Murray Johnson, P.Eng., P.E.
Milton Madison Bridge
Main Spans (Trusses) Design and Construction
Existing Bridge
Proposed
Bridge
Bid Documents
Truss Design
Plan View – Before Sliding – Old & New Bridge
Elevation of Completed New Bridge
10-11-20152
Truss Design
• Permanent Bridge Design Features
• Design-Build Challenges for Steel
Truss Bridge
• Bridge Design
Adapted for Construction
Techniques
Truss Design
Truss Design
10-11-20153
Truss Design
Bearings
Main Spans: Construction Sequence
Float in Span 2
Lift
Span 2
Cantilever Span 1
10-11-20154
Main Spans: Construction Sequence
Float in & Lift Span 3
Cantilever Span 4
Slide Completed
Bridge Laterally
Main Spans: Construction Sequence
Existing Bridge
New Pier Cap
Temporary Pier
10-11-20155
Temporary Piers
Barge Impact
Temporary Piers –Barge Impact Protection Frames
10-11-20156
Barge Impact Protection Frames
Barge Impact Protection Frames
Towers
10-11-20157
Temporary Pier Connection to Pier
Towers
Lifting Frames
10-11-20158
Temporary Pier at Lifting
Stability Frames
Sliding Girders
10-11-20159
Sliding Girders
Sliding Girders
Sliding Girders
10-11-201510
Span Lifting
Preassembly of Steel Trusses on Barges
Span Lifting
Span Lifting
10-11-201511
Span Lifting
Span Lifting
Span Lifting
10-11-201512
Span Lifting
Span Lifting
Span 3 Lifting
10-11-201513
Sliding Girder Installation
Sliding Girder Installation
Sliding Girder Installation
10-11-201514
Sliding Girder Installation
Sliding Girder Installation
Sliding Girder Installation
10-11-201515
Sliding Girder Installation
Sliding Girder Installation
Temporary Restraints
10-11-201516
Side Span Cantilever Construction
Erection Bents
10-11-201517
Demolition
New Pier Caps
New Pier Caps
10-11-201518
Truss Sliding
The Numbers:
•2433 Feet Long
•4 Spans Continuous
•15,260 Tons
•Lateral Move 55 Feet
Sliding Main Spans
Truss Sliding
10-11-201519
Truss Sliding
Sliding Bearings
Sliding Surface
10-11-201520
Strand Jacks for Sliding
Pulling Frames
Pulling Frames
10-11-201521
Bearing Sliding Harnesses
Bearing Sliding Harnesses
Bearing Sliding Harnesses
10-11-201522
Slide Control
Slide Control
Slide Control
10-11-201523
Main Span Sliding: Time-Lapse Video
› Video is in PPT version; in PDF version, go to:
› http://www.miltonmadisonbridge.com/gallery/video/milton-madison-bridge-slide/
Slide Complete
Lessons Learned
• develop construction scheme as far as possible
(including during bid design) before committing to material order sizes
• be prepared for potential rejection of modifications
to the permanent design to accommodate construction, have a backup plan
• friction can be too low as well as too high!
• no bridge is too big for a lateral slide!
10-11-201524
Questions?
Thanks to the following for photos and
other material included in this presentation :
• Charlie Gannon, Walsh Construction
• Deborah Crawford
• Michael Baker International