10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Supply Chain Integration Integration 10 For For Operations Management, Operations Management, 9e 9e by by Krajewski/Ritzman/Malhotr Krajewski/Ritzman/Malhotr a a PowerPoint PowerPoint Slides by Jeff Slides by Jeff Heyl Heyl

Upload: george-vails

Post on 29-Mar-2015

226 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 1Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Supply Chain IntegrationSupply Chain Integration10

For For Operations Management, 9eOperations Management, 9e by by Krajewski/Ritzman/Malhotra Krajewski/Ritzman/Malhotra © 2010 Pearson Education© 2010 Pearson Education

PowerPoint Slides PowerPoint Slides by Jeff Heylby Jeff Heyl

Page 2: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 2Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Supply Chain IntegrationSupply Chain Integration

The effective coordination of supply chain processes through the seamless flow of information up and down the supply chain

A river that flows from raw material suppliers to consumers Upstream Downstream

Mitigating the effects of supply chain disruptions

Page 3: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 3Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Supply Chain IntegrationSupply Chain Integration

Upstream

Tier 3 Tier 2 Tier 1

Downstream

Information flows

Cash flows

Tomatosuppliers

Tomatopaste

factories

Tomatogradingstations

Retailsales ConsumersKetchup

factory

Figure 10.1 – Supply Chain for a Ketchup Factory

Page 4: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 4Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Supply Chain DynamicsSupply Chain Dynamics

Bullwhip effect Upstream members must react to the demand Slightest change in customer demand can

ripple through the entire chain

External causes

Internal causes

Page 5: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 5Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Supply Chain DynamicsSupply Chain Dynamics

Consumers’ daily

demands

Retailers’ daily orders to

manufacturer

Manufacturer’s weekly orders to package supplier

Package supplier’s weekly orders to

cardboard supplier

9,000

7,000

5,000

3,000

0

Ord

er

qu

an

tity

Month of April

Day 1 Day 30 Day 1 Day 30 Day 1 Day 30 Day 1 Day 30

Figure 10.2 – Supply Chain Dynamics for Facial Tissue

Page 6: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 6Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Supply Chain DynamicsSupply Chain Dynamics

Integrated supply chains High degree of functional and organizational

integration minimizes disruptions Integration must include linkages between the

firm, its suppliers, and its customers SCOR model

Plan Source Make Deliver Return

Page 7: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 7Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Supply Chain DynamicsSupply Chain Dynamics

First-Tier Supplier Service/Product Provider

Support Processes

Ex

tern

al

Su

pp

lie

rs

Support Processes

Supplier relationship

process

New service/ product

development process

Order fulfillment process

Business-to-business

(B2B) customer

relationship process

Ex

tern

al C

on

su

me

rs

Supplier relationship

process

New service/ product

development process

Order fulfillment process

Business-to-business

(B2B) customer

relationship process

Figure 10.3 – External Supply Chain Linkages

Page 8: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 8Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

New Service or Product DevelopmentNew Service or Product Development

Design

Analysis

Development

Full Launch

Service or product not profitable

Need to rethink the new offering or production process

Post-launch review

Figure 10.4 – New Service/Product Development Process

Page 9: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 9Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Supplier Relationship ProcessSupplier Relationship Process

Sourcing Supplier selection

Material costs

Freight costs Inventory costs

Annual material costs = pD

Cycle inventory = Q/2Pipeline inventory = dL

Annual inventory costs = (Q/2 + dL)H

Administrative costs

Page 10: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 10Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Supplier Relationship ProcessSupplier Relationship Process

Total Annual Cost = pD + Freight costs

+ (Q/2 + dL)H

+ Administrative costs

The total annual cost for a supplier is the sum of these costs:

Other supplier selection criteria Green purchasing Supplier certification and evaluation

Page 11: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 11Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Total Cost AnalysisTotal Cost Analysis

EXAMPLE 10.1

Compton Electronics manufactures laptops for major computer manufacturers. A key element of the laptop is the keyboard. Compton has identified three potential suppliers for the keyboard, each located in a different part of the world. Important cost considerations are the price per keyboard, freight costs, inventory costs, and contract administrative costs. The annual requirements for the keyboard are 300,000 units. Assume Compton has 250 business days a year. Managers have acquired the following data for each supplier.

Which supplier provides the lowest annual total cost to Compton?

Page 12: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 12Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Total Cost AnalysisTotal Cost Analysis

Annual Freight Costs

Shipping Quantity (units/shipment)

Supplier 10,000 20,000 30,000

Belfast $380,000 $260,000 $237,000

Hong Kong $615,000 $547,000 $470,000

Shreveport $285,000 $240,000 $200,000

Keyboard Costs and Shipping Lead Times

Annual Inventory Shipping Administrative

Supplier Price/Unit Carrying Cost/Unit Lead Time (days) Costs

Belfast $100 $20.00 15 $180.000

Hong Kong $96 $19.20 25 $300.000

Shreveport $99 $19.80 5 $150.000

Page 13: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 13Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Total Cost AnalysisTotal Cost Analysis

SOLUTION

The average requirements per day are

Each option must be evaluated with consideration for the shipping quantity using the following equation:

Total Annual Cost = Material costs + Freight costs+ Inventory costs + Administrative costs

= pD + Freight costs + (Q/2 + dL)H + Administrative costs

d = 300,000/250 = 1,200 keyboards

Page 14: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 14Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Total Cost AnalysisTotal Cost Analysis

For example, consider the Belfast option for a shipping quantity of Q = 10,000 units. The costs are

Material costs = pD =

Freight costs= $380,000

Administrative costs= $180,000

Total Annual Cost =

= (10,000 units/2 + 1200 units/day(15 days))$20/unit/year

= $460,000

= $31,020,000$30,000,000 + $380,000 + $460,000 + $180,000

= $30,000,000($100/unit)(300,000 units)

Inventory costs= (cycle inventory + pipeline inventory)H

= (Q/2 + dL)H

Page 15: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 15Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

The total costs for all three shipping quantity options are similarly calculated and are contained in the following table.

Total Cost AnalysisTotal Cost Analysis

Total Annual Costs for the Keyboard Suppliers

Shipping Quantity

Supplier 10,000 20,000 30,000

Belfast

Hong Kong

Shreveport

Page 16: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 16Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Total Annual Costs for the Keyboard Suppliers

Shipping Quantity

Supplier 10,000 20,000 30,000

Belfast

Hong Kong

Shreveport

The total costs for all three shipping quantity options are similarly calculated and are contained in the following table.

Total Cost AnalysisTotal Cost Analysis

$30,387,000 $30,415,000 $30,434,000

$31,020,000 $31,000,000 $31,077,000

$30,352,800 $30,406,800 $30,465,800

Page 17: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 20Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Using a Performance MatrixUsing a Performance Matrix

The management of Compton Electronics has done a total cost analysis for three international suppliers of keyboards (see Example 10.1). Compton also considers on-time delivery, consistent quality, and environmental stewardship in its selection process. Each criterion is given a weight (total of 100 points), and each supplier is given a score (1 = poor, 10 = excellent) on each criterion. The data are shown in the following table.

Score

Criterion Weight Belfast Hong Kong Shreveport

Total Cost 25 5 8 9

On-Time Delivery 30 9 6 7

Consistent Quality 30 8 9 6

Environment 15 9 6 8

Page 18: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 21Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Using a Performance MatrixUsing a Performance Matrix

SOLUTION

The weighted score for each supplier is calculated by multiplying the weight by the score for each criterion and arriving at a total. For example, the Belfast weighted score is

Score

Criterion Weight Belfast Hong Kong Shreveport

Total Cost 25 5 8 9

On-Time Delivery 30 9 6 7

Consistent Quality 30 8 9 6

Environment 15 9 6 8

WS =

Similarly, the weighted score for Hong Kong is 740, and for Shreveport, 735. Consequently, Belfast is the preferred supplier.

(25 5) + (30 9) + (30 8) + (15 9) = 770

Page 19: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 24Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Supplier Relationship ProcessSupplier Relationship Process

Design collaboration Early supplier involvement Presourcing Value analysis

Negotiation Obtain an effective contract that meets the

price, quality, and delivery requirements Competitive orientation Cooperative orientation

Page 20: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 25Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Supplier Relationship ProcessSupplier Relationship Process

Buying Procurement of the service or material from

the supplier e-purchasing Loss of control

Information exchange Radio frequency identification (RFID) Vendor managed inventories (VMI)

Page 21: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 26Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Order Fulfillment ProcessOrder Fulfillment Process

Customer demand planning Facilitates collaboration Demand forecasts

Supply planning Inventory management Operations planning and scheduling Resource planning

Production Logistics

Ownership Facility location Mode selection Capacity Cross-docking

Page 22: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 27Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

4Kitting

8Delivery

7 Boxingand shipping

Order Fulfillment ProcessOrder Fulfillment Process

6 Testing andsystem integration

3Traveler Sheet

2JIT Inventory

1 (d) Directrelationship sales

1 (a)Web site

1 (b)Voice-to-voice

1 (c)Face-to-face

5 Assembleto order

Figure 10.5 – Dell’s Order Fulfillment Process

Page 23: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 28Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Using Expected ValueUsing Expected Value

EXAMPLE 10.3

Tower Distributors provides logistical services to local manufacturers. Tower picks up products from the manufacturers, takes them to its distribution center, and then assembles shipments to retailers in the region. Tower needs to build a new distribution center; consequently, it needs to make a decision on how many trucks to have. The monthly amortized capital cost of ownership is $2,100 per truck. Operating variable costs are $1 per mile for each truck owned by Tower. If capacity is exceeded in any month, Tower can rent trucks at $2 per mile. Each truck Tower owns can be used 10,000 miles per month. The requirements for the trucks, however, are uncertain. Managers have estimated the following probabilities for several possible demand levels and corresponding fleet sizes.

Page 24: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 29Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Using Expected ValueUsing Expected Value

Notice that the sum of the probabilities must equal 1.0. If Tower Distributors wants to minimize the expected cost of operations, how many trucks should it have?

Requirements (miles/month) 100,000 150,000 200,000 250,000

Fleet Size (trucks) 10 15 20 25

Probability 0.2 0.3 0.4 0.1

Page 25: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 30Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Using Expected ValueUsing Expected Value

SOLUTION

We use the expected value decision rule to evaluate the alternative fleet sizes where we want to minimize the expected monthly cost. To begin, the monthly cost, C, must be determined for each possible combination of fleet size and requirements. The cost will depend on whether additional capacity must be rented for the month. For example, consider the 10 truck fleet size alternative, which represents a capacity of 100,000 miles per month.

Page 26: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 31Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Using Expected ValueUsing Expected Value

C = monthly capital cost of ownership + variable operating cost per month + rental costs if needed

C(100,000 miles/month) =

C(150,000 miles/month) =

C(200,000 miles/month) =

C(250,000 miles/month) =

($2,100/truck)(10 trucks) + ($1/mile)(100,000 miles) = $121,000

($2,100/truck)(10 trucks) + ($1/mile)(100,000 miles) + ($2 rent/mile)(150,000 miles – 100,000 miles)

= $221,000

($2,100/truck)(10 trucks) + ($1/mile)(100,000 miles) + ($2 rent/mile)(200,000 miles – 100,000 miles)

= $321,000

($2,100/truck)(10 trucks) + ($1/mile)(100,000 miles) + ($2 rent/mile)(250,000 miles – 100,000 miles)

= $421,000

Page 27: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 32Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Using Expected ValueUsing Expected Value

Next, calculate the expected value for the 10 truck fleet size alternative as follows:

Expected Value (10 trucks) =

Using similar logic, we can calculate the expected costs for each of the other fleet-size options:

Expected Value (15 trucks) =

Expected Value (20 trucks) =

Expected Value (25 trucks) =

0.2($121,000) + 0.3($221,000) + 0.4($321,000) + 0.1($421,000) = $261,000

0.2($131,500) + 0.3($181,500) + 0.4($281,500) + 0.1($381,000) = $231,500

0.2($142,000) + 0.3($192,000) + 0.4($242,000) + 0.1($342,000) = $217,000

0.2($152,500) + 0.3($302,500) + 0.4($252,500) + 0.1($302,500) = $222,500

Page 28: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 37Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

The Customer Relationship ProcessThe Customer Relationship Process

Customer relationship management (CRM) programs identify, attract, and build relationships with customers

Marketing Electronic commerce (e-commerce) Business-to-Consumer (B2C) systems Business-to-Business (B2B) systems

Page 29: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 38Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

The Customer Relationship ProcessThe Customer Relationship Process

Customer service Helps customers with answers to

questions, resolves problems, and, provides general information

Call centers

Order placement Execute a sale, register the specifics,

confirm acceptance, and track progress Internet provides advantage

Page 30: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 39Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

The levers Sharing data Collaborative activities Reduce replenishment lead times Reduce order lot sizes Ration short supplies Use everyday low pricing (EDLP) Be cooperative and trustworthy

Levers for Improved Supply Chain Levers for Improved Supply Chain PerformancePerformance

Page 31: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 40Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Performance measures Costs Time Quality Environmental impact

Levers for Improved Supply Chain Levers for Improved Supply Chain PerformancePerformance

Page 32: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 41Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Performance MeasuresPerformance Measures

TABLE 10.1 | SUPPLY CHAIN PROCESS MEASURES

Customer Relationship Order Fulfillment Supplier Relationship

Percent of orders taken accurately

Time to complete the order placement process

Customer satisfaction with the order placement process

Customer’s evaluation of firm’s environmental stewardship

Percent of incomplete orders shipped

Percent of orders shipped on-time

Time to fulfill the order

Percent of botched services or returned items

Cost to produce the service or item

Customer satisfaction with the order fulfillment process

Inventory levels of work-in-process and finished goods

Amount of greenhouse gasses emitted into the air

Percent of suppliers’ deliveries on-time

Suppliers’ lead times

Percent defects in services and purchased materials

Cost of services and purchased materials

Inventory levels of supplies and purchased components

Evaluation of supplier’s collaboration on streamlining and waste conversion

Amount of transfer of environmental technologies to suppliers

Page 33: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 42Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Supply Chains and the EnvironmentSupply Chains and the Environment

Sustainability Environmental stewardship Environmental protection Productivity improvement Risk minimization Innovation

Reverse logistics Planning, implementing, and controlling flows

from consumption back to origin Closed-loop supply chain

Page 34: 10 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Supply Chain Integration 10 For Operations Management, 9e by Krajewski/Ritzman/Malhotra

10 – 43Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.

Closed Loop Supply ChainClosed Loop Supply Chain

Wastedisposal

Recycle partsand materials

Remanufacture

Direct reuse Repair

Product information

Forward logistics flow

Reverse logistics flow

Returnsprocessor

Figure 10.6 – Flows in a Closed-Loop Supply Chain

CustomersDistribution/RetailersProduction process

New service/productdevelopment process