10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review Don’t over work this issue, you already have the information Inspection criteria requirements How much in the way of supplies are you required to have Software to Automate your Mechanical Integrity Program & Pre startup review

Upload: edsattar

Post on 26-Dec-2014

218 views

Category:

Technology


2 download

DESCRIPTION

Listen to the panel of key SEMS thought leaders and analysts as they answer your questions and share their thoughts on: • Don't over work this issue, you already have the information • Inspection criteria requirements • How much in the way of supplies are you required to have • Software and Tools to Scale and Automate your SEMs Compliance This may seem like a daunting task, but much of this information is already there for you to utilize. Perfecting this process will go a long way to decreasing downtime and increasing your revenue; and of course compliance.

TRANSCRIPT

Page 1: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

10 SEMSinar™ Series, Part 7,Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

Don’t over work this issue, you already have the information

Inspection criteria requirements

How much in the way of supplies are you required to have

Software to Automate your Mechanical Integrity Program & Pre

startup review

Page 2: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

IntroductionBrady Austin – Webinar PresenterSEMS and Regulatory Compliance Expert

Ken Smith- PanelistCEO – SEMS Services

Ed Sattar - PanelistCEO, 360Factors.com

George Bunker- PanelistDrilling EHS Professional

Ron White - PanelistVP Operaions, I3P, LLC – SEMS Audit Service Provider (ASP)

Page 3: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

10 SEMSinar™ Series, Part 7,Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

Don’t over work this issue, you already have the information

Inspection criteria requirements

How much in the way of supplies are you required to have

Software to Automate your Mechanical Integrity Program & Pre

startup review

Page 4: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

Don’t over work this issue, you already have the information

You must develop and implement written procedures that provide instructions to ensure the mechanical integrity and safe operation of critical equipment through inspection, testing, and quality assurance.

Your mechanical integrity program must encompass all equipment and systems used to prevent or mitigate uncontrolled releases of hydrocarbons, toxic substances, or other materials that may cause environmental or safety consequences.

Your procedures must address the design, procurement, fabrication, installation, calibration, and maintenance of your equipment and systems in accordance with the manufacturer’s design and material specifications.

Page 5: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

10 SEMSinar™ Series, Part 7,Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

Don’t over work this issue, you already have the information

Inspection criteria requirements

How much in the way of supplies are you required to have

Software and Tools to Scale and Automate your SEMs Compliance

Page 6: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

Is compliance risk?Inspection criteria requirements

The frequency of inspections and tests must be in accordance with BSEE

regulations and meet the manufacturer’s recommendations.

Inspections and tests can be performed more frequently if determined to be

necessary by prior operating experience.

Documentation must identify the individual who performed the inspection or

test; include a description of the inspection or test performed and the results of

the inspection test.

Page 7: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

Your SEMS program must require that the commissioning process include

a pre-startup safety and environmental review.

Below are a few of the criteria that should be met:

a) Construction and equipment are in accordance with applicable specifications.

b) Safety, environmental, operating, maintenance, and emergency procedures are in place and are adequate.

c)  Safety and environmental information is current.

d)  Hazards analysis recommendations have been implemented as appropriate.

e) Training of operating personnel has been completed.

f)  Programs to address management of change and other elements of this subpart are in place.

g) Safe work practices are in place.

Pre-Start Up Review

Page 8: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

10 SEMSinar™ Series, Part 7,Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

Don’t over work this issue, you already have the information

Inspection criteria requirements

How much in the way of supplies are you required to have

Software and Tools to Scale and Automate your SEMs Compliance

Page 9: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

How much in the way of supplies are you required to have?

Page 10: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

10 SEMSinar™ Series, Part 7,Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

Don’t over work this issue, you already have the information

Inspection criteria requirements

How much in the way of supplies are you required to have

Software to Automate your Mechanical Integrity Program & Pre

startup review

Page 11: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

Mechanical Integrity Automation through Software

Page 12: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

Policy and Procedure Automation

Page 13: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

Automate Your Mechanical Integrity Program

Page 14: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

Continuous Third Party Audits..

Page 15: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

Thank You for Attending 10 SEMSinar™ Series, Part 7,

Page 16: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

Thank You for Attending 10 SEMSinar™ Series, Part 6,

Contact Information

Steve PattersonVP of [email protected]

Corporate Headquarters360Factors, Inc13801 Burnet Road Suite 100Austin Texas, 78727Phone: 866-385-2341

Page 17: 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review

 

To Be Continued...