Page 1: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

Delaware Department of Transportation

BR 1-813 \ I-495Emergency Repairs

Page 2: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs

AGENDA

2

Construction Efforts

Lessons Learned

Acknowledgements

Page 3: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs

Introduction

3

Javier TorrijosAssistant Director, ConstructionDelDOTEmail: [email protected]: 302-632-8409

Page 4: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs

Introduction

AECOMNeil Shemo, PE – Design Project ManagerHarry Roecker, PE – Technical LeaderJohn Milius, PE – StructuresPaul Moffitt, PE - GeotechBruce Kay – Construction Project ManagerNicholas Hetrick, PE – Resident Engineer

J.D. Eckman, Inc.Jim Roberts – Project ManagerJosh Smolinsky, PE – Project EngineerJoe Rovnan, PE – Senior Structural EngineerGreg Burkhart, PE – VP Steel Division

4

Page 5: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 5

Construction Overview

• Putting the team together, planning, and execution

Page 6: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 6

Construction Overview• Construction

– Began 6/9/2014• Site grading• Causeway• Pier ties

– Drilling Began 6/13/2014

– 32 of 32 drilled shafts installed by 7/16/2014

– Grade Beams Constructed at:

• 12 and 13 SB North & South – 7/8/14

• 12 and 13 NB North & South – 7/25/14

Pier Ties Installed

Page 7: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 7

Construction Overview

– Shoring Towers• 12 and 13 SB North &

South – 7/22/14• 12 and 13 NB North &

South – 8/5/14

– Underpinning• Pier 11 & 14 SB –

7/26/14• Pier 11 & 14 NB –

8/05/14

– Jacking• SB 7/29/14• SB Open – 7/31/14• NB 8/20/14• NB Open – 8/23/14

First Delivery of Casing Arrives6/12/2014

Page 8: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 8

Construction Efforts

Rebar Cage from Tappan Zee6/16/2014

First Drill Rig on Site6/13/2014

Page 9: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 9

Construction Efforts

Page 10: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs

Construction Efforts

ExcessiveDirt

• Terminal Ave

• 12th St.

• Hazmat Disposal

10

Page 11: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs11

Construction Efforts

Lifting 160 foot long Rebar Cage

Page 12: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs12

Construction Efforts

First Drilled Shaft Reinforcing Cage6/21/2014

Page 13: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs13

Construction Efforts

Access Holes in Bridge Deck for Placement of Drilled Shaft Rebar

Page 14: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 14

Construction Efforts

Page 15: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs15

Construction Efforts

• Drilled Shafts – Pouring PCC– Casings went to bedrock and were filled with a slurry.– SCC concrete was tremie poured from the bottom and slurry was

pumped out and recycled.

Page 16: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 16

Construction Efforts

Page 17: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 17

Construction Efforts

Page 18: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 18

Construction Efforts

Page 19: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 19

Construction Efforts

Page 20: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs20

Construction Efforts

• Grade Beams (Piers 12 & 13)– Grade beams were formed on each side of the piers.– Poured in 2 segments. SB portions poured first.– Because of the mass of the pours, a thermal plan circulating

water from the river to regulate the temperatures had to be used.

Page 21: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs21

Construction Efforts

• Underpinning (Piers 11 & 14)– 4 Drilled Shafts per Pier– Poured in 2 lifts over existing

footing.– Post tensioned to existing footing.– Also required a thermal plan due to

the mass concrete pour.

Page 22: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs22

Construction Efforts

View of Site Looking East 6/27/2014

Page 23: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs23

Construction Efforts

Page 24: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs24

Construction Efforts

Shoring Towers on Grade Beam with Header Beam at 12 SB

7/24/2014

Page 25: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs25

Construction Efforts

Southbound Jacking 7/29/2014

Page 26: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs26

Construction Efforts

Southbound Jacking 7/29/14 -7/31/14

Project team working through one unpredicted structural response during jacking.

“…The credit belongs to the person who is actually in the arena…”

T. Roosevelt

Page 27: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs27

Construction Efforts

Longitudinal Bracing

Page 28: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 28

Construction Efforts

Southbound Opening7/31/2014

Page 29: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs29

Construction Efforts

Erecting Shoring Towers on NB 8/4/2014

Page 30: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs30

Construction Efforts

Northbound Jacking8/20/2014

Page 31: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs31

Construction Efforts

Bridge Superstructure Displaced from Bearing and Pier at Pier 12 NB

Page 32: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 32

Construction Efforts

Completed underpinning and longitudinal bracing

Page 33: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 33

Construction Efforts

Northbound Opening8/23/2014

Page 34: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 34

Construction Efforts

Removal of Existing Piers 12 & 13

Page 35: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 35

Construction Efforts

Cutting Pier Caps with Wire Saw

Page 36: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 36

Construction Efforts

Lowering Exterior Cut Section

Page 37: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 37

Construction Efforts

Lowering Interior Cut Section

Page 38: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 38

Construction Efforts

Removing Columns

Page 39: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 39

Construction Efforts

Pier 12E Removed10/15/2014

Page 40: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 40

Construction Efforts

Geofoam place between grade beams and caps poured.

10/30/14

Page 41: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 41

Construction Efforts

Columns for new 3 Pile Bent Going Up12/08/14

Page 42: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs

Construction Efforts

Temporary support structure for pier cap

42

Page 43: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs

Construction Efforts

Temporary Support structure for pier cap (limited room)

43

Page 44: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs

Construction Efforts

Tie complete rebar cage for pier cap.Installed cooling tubes.Set bulkheads.

Set pier cap forms.

44

Page 45: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs

Construction Efforts

45

Page 46: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs

Construction Efforts

46

Page 47: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs

Construction Efforts

47

Page 48: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs

Construction Efforts

48

Page 49: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs

Construction Efforts

49

Page 50: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs

Construction Efforts

Installation of Bearings at Pier 11.

50

Page 51: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 51

Lessons Learned

• Lessons learned– Need to get design and construction team together ASAP.– Need qualified designer and contractor that has the expertise on

board.– Identify long lead items– Establish chain of command– Manage site– Emergency Declaration– Communication to key stakeholders – There are no bad ideas. Consider all options and create

atmosphere of cooperation and collaboration– Relationships are very important– Engage all sections of the Department

Page 52: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

DelDOT BR 1-813 \ I-495 Emergency Repairs 52

Acknowledgements

• AECOM– Neil Shemo, PE– Harry Roecker, PE– Bruce Kay, PE– John Millius, PE– Paul Moffitt, PE– Nicholas Hetrick, PE

• FHWA– Dennis O’Shea, PE– Daniel Montag, PE– Khalid Mohamed, PE

• DRBA• Greg Pawlowski

• HNTB– Ted Zoli, PE

• JD Eckman, Inc.– Jim Roberts– Greg Burkhart– Matt Hurley– Josh Smolinsky– Joe Rovnan

• AH Beck– Ian Kolda

• Tappan Zee Constructors• All States that pitched in

to offer assistance with permits, materials and knowledge.

• Entire DelDOT Team

Page 53: 10 I-495 Emergency JTorrijosDelDOT BR 1-813 \ I-495 Emergency Repairs 2 6 Construction Efforts Southbound Jacking 7/29/14 - 7/31/14 Project team working through one unpredicted structural

QUESTIONS?