Zero Tax Increase Referendum:
Community Information Session
2
The November 6th referendum focuses
on projects in all district schools that improve learning
and keep our kids safe, warm and dry.
What is the Referendum Focus?
3
District buildings have been well maintained and will last decades longer
if we protect our investment.
These projects have been strategically planned to be smaller in size as not to
create a tax burden with one large referendum.
Why Now?
4
Example Projects to be Completed
Middle School Ceiling
Various Classroom Carpet Replacement
5
Interior, Academic Area Projects
HIGH SCHOOL•Science lab remodeling•New flooring and misc. remodeling for locker rooms•Replace field house sound system•Main office remodeling (administration and guidance)•Replace interior field house doors•Repaint the field house track floor•Pool area lighting replacement•Pool area column structural repairs•Pool equipment and piping repairs•Replace bleachers in auxiliary gymMIDDLE SCHOOL•Replace restroom ceramic tile floors and wash fountains•Re-plumb drain lines for drinking fountains•Repair plaster ceilings in north stairwell•Replace restroom stall partitions•Replace pool lighting, remove ceiling and paint structure•Replace shower doors at pool•Replace all entry doors
GENERAL MITCHELL ES•Classroom flooring replacement•Replace restroom partitions•Sand and re-finish the stageJE JONES ES•Replace restroom partitions and tile repairs•Ceramic wall tile repair (allowance)KOSCIUSZKO ES•Install carpet in cloakrooms•Replace art room tilePARKVIEW ES•Replace PA in office and lunch room•Replace bathroom ceilings and lighting (1 bathroom only)•Cover/paint ductwork in music roomLINCOLN ES•Carpet replacement in offices and classrooms•Misc. terrazzo floor repairs
6
Example Projects to be Completed
Pool ceiling
Pool columns
Indoor Track Floor Paint
Restroom partitions
7
HIGH SCHOOL•Secured entrance sequence/vestibule work•New daytime entrance adjacent to main entrance•Security camera system updates•Security for music practice rooms•Bathroom modifications for ADA accessibility•Selective window replacement•Replace exterior glass doors from auxiliary gym•Band area door updates for security•Concrete sidewalk replacement at front entrance•Re-key to have a consistent keyway and ADA lever sets
Exterior, Security and ADA Projects
MIDDLE SCHOOL•Security camera system updates•Selective window replacement•Re-key to have a consistent keyway and ADA lever setsGENERAL MITCHELL ES•Replace cores and door handles for ADA complianceKOSCIUSZKO ES•Replace window hardware onlyPARKVIEW ES•Replace wooden front entrance doorsLINCOLN ES•Replace roof, flashings and masonry patching
8
New High School Entrance
9
High School Renderings
10
High School Renderings
11
High School Renderings
12
What Will This Cost?
This referendum will have NO TAX INCREASE.
How?
13
Zero Tax Increase
Existing Debt Service
New Debt Service
14
Why Now?
• Currently, interest rates are at historic lows for this type of borrowing.
• In addition, the District may be eligible for no-interest financing that is available right now.
Recenttrend inrates
15
Vote Tuesday November 6th!