10-11-2015 1 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing Bridge Proposed Bridge Bid Documents Truss Design Plan View – Before Sliding – Old & New Bridge Elevation of Completed New Bridge

Upload: others

Post on 01-May-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-20151

Murray Johnson, P.Eng., P.E.

Milton Madison Bridge

Main Spans (Trusses) Design and Construction

Existing Bridge

Proposed

Bridge

Bid Documents

Truss Design

Plan View – Before Sliding – Old & New Bridge

Elevation of Completed New Bridge

Page 2: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-20152

Truss Design

• Permanent Bridge Design Features

• Design-Build Challenges for Steel

Truss Bridge

• Bridge Design

Adapted for Construction

Techniques

Truss Design

Truss Design

Page 3: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-20153

Truss Design

Bearings

Main Spans: Construction Sequence

Float in Span 2

Lift

Span 2

Cantilever Span 1

Page 4: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-20154

Main Spans: Construction Sequence

Float in & Lift Span 3

Cantilever Span 4

Slide Completed

Bridge Laterally

Main Spans: Construction Sequence

Existing Bridge

New Pier Cap

Temporary Pier

Page 5: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-20155

Temporary Piers

Barge Impact

Temporary Piers –Barge Impact Protection Frames

Page 6: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-20156

Barge Impact Protection Frames

Barge Impact Protection Frames

Towers

Page 7: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-20157

Temporary Pier Connection to Pier

Towers

Lifting Frames

Page 8: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-20158

Temporary Pier at Lifting

Stability Frames

Sliding Girders

Page 9: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-20159

Sliding Girders

Sliding Girders

Sliding Girders

Page 10: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-201510

Span Lifting

Preassembly of Steel Trusses on Barges

Span Lifting

Span Lifting

Page 11: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-201511

Span Lifting

Span Lifting

Span Lifting

Page 12: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-201512

Span Lifting

Span Lifting

Span 3 Lifting

Page 13: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-201513

Sliding Girder Installation

Sliding Girder Installation

Sliding Girder Installation

Page 14: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-201514

Sliding Girder Installation

Sliding Girder Installation

Sliding Girder Installation

Page 15: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-201515

Sliding Girder Installation

Sliding Girder Installation

Temporary Restraints

Page 16: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-201516

Side Span Cantilever Construction

Erection Bents

Page 17: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-201517

Demolition

New Pier Caps

New Pier Caps

Page 18: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-201518

Truss Sliding

The Numbers:

•2433 Feet Long

•4 Spans Continuous

•15,260 Tons

•Lateral Move 55 Feet

Sliding Main Spans

Truss Sliding

Page 19: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-201519

Truss Sliding

Sliding Bearings

Sliding Surface

Page 20: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-201520

Strand Jacks for Sliding

Pulling Frames

Pulling Frames

Page 21: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-201521

Bearing Sliding Harnesses

Bearing Sliding Harnesses

Bearing Sliding Harnesses

Page 22: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-201522

Slide Control

Slide Control

Slide Control

Page 23: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-201523

Main Span Sliding: Time-Lapse Video

› Video is in PPT version; in PDF version, go to:

› http://www.miltonmadisonbridge.com/gallery/video/milton-madison-bridge-slide/

Slide Complete

Lessons Learned

• develop construction scheme as far as possible

(including during bid design) before committing to material order sizes

• be prepared for potential rejection of modifications

to the permanent design to accommodate construction, have a backup plan

• friction can be too low as well as too high!

• no bridge is too big for a lateral slide!

Page 24: 10-11-2015 - Accelerated Bridge Construction · 2016. 8. 14. · 1 10-11-2015 Murray Johnson, P.Eng., P.E. Milton Madison Bridge Main Spans (Trusses) Design and Construction Existing

10-11-201524

Questions?

Thanks to the following for photos and

other material included in this presentation :

• Charlie Gannon, Walsh Construction

• Deborah Crawford

• Michael Baker International