
Overwork
• Overwork can have effects that may be classified as– Psychological– Physiological
• People are overloaded for two main reasons
– The person or team does too much
– The person or team have too much to do
![Page 39: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/39.jpg)
39
Overwork
• To deal with over-work, try the following – Understand your pressures – Don’t get worked up or panicked – Don’t blame everything on yourself – Walk away
– Estimate time as well as possible – Agree priorities and keep them – Remind yourself that there is a limited
amount of time available to you
![Page 40: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/40.jpg)
40
Urgency V Importance
• Differentiating between – Urgent tasks
• assume importance as they demand immediate attention
– Important tasks• May become urgent if left undone • Usually have a long term effect
– To judge importance v urgency, gauge tasks in terms of
• Impact of doing them• Effect of not doing them
![Page 41: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/41.jpg)
41
Prioritization Grid
Importance
Urgency
Priority 1Priority 2
Priority 3Priority 4
![Page 42: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/42.jpg)
42
Prioritization
• The main aim of prioritization is to avoid a crisis
• To do this then you must
Schedule your Priorities
as opposed to
Prioritizing your Schedule
![Page 43: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/43.jpg)
43
Crisis Management
![Page 44: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/44.jpg)
44
Crisis Management
Proactive V Reactive
Why Crises Occur
Anticipating & PreventingCrises
![Page 45: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/45.jpg)
45
Proactive v Reactive Work
• Reactive work - concentrates on getting things done
– Handling daily routines
– Dealing with urgency
– Resolving crises
– Handling interruptions
![Page 46: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/46.jpg)
46
Proactive v Reactive Work
• Proactive work - concentrates on making things happen
– Developing plans and schedules
– Focusing on key tasks
– Achieving deadlines & targets
– Managing projects
![Page 47: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/47.jpg)
47
Why Crises Occur
• Checklist of reasons:
– Failure to recognize the crisis
– Underestimation of time required
– No contingency plan is ready
– No follow-up on delegated tasks
![Page 48: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/48.jpg)
48
Anticipating & Preventing Crises
• The most effective way to anticipate and prevent crises is to:
– Set deadlines and stick with them
– Use interim targets and milestones to break the task or project into manageable chunks
– Build the schedule so that it is realistic
![Page 49: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/49.jpg)
49
Planning
![Page 50: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/50.jpg)
50
Planning
What is a Plan?
Information & Planning
Time Management Systems
Goals & Time Spans
Cascading
The Daily Plan
![Page 51: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/51.jpg)
51
Planning in Time Management
Rule No 1
Failing to Plan
is Planning to Fail
![Page 52: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/52.jpg)
52
What is a Plan?
A plan is a road map set in real time to reach an
objective or set of objectives through the use of defined
resources
![Page 53: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/53.jpg)
53
Information & Planning
Essential information:
• You need to know what you have to plan
• Once this is established – Break the task into manageable chunks – Gauge the time required for each chunk – Schedule each chunk into a logical sequence
![Page 54: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/54.jpg)
54
Time Management Systems
• There are certain key criteria that need to be applied to a time management system:
– Functional
– Portable
– Intelligible
![Page 55: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/55.jpg)
55
Time Management Systems
Pitfalls
• Totally dis-organized ‘system’– Nothing can be located when required
• Perfectly maintained system– Too much time is spent keeping the
system in perfect condition as opposed to actioning the items contained within it
![Page 56: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/56.jpg)
56
Time Management Systems
• Key components– Appointments– Dated deadlines– Tasks - to do and work in progress– Ideas and notes– Key task identification– Personal information– Financial planning records– Crises log– Project log– Contact list
![Page 57: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/57.jpg)
57
Goals & Time-spans
• A time management system is ineffective if defined goals are not available to work towards
– Strategic Goals - long term goals, perhaps out to five years
– Tactical Goals - medium term goals, from 3 - 12 months ahead
– Operational Goals - short term goals defining the exact action to be taken The schedule may cover hours or days
![Page 58: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/58.jpg)
58
Checklist for Goals
• Checklist for Goals– Are they realistic and challenging?– Have they been agreed with the manager and
linked to the performance appraisal system?– Do you know what it will look like when you have
achieved the goal (visualization)?
– Are the goals important to you?– Is there a time bound aspect to the goals?– Are the goals SMART?– What will the reward be once the goals have been
achieved?
![Page 59: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/59.jpg)
59
Cascading
• Planning levels should cascade as follows:– Yearly overview plan
– Monthly Plan
– Weekly Plan
– Daily Plan• Note that in the cascade, the time span decreases whereas
the level of complexity increases
![Page 60: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/60.jpg)
60
The Daily Plan
• The Daily Plan should cover three main areas:
– Scheduled activities for the day showing time allocated to each
– Identification of key tasks for the day to allow them to be prioritized
– Indication of who you need to contact during the day to allow you to complete tasks
![Page 61: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/61.jpg)
61
The Daily Plan• When setting out the daily plan pay
attention to the following points:– When do you perform best, suit your bio-
rhythm
– Build in planning time at the start and end of the day
– Prioritize actions into ‘musts, shoulds and coulds and focus on the ‘musts’
![Page 62: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/62.jpg)
62
The Daily Plan
• Guidelines continued– Leave room for unexpecteds
– Don’t stack meetings back to back
– Batch telephone calls
– Build in quality time
![Page 63: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/63.jpg)
63
Tips & Techniques
![Page 64: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/64.jpg)
64
Tips & Techniques
Time Logs
Quality Time
Managing Documents
Managing Interruptions
Managing Workspace
Managing your Phone
![Page 65: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/65.jpg)
65
Time-logs
• A time-log is an effective way to see where your time actually goes to during the working day Record the information for about 2 weeks to get a representative picture of time spent
• By logging activities and the time taken to complete them, the time-log provides useful information that can identify
• Accuracy of estimating time for tasks• Time stealing activities• Level of interruption• Loading during the day • Crises points / tasks
![Page 66: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/66.jpg)
66
Quality Time
• Quality time is where you can plan to do the most important high priority tasks
• It allows for deep concentration through eliminating interruptions
• It imposes a structure on work
• It allows you to move away from reactive work to proactive work
![Page 67: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/67.jpg)
67
Dealing with Documents
• Document handling can steal a vast quantity of time from our working day
• Improve your document handling by:• Handling documents only once by :
– Act on what is required by the document
– File the document for reference later
– Dump the document
![Page 68: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/68.jpg)
68
Dealing with Documents
• Have a good system for handling your documents that allows you to:
– Define what you need to keep and for how long
– Allows you to file materials easily and logically
– Facilitates access to materials
– Purge the files on a regular basis
![Page 69: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/69.jpg)
69
Managing Interruptions
• Try to reduce the number of interruptions by applying the following techniques:
• Create a visual barrier at your workspace to reduce the incidence of ‘drop-in’ visits
• Don’t have extra chairs in your workspace - people do not hang around as long if they must stand
• For important work - move to another space so the potential interruptors can’t find you!
• Tell people that you are busy, explain why and arrange to contact them at a more suitable time
![Page 70: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/70.jpg)
70
Managing Your Workspace
• How our workspace is organized has an impact on how efficient we are - try the following to improve efficiency
– De-clutter your desk by clearing it at the end of each working day
– File documents once they have been used
– Purge files regularly
– Organize a work flow system in your space
![Page 71: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/71.jpg)
71
Managing Your Phone
• The telephone can be responsible for eating vast quantities of time - control the phone by using:
– Batch your outward calls
– Delegate calls that you don’t have to make personally to one of your team
– Terminate calls once the business has been done
– Set up a rota in your team for handling incoming calls
![Page 72: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/72.jpg)
72
Summary
![Page 73: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/73.jpg)
73
Summary
• Have a great planning system and use it
• Take on realistic goals an schedule accurately
• Do not over-commit
• Set and agree priorities to distinguish between urgent and important tasks
• Build in some flexibility to cope with anything unexpected
• Control your documents, workspace and phone
![Page 74: 10087184 Time Management Training PPT](https://reader034.vdocuments.us/reader034/viewer/2022051609/5467de0ab4af9f42298b4d12/html5/thumbnails/74.jpg)
74
Summary
• Don’t procrastinate – Manage Your Time Today
• Define and use periods of quality time in your schedule
• Learn to say No in a professional manner
• Stay away from perfectionism and aim for excellence
• Build in time for personal development